L-2014-033, License Amendment Request LAR-229, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 186: Line 186:
N Umber:                      FPTN-O0-O01                                                                      Delete  ....Lo.......
N Umber:                      FPTN-O0-O01                                                                      Delete  ....Lo.......
This    ..
This    ..
Title:
 
==Title:==
* Ilemova. of."breaker racked out" and "breaker not racked out" flags Files Affected:                  *IName?
* Ilemova. of."breaker racked out" and "breaker not racked out" flags Files Affected:                  *IName?



Revision as of 07:52, 5 December 2019

License Amendment Request LAR-229, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program
ML14105A042
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/09/2014
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2014-033, LAR-229
Download: ML14105A042 (216)


Text

FPL. April 9, 2014 L-2014-033 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Nuclear Plant, Units 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating Licenses DRR-31 and DPR-41 License Amendment Request No. LAR-229 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Pursuant to 10 CFR Part 50.90, Florida Power and Light Company (FPL) is submitting a request for an amendment to the Renewed Facility Operating Licenses DPR-31 and DPR-41 for Turkey Point Nuclear Plant (Turkey Point) Units 3 and 4, respectively. The proposed amendment would modify the Turkey Point Technical Specifications (TS) by relocating specific surveillance frequencies to a licensee-controlled program with implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specification Initiative 5b, Risk Informed Method for Control of Surveillance Frequencies," (ADAMS Accession No. ML071360456).

The changes are consistent with NRC-approved Technical Specifications Task Force (TSTF)

Standard Technical Specifications (STS) change TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specifications Task Force (RITSTF)

Initiative 5b," Revision 3, (ADAMS Accession No. ML090850642). Federal Register "Notice of Availability of Technical Specification Improvement to Relocate Surveillance Frequencies to Licensee Control - Risk Informed Specification Task Force (RITSTF) Initiative 5b, Technical Specification Task Force - 425, Revision 3," published on July 6, 2009 (74 FR 31996) announced the availability of this TS improvement.

Attachment 1 provides a description of the proposed changes, the requested confirmation of applicability, and plant-specific verifications. Attachment 2 provides documentation of probabilistic risk assessment (PRA) technical adequacy. Attachment 3 provides the existing TS pages marked-up to show the proposed changes, and Attachment 4 provides the proposed TS Bases changes. The changes to the TS Bases are provided for information only and will be incorporated in accordance with the TS Bases Control Program upon implementation of the approved amendment. Attachment 5 contains the Proposed No Significant Hazards Consideration Determination. Attachment 6 provides a cross-reference between the surveillance requirements (SR) contained in TSTF-425 and the SR in the Turkey Point TS.

Florida Power & Light Company 9760 S.W. 344' Street Homestead, FL 33035

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Page 2 of 2 Please process these changes within one (1) year of receipt, and once approved, the amendments will be implemented within 90 days. This letter contains no new commitments and no revisions to existing commitments.

These changes have been reviewed by the Turkey Point Plant Nuclear Safety Committee.

Pursuant to 10 CFR 50.91 (b)(1), a copy of this submittal is being forwarded to the designated State of Florida official.

Should you have any questions regarding this submittal, please contact Mr. Robert J. Tomonto, Licensing Manager, at (305) 246-7327.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the ninth day of April 2014.

Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant Attachments (6) cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms Cindy Becker, Florida Department of Health

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 1 Attachment 1 Turkey Point Nuclear Plant Description and Assessment License Amendment Request No. LAR-229

Subject:

Application for Technical Specification Change Request Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program

1.0 DESCRIPTION

2.0 ASSESSMENT 2.1 Applicability of Published Safety Evaluation 2.2 Optional Changes and Variations

3.0 REGULATORY ANALYSIS

3.1 No Significant Hazards Consideration 3.2 Applicable Regulatory Requirements / Criteria 3.3 Conclusion

4.0 ENVIRONMENTAL CONSIDERATION

5.0 REFERENCES

Page 1 of 6

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 1

1.0 DESCRIPTION

The proposed amendment would modify the Turkey Point Nuclear Plant (Turkey Point),

Units 3 and 4 Technical Specifications (TS) by relocating specific surveillance frequencies to a licensee-controlled program with the adoption of Technical Specification Task Force (TSFT)-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b"

[Reference 1]. Additionally, the change would add a new program, the Surveillance Frequency Control Program (SFCP) to TS Section 6.0, Administrative Controls, Subsection 6.8, Procedures and Programs. The changes are consistent with NRC approved industry / TSTF Standard Technical Specifications (STS) change TSTF-425, Revision 3. Federal Register "Notice of Availability of Technical Specification Improvement to Relocate Surveillance Frequencies to Licensee Control - Risk Informed Specification Task Force (RITSTF) Initiative 5b, Technical Specification Task Force -

425, Revision 3," published on July 6, 2009 (74 FR 31996) [Reference 2] announced the availability of this TS improvement.

2.0 ASSESSMENT 2.1 Applicability of Published Safety Evaluation Florida Power and Light Company (FPL) has reviewed the safety evaluation dated July 6, 2009. The review included a review of the NRC staff's evaluation, TSTF-425, Revision 3, and the requirements specified in Nuclear Energy Institute (NEI) 04-10, Revision 1 "Risk-Informed Method for Control of Surveillance Frequencies,"

[Reference 3].

Attachment 2 includes FPL's documentation with regard to PRA technical adequacy consistent with the requirements of Regulatory Guide (RG) 1.200, Revision 1, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results in Risk-Informed Activities," [Reference 4], Section 4.2, and describes any Probabilistic Risk Assessment (PRA) models without NRC-endorsed standards, including documentation of the quality characteristics of those models in accordance with RG 1.200.

FPL has concluded that the justifications presented in the TSTF proposal and the safety evaluation prepared by the NRC staff are applicable to Turkey Point Units 3 and 4 and justify this amendment to incorporate the changes to the Turkey Point TS.

2.2 Optional Changes and Variations The proposed amendment is consistent with STS changes described in TSTF-425, Revision 3, but FPL proposes variations or deviations from TSTF-425, as described below:

1. Revised (clean) TS pages are not included in this amendment request given the number of TS pages affected, the straightforward nature of the proposed changes, and outstanding license amendment requests that may affect some of the same TS pages. Providing only mark-ups of the proposed TS changes satisfies the requirements of 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," in that the mark-ups fully describe the changes desired.

Page 2 of 6

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 1 This is an administrative deviation from the NRC staffs model application dated July 6, 2009 (74 FR 31996) with no impact on the NRC staffs model safety evaluation published in the same Federal Register Notice. As a result of this deviation, the contents and numbering of the attachments for this amendment request differ from the attachments specified in the NRC staff's model application.

2. The Turkey Point TS were based on the standard TS at the time they were issued.

As a result, the Turkey Point TS surveillance numbers and associated Bases numbers differ from the surveillance numbers and Bases numbers in NUREG-1431, "Standard Technical Specifications -Westinghouse Plants," Revision 4, Volumes 1 and 2 [Reference 5] and TSTF-425, Revision 3. In addition, the Administrative Controls Section TS is Section 6.0 for Turkey Point verses Section 5.0 for NUREG-1431. These differences are administrative deviations from TSTF-425 with no impact on the NRC staffs model safety evaluation dated July 6, 2009 (74 FR 31996).

There are surveillances contained in NUREG-1431 that are not contained in the Turkey Point TS. These surveillances identified in TSTF-425 for NUREG-1431 are not applicable to Turkey Point. This is an administrative deviation from TSTF-425 with no impact on the NRC staffs model safety evaluation dated July 6, 2009 (74 FR 31996).

3. The Turkey Point TS include plant-specific surveillances that are not contained in NUREG-1431 and, therefore are not included in the NUREG-1431 surveillances provided in TSTF-425. FPL has determined that the relocation of the frequencies for these Turkey Point specific surveillances is consistent with TSTF-425, Revision 3, and with the NRC staffs model safety evaluation dated July 6, 2009 (74 FR 31996),

including the scope exclusions identified in Section 1.0, "Introduction," of the model safety evaluation, because the plant-specific surveillance frequencies involve fixed period frequencies. Changes to the frequencies for these plant-specific surveillances would be controlled under the SFCP.

The SFCP provides the necessary administrative controls to require that surveillances related to testing, calibration, and inspection are conducted at a frequency to assurethat the necessary quality of the systems and components is maintained, the facility operation will be within safety limits, and that the Limiting Conditions for Operation will be met. Changes to frequencies in the SFCP would be evaluated using the methodology and probabilistic risk guidelines contained in NEI 04-10, Revision 1, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method of Control of Surveillance Frequencies," as approved by NRC letter "Final Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk Informed Technical Specification Initiative 5b, "Risk-Informed Method for Control of Surveillance Frequencies(TAC No. MD61 11)," dated September 19, 2007 [Reference 6].

The NEI 04-10, Revision 1 methodology includes qualitative considerations, risk analyses, sensitivity studies and bounding analyses, as necessary, and recommended monitoring of the performance of systems, structures, and components (SSCs) for which frequencies are changed to assure that reduced testing does not adversely impact the SSCs. The NEI 04-10 Revision 1 methodology Page 3 of 6

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 1 satisfies the five key safety principles specified in RG 1.177, "An Approach for Plant-Specific Risk-Informed Decision Making: Technical Specifications," dated August 1998 [Reference 7], relative to changes in surveillance frequencies.

Therefore, the proposed relocation of the Turkey Point-specific surveillance frequencies is consistent with TSTF-425 and with the NRC staff's model safety evaluation dated July 6, 2009 (74 FR 31996).

4. The definition of STAGGERED TEST BASIS is being retained in the Turkey Point TS Definition Section 1.0 since the terminology is being maintained in TS Surveillance Requirements in Sections 3/4.3, Instrumentation, 3/4.7, Plant Systems, and 3/4.8, Electrical Power Systems. In addition, the terminology is used in Section 6.8.4.k, "Control Room Envelop Habitability Program," which is not the subject of this amendment request and is not proposed to be changed. This is an administrative deviation from TSTF-425 with no impact on the NRC staffs model safety evaluation dated July 6, 2009 (74 FR 31996).
5. The insert provided in TSTF-425 for the TS Bases (Insert 2) states "The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program." In a letter dated April 14, 2010 [Reference 8], the NRC staff agreed that the insert applies to surveillance frequencies that are relocated and subsequently evaluated and changed in accordance with the SFCP, but does not apply to frequencies relocated to the SFCP, but not changed. Therefore, the insert for the Bases is revised to "The Surveillance Frequency is controlled under the Surveillance Frequency Control Program." This is an administrative deviation from TSTF-425 with no impact on the NRC staffs model safety evaluation dated July 6, 2009 (74 FR 31996).
6. The Turkey Point TS were based on the standard TS at the time they were issued which did not contain Bases as comprehensive as those in NUREG-1431.

Therefore, many of the Bases mark-ups in TSTF-425 are not applicable to the Turkey Point TS. The proposed Bases changes in Attachment 4 revise only those Bases that currently discuss surveillance frequencies. This is an administrative deviation from TSTF-425 with no impact on the NRC staff's model safety evaluation dated July 6, 2009 (74 FR 31996). The existing Bases information describing the basis for the surveillance frequencies will be relocated to the Turkey Point SFCP.

7. The SR for the Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation in Turkey Point TS 3.3.1 and 3.3.2 are presented in tabular format, which is different from the format of the SR for the same instrumentation in NUREG-1431. To accommodate this difference, the proposed changes includes use of "SFCP" as a frequency notation in the tables that specify instrumentation SR. This is an administrative deviation from TSTF-425 due to differences in format between Turkey Point TS and NUREG-1431, which has no impact on the NRC staffs model safety evaluation dated July 6, 2009 (74 FR 31996).
8. TS Table 3.3-4, Action Statements, Action 27 is being revised to change "expect" to "except" and TS 3.7.1.2 is being revised to change "APPLICA81LITY" to "APPLICABILITY". These differences from TSTF-425 are editorial changes to correct existing typographical errors and have no impact on the NRC staffs model safety evaluation dated July 6, 2009 (74 FR 31996).

Page 4 of 6

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 1

3.0 REGULATORY ANALYSIS

3.1 No Significant Hazards Consideration FPL has reviewed the proposed no significant hazards consideration (NSHC) determination published in the Federal Register July 6, 2009 (74 FR 31996). FPL has concluded that the proposed NSHC presented in the Federal Register notice is applicable to Turkey Point and is provided as Attachment 5 to this amendment request which satisfies the requirements of 10 CFR 50.91(a).

3.2 Applicable Regulatory Requirements / Criteria A description of the proposed changes and their relationship to applicable regulatory requirement is provided in TSTF-425, Revision 3 (ADAMS Accession No.

ML090850642) and the NRC staffs model safety evaluation published in the Federal Register is applicable to Turkey Point.

3.3 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of an amendment will not be inimical to the common defense and security or to the health and safety of the public.

4.0 ENVIRONMENTAL CONSIDERATION

FPL reviewed the environmental consideration included in the NRC staffs model safety.

evaluation published in the Federal Register on July 6, 2009 (74 FR 31996). FPL concluded that the NRC staff's findings presented therein are applicable to Turkey Point and the determination is hereby incorporated by reference to this application.

The proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.

5.0 REFERENCES

1. Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b," March 18, 2009 (ADAMS Accession No. ML090850642).

Page 5 of 6

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 1

2. Notice of Availability of Technical Specification Improvement to Relocate Surveillance Frequencies to Licensee Control - Risk-Informed Technical Specification Task Force (RITSTF) Initiative 5b, Technical Specification Task Force (TSTF)-425, Revision 3, July 6, 2009 (74 FR 31966).
3. Nuclear Energy Institute (NEI) 04-10, Revision 1, "Risk-Informed Method for Control of Surveillance Frequencies," April 2007 (ADAMS Accession No. ML071360456).
4. Regulatory Guide (RG) 1.200, Revision 1, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results in Risk-Informed Activities,"

Revision 1, January 2007 (ADAMS Accession No. ML070240001).

5. NUREG-1431, "Standard Technical Specifications - Westinghouse Plants," Revision 4, Volumes 1 and 2, April 30, 2012, (ADAMS Accession Nos. ML12100A222 and ML12100A228).
6. H. K. Niedh (NRC) letter to B. Bradley (NE), "Final Safety Evaluation for Nuclear Energy Institute (NEI) Topical Report (TR) 04-10, Revision 1, "Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies" (TAC No. MD6111), September 19, 2007, (ADAMS Accession No.

ML072570267)

7. Regulatory Guide (RG) 1.177, "An Approach for Plant-Specific, Risk Informed Decision-Making: Technical Specifications," August 1998 (ADAMS Accession No. ML003740176).
8. NRC letter to Technical Specifications Task Force, "Notification of Issue with NRC-Approved Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Imitative 5b,"

April 14, 2010 (ADAMS Accession No. ML100990099).

Page 6 of 6

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 2 Attachment 2 Turkey Point Nuclear Plant License Amendment Request No. LAR-229 Documentation of Probabilistic Risk Assessment (PRA)

Technical Adequacy This coversheet plus 65 pages.

Documentation of PRA Technical Adequacy Table of Contents 1.0 Introduction .......................................................................................................... 3 2.0 Background .......................................................................................................... 5 2.1 RG 1.200 and PRA Standard .......................................................................... 5 2.2 Turkey Point PRA History ......................................................................... 5 2.3 Model Change Database ......................................................................... 6 2.4 Turkey Point PRA Capability Target .......................................................... 7 2.5 Assessment Process ................................................................................ 8 3.0 Evaluation ......................................................................................................... 8 3.1 Parts 2 and 3 - Internal Events and Internal Flooding ................................ 8 3.2 Parts 4 to 9 - External Events ................................................................... 9 3.3 PRA Model Maintenance and Control .................................................... 11 4.0 Conclusion .......................................................................................................... 11 5.0 References .......................................................................................................... 12 Enclosure - Peer Review Findings ............................................................................ 13 2

1.0 INTRODUCTION

The implementation of the Surveillance Frequency Control Program (SFCP, also referred to as Technical Specifications Initiative 5b) at Turkey Point Station will follow the guidance'provided in NEI 04-10, Revision 1 [Reference 1] in evaluating proposed surveillance test interval (STI) changes. The following steps of the risk-informed STI revision process are common to all proposed STI changes within the proposed licensee controlled program.

" Each proposed STI revision is reviewed to determine whether there are any commitments made to the NRC that may prohibit changing the interval. If there are no related commitments, or the commitments may be changed using a commitment change process based on NRC-endorsed guidance, then evaluation of the STI revision can proceed. If a commitment exists, and the commitment change process does not permit the change without NRC approval, then the STI revision cannot be implemented. Only after receiving NRC approval to change the commitment could a STI revision proceed.

" A qualitative analysis is performed for each STI revision that involves several considerations as explained in NEI 04-10, Revision 1.

  • Each STI revision is reviewed by an expert panel, referred to as the Integrated Decision-making Panel (IDP), which is normally the same panel used for Maintenance Rule implementation, but with the addition of specialists with experience in surveillance tests and system or component reliability. Ifthe IDP approves the STI revision, the change is documented, implemented, and available for future audits by the NRC. Ifthe IDP does not approve the STI revision, the STI value is left unchanged.
  • Performance monitoring is conducted as recommended by the IDP. In some cases, no additional monitoring may be necessary beyond that already conducted under the Maintenance Rule. Performance monitoring helps to confirm that no failure mechanisms related to the revised test interval are subsequently identified as sufficiently significant to alter the basis provided in the justification for the surveillance interval change.

