VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH ocensor. YEAR 197o Revised 1-29-80 SUBMITTED:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH ocensor. YEAR 197o Revised 1-29-80 SUBMITTED:
M3        [$xm h SUPERINTENDENT - OPERATIONS APPROVED:
M3        [$xm h SUPERINTENDENT - OPERATIONS APPROVED:
                                    '
hff    t    l'h MANAGER  J 1937 19I 8002070          339
hff    t    l'h MANAGER  J 1937 19I 8002070          339


                                                                                                                .      .
OPERATING DATA REPORT DOCKET NO. 50-338 DATE l//9/W COMPLETED BY      W. R. Madison TELTPHONE (/03)894-5151 OPERATING STATUS florth Anna, Unit 1                                  Notes
OPERATING DATA REPORT DOCKET NO. 50-338 DATE l//9/W COMPLETED BY      W. R. Madison TELTPHONE (/03)894-5151 OPERATING STATUS florth Anna, Unit 1                                  Notes
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period:      October 1979 (Revised)                                                                  -
: 2. Reporting Period:      October 1979 (Revised)                                                                  -
: 3. Licensed Thermal Power (MWt):        2776                                                    *
: 3. Licensed Thermal Power (MWt):        2776                                                    *
                                                                                                    -
: 4. Nameplate Rating (Gross MWe):      947
: 4. Nameplate Rating (Gross MWe):      947
: 5. Design Electrical Ratmg (Net MWe):      907
: 5. Design Electrical Ratmg (Net MWe):      907
Line 38: Line 34:
N/A
N/A
: 9. Power Level To Which Restricted If Any (Net MWe):                                  N/A
: 9. Power Level To Which Restricted If Any (Net MWe):                                  N/A
: 10. Reasons For Restrictions,if Any:                                                    N/A
: 10. Reasons For Restrictions,if Any:                                                    N/A This Month            Yr..to.Date        Cumulative 745                  7,296              12,313 l1. Hours In Reporting Period
                                                                                                                .
                                  .
                                                          '
                                                                                                                        '
This Month            Yr..to.Date        Cumulative 745                  7,296              12,313 l1. Hours In Reporting Period
: 12. Number Of Hours Reactor Was Critical                    0                  6 47R 4            10 169 9
: 12. Number Of Hours Reactor Was Critical                    0                  6 47R 4            10 169 9
: 13. Reactor Reserve Shrtdown Houn 0                        51.5                148.3
: 13. Reactor Reserve Shrtdown Houn 0                        51.5                148.3
Line 56: Line 47:
: 22. Unit Capacity Factor (Using DER Net)
: 22. Unit Capacity Factor (Using DER Net)
: 23. Unit Forced Outage Rate                                0                        4.8                    3.3
: 23. Unit Forced Outage Rate                                0                        4.8                    3.3
                                                                                                      '
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of E2ch):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of E2ch):
N/A December 17, 1979
N/A December 17, 1979
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup.
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup.
: 26. Units in Test Status t Prior to Commercial Operation):                      Forecast          Achieved INITIA L CRITICALITY
: 26. Units in Test Status t Prior to Commercial Operation):                      Forecast          Achieved INITIA L CRITICALITY
     ,                  NITIAL ELECTRICITY MMERCIAL OPERATION
     ,                  NITIAL ELECTRICITY MMERCIAL OPERATION 1937 192              m}}
        .
1937 192              m}}

Latest revision as of 22:25, 1 February 2020

Revised Monthly Operating Rept for Oct 1979
ML19260D085
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/29/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19260D082 List:
References
NUDOCS 8002070379
Download: ML19260D085 (2)


Text

. '

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH ocensor. YEAR 197o Revised 1-29-80 SUBMITTED:

M3 [$xm h SUPERINTENDENT - OPERATIONS APPROVED:

hff t l'h MANAGER J 1937 19I 8002070 339

OPERATING DATA REPORT DOCKET NO. 50-338 DATE l//9/W COMPLETED BY W. R. Madison TELTPHONE (/03)894-5151 OPERATING STATUS florth Anna, Unit 1 Notes

1. Unit Name:
2. Reporting Period: October 1979 (Revised) -
3. Licensed Thermal Power (MWt): 2776 *
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Ratmg (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 928
7. Maximum Dependable Capacity (Net MWe):

898

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted If Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A This Month Yr..to.Date Cumulative 745 7,296 12,313 l1. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 0 6 47R 4 10 169 9
13. Reactor Reserve Shrtdown Houn 0 51.5 148.3
14. Hours Genentor On Line 0 5,401.5 10.053.2 0 0 0'
15. Unit Reserve Shutdown Houn
16. Gross Thermal Energy Generated (MWH) 0 14,083,118 26.279.913 l~. Gross Electzical Energy Generated (MWH) 0 _ _ .

4.445.912 8.346.344

18. Net Elecmcal Energy Generated (MWH) 0 4.1R8.866 7.851.446
19. Unit Semce Factor 0 74.0 81.6
20. Urut Availabdity Factor 0 74.0 81.6
21. Unit Capacity Factor (Using MDC Net) 0 63.9 71.0 U 63.3 70.3
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0 4.8 3.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of E2ch):

N/A December 17, 1979

25. If Shur Down At End Of Report Period. Estimated Date of Startup.
26. Units in Test Status t Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY

, NITIAL ELECTRICITY MMERCIAL OPERATION 1937 192 m