ML19270F881: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:^
{{#Wiki_filter:^
  "
.-                Commonwealth Edison One First National Plaza, Chicago, tilinois Address Reply to: Post Office Box 767 Chicago, Ilknois 60690 March 15, 1979 Mr. O. D. Parr, Chief Light Water Reactors - Branch 3 Division of Project Management U.S. Nuclear RegulF*.ory Commission Washington, D.C. 20555
.-                Commonwealth Edison One First National Plaza, Chicago, tilinois Address Reply to: Post Office Box 767 Chicago, Ilknois 60690 March 15, 1979 Mr. O. D. Parr, Chief Light Water Reactors - Branch 3 Division of Project Management U.S. Nuclear RegulF*.ory Commission Washington, D.C. 20555


==Subject:==
==Subject:==
Pre-Service Inspection Plan LaSalle County Units 1 and 2
Pre-Service Inspection Plan LaSalle County Units 1 and 2 NRC Dockec Nos. 50-373 and 50-374 References (a) :          L. O. DelGeorge to O. D. Parr dated December 8, 1978 (b):      O. D. Parr letter to L. O.              DelGeorge dated January 10, 1979
                          '
NRC Dockec Nos. 50-373 and 50-374 References (a) :          L. O. DelGeorge to O. D. Parr dated December 8, 1978 (b):      O. D. Parr letter to L. O.              DelGeorge dated January 10, 1979


==Dear Mr. Parr:==
==Dear Mr. Parr:==
Line 31: Line 28:
Section 5.2.4 of the LaSalle County FSAR addresses the topic of inservice inspection.                      In addition, augmented inspection requirements have been committed in response to FSAR Questions 111.35, 111.49, 111.72 and 111.81. The Technical Specification commitment for inservice inspection of ASME Code Class 1, 2 and 3 components is delineated in Specification 3.4.8/4.4.8. Throughout the Pre-Service Plan that is enclosed, an asteri.sk is used to designate the augmented inspection requirements.
Section 5.2.4 of the LaSalle County FSAR addresses the topic of inservice inspection.                      In addition, augmented inspection requirements have been committed in response to FSAR Questions 111.35, 111.49, 111.72 and 111.81. The Technical Specification commitment for inservice inspection of ASME Code Class 1, 2 and 3 components is delineated in Specification 3.4.8/4.4.8. Throughout the Pre-Service Plan that is enclosed, an asteri.sk is used to designate the augmented inspection requirements.
Commonwealth Edison will submit the In-Service Inspcction Program (ISI) along with the results of the Pre-Service Baseline Program in July 1979, which is six months prior to the LaSalle Unit 1 commercial service date. This approach is in conformance with tue applicable requirements of 10 CFR 50.55 and is considered necessary to allow for minor modifications to the ISI program to reflect the results of the pre-service baseline
Commonwealth Edison will submit the In-Service Inspcction Program (ISI) along with the results of the Pre-Service Baseline Program in July 1979, which is six months prior to the LaSalle Unit 1 commercial service date. This approach is in conformance with tue applicable requirements of 10 CFR 50.55 and is considered necessary to allow for minor modifications to the ISI program to reflect the results of the pre-service baseline
                                                                                      '
                                                                                           <\
                                                                                           <\
7903290//S'.
7903290//S'.
Line 41: Line 37:
final submittal of the In-Service Inspection Plan, please direct them to this office.
final submittal of the In-Service Inspection Plan, please direct them to this office.
One (1) original and thirty-nine (39) co'ioe of this letter plus forty (40) copies of the LaSalle County Pre-Service Inspection Plan are enclosed for your use. Included as part of the Plan are color-codeu piping and instrument diagrams which designate the code classification of the piping and components subject to inspection.
One (1) original and thirty-nine (39) co'ioe of this letter plus forty (40) copies of the LaSalle County Pre-Service Inspection Plan are enclosed for your use. Included as part of the Plan are color-codeu piping and instrument diagrams which designate the code classification of the piping and components subject to inspection.
Very truly yours,
Very truly yours, L. O. DelG orge Nuclear Licensing Administrator enclosure}}
                                          -
L. O. DelG orge Nuclear Licensing Administrator enclosure}}

Latest revision as of 19:30, 1 February 2020

Forwards Preservice Insp & Testing Plan,Revision 3,March 1979.
ML19270F881
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/15/1979
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML19270F882 List:
References
NUDOCS 7903290115
Download: ML19270F881 (2)


Text

^

.- Commonwealth Edison One First National Plaza, Chicago, tilinois Address Reply to: Post Office Box 767 Chicago, Ilknois 60690 March 15, 1979 Mr. O. D. Parr, Chief Light Water Reactors - Branch 3 Division of Project Management U.S. Nuclear RegulF*.ory Commission Washington, D.C. 20555

Subject:

Pre-Service Inspection Plan LaSalle County Units 1 and 2 NRC Dockec Nos. 50-373 and 50-374 References (a) : L. O. DelGeorge to O. D. Parr dated December 8, 1978 (b): O. D. Parr letter to L. O. DelGeorge dated January 10, 1979

Dear Mr. Parr:

Enclosed for review by NRC is the subject Pre-Service Inspection Plan for LaSalle County Station. This plan supercedes the submittal made in Reference (a) and addresses comments and guidance made by the NRC Staff in Reference (b).

Section 5.2.4 of the LaSalle County FSAR addresses the topic of inservice inspection. In addition, augmented inspection requirements have been committed in response to FSAR Questions 111.35, 111.49, 111.72 and 111.81. The Technical Specification commitment for inservice inspection of ASME Code Class 1, 2 and 3 components is delineated in Specification 3.4.8/4.4.8. Throughout the Pre-Service Plan that is enclosed, an asteri.sk is used to designate the augmented inspection requirements.

Commonwealth Edison will submit the In-Service Inspcction Program (ISI) along with the results of the Pre-Service Baseline Program in July 1979, which is six months prior to the LaSalle Unit 1 commercial service date. This approach is in conformance with tue applicable requirements of 10 CFR 50.55 and is considered necessary to allow for minor modifications to the ISI program to reflect the results of the pre-service baseline

<\

7903290//S'.

    • ~ Commonwealth Edison NRC Docket Nos. 50-373/374 Mr. O. D. Parr: March 15, 1979 I

inspection including possible changes to relief requests. The baseline results will also influence the ISI coverage schedule during the program's inspection interval. LaSalle Station procedures will identify the detailed ISI inspection schedule.

In this regard, the radiologically " hottest areas" will be inspected early in the inspection cycle.

In the event you have any questions relative to the enclosed Pre-Service Inspection Plan, or the schedule defined for:

final submittal of the In-Service Inspection Plan, please direct them to this office.

One (1) original and thirty-nine (39) co'ioe of this letter plus forty (40) copies of the LaSalle County Pre-Service Inspection Plan are enclosed for your use. Included as part of the Plan are color-codeu piping and instrument diagrams which designate the code classification of the piping and components subject to inspection.

Very truly yours, L. O. DelG orge Nuclear Licensing Administrator enclosure