" The IDP is responsible for periodic review of performance monitoring results. If it is determined that the time interval between successive performances of a surveillance test is a factor in the unsatisfactory performances of the surveillance, the IDP returns the STI back to the previously acceptable STI.

" In addition to the above steps, the Probabilistic Risk Assessment (PRA) is used, when possible, to quantify the effect of a proposed individual STI revision compared to acceptance criteria in NEI 04-10, Revision 1. Also, the cumulative impact of risk-informed STI revisions on PRA evaluations (i.e., internal events, external events, and shutdown) is compared to the risk acceptance criteria as delineated in NEI 04-10, Revision 1. For those cases where the STI cannot be modeled in the plant PRA (or where a particular PRA model does not exist for a given hazard group), a qualitative or bounding analysis is performed to provide justification for the acceptability of the proposed test interval change.

The NEI 04-10, Revision 1 methodology endorses the guidance provided in Regulatory Guide (RG) 1.200, Revision 1, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities." The guidance in RG 3

1.200 indicates that the following steps should be followed when performing PRA assessments:

1. Identify the parts of the PRA used to support the application.
  • Identify structures, systems, and components (SSCs), and operational characteristics that are affected by the application and how these are implemented in the PRA model.
  • A definition of the acceptance criteria used for the application.
2. Identify the scope of risk contributors addressed by the PRA model.

If not full scope (i.e., internal events, external events, applicable modes),

identify appropriate compensatory measures or provide bounding arguments to address the risk contributors not addressed by the PRA model.

3. Summarize the risk assessment methodology used to assess the risk of the application.
  • Include how the PRA model was modified to appropriately model the risk impact of the change request.
4. Demonstrate the technical adequacy of the PRA.

" Identify plant changes (design or operational practices) that have been incorporated at the site, but are not yet in the PRA model and justify why the change does not impact the PRA results used to support the application.

  • Document peer review findings and observations that are applicable to the parts of the PRA required for the application, and for those that have not yet been addressed, justify why the significant contributors would not be impacted.
  • Document that the parts of the PRA used in the decision are consistent with applicable standards endorsed by the RG (currently, RG 1.200, Revision 1, which includes only the internal events PRA standard).

Provide justification to show that where specific requirements in the standard are not adequately met, it will not unduly impact the results.

  • Identify key assumptions and approximations relevant to the results used in the decision-making process.

Because of the broad scope of potential Initiative 5b applications and the fact that the impact of such assumptions differs from application to application, each of the issues encompassed in Items 1 through 3 will be covered with the preparation of each individual PRA assessment made in support of the individual STI interval requests. The purpose of the remaining portion of this attachment is to address the requirements identified in item 4 above.

This evaluation summarizes the assessment of the Turkey Point PRA capability as measured against the current ASME/ANS PRA Standard (ASME/ANS RA-Sa-2009)

[Reference 2], endorsed by NRC Regulatory Guide (RG) 1.200, Revision 2 [Reference 3]. While the NEI guidance document refers to RG 1.200, Revision 1, which includes 4

only the internal events PRA standard (ASME RA-Sb-2005), this evaluation addresses the broader scope of RG 1.200, Revision 2. This assessment addresses the technical adequacy of the Turkey Point PRA for use in risk-informed applications.

The assessment is based on a series of formal peer reviews and other technical reviews, documented in the peer review reports. This assessment uses the latest Turkey Point PRA model update [Reference 4] and internal flood analysis [Reference 5].

2.0 BACKGROUND

2.1 RG1.200 and PRA Standard The ASME/ANS PRA Standard (ASME/ANS RA-Sa-2009) has eight "parts" with technical elements, high level requirements (HLRs), and detailed supporting requirements (SRs). These parts represent the major classes of hazards included in a PRA:

e Part 2, internal events (addressed in Section 3.1),

e Part 3, internal flood (addressed in Section 3.1),

  • Part 4, internal fire (addressed in Section 3.2),

e Part 5, seismic events (addressed in Section 3.2),

a Parts 6 to 9, other external hazard events (addressed in Section 3.2).

Note - Part 1 of the PRA Standard is introductory information and does not contain any requirements except configuration control (addressed in Section 3.3).

NRC Reg Guide 1.200, Revision 2 endorses this Standard with minor "clarifications."

The Standard supporting requirements allow the assessment of the portions of the PRA as Capability Category CC-I, CC-Il, or CC-Ill, with increasing scope and level of detail, plant-specificity, and realism. Thus, the overall assessment of PRA capability is the collection of the assessments of the hundreds of supporting requirements.

2.2 Turkey Point PRA History The Turkey Point PRA was originally developed in 1991 for the IPE submittal [Reference 6] as a Level 2 risk assessment of at-power operation of Turkey Point addressing internal events including fires and floods. This PRA was subject to a number of reviews, internal and external, during its preparation as well as extensive review by NRC through national labs following its publication. The first of these reviews consisted of normal engineering quality assurance practices carried out by the organization performing the analysis. A qualified individual with knowledge of PRA methods and plant systems performed an independent review of the results for each task. This represented a detailed check of the input to the PRA model and provided a high degree of quality assurance.

The second level of review was performed by plant personnel not directly involved with the development of the PRA model: This review was performed by individuals from Operations, Technical Staff, Training, and the Independent Safety Engineering Group, 5

who reviewed the system description notebooks and accident sequence description.

This provided diverse expertise with plant design and operations knowledge to review the system descriptions for accuracy.

The third level of review was performed by PRA experts from ERIN Engineering. This review provided broad insights on techniques and results based on experience from other plant PRAs. The review team reviewed the PRA development procedures, as well as the output products.

Comments obtained from all the review sources were incorporated, as appropriate, into the work packages and the final product. Following the Turkey Point IPE submittal to the NRC on June 25, 1991, it was reviewed extensively by the NRC and NRC contractors.

In fact, the Turkey Point IPE was one of the few IPE submittals to receive a Step 1 and a Step 2 review by the NRC. The Step 2 review consisted of a team of NRC representatives and contractors visiting FPL to conduct a week-long, extensive review of the Turkey Point IPE. Following these reviews, the Turkey Point IPE was revised in early 1992, and FPL received the NRC Safety Evaluation Report (SER) for the Turkey Point IPE on October 15, 1992. The SER concluded that the Turkey Point IPE had met the intent of GL 88-20.

The Turkey Point Internal Events Peer Review was performed in January 2002 using the NEI 00-02 process. Following the issuance of the ASME PRA Standard and Regulatory Guide 1.200 (RG 1.200), an internal gap analysis was performed where the findings from the original 2002 peer review were incorporated into the overall assessment of the PRA's quality with respect to the Standard's supporting requirements. The current Turkey Point gap analysis uses the RA-Sa-2009 version of the standard as endorsed by RG 1.200, Revision 2.

To supplement the original peer review and internal gap analysis, and to further verify the quality of the updated internal events model used in the Fire PRA, in April 2011, a focused peer review was performed assessing the human reliability analysis (HRA) and internal flooding analysis portions of the PRA using the latest PRA standard, ASME/ANS RA-Sa-2009, and Regulatory Guide 1.200, Rev. 2. The internal flooding analysis focused peer review was performed because the latest internal flooding analysis was a much more comprehensive analysis than the original screening analysis that was performed for the IPE [Reference 6]. Although the basic methods used for the HRA had not changed substantially, the HRA focused peer, review was performed because of the enhanced HRA dependency analysis and the use of the HRA Calculator software in the latest model, and the fact that HRA plays a significant role in the determination of the dominant sequences and overall risk profile.

Finally, a peer review was performed in October 2013, to assess portions of the PRA model which had received upgrades: 1) Common-cause failure analysis - use of alpha factors; 2) Level 2 analysis - upgrade to the latest methodology; and 3) Interfacing system LOCAs - upgrade to the latest methodology.

Significant findings from the peer reviews, along with their resolutions, are listed in the Enclosure.

2.3 Model Chan-qe Database The living PRA is maintained through use of the plant Change Database. A sample screen shot of the input form is shown below.

6

PTN PSA Change Lo E All Records are shown Add New Log. .

N Umber: FPTN-O0-O01 Delete ....Lo.......

This ..

Title:

  • Ilemova. of."breaker racked out" and "breaker not racked out" flags Files Affected: *IName?

Description:

The "breaker racked out" and "breaker not racked out" flags for CC'W and ICv pumps are cumbersome and unnecessary, especially in the use ot EOOS. The "breaker racked out" flag will be replaced with the relevant maintenance event, and the "breaker not racked out" flag willbe replaced with the NOT of the relevant maintenance event. With the use of FORTE. NOT gates are now quantifiable.

Details of Actual The tollowing changes were made.

Changes:

Delete C6OOZ1 1 Replace Z-C0011 with CTM4OCCCWPA in g ate Cl 451 LL.

ii,: C°.,mn,, Jl'. Replace 0C0011 with CTM40CCv4-PA in g ate C1i451 K2.

....... ......................

.. ...... ...... .

Comments:

i . . . ~j~ .. . . . . . . . . . . . . . . . . . .. . .

APiepared By:: jW ,**.Fitte r Itema are:

Date Prepared: r2/25/2000 Print This?..

Status (Open/Closed):*Closed ImplementedY: M* 21 0*

--- .---- n t-----

P.... -

Date Implemented.: / 3/2000 R-:d4 1 of 641 ' .' Unrfiltered 'Search This database is used to store the details of all modifications, proposed and actual, open or closed, for the Turkey Point PRA model. This includes findings and observations from peer reviews, self-assessments, and issues identified during use and update of the PRA model. The open items are all model enhancements or documentation issues, and have been judged not to significantly impact PRA model applications. Open items will be addressed in future PRA updates, based on the significance of the open item and the scope of the update.

As part of the PRA evaluation for each STI change request, a review of open model changes for Turkey Point will be performed and an assessment of the impact on the results of the application will be made prior to presenting the results of the risk analysis to the IDP. If a nontrivial impact is expected, then this may include the performance of additional sensitivity studies or PRA model changes to confirm the impact on the risk analysis.

2.4 Turkey Point PRA Capability Tarqet The target capability level for the Turkey Point PRA is Capability Category II(CC-II).

That is, the goal is to meet all supporting requirements (SRs) at least at the CC-Il level.

This is the maximum capability level needed by any foreseeable application.

Note that in many supporting requirements, the requirement spans all three capability categories. Thus, if the SR is met, it meets CC Ill. While CC II is the target, CC III is met in many SRs.

7

2.5 Assessment Process The assessment of PRA capability judges the Turkey Point PRA against each supporting requirement in the PRA Standard as "Meets" CC-I, CC-Il, or CC-Ill. If the PRA does not meet the requirements of category CC-Il for a specific SR, it is assessed as "Not Met."

This assessment is captured in a Microsoft Access database. There is a table in this database with the SR-by-SR assessments from industry peer reviews and internal self-assessments. There is a separate database with tables with Facts and Observations (F&Os) from the WOG peer review and the focused peer reviews, along with their status and resolutions.

3.0 EVALUATION The following sections describe the capability of the Turkey Point PRA for the major Standard parts.

3.1 Parts 2 and 3 - Internal Events and Internal Flooding The internal events portion of the Turkey Point PRA has been updated a number of times since the original IPE submittal.

As described in Section 2.2, there has been one global peer review, and focused peer reviews in the following areas: HRA, internal flooding, CCF, Level 2, and ISLOCA.

Three peer reviews have been conducted against internal event supporting requirements:

  • In 2002, a review of all technical elements was performed using the industry PRA Certification process, the precursor to the PRA Standard. The 2002 peer review resulted in 60 findings and observations (2 "A"level, 28 "B" level, 28 "C" level, and 2 "S (Superior) level). All of the findings and observations have been addressed in the model updates following this peer review.
  • In 2011, a focused peer review was performed for the elements IF and HR. This assessment replaced the 1999 peer review for those elements that were in scope. This review was done using the current PRA Standard (ASME/ANS RA-Sa-2009). The 2011 focused peer review resulted in 21 findings, 7 suggestions, and 1 strength. All of the findings and suggestions have been resolved, and, where changes were necessary, addressed in a model update.
  • In 2013, a focused peer review was performed to review upgrades to the CCF, Level 2, and ISLOCA analyses. This review was done using the current PRA Standard (ASME/ANS RA-Sa-2009) and Regulatory Guide 1.200, Rev. 2. The peer review resulted in 11 findings and 2 suggestions. These findings and suggestions have not yet been resolved in the current PRA model, but will either be addressed via model updates before the implementation of 5b, or shown to have an insignificant impact on the 5b application.

Conclusion The findings and F&Os that have not yet been resolved will either be resolved in model updates before the implementation of the 5b application, or shown not to represent a significant deficiency in the analyses necessary to support the 5b application.

8

3.2 Parts 4 to 9 - External Events The NEI 04-10 methodology allows for STI change evaluations to be performed in the absence of quantifiable PRA models for all external hazards. For those cases where the STI cannot be modeled in the plant PRA (or where a particular PRA model does not exist for a given hazard group), a qualitative or bounding analysis is performed to provide justification for the acceptability of the proposed test interval change.

3.2.1 Part 4 - Internal Fire A fire PRA was performed for Turkey Point as part of the 1991 IPE submittal. Since it was done for the IPE, it was more of a screening analysis to discover any fire vulnerabilities than an attempt to determine a realistic estimate of core damage risk due to fire. It has not been updated since the original submittal.

Turkey Point is an NFPA-805 plant, and therefore has a fire PRA to support the NFPA-805 effort. The fire PRA uses the latest internal events PRA model as a basis. The Turkey Point NFPA-805 fire PRA uses NUREG/CR-6850 guidance as required by NFPA-805, and thus produces a conservative estimate of core damage risk due to fire.

A peer review of the Turkey Point (PTN) Fire PRA was performed in February 2010 at PTN using the NEI 07-12 Fire PRA peer review process, the combined PRA standard, ASME/ANS RA-Sa-2009, and RG 1.200, Revision 2. The purpose of this review was to provide a method for establishing the technical quality and adequacy of the Fire PRA for the spectrum of potential risk-informed plant licensing applications for which the Fire PRA may be used. The February 2010 PTN Fire PRA Peer Review was a full-scope review of all the Technical Elements of Part 4 of the ASME/ANS standard. This report was issued to PTN in April 2010 [Reference 8]. A subsequent peer review performed in March 2012 was a focused scope peer review addressing the FSS, HRA and PRM Technical Elements. The report was finalized and issued to PTN in May 2012

[Reference 9].

The Fire PRA update addressed the Supporting-Requirement-assessed deficiencies (i.e., Not Met or CCI). Completion of recommendations related to Supporting Requirement assessments and 'Finding' F&Os results in a Capability Category II assessment for the majority of the Supporting Requirements.

Conclusion Based on the completion of peer review recommendations and the assessment of deferred items, the Turkey Fire PRA is adequate to support this application, with the caveat that the PRA is a conservative representation of the fire risk from operation of Turkey Point Station. The Fire PRA model will be exercised to obtain quantitative fire risk insights, but refinements may need to be made on a case-by-case basis.

3.2.2 Part 5 - Seismic Events Turkey Point is sited in an area of very low seismicity. There is no seismic PRA for Turkey Point. For the seismic portion of the Turkey Point IPEEE (Reference 7), FPL used the FPL site-specific seismic program associated with Unresolved Safety Issue 9

O1

-sseoIsow u! pz!i!lln aq ii!M qoeoJdde 6uipunoq e JO aA!leB!Ienb e 'sdnoJ6 pJezeq JaqjLo eqBl 104 suauwssesse eql 6u!uwJOjed u! 'ejojejeiej_ "suoileOildde *ljS o!poads-uoileJn6!iuoo jol pel!ns-IlM lou aJojeiqeL pue 'eJnleu u! 6u!ueeJos PUB 6u!punoq/flleoidfiB aJam sasAleue esaqJ *aou!s palepdn uaaq jou GAeq PUB s066L AlIJeg qLu! 333cdl Iu!Od A~jlnJl eq PUB cll ldIu!Od Alejn/

aql uj peqsilqnd pue pawjo:ped eJame spiezeq leuJaexa JaqlO eql 9jo sesAleue 5S!IJ e14-L sPJezeH leuJle)xD Jelo - 6 01 9 s*Jed £C "uo!jeoildde qg eqj u! Joloej lueoI!ub!s e aq iou II!M pue lew!u!uW si 1u!od AleJn_LB )ls!i o!ws!es eqLj uoisnlouoo aql slioddns Je9A jad 80-3 [40 :103 o!s!Bs jol eew!Lisa Iv-I fdld 941 pue '.Jco JeEA //o-DLe u! pellnsei OJN Aq )is!J o!ws!as jo S!Sileue 6uipunoq e :f/iajes ol lue:podw! luawd!nbe jo u6!sep O!uWs!aS eql Aý!JeA o0pawjojjed ueeq ABeq SUMoPNIleM o!LUS!aS aldillnw A*o!uwsaIs MOl Ae^A 40 uoi6ei e ui si lUlod Ae~jnj nBLJ oel aB4_

uoisnlouoo Jea Jed 0 -3 L aq ol paleuw!lse sBm =1- o!us!es eqGpue 'JeA Jed 8O- l, eq o pelejw!lse seBm 410 o!ws!es eqL "lepowu Vdlcl slueGe leuJE),u ,U!Od Ae)Jin/ aql 1uoJ11 dOO1 p!j5 elqeJEAooeJun ue JOl (d(33O) A!l!qeqoJd a6eu-ep eJoo IBUO!pu0o e ql!M pEuuiqwoo 99t1-D3E1lN wOJ4 se!ouenbaiJ iuGAa 6u!1B!1!u! oiwsias 6u!sn apew sBm ýsiJ oiwSes aqj jo a0euw!lsa ue '(Ll eoueJajaNj) leiJdfl JiMOd p@pueap eqI Jo04Iýi Iu!od

, ANijni 0L0; aii ul "Al!l!BeJj IeAaI-ueld bu!punoq e aleo!pu! Aluo slinsei eqi eou!s ')s!iJ eqI 40o elewilse punoq jeddn ue (Iseq ie) iuaseidej 01 peAGIleq si ajeBw!se s!ij_ Tu!Od AaNeni j10JeaA jad 90-0' 1 jo ajeBW!lSe jlO0-opnesd o!ws!es e peonpoid s!SAleue s!Lf -[ol eouJoiaejl] (9ooz-s$sn) sosnoet* Aq seileuse pJeZeqI o0wseas peslAei ql!M sllnseJ 333]ll uo paseq 'sal!s (srn3) Sn uJaisee Pue leIJueo lie jol0 snleA )s!iJ-opnesd p8Belnoleo '661, anssl o!Jaue)Eo qLfnoitl '3OJN '010Z Ul "wBeJOJd UO!13V eAi1eJJOO se1!s aqel q6noJql passaippe

'eq ol pelnpeqos ewe jo 'ejaM sanss! esaq/ "BUNoJ3o elejouoo JOU!w jo UO!SOJJOo ol enp sjBedeJ Ilews JO '6u!deelaNsnoq peAoJdwi 's*,epdn Uo!lewUawnoop pei!nbei Beql punofl eaie senssi JOU!UJ AluO ppa*jluap! eJat suiaouoo A4!l!qeJedo ON suO!,!PuOo O!LUs!es esJiApe AUe A4!1uap! ol PUB slueuod woo 13AAS elqeoildde eqL 40o 6BeJoqoue jedoid A4!JGA o, Jepio u! peawjoUed aiam sumopNIeM lood lenj luads eql jo uMop-u!eJp p!deJ e ol peal plnoo ejnl!ej asoqm slUauodwoo 1 Ajo6aleo o!wus!eS o0*a4JeA e 40 pelsIsuOo puooes eq_L "uo!lounjlua4uueBuoo pue 'IBAOUWJ Beaq A8e8p 'lOJ1UO3 AJO1UGAUI pue ainsseid UelOoo JOOIoeeJ 'lOJUO0O A1!A!lOeGJ 40 suo!lounfl A/e4Bes aqe lioddns Leql sjuauodwoo 40 f4ae!JBeA B 40 peOs!sUoo IsiJ eq_L -pajeJeue6 ejam (sqMAAS) s1s9 1ueawd!nb3 UMOPNIeAA o!ws!eS o~q '9ouep!n6 IP1d13 eqi Jad sV 'siseq 6u!sueo!Il o*WSieS lUaeno eqi ol joedseJ qj!m 'suoil!puoo pazAleueun Jo '6u!uWJOjUOO-UOU 'papeB6ep jueld ssaBppe PUB Ae!IUGp! 01 SUMoPNleM o!UJs!es wjojJad seasueo!l lie Leql 6uilsenbei Z l0 'Zl, qoJeAIN uO J9e1el -V0£9-I00 I e Penss! OHN eqI '.C- uo!1BPuuaULwuooI eJOJ )jsei LuJIel-JeON ol asuodsei u! sumoPNlem ouwsias leuo!1!ppe pewioped AllueoaJ Iu!Od Ae)ljn_ le jeB1j

  • SE!il!l!qeJeulnA o!uSIS Jo0 6U1)OOl 9l!S U!sd Ae)djnj aql 40o sumop)Blem eA!SUepXG 40 pas!suoo Al!Jew!iJd siqI "(,,sJojoeeH u!BieJdO u! uauwd!nb3 leO!Joal3 PUB leo!ueqoalA 40 AoBenbepV oiws!es jo uO!leoB!!JaA,, 'zO-,L Jei,9i o!JeUeo) 9k-V (1sn)

3.2.4 Conclusion - External Events As stated earlier, the NEI 04-10 methodology allows for STI change evaluations to be performed in the absence of quantifiable PRA models for all external hazards.

Therefore, in performing the assessments for the other hazard groups, a qualitative or a bounding approach will be utilized in most cases. The Fire PRA model will be exercised to obtain quantitative fire risk insights but refinements may need to be made on a case-by-case basis. This approach is consistent with the accepted NEI 04-10 methodology.

3.3 PRA Model Maintenance and Control PRA model maintenance and control requirements are described in the PRA Standard, Section 1-5. These requirements are addressed in the current set of Nextera/FPL fleet procedures that address model maintenance and control:

EN-AA-105, Probabilistic Risk Assessment Program EN-AA-105-1000, PRA Configuration Control and Model Maintenance EN-AA-105-10000, Control of PRA Documentation and Evaluations

4.0 CONCLUSION

The Turkey Point PRA model of record fully meets all the requirements of Part 2 (Internal Events) and Part 3 (Internal Flood) of the current ASME/ANS PRA Standard.

All significant findings from peer reviews or other technical reviews have been addressed and closed.

Based on the completion of peer review recommendations and the assessment of deferred items, the Turkey Fire PRA is adequate to support this application, with the caveat that the PRA is a conservative representation of the fire risk from operation of Turkey Point Station. The Fire PRA model will be exercised to obtain quantitative fire risk insights, but refinements may need to be made on a case-by-case basis.

Seismic risk at Turkey Point is minimal and will not be a significant factor in the 5b application.

As stated earlier, the NEI 04-10 methodology allows for STI change evaluations to be performed in the absence of quantifiable PRA models for all external hazards.

Therefore, in performing the assessments for the other hazard groups, a qualitative or a bounding approach will be utilized in most cases. This approach is consistent with the accepted NEI 04-10 methodology.

11

5.0 REFERENCES

1. NEI 04-10, Risk-Informed Technical Specifications Initiative 5b Risk-Informed Method for Control of Surveillance Frequencies, April 2007.
2. ASME/ ANS RA-Sa-2009, "Addenda to ASME/ ANS RA-S-2008 Standard for Level 1/ Large Early Release Frequency Probabilistic.Risk Assessment for Nuclear Power Plant Applications", American Society of Mechanical Engineers and American Nuclear Society, 2009.
3. U.S. Nuclear Regulatory Commission, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, Regulatory Guide 1.200, Revision 2, 2008.
4. PTN-BFJR-00-001, PTN PRA Model Update, Revision 10, 7/16/12.
5. PTN-BFJR-11-009, Turkey Point Internal Flooding Analysis, Revision 0, 8/21/13.
6. Turkey Point Plant Units 3 and 4 Probabilistic Risk Assessment Individual Plant Examination Submittal, 6/25/91.
7. Individual Plant Examination of External Events for Turkey Point Units 3 and 4, June 1994.
8. Turkey Point Nuclear Plant Units 3 and 4 Fire PRA Peer Review Report Using ASME PRA Standard Requirements, April 2010.
9. Follow-on Fire PRA Peer Review Against the Fire PRA Standard Supporting Requirements from Section 4 of the ASME/ANS Standard for the Turkey Point Nuclear Plant Units 3 and 4 Fire Probabilistic Risk Assessment, Westinghouse, May 2012.
10. Enclosure "Safety / Risk Assessment" to NRC Internal Memorandum, P.Hiland (Chairman of Safety/Risk Assessment Panel for G1199) to B.Sheron (Director RES),

Subject:

Safety / Risk Assessment Results for Generic Issue 199, "Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants," September 2, 2010.

11. Turkey Point Units 3 and 4 License Amendment Request for Extended Power Uprate, August 2010.

12

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # ee j Possible Resolution . Plant Responseor Resolution Review R.spons.

11 AS-1 WOG The following items were observed related (1) Perform a more explicit (1) For the small-small LOCA sequences where RWST 2002 to the success criteria: evaluation of the RWST is credited, secondary cooling is available. Therefore, (1) For small - small LOCAs where high refill function to document it is a virtual certainty that depressurization will take pressure recirculation fails, the ECA-1.1 the ability to achieve a place and the leak rate reduced such that RWST refill (Loss of ECC recirculation) actions to refill stable state end state. is viable. In most of these sequences, some fault(s) in the RWST via the CVCS and continue (2) Consider revising the the RHR system is preventing successful recirculation injection are modeled. If this succeeds, the charging pump modeling to or shutdown cooling. While RWST refill may not be modeled endstate is successful core be consistent with plant considered by some as a stable state, the small flow cooling. procedures. rate associated with a depressurized small-small LOCA Although crediting the action is valid, the and successful RWST refill makes it fairly stable sequence as modeled has not necessarily regardless. The concern over extending the mission reached a stable end state; additional time beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is offset by the increasing action in the long term is required to put probability of recovering hardware failures in the the plant in a stable state. For example, the cutset which prevented initiating recirculation or RWST refill can be argued to extend the shutdown cooling. Further, if RWST refill fails, HHSI accident sequence mission time past 24 from the opposite-unit pumps and RWST is available.

hours and therefore beyond the current Level 1 PRA model scope. If the additional (2) The charging pump success criterion has been time were long, then in taking credit for changed to 1/3 charging pumps for emergency these strategies the impact on pump and boration.

other component run failures, and any additional actions to achieve a stable state should be modeled. In addition, some evaluation should be included regarding potential effects on containment instrumentation or components of increasing water level.

(2) For ATWS sequences where "Reactivity Control Late" is asked, the model credits 13

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

Peer

  • Description Possible Resolution . Plant. 'o or Resolution emergency boration, per procedure FR-S.I.

The procedure, and plant training documents, indicate that 1 of 3 charging pumps are needed to ensure at least 60 gpm of borated injection for shutdown.

However, the fault tree model (at gate U3WRCL1) implements this as failure if any single charging pump fails. This is incorrect and should be fixed.

AS-2 WOG Several inconsistencies between the success Revise the Accident The updated Accident Sequence Analysis Notebook, 2002 criteria as stated in the Accident Sequence Sequence Analysis the new Success Criteria Calculation (PTN-BFJR Analysis Notebook and the linked fault tree Notebook and/or the 014), and the updated Revision 9 PTN PRA model model. Specific examples are: linked fault tree model to (PTN-BFJR-00-001, Rev. 9) resolved the

a. The Small-small LOCA success criteria for ensure consistency inconsistencies.

early core heat removal is listed in Table 3 between the as 2/4HHSI pumps and 1/3 AFW pumps. documentation and the However, fault tree gate GIPMP3 shows 1 success criteria modeled in HHSI pump required for small-small LOCA. the linked fault tree.

b. The Small LOCA success criteria for early core heat removal is shown as 2/4 HHSI pumps OR 1/2 RHR and depressurization.

However, section 4.1 of the Accident Sequence Analysis Notebook and fault tree gate U3S2CD2 only credit HHSI.

c. The Medium LOCA success criteria for early core heat removal is listed as 2/4HHSI pumps in Section 5.1 and Table 5 of the Accident Sequence Analysis Notebook.

14

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or 'B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

  • :Peer .:*::***:*  :: " . .: . .

F&O # Description Possibe Resolution* Plant Response orResolutin Re v ie w .. . .a n, .. " .. . .. . : ..

However, fault tree gate G1PMP3 and the supporting MAAP analyses from the IPE show only 1 of 4 HHSI pumps to be required.

d. The success criteria for early core heat removal using the AFW system is described differently in the PTN System Analysis Notebook and the Accident Sequence Analysis Notebook. The fault tree modeling appears to be generally consistent with the criteria stated in the System Analysis Notebook. For example, the System Analysis Notebook states that for ATWS, the AFW system must supply flow from 2 AFW pumps through all six AFW control valves. In Table 8 of the Accident Sequence Analysis Notebook, the ATWS success criteria for AFW is stated as 2 AFW pumps to 3/3 SGs.

The structure of fault tree gate A0201 agrees with the System Notebook criteria rather than the Accident Sequence Analysis Notebook. Similar differences were noted in the success criteria descriptions related to the heat removal requirements for the Transient and Small-small LOCA sequences where the Accident Sequence Analysis only gives the pump success citeria without including the requirement to provide flow 15

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

S F&O#

  1. KPeer. Derito Description .Possible osbe Resolution, Plant Response or Resolution through at least 3 of 6 flow control valves.. ..........

AS-3 WOG The Accident Sequence Analysis Notebook Consider removing non- Continued HHSI using the opposite unit RWST is now 2002 lists several systems available to provide credited systems from the credited for long-term cooling of transients. RWST various success criteria which are not discussion of systems replenishment is not credited, based on the judgment credited in the linked fault tree. For available to meet critical that the leak (2 PORVs worth) is rather substantial, example: safety functions in the and no secondary cooling is available. The remaining

a. The Transient success criteria for long Accident Sequence options may be viable, but have many of the same term core cooling does not credit RHR Analysis Notebook or hardware dependencies as HHSR, and consequently Shutdown Cooling, Low-head Recirculation, model the appropriate will make little difference and will not be added.

RWST replenishment with continued HHSI, alternate systems in the Depressurization with Low-head injection linked fault tree. As for small-small LOCA, continued HHSI using the and low-head recirculation, continued opposite unit RWST has been added. The addition of charging with RWST replenishment, or low-head recirculation with depressurization would continued HHSI with opposite Unit RWST. have little effect due to shared dependencies with

b. The Small-small LOCA success criteria do HHSR and, therefore, will not be added. Credit for not credit Bleed and Feed and the long- bleed-and-feed cooling for the SIB sequences has term cooling success criteria does not credit been added to the model.

low-head recirculation or continued HHSI using the opposite unit RWST For small LOCA, continued HHSI using the opposite

c. The Small LOCA success criteria for early unit RWST has been added. As for the addition of the core heat removal does not credit other options, the addition of low-head recirculation depressurization and Low-head injection. In with depressurization would have little effect due to addition, the long-term cooling function shared dependencies with HHSR, and credit for takes no credit for RHR cooling, low-head depressurization and low-head injection was not recirculation or opposite unit RWST. modeled due to the reduced time available because of the larger break size (2-6").

The suggestion of removing mention of other, non-16

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

Peer K

'"DescriptionsIleResolution Plant Response.or Resolution i ew H

. I . . ., : ** :* , . . . .  :' ,*..  : -  :  :

modeled alternative from the AS notebook will not be taken. Removing them would only be removing information that may be useful in the future.

.............

.....

..

......

AS-4 WOG Event sequence transfers for the following Plant-specific, realistic a) No change necessary. Presently, it is an extremely 2002 may be conservative: thermal hydraulic analyses small contributor to risk.

a. The Small LOCA event tree includes a may result in elimination of transfer to ATWS on failure of reactor trip. currently modeled core b) No change necessary. Presently, it is an extremely However, analysis at similar plants have damage sequences. If it is small contributor to risk.

shown that core voiding and boron injection decided to retain from HHSI will shut down the reactor conservative success without rod insertion for similar plants. criteria, the reason for this

b. The SGTR event tree was revised during decision should be the review visit. The new SGTR event tree documented in the logic was reviewed. The revised logic Accident Sequence appears to be appropriate and generally Analysis Notebook.

consistent with plant EOPs. Given that the SGTR is essentially a small LOCA outside containment, Turkey Point does model RWST Refill. Core damage sequence, U3RCD2, may be somewhat conservative.

Given secondary heat removal (B) and steam generator isolation (SGI) there will be a gradual RCS cool down and depressurization with, as a minimum, steam relief via the main steam safety valves. The initial SGTR leak rate is typically in the 400

pm but this decreases rapidly to about 100

.pm as the RCS depressurizes to the HHSI 17

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&OP#D escription Possible Resolution Plant Response or Resblution Review..... j............................ ....

setpoint as a result of the SGTR. Assuming the leak rates remains at about 100 gpm, RWST refill within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> mission time would not be required as long as the remaining RWST inventory when the leak rate reaches 100 gpm exceeds about 200,000 gallons. (33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> at 100 gpm).

AS-5 WOG Several items were noted regarding the Consider adding explicit 1) The RPS model in the PTN PRA is deliberately 2002 ATWS model: modeling of the RPS simplified. With the myriad of redundant systems (1) The Turkey Point PRA model assumes equivalent to that provided which can trip the reactor, coupled with the further that ATWS is always the result of for the ESFAS logic and redundancy of the operating crew to manually trip the mechanical failures (control rod insertion :onsider adding system plant based on indicated parameters, it was deemed failure, trip breaker failure to open), such modeling for AFW to not worthwhile to produce a detailed model of the that a reactor trip signal will occur. The 3ccount for variations in RPS. An AMSAC model was added to the PRA.

model therefore ignores the possibility of the success criteria for failure of automatic actuation of AFW and secondary heat removal. 2) No changes made. The potentially conservative turbine trip; AMSAC is not modeled as being modeling of the recirculation failures in AFW for needed for these functions. ATWS is not a major contributor to CDF, so it was left The Accident Sequence notebook states as is.

that "mechanical failure is the principal cause of the control rods failing to insert," 3) A new ATWS event tree was created using the and implies that failure of the reactor trip guidance in WCAP-15831-P-A, WOG Risk-Informed signal is not modeled. However, there is a ATWS Assessment and Licensing Implementation random failure "LOGIC CIRCUIT FAILS TO Process, Revision 2, August 2007. ATWS top event GENERATE SIGNAL" (a different gate for fault tree logic was developed using the new ATWS each train) that is input to each "TRIP event tree.

BREAKER RT FAILS TO OPEN" gate. It is not clear what portion of the reactor protection 18

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # ee Peer Ie scription rit n  ; *;  :*::  : Possible Resolution Plant Re

,
oon' or Resolution Review .,.._.._.,:__._____.___._.._.______... ___.. ,___ _ I. ___ ___ __ n~~~rRslto system is intended to be represented by these logic circuit gates. Further, common cause failure is not explicitly addressed for these gates, although there is a common cause failure "TRIP BREAKERS FAIL TO OPEN DUE TO COMMON CAUSE"; it isn't clear from the available documentation whether or not logic circuit common cause is included in this event. Further, it isn't clear that the possibility that signal failures leading to failure of both reactor trip and AFW startup or turbine trip, such that AMSAC actuation would be needed, have been addressed in this manner.

Development of a more detailed description of the ATWS fault tree logic should be considered.

(2) The AFW logic for ATWS sequences, where 2 pumps are required to provide flow to 3 steam generators, includes pump failures due to recirculation (i.e., "mini-flow") failures (e.g., Gate A0010). While this may normally be a valid failure mechanism for these pumps, it would seem that, with the high flowrates required for ATWS response, it would not apply under these conditions. Consider reviewing the basis for this modeling and correcting if necessary.

(3) The Turkey Point ATWS model is 19

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

_"

MO_ .#_" ... II Pe Descito

':.. _.__ 2 _ _*%_.__

.. . .. .. _ _ _.__

Possible

. .__

_._

Resol~to

_ . _ _ . 1.. . Response Plant .

brResolution,

. . -1 .'. . ' . =.= . * * . . o F # ~Review srpinuin*o significantly different than the WOG ATWS model presented in WCAP-11993 (and currently being updated for the WOG).

Consideration should be given to adopting the revised WOG model after it is completed and reviewed by NRC.

AS-7 WOG The SGTR event tree branches to the ATWS Consider discussing this in The SGTR frequency is 3.2E-03 per year. Couple that 2002 tree on failure of reactivity control. The the ATWS or SGTR with the pre-eminent ATWS "failure-to-scram" cutset ATWS tree does not address the secondary writeups to provide of NRDPHYSICAL, the physical failure of the rods to fall side isolation and depressurization needed justification for not in the core" with a probability of 1.2E-06, and before to mitigate an SGTR. including this logic (i.e. you have considered the probability of other failures negligible impact.) necessary for core damage, you are already at a frequency of 4E-09 per year. SGTR does appear in the ATWS top logic as an initiator but it is true that the ATWS top logic does not take into account the special requirements to mitigate a SGTR. However, to include such logic would have no appreciable effect on the quantitative results of the model, baseline or configuration-specific.

AS-8 WOG The potential for an induced SGTR is not The accident sequence The ATWS event tree was upgraded in the PTN 2002 addressed in the ATWS model. Nor is it notebook should be Accident Sequence Analysis for RG 1.200 using addressed for the transient model updated to include a guidance in WCAP-15831-P. In this WCAP, it states associated with main steam line break. qualitative discussion of that current studies have indicated that the SG tubes the basis for excluding will withstand an ATWS pressure peak that results in induced tube ruptures. RCS failure.

AS-9 WOG The SGTR event tree does not have Ensure that there is The SGTR event tree was revised such that no credit complete sequence delineation. For the sufficient basis for th,B for RCS cooldown and depressurization is given for 20

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # Peer

. : ]Description . "' . .Possible Resolutnio Plant Response or Resolution

.:Review.

2002 case with failure of isolation and failure of modeled accident sequences where SG isolation and HHSI fail.

HHSI, cooldown and depressurization to sequences.

RHR conditions is asked and, if successful, no further delineation is provided in the model. There should be some T/H analysis to show that the plant can be cooled down to RHR entry conditions without HHSI given a SGTR.

DA-1 WOG NUREG/CR-4550 was followed to develop Consider revising CCF The Turkey Point CCF model was updated to reflect 2002 CCF. NUREG/CR-4550 was issued in 1986. modeling based on the the alpha-factor approach and data from INEL The approach addressed in NUREG/CR-4550 NUREG/CR-4550 94/0064.

may have been out of date. NUREG/CR- systematic approach. A 4780 (or equivalent) systematic approach more updated systematic should be followed. approach (such as NUREG/CR-4780 or equivalent) should be followed.

DA-2 WOG The test and maintenance probabilities Consider revising the T&M Logic was introduced to the model to change the 2002 used for individual components are based event probabilities for the opposite-unit EDG testand maintenance probability Dn actual outage time as collected by the opposite unit components during outage conditions through the use of flags plant. The component outage time was to account for representing the operating mode of the unit. These clearly collected over the period of time the unavailability over the total flags were also used to model the effect of the plant was in Modes 1, 2, and 3. period of demand. As opposite unit's mode on the different system The fault trees and event trees use several stated above, this can be crossties.

cross-ties from AC power, HHSI, and AFW. done at the fault logic level In the use of these cross-ties, the opposite or in the data probabilities.

unit components have T&M events. The 21

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

Reie Description Possible Resolution Plant Responseor Resolution

  • opposite unit may be in Modes 4, 5, and 6 at the time of demand and the desired equipment may have lesser Tech Specs than those assumed for power operation. The T&M event probabilities for the opposite unit components must consider unavailability over the total period of demand, not just during power operation.

This can be done at the fault logic level (with house events for OOS) or in the data probabilities. Currently, neither is done.

The most important case of this is the DG's.

The DG T&M unavailability is about 6E-3 (55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> per year). If the OOS time for major overhaul were considered, the unavailability would be .03 to .05.

DA-3 WOG There is no clear guidance for component Consider updating the data Component boundary definitions and consistent 2002 boundaries and grouping. The Bayesian process procedure to be Bayesian updating are part of the latest data update approach addressed in the Data Process consistent with the (PTN-BFJR-02-026, Rev. 1).

Procedure is inconsistant with the approach approach applied in Rev. 4.

applied in Rev 4. In the data process procedure, the lognormal distribution will be convered to alpha and gamma first, then perform Bayesian updating. In Rev. 4, IP6, 7, B,9 updating in Rev. 4 are not following the method addressed in the procedure.

DA-4 WO G The latest data updating was done in 1995 lReview industrial events I'he data used in the latest model update has plant-22

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

Peer ... , D P Possible Resolution :Plant Response or Resolution Review scptoIOHa..sne 2002 based on plant specific data from 1990 to after 1989 to update the specific data derived from plant records from 1992 1994, and the generic database developed generic database and through 2006, and generic data from the latest

.in 1989. update the reliability data sources, primarily NUREG/CR-6928.

based on current plant specific data.

DA-5 WOG Loss of 4kV buses A and B are modeled as Remove maintenance The normal power supply to 4KV buses A and B is not 2002 special initiating events. The normal power events for components the startup transformer, but the auxiliary transformer.

supply to these buses is Startup which cannot be removed The startup transformer supplies power to the 4KV Transformer 3 with emergency power from from service during at- buses only if power from the aux transformer is not the diesel generators. Since loss of power to power operation. If these available, such as following a reactor trip. Therefore, 4kV Bus 3A or 3B will result in a plant trip, it events are required for the startup transformer can be removed from service is unclear that maintenance would be maintenance rule during power operation, and occasionally is.

  • performed on the startup transformers performance criteria during at-power conditions unless there are sensitivity analysis, then it unmodeled crosstie arrangements during should be confirmed that the maintenance. It was noted that the all such events are set false maintenance events for the 4kV buses false in the baseline (ETM3A4KV and ETM3B4KV) are set false quantification flag file.

prior to quantification. It would seem that the same should be true for event ETM33SU. This might be negligible, except the the maintenance unavailabilities are almost two orders of magnitude greater than the random failure of the transformer.

DA-8 WOG The diesel FOT pump is not explicitly Verify the component rhe pumps do not have to be added to the model for 2002 included in the PRA. It is stated that the FOT boundaries of the day tank the U3 EDGs as the U3 day tanks gravity-feed the is assumed within the failure events for tank and IDG so that it is clear EDGs, and have enough capacity (4,000 gallons each) 23

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # Pee escriptioni  : ;; . Possible.ResolutionK; j Plant Response or Resolution**

failure. While this may be true, the CCF of where the FOT pump is to supply their respective EDGs for the entire mission the FOT pumps is therefore not included, subsumed. Verify that CCF time. The situation for U4 is different as each day tank because there is no CCF for the daytanks, of FOT is similarly only contains 650 gallons. Therefore, the fuel oil subsumed in the higher transfer pumps were added to the model for the U4 component. EDGs.

DE-2 WOG The Flooding analysis considered Review flooding analysis to The internal flooding analysis has been completely 2002 *component vulnerability to both flooding determine if the screening revised for RG 1.200. See Calculation PTN-BFJR and spray effects. Multiple screening and flooding initiator 009, Rev. 0.

criteria were employed to eliminate areas frequency calculations are from further consideration. The three still current using updated remaining areas were then analyzed in methodology, models and more detail to determine a CDF from assumptions.

flooding.

A CDF of approximately 5E-7 was calculated for flooding and determined to be not significant relative to then overall risk (IPE CDF of 3.7E-4). The current model maintains cutsets of lower CDF than these flooding cutsets. The conclusion that the flooding is not significant is no longer supported.

............................................ ......................

  • ............ . ................

IE-1 WOG *The PTN PRA updates are not documented Develop integrated As part of the RG 1.200 effort, notebooks were 2002 in a single document. There is not a single IE notebooks with all prepared for each 'part of the PRA update process: AS, system notebook that contains all pertinent revisions. IE, SC, HRA, etc.

information and references for the IE task.

The basis for the current PRA is some cases go back to the 1991 IPE. Updates have been

_performed as needed. Each update is 24

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

* ".i *Peer .. = *.., ' ..  :.": ";,:

PPe #Desp Possible Resolution Plant Response orResolution Review..cription documented as it is done and filed by time of update, not subject matter. It was very difficult to find the current status of an analytical issue.

IE-2 WOG The disposition of dual unit initiators and Clarify the nature of dual 1)The LOOP initiators are now split into 5 different 2002 dual unit success criteria is not clear. The init initiators and dual unit nitiators. There are 4 dual-unit initiators: plant-following observations were made: success criteria within the -entered, weather-induced, grid-related, and grid

1) Loss of grid is called a "dual unit initiator" PRA. blackout; and 1 single-unit intiator. The two units with a frequency of 0.053. The derivation share one switchyard, so it is assumed that switchyard for 0.053 is dominated by switchyard faults, Faults cause a dual-unit LOOP. The single-unit LOOP is which the IPE notebook implies would be a dominated by unit-specific startup transformer faults single unit initiator. which are on the periphery of the switchyard and
2) Loss of a DC bus on either unit will cause a loss of offsite power to only one unit.

require the other unit to shutdown, but it is not explained why this is not a dual unit 2) This is because the other unit would have to shut initiator. down due to Tech Specs. As such, it would not be an

3) There are no guidelines for dual unit immediate reactor trip, but a controlled shutdown.

success criteria.

There are several shared systems at PTN. 3) Dual-unit success criteria are discussed fully in the The success criteria for Unit 3 assume AS Notebook and the SC calculation PTN-08-014. The complete availability of the Unit 4 systems effects of the dual-unit initiating events on the to mitigate events at Unit 3. There should opposite-unit systems are modeled.

be an identification of dual-unit initiators and development of associated dual-unit success criteria.

IE-3 WOG The initiator for Pressurized Thermal Shock Provide justification for Added RV Rupture IEin PTN-04-011. Research over 2002 is considered "out of scope" with no elimination of these the last few years by NRC, EPRI, DOE, MRP, and others 25

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

i Resolution. Plant Response or Resolutioni Fevi e s . .. ,. .. *.

ustification. PTS is not out of scope for PRA. initiators or include in has shown PTS to be a non-issue for plants like Turkey Discussion with PTN PRA staff indicate that model. Point.

from a licensing perspective, it has been determined to be a resolved and therefore should not be in the PRA. This should be explained, with a probabilistic explanation

  • of why it is a small contributor.

The initiator for Reactor Vessel Rupture is considered out of scope with no ustification.

IE-4 WOG PTN has several shared systems. These Develop and implement See resolution of DA-2 for 1) and 3). 2) is addressed by 2002 include HHSI, AFW, and DG. The criteria for modeling dual PRA Change PTN-02-005, which is implemented in the configuration of these systems may depend unit plant operating status. current PRA model.

on the status of the unit. For the purpose of system sharing, the opposite unit equipment is always assumed to be available in Mode 1 operability.

The following observations were made:

1) The T&M unavailability for DG implies about 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> a year OOS. This can not include time for annual overhaul, (which is done at shutdown). When the opposite unit is in Mode 6, the DG tech spec is reduced to 1 DG. The PRA does not capture this dependency on plant status.
2) When Unit 4 is in Mode 5 or 6, the HHSI for unit 4 is cooled by CCW on unit 3. The PRA does not capture this.

26

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

Peer Possible.Resolution =Pl.nt F&O .# Description .Possible Resolution Plant Response or Resolution Review _____'"

3) there are no overall guidelines and criteria for treatment of the opposite unit's operability and it's affect on equipment availability.

IE-5 WOG There are several methods for quantifying Consider creating a See Initiating Events Notebook, Rev. 3 and PTN data 2002 IE frequencies. They are derived from a) summary table consisting update calculation, PTN-BFJR-02-026, Rev. 1.

plant specific experience, b) NUREG/CR- of initiating event category, 5750, c) plant specific fault trees, d) CE frequency, and Owner's Group for LOCA's. It was not quantification method.

possible to find, in one place a summary of the quantification methods.

IE-7 WOG The level of independent technical review Provide evidence of an There is now a comment and resolution section in the 2002 of PRA changes is indeterminate. There are independent technical model update calculations.

no comment and resolution sheets for the review. Document how PRA modification process. There is only a review was conducted and signoff sheet on the overall update package what comments were (which contains several individual changes). made during the review.

IE-8 WOG The system notebook states that MSIV Provide a basis for The PCS system notebook no longer makes this 2002 Closure and Loss of condenser vacuum are zlassifying MSIV Closure statement. However, the statement is irrelevant as classified as a Reactor trip with full MFW 3nd Loss of condenser the determination of the IE frequency for LMFW is available. There are 2 issues on which this vacuum as Reactor trip solely based on actual plant-specific and industry could conflict. vvith full MFW available. experience.

1) The availability of condensate water may Steam relief of the SGs is modeled.

be affected by loss of condenser, but the staff states that there are 2 CST's with make-up and transfer capacity.

2) the operability of steam relief from the 27

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

Pveerv> '

F&O# D Possible Resolution Plant Response or Resolution, Review Dsrpino~eouin SG, whioch is not modeled in the PRA.

The basis for classifying these IEas reactor trip is not given. But, the affect on the results (if this is misclassified) is not important because the frequency for the IE are derived based on industry and plant specific data and do no account for each individual category.

IE-9 WOG Random reactor coolant pump seal failure Include random RCP seal A review of NUREG/CR-5750 revealed that the 2002 has not been included. From NUREG/CR- LOCA as an initiator, random seal LOCA frequency is 2.5E-3 per year, and is 5750, this event can be about 1E-3. The Si based on 2 events: a 1975 event at Robinson-2, and a frequency is derived from pipe rupture 1980 event at ANO-i. The incident at ANO-1 can be failures only. It does not include component discounted not only due to the fact that it was 20 leakage, RCP seal LOCA, or any other years ago and design changes have likely been made sources of small leakage. to preclude similar events, but also due to the fact that ANO-i is a B&W plant with substantial differences in RCP and RCP seal design. The incident at Robinson-2 was discounted due to changes in seal design and seal-related operating practices and procedures implemented in the last 37 years.

MU-1 WOG Performed a quick review of the PRA Closer adherance to Fixed. Should have been PTN-03-026.

2002 Change Access database process.

PRAUPDATELOG.mdb with help of Turkey Point PRA staff. Searched the PCN table until a PCN which had a PRA impact was found. This PCN, 94131, involved a change to remove a valve, CV-4-32202, and replace 28

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

iD: n.I .... * "m ni...... "I '" *: ":=* '* =; " " "' "

F&O # Description R . Plant

. R Resolution VReview josE~ns~Lo epneo it with a spool piece. This PCN pointed to PTN-99-026, which in turn pointed to PTN-BFJR-99-010 for final resolution. PTN-BFJR-39-010 was the update of the level 2 analysis and did not discuss the valve change at all. Additional investigation revealed that PCN 94131 should have pointed to a different PRA change form and calculation.

.. .. .... . .....

MU-2 WOG STD-R-001 has a requirement for signoff by Consider augmenting There is now a comments and resolutions section in 2002 the preparer, an independent reviewer and existing RRAG processes by the model update and other PRA Group calculations.

the RRAG supervisor. The PRA update defining such measures as calculations that were reviewed had all the a standard, expanded level Details of each change are documented in the PTN required signatures. However there were of detail in description of Change Database. Each model update includes a table no review notes or discussion of the PRA changes being of the changes implemented for that model update disposition of review comments in the incorporated, items to be and reasons for those changes.

various calcs examined by the peer checked for by reviewers, reviewers. Further, the peer reviewers etc. In particular, the Consistency issues between the Accident Sequence found examples of inconsistencies in several purpose/basis for each Analysis, the Success Criteria calculation, and the signed-off notebooks (e.g., Accident change should be defined model update calculations have been resolved in RG Sequence Notebook included incorrect in the change packages. 1.200-related upgrades of all of these documents.

success criteria for S2 LOCAs), and examples This should provide the Df errors carried through several PRA reviewer with enough The other issues are treated separately in other F&Os.

Update Calc revisions (e.g., CDF cutsets that information to determine if included single failures in emergency the detailed changes boration pumps for ATWS, which should actually are sufficient to have required multiple failures). fully address the basis for the change.

29

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

PFe& Description Possible Resolution. Plant Response or Resolution Rei ew . .esponseorResolution_. ____:_ _____ ... ..

MU-3 WOG Procedures STD-R-001, Rev. 0 (Software NA 2002 Control Procedure) and STD-R-002, Rev. 5 (Update and Maintenance) govern model control.

The computer models (e.g., current and previous model files such as *.CAF and *.BE) for the Turkey Point PRA are maintained on a server (g:nis\PSA). The server is backed up daily and therefore provides secure storage.

Access to files on this server is limited to those with permission and is on a read-only basis. In addition, computer models are stored on a CD and sent to the document control center. A second copy is maintained locally. Model changes are also maintained on this server.

This same process is used for the PRA software (e.g., EOOS, CAFTA, FORTE).

MU-4 WOG STD-R-002 requires a data update every 5 Update the reliability data. Data updated in current PRA model using the data 2002 years. However, it does not appear that Ensure adherence to documented in the data update calculation, Rev. 1 of Turkey Point has updated the reliability procedures PTN-BFJR-02-026.

data since 1995 even though the common cause failure data, the human factors data, the initiating event data and the unavailability data was updated in 2000.

MU-5 WOG STD-R-002 includes a set of criteria for Revise the procedure, STD- Changed procedure to have a maximum interval of 2002 when to perform a model update. The key R-002 to incorporate a five years between model updates.

30

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&

Peer ~1 1Plant

. Dscription ~ Possible -Resolution .Response or Resolution.

~~iReview criteria are if the change has a significant fixed update equivalent to impact on CDF or risk insights. However, the fixed data update Whether minor changes constitute justification for a there are no criteria as to what constitutes schedule to preclude an model update is determined by the model custodian.

a significant impact. Given that there is no unending build up minor fixed update period, there is a concern that changes that could have a the number of "minor" changes pending significant cumulative

ould build up until the combined impact is impact. The procedure significant without triggering an update. should also be revised to include a process for evaluating the potential cumulative impact of pending changes and triggering a model update if the cumulative impact of the pending changes is judged to be significant

. ...... ....... . . .. ......

.. -.

.. .. . . ... .. ... ..

MU-6 WOG Turkey Point does not appear to have a Establish a controlled list of List added to STD-R-002 (see Table 5).

2002 single list of "Living PRA Applications" PRA applications and revise the procedure to require at least a qualitative evaluation of all applications on the list be performed and documented following each model update.

QU-1 WOG Loss of RCP seal cooling sequences Those transients which Transient initiators are input to all of the transient 2002 following transient initiating events are result in a 21 gpm leak rate sequences.

31

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

IPeer .1

  • vew Desciption Possible Resolution  : Plant Response or Resolution transferred to the S1 LOCA event tree with would be treated as a ZZSL flag event set to 2.1E-1. However, it normal transients and is not clear that the 79% of loss of seal would be accounted for in cooling events resulting in 21 gpm per the transient sequences.

pump seal leakage are being retained in the transient event sequences.

__._.._.........__..............___

.... ._

__..._._.._.. ....... ____ _____________________________________

..... .___________________________________________

.....

QU-10 WOG The truncation limit for the CDF results is 'onsi*deration should be In the Rev. 9 PTN PRA model, the Level 2 model is 2002 consistent with the grade 3 requirements, given to performing incorporated directly into the fault tree and quantified but the same core damage results are used sensit ivity studies at lower separately. The truncation for the quantification is as the basis of determining the LERF. This LERF t runcation levels for more than 1E-4 below the mean LERF value.

effectively results in the LERF truncation 3pplic ations where LERF is level being less than 1E-4 below the total mpor -tant.

LERF.

... . . .. . . ...

. ................

. ...............................

.. ...

. . . . . . . . . . . . ...........

..........

..................

. . . . .. . .. . . . . . .. ................

..................... ........... ............

. . . , ........... .. ...;........... . ........... ....... .

QU-2 WOG The guidance provided for the Consii der establishing clear Changes to the mutually exclusive event 2002 quantification process is IPE vintage. Several guidaince for the selection combinations, flag file, and recovery rule file that have new codes are being used in the current of mu tually exclusive event occurred since 1998 are documented in the PTN process which did not exist at the time of comb inations, the use and Change Database and the model updates. They the IPE. No guidance procedures currently develi opment of flag files to document the mutually exclusive event combinations, exist to control key processes involved in contr ol the quantified flag file, and recovery rule file with justification for model integration and quantification such systern configuration, the their content. Truncation level is set as low as the as: deter mination of an hardware and software will allow, or until

a. Criteria for development of the mutually appro priate truncation convergence is achieved. Uncertainty analysis input is exclusive events file level, and acceptable described in the model update calculations.
b. Selection of truncation value input, sfor performance of
c. Quantification on a sequence basis versus uncer tainty analysis.

quantification of top gate

d. Process for breaking circular logic in the 32

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&*

Peer

. .. =.Description

  1. .- Review,

'

IPossible Pb" Resoluton  :.RsosrRslto Pl" Plant Response or Re

.:

tion single top linked fault tree (i.e., selection of proper gate level for performing the logical break, naming scheme to be used for gates in the new system fault tree, etc.

e. Process for development of flag files for the baseline quantification to ensure the quantified configuration represents normal plant operation practices
f. Selection of parameters for input to the UNCERT code for uncertainty calculation QU-3 WOG The quantification of a linked fault tree Consider developing a See QU-2.

2002 model involves the proper integration of documentation package several files which can affect the results. For for the flag file, mutually example: exclusive events file and

a. The quantification flag file is used to set the recovery rules which logic flag events true or false to represent provides the basis of each normal system alignment. At PTN, this flag item in the respective files.

file is also used to set certain maintenance Cross-disciplinary review of events false. the flag file and mutually

b. The mutually exclusive file is used to exclusive events file by remove cutsets from the results file which plant personnel may also contain certain combinations of events be considered.

representing disallowed maintenance or illogical event combinations (i.e., events for failure to open and spurious opening of the same valve in a single cutset).

c. The recovery rule file is used to add recovery events to the cutset results ased 33

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

PeersieReouinPnt.

F&O-#t '

_______

.Description.

i*"Revie Review~

........ .Possible

:;

____________________________________________

' I

  • '*';

Resoplution

"*:

,.,... * . .*:. ,'**

_. Onse_ __or Resolution

...:_...__ .. _......_...

_ _ _..._ _ _."*._ _

  • _ _ _.

on the appearance of certain combinations of failure events. At PTN, this process is also used to apply human error factors to the quantification results.

Since these files control vital processes during quantification, independent review and thorough documentation is needed to ensure that the quantification results do not exclude valid failure sequences. The current mutually exclusive events file (PTN2KMEE.TXT) was changed as a result of the addition of new T&M events for LC/SWGR HVAC AHUs and Sump Level Indicators. The calculation package includes a description of "add double maintenance events for these basic events to mutually exclusive events." However, no justification for making the events mutually exclusive or specifying the combinations that are mutually exclusive is provided. In addition, the review of the mutually exclusive events file indicates that some complimentary combinations related to AFW pump maintenance may not be included. While this would lead to conservative results due to failure to remove invalid cutsets, the addition of inappropriate mutually exclusive combinations would have the opposite result. Similar errors can be introduced 34

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O 4"

'Peer Description Possible Resolution V ePlantResponse or Reslution Re ie ie_.1 "r. ". . . . .

"_____.. " .. .. . . . . "'___"

. . ... ".. . .. . . . .. "... ":*: *. . _ '

_______  :!,..*: '.:.~ ! ":.

through the recovery file through the inappropriate application of recovery events to sequences which do not represent the conditions assumed in the HRA analysis.

[QU-4 WOG The current practice is to run the baseline Consider performing future The flags are now set to split fractions.

2002 quantification with the flags set to use Loop quantifications with flags A as the broken loop for LOCA events. From set to split fractions rather discussion with PRA group personnel, this than True or False. This will was decided based on evaluations during ensure all complimentary the IPE which did not identify any cutsets appear in the asymmetry due to broken loop and quantification results and operating equipment alignment. However, provide an opportunity to there was no evidence that this evaluation identify any asymmetry has been performed since the IPE to ensure introduced through plant that plant changes and changes to the modifications or model linked fault tree have not inadvertently updates.

introduced asymmetry.

...

..

.................

QU-5 WOG Documentation was not available to To meet the grade 3 In the PRA model updates, sensitivity analyses are run 2002 indicate that PTN has performed qualitative criteria for sub-elements to show the effect of key modeling assumptions.

evaluation for causes of uncertainty, such DaU-27 and QU-28 Parametric uncertainty is addressed in the model as: (uncertainty analysis updated calculations. Comprehensive uncertainty

a. possible optimistic or conservative criteria), perform and analysis evaluations are provided in the Uncertainty success criteria, document a more Analysis Notebook.
b. suitability of the reliability data, systematic uncertainty
c. possible modeling uncertainties evaluation to identify (asymmetry or other modeling limitations potential uncertainties due due to the method selected), to such items as modeling 35

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

  • i : *:=P ee r ::i " ".. .. . .. ... .. .

F&O #  : Description Possible Resolution  : Plant Response or Resolution It

,

_ _ _ _ __*

, R*i

_____ ________:_____________~_

d. degree of completeness in the selection assumptions, success of initiating events, and criteria conservatisms,
e. possible spatial dependencies. data, etc, Identify the likely impacts of these sources of uncertainty on results, and perform sensitivity analyses as appropriate to achieve an understanding of whether/how they may affect risk-informed decision-making using the PRA.

... Q........U.-.6.....

.......

QU-6 WOG Recovery of offsite power is applied to Verify that the recovery of In the current model update, the recovery of offsite 2002 sequences where offsite power may not offsite power is a) power is not credited for cutsets where the recovery recover the lost function. This occurs in two applicable, b) will recover of offsite power does not recover mitigating types of circumstances: (with high probability) the equipment sufficient to avoid core damage.

1) for non-grid-loss initiators, LOSP (and lost function, c) has an SBO) can occur due to failure in the AC applicable probability. Recovery of offsite power is not credited for power distribution system. XROSPi is sequences where the LOOP simply acts as a reactor applied. The recovery probability of XROSPi trip initiator (and loss of MFW) versus a support is based on the NSAC document for system loss.

restoration of offsite power to nuclear plants. The sequence in question is cause by a failure of a breaker or transformer at the plant. It is not clear that the recovery probability is applicable.

2) for some SBO sequences where all SG heat removal is lost, XROSPi is applied.

36

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # Peer. D t Description I ~at Possible Resolution.

reouo Plant Response orResolution Review " .... __

... *_.___ ... _._.____

... . ...'___ .__.....

Adthough AC power is available, it is not clear that SG Heat Removal is restored. The 5G heat removal is provide dby 3 TD pumps and 1 diesel driven pump. If these fail, restoration of AC power does not make them operable.

For example, there is a cutset at 1.274E-9 vvhich is loss of 4KV 3A with failure of aux transformer. There is a recovery for XROS19 and EHFPXTIE.

The correctness and reasonableness of this practice is questioned.

QU-7 WOG 4, review of the dominant cutsets revealed Evaluate the applicability Added CHFPSTPRCP, failure to stop RCPs given loss of 2002 that the failure of the operators to trip the of this RCP seal failure CCW, to the model.

Reactor Coolant Pumps following a loss of mode to Turkey Point and Ail cooling does not appear to be modeled modify the PRA model or in the Turkey Point PRA model. This has documentation as been found to be a dominant contributor to appropriate.

core damage at similar plants.

QU-8 WOG The subtier criteria for a grade 3 on this Consider expanding the a. A comparison of PTN CDF cutsets to Robinson's CDF 2002 element considers the following to be discussion of the cutset was made and is documented in the indicative of a good understanding of the quantification results in the Quantification Notebook. Where differences in the dominant risk contributors: calculation packages or cutsets occurred, they could be explained by design or

a. The accident sequence results by developing a PRA Summary data differences.

sequence, sequence types, and total should Document- containing this b. A list of the top 50 cutsets is provided in the model be reviewed and compared to similar plants type of evaluation for each updates.

to assure reasonableness and to identify revision. c. Initiating event pie charts, system importance

.

..............

37

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O# [Peer 1 ~clto

_#_evwscription sesponse Possible Resolution.

oRevieweoltonse P

Plant ~ oor Resolution any exceptions. charts, and a table listing the individual sequence

b. A detailed description of the Top 10 to contributions are included in each model update 100 accident cutsets (CAFTA or NUPRA) or calculation.

accident sequences (RISKMAN) should be provided because they are be important in ensuring that the model results are well understood and that modeling assumption impacts are likewise well known.

The dominant accident sequence groups or functional failure groups should also be discussed. These functional failure groups should be based on a scheme similar to that identified by NEI in NEI 91-04, Appendix B.

There is no discussion of results in the calculation packages for updates provided to the review team to indicate that this type of evaluation is done of the quantification results. Also, the calculation packages provide no discussion of how the dominant

utsets or impotant systems were affected by the changes to the model when compared to the previous revision.

SY-1 WOG Module GMM3GK100 contained failures for Update the simplified Fixed in the HHSI system notebook update for RG 2002 3 valves in the mini-flow recirculation line schematics to include all 1.200.

For HHSI 3A. Only 2 of these valves could be modeled components or Found on Figure 10 on page 44 of 127 in the provide some other means PTN System Analysis Notebook. for identifying the location of all modeled components 38

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

' : "Peer "  :;  :..:  ;  : . .* . . ". .....

F&O4 . Description 'Possible Resolution ion ReolutonlRenview or SY-2 WOG The RHR/LHSI model for recirculation The discrepancy between Added JHFA3RWSTLVL, "common cause miscalibration 2002 assumes that failure of either the RWST definition of dependencies of U3 RWST level indicators" to gate J504. Added level indication or the sump level indication in section 3.6.5 and the JHFA4RWSTLVL, "common cause miscalibration of U4 will result in a failure to switchover to model should be resolved RWST level indicators" to gate U4J504.

recirculation. Themodel for failure of the and the model revised sump level indication includes common accordingly.

cause miscalibration but common cause miscalibration of the RWST level indicators is not included in the model and no basis could be found for the exclusion of this failure.

The CCW model does not include the relief valve, or the surge tank level instrumentation.

SY-3 WOG The level of detail for the electrical systems Explicitly model the diesel a) The pumps do not have to be added to the model 2002 is not consistent with normal industry fuel oil transfer pumps and for the U3 EDGs as the U3 day tanks gravity-feed the practice. For example: grid/switchyard failure. EDGs, and have enough capacity (4,000 gallons each)

a. Modeling of the diesel generators to supply their respective EDGs for the entire mission includes leakage from the fuel oil storage time. The situation for U4 is different as each day tank tanks and piping, but does not include only contains 650 gallons. Therefore, the fuel oil failure of the fuel oil transfer pumps. This transfer pumps were added to the model for the U4 was noted as a deficiency in the Revision 1 EDGs. See PTN-2-034 for addition of diesel fuel oil update, but no clear resolution was noted. transfer systems to the model.

It is implied that the transfer pump failures are included in the tank leakage event, but b) Switchyard failure following non-LOSP initiators is there is no documentation that has been included in the LOSP event database.

found for the inclusion of the pumps in the tank boundary for data collection and 39

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F9O # R

_Peer:* : ,:Description

.. ,:... R Possible Resolution Plant Response or Resolution AevewPsil calculation of the tank leakage event probability.

b. Only Startup transformer failures are modeled for offsite power feeds following an initiating event. Switchyard failure following non-LOSP initiating events is not included.

SY-4 WOG Gate E3093H models failure of the Charging Replace event ECBR335008 This has been fixed.

2002 Pump 3C breaker to open on undervoltage. with the proper basic event However, the breaker failure event included coding to ensure the under this gate is ECBR335008, Breaker correct event probability is 35008 Transfers Open. assigned. Review similar logic gates to ensure this is not a generic modeling concern.

TH-1 WOG The basis for requiring or dismissing HVAC Consider revising analysis The HVAC analysis has been fully revised. GOTHIC 2002 requirements is poorly supported and to better support HVAC room heat-up calculations have been performed for inconsistent throught the PRA. The requirements. many of the HVAC-cooled areas containing PRA following observations were made: components, especially those where the need for

1) The HVAC system notebook and DG HVAC was questionable. The heatup calculation system notebook require HVAC for EDG results were compared to the survivability rooms, DC equipment room and 4160 temperatures of the PRA components in the various equipment rooms. The analysis is based on rooms and the dependencies applied accordingly, design basis calculations from A&E done in 1985-1988.
2) Recent updates use engineering judgment and plant experience from system 40

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

FO Pee~r Review Description Possible Resolution Plant Response

" Resolution

..... .. Resp o Ors :ResolUtlon  :

engineer to dismiss need for HVAC to 4160 and DC power rooms.

3) The current fault trees require HVAC for DC room and EDG room for LOCA events nily.

4,)GOTHIC or other room heat up

alculations have not been done to support room cooling of these rooms.

Discussions with plant staff during the Certification indicate the following requirements for HVAC:

4,) Unit 3 DG does not need HVAC.

B) Unit 4 DG need HVAC whenever they Dperate C) the switchgear room needs ventilation to protect the 480v transformer. The switchgear ventilation system is normally running. Remedial action via opening doors and running an exhaust fan is sufficient to maintain temperatures. The lead time and indication of loss of ventilation is sufficient enough that loss of switchgear room ventilation is not considered an initiating event.

D) The inverter and battery charger need room cooling. Remedial action is available vith plug-in, portable fans, but recovery 41

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

  1. :

Peer*I.".

Description i0 :Possible

'" .

Resolution Plant Response or Resolution Review

.time is on the order of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

TH-3 WOG It is difficult to determine, from the PRA Provide clearer traceability The updated Accident Sequence Analysis Notebook 2002 notebooks, which codes or methods of of success criteria to *(Revision 3), the new Success Criteria Calculation analysis are used for specific success criteria analytical bases, at least (PTN-BFJR-08-014, Rev. 0), and the updated Revision 8 determination, or why these methods are for "non-obvious" criteria PTN PRA model (PTN-BFJR-00-001, Rev, 8) resolved appropriate. For example, applications of (e.g., for those whose basis this F&O.

the MAAP code, particularly the IPE-vintage is other than FSAR).

3b version, may require some justification Consider developing a clear or check for applicability (e.g., avoiding use set of guidelines of MAAP 3.0b for rapid RCS establishing the acceptable depressurization scenarios, which typically range of applications of require capabilities beyond what was various types of codes and available in that particular version of the calculations.

code).

Further, it is difficult to determine the specific analytical bases for specific success criteria used in the model. While the Accident Sequence Notebook includes a summary of success criteria for each event, reference for the bases for the success criteria is to the IPE, which does not provide additional information on this subject.

TH-4 WOG The LOCA break size definitions for the PRA Because the break size The updated Initiating Events Notebook (Revision 3),

2002 are based on different criteria than those definitions are central to the updated Accident Sequence Analysis Notebook for most other PRAs. This is acceptable if the LOCA modeling for the (Revision 3), the new Success Criteria Calculation the underlying analyses provide sufficient Turkey Point PRA, there (PTN-BFJR-08-014, Rev. 0), and the updated Revision 8 basis for the definitions. should be, in the event PTN PRA model (PTN-BFJR-00-001, Rev. 9) provide 42

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

4Peer.t

... F&O

____# _Revieiw .....Description _" Possible Resolution "P""a"i" Resp.nse Plant Response,or Resolution

, series of MAAP 3.Ob analyses was tree notebook or appendix, justification for the LOCA break sizes.

oerformed for the Turkey Point IPE. The a clear discussion of the 3vailable documentation consists of the bases for the selections, Accident Sequence Notebook descriptions including reference to the 3nd success criteria summary and an spectrum of analyses nternal memo from the IPE, which provides performed and the specific 3 summary listing of the MAAP cases that set of MAAP or other were run, along with an indication as to analyses that define the Nhether or not core uncovery/vessel failure size range for each size occurred. Reviewer note R11 to table TH break.

provides a comparison of the definitions Consideration should be 3nd their bases, with focus on the injection given to evaluating and phase, as discerned from this information: documenting the effect on From the comparison in note R11, it can be PRA results and risk seen that the principal difference in size insights resulting from definitions (aside from the names used) is in using these (as opposed to the PTN Medium Break category, which is more "traditional")

essentially the lower end of the typical definitions.

Large Break category. Confirm that all definitions Comments on the above are as follows: are based on analyses The available documentation provides the performed using oasis for some, but not all, of the size appropriate codes and ranges noted above. Information provided modeling assumptions, n FPL memo NF-90-450 (October 19, 1990) especially for the larger provides sufficient information to serve as a break size definitions (i.e.,

basis for the S1 and 52 ranges and the lower those in the range of 3" end of the Medium LOCA range. But it does and above). Consider not provide any basis for the upper end of confirming the results of the Medium LOCA / lower end of the Large key earlier MAAP 3.0b 43

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&. Review Description ' Pssble Resolution . Plant Response or Resolution 1 erltnlPsie[a LOCA size ranges (i.e., the 13.5" break). analyses against results Available MAAP runs listed in the memo are obtained using currently for breaks up to 10" diameter. Discussions available versions of with FPL personnel identified that the 13.5" MAAP, which have size cutoff may have been selected by the improved capabilities for IPE contractor during the early stages of the modeling depressurization IPE, but a specific basis was not located and other T/H phenomena.

during the review.

For the TPN Medium LOCA, i.e., breaks up to 13.5 inches, the PRA assumes that a single train of high head injection can mitigate this class of LOCAs, whereas typical PRAs would instead tend to credit a single train of low head injection for breaks at the upper end of this size range (i.e., above 6").

As noted above, analyses supporting the upper end of the Medium LOCA range with this success criterion were not available during the peer review.

MAAP 3.Ob analyses were used to support the definition of ECCS requirements for the MLOCA, even at the upper end of the break size range (i.e., 13 inches). In general, MAAP 3.Ob is not appropriate for rapid depressurizations as would be occurring for breaks in the MLOCA size range.

TH-5 WOG The Accident Sequence Notebook indicates Revise the discussion of :The new Success Criteria Calculation (PTN-BFJR 2002 that core damage is defined, for referenced core damage conditions .1014, Rev. 0) and the updated Revision 8 PTN PRA 44

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

"Peer[

F&O #

_ _ _ _ _ F&Ovi

_ I*'::

w.e.oui.

__eiw .e,_I _ s_ _ _ _ _: :':':

_ _': _ _ _ : _ , !*:*:i:i*:ii

_ _ _ I

..:.Descrip:ion.

iPosible Resolution

  • _ ::::?

_ _ _ _ _ i _*::::::!

Plant Responseor.Resolution

_ _: _ _ _ i =:;:,i~i*;

_ _ _ _ _ _ ,* _ _ _ _ _ _ _ _ _ .

design-basis analyses, as 2200 degF peak and rationale to address model (PTN-BFJR-00-001, Rev. 9) define 1% clad fuel clad temperature. No discussion is the capabilities of the damage as the core damage end state.

provided regarding the core damage codes and models used.

criterion for analyses performed using Consider checking to see MAAP, but it appears, from the available that the success criteria summary of MAAP runs performed for the would not change IPE, that it was assumed that core damage significantly if existing would occur as soon as core uncovery was conservatisms were predicted by the code. removed from the model.

These definitions are reasonable but conservative (i.e., pessimistic) from a PRA perspective. The following observations are noted.

The selected core damage criteria can be considered to be functions of the accuracy of the code and model being used to calculate them. For example, supporting requirement SC-A2 of Rev. 14 of the ASME PRA Standard provides example measures

.of core damage that indicate that 2200

.degF would be appropriate using a code

.With "detailed core modeling" whereas a

.lower temperature (e.g., 1800 degF) would

be more appropriate using a code with simplified (e.g., single node core model, lumped parameter) core modeling". The
idea is to provide sufficient margin between

!actual and code-calculated values to allow Ifor limitations in codes and models, and 45

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

[Peer I  ;

____..... [Reve Rev iewIDescription

"______

Resolution .Plant: Response or Resolution

___________________ ____________________________________'_

uncertainties in inputs and calculations. So, for those PRA success criteria for which the licensing basis analyses provide the success criteria bases, the 2200 degF value is appropriate. Where the MAAP code (or other codes / models with more simplified modeling detail than the licensing basis codes) is used, selection of a lower predicted temperature may be more appropriate.

If core uncovery has been used as the core damage criterion in the available Turkey Point MAAP analyses, it is possible that some scenarios for which success credit was not taken may in fact be successful. This is because in some events there may be a brief uncovery of the top of the core without gross fuel heatup, followed by refilling of the vessel as injection occurs.

Thus, some PRAs apply a combined temperature and onset of core uncovery, or temperature and time, criterion. It is not possible to determine from the available MAAP 3b analysis summary which cases might change, but the breaks in the S2 size range represent a set of cases where additional investigation might change requirements. Other criteria that could be examined include human action timing.

46

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # e . Description .ossible Resolution Plant Response or Resolutin Consideration could also be given to demonstrating the viability of secondary side cooldown and depressurization to allow injection via the RHR or charging pumps for sequences with failure of the high head pumps.

It is also important that the events being modeled are within the capability of the code used. In the case of the MAAP code, recent versions (e.g., MAAP 4 and later) have enhanced capabilities relative to MAAP 3b for many events modeled in the PRA.

TH-6 WOG The selection of analytical bases for success Consider developing a The new Success Criteria Calculation (PTN-BFJR 2002 criteria, and the MAAP analyses performed process for documenting D14, Rev. 0) and the updated Revision 8 PTN PRA for the IPE are documented only in two PRA supporting analyses, model (PTN-BFJR-00-001, Rev, 8) resolve this F&O.

internal memos (FRN-89-1010, November including guidance 1989, and NF-90-450, October 1990). The regarding consistent 1989 memo documents results of a review information (inputs, of available WCAPs to determine timing and outputs, other T/H bases for the IPE, but the dicussion/interpretation of conclusions reached there appear to have results), and implementing mainly been superceded by the information this for future analyses.

in the 1990 memo. The 1990 memo Consider having the MAAP provides only tabular summary of results of analyst re-document the the various MAAP cases performed, and available analysis provides no reference for a verified MAAP information (per the base deck, check of input parameters, etc. above-referenced memos) 47

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

P . Description F&O #

Review

...

7_______________________

IPossible Resolution. Plant Response or Resolution The memo also does not provide any in a current calc, adding discussion of how the results should be or best-available information were interpreted. Per discussions with the (e.g., by capturing analyst FPL analyst who performed the MAAP recollections) regarding analyses (and who authored the memos), how the results were there was a preliminary analysis calc interpeted and prepared for the MAAP analyses, but this implemented in the PRA.

was not reviewed/approved, since there were no procedural requirements at the time to do so. Thus, there is no clear documentation of a verified analysis basis for key PRA success criteria, beyond the summary information provided in the memos:

HR-A2-01 FPR 2010 This HR requires identification, through a A review of the procedures Rather than examine all possible maintenance, review of procedures and practices, those listed in the system surveillance, and calibration procedures and calibration activities that if performed notebooks should be associated practices, a more practical method was incorrectly can have an adverse impact on performed to identify used which presumed that pre-initiators can the automatic initiation of standby safety those that could result in potentially exist for all redundant standby trains equipment.. The system notebooks contain potential miscalibration modeled in the PRA and to insert screening values for a detailed listing of testing and events, and provide a their probability of occurrence. If quantification of the maintenance procedures that were justification for those that model with the screening values demonstrates that identified for each system, but there is no were excluded from they are risk significant contributors (FV>0.005), then discussion as to which procedures were further consideration. For a specific review of potential maintenance, determined to have the potential to result miscalibrations that have surveillance, and calibration procedures and practices in equipment being left in a miscalibrated the potential to impact that could cause the pre initiator condition to exist is condition, and which were screened from multiple systems, ensure performed against the screening rules in HR B1. Any consideration with the basis for screening. that they are treated procedures that meet this criterion are identified and 48

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

e . Resolution

'Possible Resolution Response or Plant Response or Resolution ..

Review

& Description" ....

consistently between both documented in the HRA Calculator file.

systems, and that HR-Al presumes that EVERY possible procedure or appropriate HFEs are listed practice that could cause misalignment or in all impacted system miscalibration are identified before any screening of notebooks. events can occur. Further, review of Table 7 revealed that only 2 of the 9 calibration procedures required Similar traceability needs pre-initiator events for the PRA model, and the events to be provided for other were already in the model.

Test and Maintenance procedures that have the ability to render a system/equipment unavailable as well.

HR-B2-01 FPR 2010 This SR does not allow screening of Review the actual test and Verify assumption in HHSI system notebook. If any of activities that could simultaneously have an maintenance procedures these valves are rendered unavailable for impact on multiple trains of a redundant associated with these maintenance during power operation, add system or diverse system. valves and determine appropriate T&M events and pre-initiators.

when they can be subject to testing or maintenance. For the 864 valves, the model has a T&M event for If they can be subject to each RWST to account for the time the RWST contents testing or maintenance are used to fill the refueling canal, which is probably when either of the Units is the only time the 864 valves could be maintained. The shutdown, then a T&M RWST T&M event should be a palatable substitute.

needs to be added into the model as well as The 845 and 882 valves are locked-open manual consideration for a pre- valves, so no T&M or pre-initiator is needed there.

initiator misalignment of the valves, and a post- The HHSI recirculation valves 856 and 874C, if closed 49

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # Peer '.Description :Possible Resolution Plant Response or Resolution ,

Review :j' initiator HRA to re-align if For maintenance take out their related HHSI pumps.

necessary. The 856 valves are stroke-tested during the associated unit refueling outages. Evaluated pre-initiators for the 356 valves and added these to the model.

The 878A and 878B valves, if closed for maintenance, Nould prevent opposite-unit SI. Evaluated pre-nitiators for the 878 valves and added these to the model.

rhe 856 valves are stroke-tested during the associated unit refueling outages. Evaluated pre-initiators for the B56 valves and added these to the model.

Ran quantification of the U3 and U4 models with these pre-initiators added - negligible effect on CDF and LERF.

HR-C2-01 FPR 2010 There is no provided documentation of the Provide documentation of In the latest data update, documented in PTN-BFJR-plant-specific or applicable generic the review of plant-specific 22-026, Rev. 1, condition reports were reviewed for operating experience for equipment left or generic operating the time period 1992-2006 for component failures. No unavailable for response in accident experience and confirm failure modes outside the ones already modeled were sequences. that no additional failure found.

mode is required.

HR-D-01o FPR 2o010 The human failure event probabilities Review and ensure The only thing that needs to be fixed for this finding is appear to be evaluated with a systematic consistency on the Table 3 in the 09-12, Rev. 1 calc. The probabilities for process that includes an initial screening calculation of HFE for all 4AHFAON2BK1, AHFAON2BK1U4, AHFAON2BK2, and value and the identification of risk- pre-initiator and post- 4AHFAON2BK2U4 need to be changed to 4.0E-05, 50

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

SF&OF&O#

    • Peer PDescription~~*"' " ..... :Possible Resolution 1Plant Responrseor Review Dsrpi j.os..ble or Resolution significant action for which a detailed initiator HFEs. matching the probabilities in Table 5 and the PRA analysis through ASEP method is used. model.

Although there appear to be some The probabilities for AHFAON2BKU and inconsistencies in the values of the HEF, AHFAON2BKUU4 need to be changed to 3.6E-05, especially for HEF already existing in matching the probabilities in Table 5 and the PRA previous version of the model. For example, model.

action AHFAON2BK1 is indicated as a pre- The manner in which these pre-initiators are existing action (i.e., not highlighted in Table calculated is documented in the HRA Calculator file 3, page 22) with an initial value of 1.10E-3. used and referenced in calculation PTN-BFJR-09-011,

There is no further discussion of this action Rev. 1.

(i.e., the action is not indicated in Table 4 at

.page 27 as one of the action requiring Only the tables, not the model, need to be changed.

further analysis). Still in Table 5 at page 31 the action has a value of 4.5E-5 (consistently with what is in the model).

Another example of inconsistency between the documentation, the HRA Calculator file and the CAFTA model is post-initiator action AHFPAFWTHROT).

HR-D3-01 I FPR 2010 The pre-initiator HRA does not specifically To achieve CCII/IlI, a For each pre-initiator analyzed in detail in the HRA discuss quality of the written procedures or discussion of the quality of Zalculator, there is an assessment of the quality of the the quality of the human-machine interface. procedures and human- irocedures and human interface in Performance machine interface need to 3haping Factors.

be provided.

HR-G7-01 FPR 2010 This SR outlines the requirements for Review the cutsets rhe fatigue rule has forced the site into a 4th RO on assessing the degree of dependence associated with Dual-Unit ;hift. Attachment 1 of the Ops Dept Instruction ODI-between HEPs contained in a single initiating events, and take 045, Shift Staffing and Accountabilities, 12/21/09 51

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O #

I eer' Description D = ..IPossible Resolution

. . ==.... ....Plant Response

...... or Resolution ..

accident sequence or cutset, and into consideration the fact has to be filled out by the Field Supervisor for all of accounting for the influence of success or that only 1 of the 2 Units the bargaining unit operators to ensure all of the failure in preceding human actions and will have 2 Reactor required positions are covered. Note that there is a system performance on the HEP under Operators available, or that fourth RCO position that they have to fill now. That consideration, including consideration of 1) each Unit may have a should give you what you need to show 2 RCOs per time required to complete all actions in single dedicated RO, and a unit on shift. The ADMs on the subject have been relation to the time available, 2) factors that shared RO, and determine changed as well to account for assignment of the 4th could lead to dependence including the impact of this resource RCO, but they have been carefully worded not to common instrumentation, procedures, limitation on the HEP. This contradict Tech Specs which only requires three...even increased stress levels, etc., and 3) review should include ALL though the attached ODI-CO-045 is what they actually availability of resources (e.g. personnel). dual Unit initiating events use to make sure all of the shift assignments are that credit any post- covered.

initiator actions, not only those with multiple actions since the Initiating Event itself creates the dependency concern.

IFPP-B3-01 FPR 2010 This SR requires that an uncertainty PTN should perform an The documentation of the internal flooding analysis assessment be included in the uncertainty assessment now includes a section on uncertainty analysis.

documentation. and document the assessment.

IFQU-A1-01 I FPR 2010 This SR states: For each flood scenario, A review of the accident ADD to section 4.2 ...as a result of flooding. "It should REVIEW the accident sequences for the sequences and be noted that the accidents sequences defined in the associated plant-initiating event group to quantification results internal events model were used to quantify internal confirm applicability of the accident should be documented. flooding scenarios. Each scenario description identifies sequence model. If appropriate accident the existing initiating event to which it is mapped. No sequences do not exist, MODIFY sequences new sequences or fault tree models were required."

52 52

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

1

  • F&-::
  • ' *Peer I)escription
  • Poss:b......lu'o...lant F:: R :ecrpto Possible Resolution. 'Plant Response or Resolution as necessary to account for any unique Section 4.2.3.1 specifically discusses main steam and flood-induced scenarios and/or phenomena feed line breaks as being explicitly addressed in the in accordance with the applicable PRA. Add to end of Section 4.2.3.1 - "This scenario is requirements described in paragraph 4.5.2. not considered further because it is already modeled in the PRA."

IFQU-A5-01 I FPR 2010 No human failure event discussion is The documentation of No HFE discussion because no credit was taken for presented in the analysis. human failure events 'itigating operator actions. Added to Section 3.1.2, included in the analysis oaragraph 6 -at specific times are noted. "These times should be provided. are noted only to highlight the differences in time Additionally, the scenario )ressures between flood scenarios. No credit is taken specific impact on PSFs for operator actions that would mitigate any leak, should be documented in spray, or rupture. Subsequently, no human reliability the analysis. analysis was necessary."

Deleted - "Subsequently, human reliability analysis Nas applied in quantifying certain accident scenarios wvhen the early termination of the release is to be

-onsidered so as to estimate the probabilities that a release would not be terminated before certain lamage occurred."

Is for the HFEs from the internal events analysis, the documentation of the internal flooding HRA is ncluded in the calculation PTN-BFJR-11-010, Rev. 0, which is referenced in the internal flooding analysis

-alculation PTN-BFJR-11-009, Rev. 0.

IFQU-A7-01 I FPR 2010 This SR states: PERFORM internal flood The quantification process The quantification is discussed in Section 4.3 of sequence quantification in accordance with should either be :alculation PTN-BFJR-11-009, Rev. 0.

53

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

LRPeer Rso.t6.Repne Rslin F..&.O # veier Description Possible Resoeion Plantesponse or Resolution' the applicable requirements described in documented in the paragraph 4.5.8. flooding analysis, or if the same process has been used elsewhere, the flooding analysis should point to that process.

Additionally a review of the quantification should be documented.

IFSN-All-01 FPR 2010 This SR states: For multi-unit sites with While PTN may not be Dual-unit impacts are discussed where applicable in shared systems or structures, INCLUDE particularly vulnerable to individual flood scenarios. The effects of these are multi-unit scenarios, multi-unit impacts, such automatically accounted for because the Unit 3 and impacts need to be Unit 4 models are linked.

discussed in the documentation. If there are no shared systems or structures, this needs to be explicitly stated in the analysis.

IFSN-A16-01 FPR 2010 This SR provides the criteria under which Documentation should be As already mentioned in the response for IFQU-A5, no human mitigative actions can be credited. provided which details the credit is taken for mitigating actions. The times at human action being which various equipment fail in each scenario do not credited, and the basis for imply an end to the scenario.

why they are valid for the scenarios under which they are credited.

54

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

M6F&O4 Description Possible Resolution " Plant Response or Resolution

~ Review IFSN-A2-01 FPR 2010 No identification of flood alarms or floor PTN should document and See response for IFQU-A5 - No credit taken for drains has been made in the flood analysis dlentify the presence of operator action to mitigate flood; therefore, there document. flood alarms and floor was no need to credit flood alarms.

drains as related to their Lreatment in the analysis. Add to end of Section 3.1.3 - "In looking at flood propagation by backflow through shared drain lines, no credit was taken for check valves."

Drain lines were not credited in determining the impact of a flood in a particular room.

IFSN-A3-01 IFPR 2010 This SR states: for each defined flood area PTN should identify As already mentioned in the response for IFQU-A5-01, and each flood source, IDENTIFY those responses which have the no credit is taken for mitigative actions.

automatic or operator responses that have ability to terminate or the ability to terminate or contain the flood -ontain flood propagation, propagation. and provide a justification for the timing used in the analysis IFSN-A4-01 FPR 2010 No supporting information has been PTN should document the The flooding calculations were added to the notebook provided to justify the estimations zalculations performed in along with added discussion in Section 3.2.

regarding flood volumes and the determining flood volumes subsequent flooding height. n a given flood area as it relates to equipment in the room (the floor area the aquipment takes up), the

-apacity of the system, the ength of time the flood oersists, etc.

55

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

POeer .

F&O # R Description , , Possible Resolutions  : Plant Response or Resolution IFSN-A6-01 FPR 2010 This SR States: For the SSCs identified in IF- Analysis should be Added to section 3.1.2, paragraph 5 end - "In light of C2c, IDENTIFY the susceptibility of each SSC performed which includes this, it should be noted that only spray and in a flood area to flood-induced failure failure by submergence or submergence damage were included in the scope of mechanisms. spray, and a qualitative this evaluation."

INCLUDE failure by submergence and spray assessment of other failure in the identification process. mechanisms needs to be EITHER: provided (e.g. jet a) ASSESS qualitatively the impact of flood- impingement, pipe whip, induced mechanisms that are not formally humidity, condensation, addressed (e.g., using the mechanisms temperature concerns, and listed under Capability Category III of this any other identified failure requirement), by using conservative modes in the identification assumptions; OR process.) Note that the b) NOTE that these mechanisms are not qualitative assessment is a included in the scope of the evaluation, requirement of the NRC No discussion has been provided for the Clarification of this SR.

impact due to the additional flood failure mechanisms.

IFSN-A8-01 I FPR 2010 This SR states: IDENTIFY inter-area Documentation of less Appendix B includes this info already. Added to propagation through the normal flow path obvious possible Section 3.1.3 - "These pathways are listed in Appendix from one area to another via drain lines; propagation pathways B under the 'Drainage' section of each zone."

and areas connected via back flow through needs to be addressed.

drain lines involving failed check valves, pipe and cable penetrations (including cable trays), doors, stairwells, hatchways, and HVAC ducts. INCLUDE potential for structural failure (e.g., of doors or walls) due to flooding loads.

56 56

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

Peer A, lseoutonn or

&O#

  • " *#la iReview Description Possible Resolution Pint Response
  • *. . or.Resolution  : :i ... ::* :: :,:

IFSO-A1-01 FPR 2010 Based on a confirmatory walkdown It is recommended that the The chilled water system operates at very low performed the Peer Review Team, the analyst ensures that spacial pressure and the lines are insulated, precluding the locations/impacts of some pipes containing information be captured possibility of a spray. This information was added to water may have been overlooked in the appropriately for spray the scenario description.

analysis. concerns. Equipment has been identified in walkdown sheets for elevation, but not spatial location. Additionally the analyst should ensure that all potential fluid sources in a given flood area are identified, and all potentially impacted equipment is identified the impact of it failing is evaluated.

IFSO-A3-01 FPR 2010 No process by which screening was PTN should document As mentioned in IFPP-B1, no screening was performed is present in the analysis. justification for screening performed, all areas were considered.

particular flood areas from further analysis.

IFSO-A4-01 I FPR 2010 No human-induced mechanisms have been It is identified that tank ,s mentioned in Section 3.1.2, human-induced included in the analysis, and additionally, no Dverfills will relief to vents, mechanisms are already taken into account in the process which justifies their exclusion was drains or the waste general failure data.

provided. disposal system but it is recommended that specific nstances be discussed as it 57

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A" or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # eR 1Descito 'PossibleReslutio suins Pln Resonse or Resolution Review. cito relates specifically to operator induced failures.

Additionally, a process or program should be identified which prevents human-induced floods from occur, thereby

  • ustifying their exclusion from the analysis.

IFSO-A5-01 FPR 2010 No summary or characterization of flood Characterize flood sources The flooding calculations were added to the notebook sources included in the analysis has been in terms of capacity, flow along with added discussion in Section 3.2.

provided. It is difficult to tell what the rate, pressure, decisions making up the source temperature, etc.

characterization were. Additionally, document the ustification for a given flow rate. PTN should also document the process used to identify potential flood sources.

DA-D5-01 FPR 2013 For several CCF groups, a "global common Two alternatives. The Could not find guidance regarding adding ct5 to c6 to cause event" (as described at the end of missing CCF terms could be approximate the 5/6 combinations in INEL-94/0064, Section 4.2 of PTN-BFJR-2008-012, Rev. 0) is added to the CAFTA fault but it makes sense. Does the reviewer have a specific used. While this is a reasonable trees and CCF basic events reference (document and page number) for this?

simplification, the global common cause calculated for the new event needs to account for the common terms. A simpler cause combinations that are not included alternative is to revise the

explicitly. However, for several 6- calculation of the a6 term 58

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O#

t~~~I:i i*  : Review ue****=***:=

DPeer De scription rito  : * :*  !:=l*:;:, *. .. jPossible Resolution Plant Resiponse *':*iiior-Resolutioni*i~ ...

component groups (AFW AOVs FTO, AFW to include the missing a5 CVs FTO, AFW MOVs FTO), the 5-of-6 terr value. Thus, ax6' = a5 + a6.

was not included and the 6-of-6 term was This overestimates the a5 not adjusted. A similar issue appears to be contribution, since it is present for SG SVs FTO (4-component applied to the case where group), where only the 4-of-4 term is all 6 components fail, but included (the 2-of-4 and 3-of-4 terms are this should be a small and missing and the 4-of-4 term was not conservative adjusted). approximation. (Similar correction for the 4-component group, a4' ac2

+ 03 + a4).

. 2 M.1 3..........

......,. ::::

.::.................: :......................

. .=.==.. . . . .. . . . . . . . . . . .................

. . . . . . . . . . . .. . . . .. . . . . . ... - :::1,......

... ..- - .... .

........... . ....

: ! ::! ::!!

..... ...... .. .. ..........1 .;;

. ==::::

.,...,,:...-4:::

...........I .......

........

.............

I . ; .::.!!.

DA-D6-01 FPR 2013 The CCF notebook did not include a reviev vReview plant-specific This needs to be done to meet the Standard, but I of plant failure data for common cause component failure events don't expect to find any plant-specific CCFs.

events. from the most recent data update to identify any common cause failures. If CCFs are identified, verify that the CCF is modeled for the specific component and failure mode. if this data indicates a significantly larger fraction of failures are CCFs than the generic CCF parameters would predict, plant-specific CCF paramneters should be 59

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A" or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

.: &O ##.

F .e Review Description,"

D, ,s, l ." , .' I.. Possible Resolution R o ui. n plant Response orResolution' or

_ .__;, _ __._..._ _ _ __._.., _ _ _ _ _ _ .__ _ . *.. ... '..* .. ..... '. , ..

calculated. If the data is limited (one or two failures in a specific component group), this would not be sufficient evidence to Justify plant-specific CCF parameters.

DA-D6-02 FPR 2013 Section 3.0 of the CCF Notebook includes Provide a basis for CCFs are included for the components in the initiating the assumption that CCFs are not included excluding CCFs from event fault trees. For example, in the CCW system in fault tree initiating events with year-long system initiating events where 2/3 pumps are normally running, there are mission times due to excessive and include CCFs where a AND gates with a single FTR event of one of the conservatism in applying CCF factors that basis for exclusion cannot normally running pumps with an 8760-hour mission are developed for 24-hr mission time. be established. For time and CCF events for the other 2 running pumps However, this is not sufficient basis for example, include CCF in with mission times equal to the MTR of the pumps.

e.xcluding CCFs for fault tree IE models. system initiating event There is not a CCF for all 3 pumps with a mission time models only for active of 8760 hours0.101 days <br />2.433 hours <br />0.0145 weeks <br />0.00333 months <br />, nor should there be; all 3 pumps are components that are in the not normally running at the same time, and certainly same configuration (i.e., not for 8760 hours0.101 days <br />2.433 hours <br />0.0145 weeks <br />0.00333 months <br />.

between normally operating pumps in the same system but not between operating and standby pumps in the same system).

IE-C14-01 FPR 2013 *{RCP TBHX rupture probability - The IE Assess the tube rupture Will assess.

.frequency for tube rupture is based on a original source data and

....... .. Reference 5 value of 3.48E-08/hr (peer whether it is applicable to 60

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

... e. Decrpto . Possible Resolution Plant Response or Resolution review did not verify this reference) for "HX each thermal barrier Tube External Leak Large >50 gpm". This cooler/RCP. Revise initiator hourly frequency is multiplied by 8760hr/yr %ZZISLTBCCW and for an annual IE frequency of 3.05E-04/yr. document any changes or Depending on the application of the data, basis accordingly.

this IE frequency could be applied at each RCP, thus event tree top event "RCP TBHX Tubes Intact?" would be multiplied by a factor of 3. Applicability of the TBHX data to one or all RCPs should be examined/documented for impact on the total %ZZISLTBCCW initiator/results.

IE-C14-02 FPR 2013 Manual operator action is credited for local Evaluate and document The fact that the pressure increase in the CCW system manual closure of MOV-*-626 (should it fail whether the operator due to the TBHX tube rupture would be mitigated by

  • toclose) and/or to local closure of manual action should be credited the CCW surge tank expansion volume and the relief valve *-736. Operator success ensures that and remove credit for the valve RV-3/4-707 opening at 50 pisg are obviously the the CCW piping remains intact. Although action if it cannot be reason some credit is given to closing a valve to isolate the HEP for the local action is 0.5, the time ustified the leak. The time available for performing the window basis should document to ensure isolation will depend upon the size of the rupture as
  • that the operator has sufficient time to well as other factors. Need to find Westinghouse perform these actions before the CCW letter FPL 88-757. Since the HEP is already high at 0.5, piping boundary fails. this may be more trouble than it's worth.

IE-C14-03 FPR 2013 Thermal Barrier ISLOCA IE Frequency - RCP Evaluate and document the Will examine these penetrations for ISLOCA potential.

Thermal Barrier CCW Supply Penetration #3 TBCCW supply penetration

- This penetration is not evaluated for for possible ISLOCA potential ISLOCA contribution. This initiating events. Should

.... ........ ._._ penetration is protected by two normally also assess the impact on 61

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B"from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

F&O # Ri 4 Description Possi.bleeResolution Plant.Response or Resolution

_________i:*; Review Re ie  :: ..; ..  ; or ......

open, active check valves (717 and CCW return line from RCP 721A/B/C) inside containment and two motor cooling and lifting of:

normally open MOVs (716A/B) outside RV-729 if V-712A fails containment. The associated piping inside open. Ensure that these containment appears to be designed for full penetrations are, also RCS pressure. However, given a thermal identified in Table 1, list of barrier tube breach, the active check valves penetrations.

could fail to close (w/CCF). The active failure of the outboard MOVs (also w/CCF) may be highly unreliable due to low differential pressure design capability and lack of relevant closure signals, and there might not be sufficient time for manual action.

Failure of this penetration should be assessed for possible contribution to the TBCCW ISLOCA event frequency and sequences.

. . . .. . . . ...... . .... .. . .. . ..... . .. .. .. . . .. . . ... ........... , .... .... ... .. .. . . . . ... . .. . . ... .

IE-C14-04 I FPR 2013 ISLOCA assessment of Penetration 1 (RHR Evaluate and document the Good catch. Will be making this change.

SDC suction line) did not consider that the RHR small ISLOCA common suction piping beyond the RHR sequences taking no credit pumps could be affected by the over- for associated Unit HHSI pressurization event. This would impact the pumps and RWST.

function of the high head SI pumps and the RWST (and Containment Spray pumps, which are not important in ISLOCA scenarios). As a result, the current RHR small ISLOCA event sequences apply too much credit for the associated Unit's RWST 62

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

Ir Descrition Possible Resolution . Plant Res or-Resolution and HHSI pumps.

IE-C14-05 FPR 2013 Penetrations 58/59/60: (HHSI cold leg Review these penetrations I assume the issue here is that 3 closed check valves

'injection) - These penetrations are and provide further basis are not believed to be equivalent to 3 manually qualitatively screened from further detailed for screening. isolated manual valves. Still, the probability of 3

.evaluation on the basis that ....' the closed check valves opening against pressure is likely Combination of three check valves is to be adequately low for screening.

equivalent to three locked/closed isolation valves", for meeting NUREG/CR-5928 criterion (c), systems isolated by redundant

.normally closed and locked manual valves that are independently verified to be closed and locked before plant startup". This comment is also applicable to Penetration

18. Additional basis is needed to support this equivalency assertion for screening these penetrations.

IE-C14-06 FPR 2013 Suggestion. Consider updating the Will likely update the ISLOCA model with the benefit ISLOCA evaluation to of the latest guidance when resources permit.

The PTN ISLOCA analysis isbased on early current industry practice NUREG information and industry practice, and reference material. It which continue to provide a reasonable is noted that there are source of inputs/practice for consideration limitations in the WCAP-in ISLOCA modeling. In general however, the evaluation might benefit from aspects 17154, Revision 1 methodology and its Df the latest industry ISLOCA best practice/methodology presented in WCAP-complete adoption is not recommended.

17154, Rev.l.

63

Enclosure - PeerReview Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

    • Review"
P e i*: ". ..  :::.:.. * ** i! "*::* !.-'"*  : ":" ' ... =::* ' " '*; **;'. : .. *** :*"... ";*** : .:.....:!. :.*.... ** ::'
i*....

F #Description 0os ibile'Resolutlatioposeo Resolution~

IE-C14-07 FPR 2013 !Suggestion. Consider updating the DK.

ISLOCA report to improve Table 1 "Potential ISLOCA Flow Paths" -

the details in Table 1, Consider adding more detail in the ISL primarily the column Screening Results column. For example, information under "ISL Penetrations 13 and 14 (Letdown and Screening Results" Charging) may not cleanly screen. Both systems interface with low pressure systems (letdown-purification piping and charging-pump suction). Typically there are redundant isolation means to isolate - thus IEfrequency should be low. However, this cannot be concluded from the table details.

Also, Penetration 3, "RCP CCW Supply" indicates that this penetration was screened based on "not connected to the RCS". However, this penetration provides the CCW supply to RCP thermal barrier cooling and should be assessed (refer to F&O IE-C14-2).

LE -D2 -01 FPR 2013 Electrical penetration assembly failure Perform a scoping For containment isolation, the Level 2 update modes have been found to be important assessment of the incorporated the existing containment isolation contributors to overall containment fragility potential impact of analysis; it did not revisit this issue directly. As for at other large dry PWRs, and in at least 2 electrical penetration containment strength, this was also something that instances, tend to be the most limiting in thermal-mechanical was provided and was not re-investigated, so would terms of ultimate failure pressure. response to severe not have affected the analysis directly. The place in Additionally, early studies at Sandia accidents. Consider using the Level 2 model where this would have an effect National Laboratories have considered the some of the following would be the "Containment Failure at Vessel Breach" potential impact of very high (beyond references: NUREG/CR- events, which were determined via NUREG sources to 64

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

  1. RF&O Reew '

Descrijption " PosibleRsolution . Plant Response or Resolution design basis) temperatures on elastomer 4944, CR-5083, CR-5096, be minimal. It is not known whether these referenced seals (this latter issue is more critical for CR-5118, and CR-5334. NUREGs already factored such considerations into small volume containments such as BWR their containment strength estimates and failure Mark I). probabilities, but it is not expected to have a significant effect.

LE-F1-01 FPR 2013 Endstate frequency totals are given in Table Perform summary Will add to update calculations.

5 of the Level 2 notebook, PTN-BJFR calculation to quantify PDS

)10, Rev. 1, and results by release category relative contribution to are given in Table 6. However, results using LERF.

the Plant Damage State definitions of Section 4.2 are not provided. CC II is not met because relative contribution to LERF by PDS is not shown, although information is available to provide such data.

. ....

........... . ..

.......... ...

.......

...

..........

...

......

.....

..

............

...

.. ....

.....

................

... ................

. ..

....

..

............

..

LE-G5-01 FPR 2013 There is no discussion of limitations of Provide a discussion of Will add discussion.

severe accident understanding and possible limitations of the modeling. This includes such matters as the LERF analysis based on, for impact of uncertainty regarding thermally example, limitations on the induced SGTR on quantification, the state of severe accident uncertainty of ISLOCA break size and understanding and level 2 location on timing and source term, and the PRA analysis. Briefly assignment of CET to endstates. describe how key Conservative treatment of some uncertainties in the LERF phenomena can affect LERF quantification, quantification could impact vhich in turn impacts LERF and delta LERF risk-informed changes to results when applying RG 1.174 guidelines the licensing basis under n risk-informed changes to the licensing RG 1.174, for example.

65

Enclosure - Peer Review Findings This table summarizes facts and observations with significance ranking "A"or "B" from the 2002 global peer review and the findings from the 2010 and 2013 focused peer reviews.

isis, for example.

66

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 3 Attachment 3 Turkey Point Nuclear Plant License Amendment Request No. LAR-229 Technical Specifications Marked-Up Pages This coversheet plus 105 pages.

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 3 Turkey Point Nuclear Plant Units 3 and 4 Technical Specifications Marked-Up Pages List of Affected Pages 3/4 1-1 3/4 2-6 3/4 3-34 3/4 4-20 3/4 6-7 3/4 7-12 3/4 8-23 3/41-2 3/42-7 3/43-38 3/44-25 3/46-11 3/47-13 3/49-1 3/4 1-4 3/4 2-8 3/4 3-39 3/4 4-28 3/4 6-12 3/4 7-14 3/4 9-2 3/4 1-8 3/42-12 3/4 3-40 3/44-37 3/46-13 3/47-15 3/49-8 3/4 1-10 3/4 2-15 3/4 3-46 3/4 4-39 3/4 6-14 3/4 7-16b 3/4 9-9 3/41-12 3/42-16 3/43-49 3/45-1 3/46-15 3/47-17 3/4 9-12 3/4 1-15 3/43-8 3/44-1 3/45-2 3/46-18 3/47-22 3/49-15 3/41-18 3/43-9 3/44-2 3/45-5 3/47-3 3/4 8-4a 3/410-3 3/4 1-21 3/4 3-10 3/4 4-4 3/4 5-7 3/4 7-4 3/4 8-5 6-18c 3/4 1-22 3/4 3-31a 3/4 4-5 3/4 5-8 3/4 7-7 3/4 8-6 3/4 1-23 3/4 3-32 3/4 4-6 3/4 5-10 3/4 7-9 3/4 8-9 3/4 1-24 3/4 3-32a 3/4 4-9 3/4 6-1 3/4 7-11 3/4 8-14 3/4 1-26 3/4 3-33 3/4 4-10a 3/4 6-5 3/4 7-11 a 3/4 8-15 3/4 2-2 3/4 3-33a 3/4 4-18 3/4 6-6 3/4 7-1 lb 3/4 8-20 List of Pages for Information Only 3/4 3-1 3/4 3-47 3/4 8-7 3/43-13 3/44-23 3/48-8 3/4 3-35 3/4 4-26 3/4 3-41 3/4 7-8

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 3 Insert I Note that Insert 1 capitalization and punctuation is varied based on the use in each specific surveillance requirement.

In accordance with the Surveillance Frequency Control Program.

Insert 2

1. Surveillance Frequency Control Program This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operations are met:
a. The Surveillance Frequency Control Program shall contain a list of frequencies of those Surveillance Requirements for which the frequency is controlled by the program.
b. Changes to the frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Method for Control of Surveillance Frequencies," Revision 1.
c. The provisions of Surveillance Requirements 4.0.2 and 4.0.3 are applicable to the frequencies established in the Surveillance Frequency Control Program.

3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 BORATION CONTROL SHUTDOWN MARGIN - Ta, 9 GREATER THAN 200°F LIMITING CONDITION FOR OPERATION 3.1.1.1 The SHUTDOWN MARGIN shall be within the limits specified in the COLR.

APPLICABILITY: MODES 1, 2*, 3, and 4.

ACTION:

With the SHUTDOWN MARGIN not within limits, immediately initiate and continue boration at greater than or equal to 16 gpm of a solution containing greater than or equal to 3.0 wt% (5245 ppm) boron or equivalent until the required SHUTDOWN MARGIN is restored.

SURVEILLANCE REQUIREMENTS 4.1.1.1.1 The SHUTDOWN MARGIN shall be determined to be within the limits specified in the COLR:

a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after detection of an inoperable control rod(s) and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the rod(s) is inoperable. If the inoperable control rod is immovable or untrippable, the above required SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s);
b. When in MODE 1 or MODE 2 with Ke, greater than or equal to 1 at least cncc per 12 hc.rs by verifying that control bank withdrawal is within the limits of Specification 3.1.3.6;
c. When in MODE 2 with Ke, less than 1, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving reactor criticality by verifying that the predicted critical control rod position is within the limits of Specification 3.1.3.
d. Prior to initial operation above 5% RATED THERMAL POWER after each fuel loading, by consideration of the factors of Specification 4.1.1.1 .le. below, with the control banks at the maximum insertion limit of Specification 3.1.3.6; and
  • See Special Test Exceptions Specification 3.10.1. Insert 1 TURKEY POINT - UNITS 3 & 4 3/4 1-1 AMENDMENT NOS. 24:F AND 24 REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
e. W he in M O DE 3 or 4, at least r,n , pe 24r .....by consideration of the following factors:
1) Reactor Coolant System boron concentration, In acco 3rdance with the Surveil lance 2) Control rod position,

.rcy Control Freque Progra m, when 3) Reactor Coolant System average temperature, Insert 1

4) Fuel burnup based on gross thermal energy generation,
5) Xenon concentration, and
6) Samarium concentration.

4.1.1.1.2 When in Mode 1 or 2, the overall core reactivity balance shall be com ped to predicted values to demonstrate agreement within +/- 1% Ak/k at-least o ,*ce per 31 Effectiv Full ,owerDays (EFPrD). This comparison shall consider at least those factors stated in Specification 4.1.1.1.1e, above. The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 EFPD after each fuel loading.

TURKEY POINT - UNITS 3 & 4 3/41!-2 AMENDMENT NOS. "-7-AND +

REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN - Taog LESS THAN OR EQUAL TO 200°F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be within the limit specified in the COLR.

APPLICABILITY: MODE 5.

ACTION:

With the SHUTDOWN MARGIN not within limits, immediately initiate and continue boration at greater than or equal to 16 gpm of a solution containing greater than or equal to 3.0 wt% (5245 ppm) boron or equivalent until the required SHUTDOWN MARGIN is restored.

SURVEILLANCE REQUIREMENTS 4.1.1.2 The SHUTDOWN MARGIN shall be determined to be within the limit specified in the COLR:

a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after detection of an inoperable control rod(s) and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the rod(s) is inoperable. If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s); and
b. At lea s'.. pcr 24 huFr by consideration of the following factors:
1) Reactor Coolant System boron concentration,

ýInsert 1 2) Control rod position,

3) Reactor Coolant System average temperature,
4) Fuel burnup based on gross thermal energy generation,
5) Xenon concentration, and
6) Samarium concentration.

TURKEY POINT - UNITS 3 & 4 3/4 1-4 AMENDMENT NOS. -24 AND 24-+

REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATH - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.1 As a minimum, one of the following boron injection flow paths shall be OPERABLE and capable of being powered from an OPERABLE emergency power source:

a. A flow path from the boric acid storage tanks via a boric acid transfer pump and a charging pump to the Reactor Coolant System ifthe boric acid storage tank in Specification 3.1.2.4a. is OPERABLE, or
b. The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if the refueling water storage tank in Specification 3.1.2.4b. is OPERABLE.

APPLICABILITY: MODES 5 and 6.

ACTION:

With none of the above flow paths OPERABLE or capable of being powered from an OPERABLE emergency power source, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.

SURVEILLANCE REQUIREMENTS 4.1.2.1 At least one of the above required flow paths shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that the temperature of the rooms containing flow path components is greater than or equal to 62°F when a flow path from the boric acid tanks is used,$<

[Insert 1 and

b. t least onee pe 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

TURKEY POINT - UNITS 3 & 4 3/4 1-8 AMENDMENT NOS. ,49-AND 245

REACTIVITY CONTROL SYSTEMS SURVEI LLANCE REQUIREMENTS 4.1.2.2 The above required flow paths shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that the temperature of the rooms containing flow path rt 1
  • components is greater than or equal to 62 0F when a flow path from the boric acid tanks is used;
b. by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position;
c. At Icast once pcr 18 ,mcnth by verifying that the flow path required by Specification 3.1.2.2a.

and c. delivers at least 16 gpm to the RCS.

TURKEY POINT - UNITS 3 &4 3/4 1-10 AMENDMENT NOS. 249-AND245-

REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCE - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.4 As a minimum, one of the following borated water sources shall be OPERABLE:

a. A Boric Acid Storage System with:
1) A minimum indicated borated water volume of 2,900 gallons per unit,
2) A boron concentration between 3.0 wt% (5245 ppm) and 4.0 wt.% (6993 ppm), and
3) A minimum boric acid tanks room temperature of 62 0 F.
b. The refueling water storage tank (RWST) with:
1) A minimum indicated borated water volume of 20,000 gallons,
2) A boron concentration between 2400 ppm and 2600 ppm, and
3) A minimum solution temperature of 39 0 F.

APPLICABILITY: MODES 5 and 6.

ACTION:

With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.

SURVEI LLANCE REQUIREMENTS 4.1.2.4 The above required borated water source shall be demonstrated OPERABLE:

a. Atleast u. ce pef 7 days by:
1) Verifying the boron concentration of the water, Insert 1 2) Verifying the indicated borated water volume, and
3) Verifying that the temperature of the boric acid tanks room is greater than or equal to 62 0 F, when it is the source of borated water.

TURKEY POINT - UNITS 3 &4 3/4 1-12 AMENDMENT NOS. 249-AND 2 REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.2.5 Each borated water source shall be demonstrated OPERABLE:

a. .t 8aGct cncz par 7 days by:

1 Verifying the boron concentration in the water, Insert 1 2) Verifying the indicated borated water volume of the water source, and

3) Verifying that the temperature of the boric acid tanks room is greater than or equal to 62 0 F, when it is the source of borated water.
b. By verifying the RWST temperature is within limits whenever the outside air temperature is less than 39 0 F or greater than 100°F at the following frequencies:
1) Within one hour upon the outside temperature exceeding its limit for 23 consecutive hours, and
2) At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while the outside temperature exceeds its limits.

TURKEY POINT - UNITS 3 & 4 3/4 1-15 AMENDMENT NOS. 24-9 AND 24-a

REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

d. With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the Allowed Rod Misalignment of Specification 3.1.3.1, POWER OPERATION may continue provided that within one hour either:
1. The rod is restored to OPERABLE status within the Allowed Rod Misalignment of Specification 3.1.3.1, or
2. The remainder of the rods in the bank with the inoperable rod are aligned to within the Allowed Rod Misalignment of Specification 3.1.3.1 of the inoperable rod while maintaining the rod sequence and insertion limits of Specification 3.1.3.6; the THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.6 during subsequent operation, or
3. The rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:

a) The THERMAL POWER level is reduced to less than or equal to 75% of RATED THERMAL POWER within one hour and within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the power range neutron flux high trip setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER. THERMAL POWER shall be maintained less than or equal to 75% of RATED THERMAL POWER until compliance with ACTIONS 3.1.3.1.d.3.c and 3.1.3.1.d.3.d below are demonstrated, and b) The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and c) A power distribution map is obtained from the movable incore detectors and F0 (Z) and FNAH are verified to be within their limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and d) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions.

SURVEILLANCE REQUIREMENTS 4.1.3.1.1 The position of each full length rod shall be determined to be within the Allowed Rod Misalignment of .. 1 the group step counter demand position at lept encc pcr 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (allowing for one hour thermal soak after rod motion) except during time intervals when Rod Position Deviation Monitor is inoperable, then verify the group positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4.1.3.1.2 Each full length rod no Ily inserted in the core shall be determined to be OPERABLE by movement of at least 10 steps in any one di ction at leact onco por92 day,.

TURKEY POINT - UNITS 3 & 4 3/4 1-18 AMENDMENT NOS. ,38AND 2 REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.3.2.1 Each analog rod position indicator shall be determined to be OPERABLE by verifying that the Demand Position Indication System and the Analog Rod Position Indication System agree within the Allowed Rod Misalignment of Specification 3.1.3.1 (allowing for one hour thermal soak after rod motion) at ec.- nc F 12 4*elffi except during time intervals when the Rod Position Deviation Monitor is inoperable, then co pare the Demand Position Indication System and the Analog Rod Position Indication System at least once r 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4.1.3.2.2 Each of the above required analog rod position indicator(s) shall be determined to be OP RABLE by performance of a CHANNEL CHECK, CHANNEL CALIBRATION and ANALOG CHANNEL OP TIONAL TEST performed in accordance with Table 4.1-1.

Ilnsert 1 TURKEY POINT - UNITS 3 & 4 3/4 1-21 AMENDMENT NOS. 2 AND-&

Replace each marked through Surveillance Frequency with "SFCP".

TABLE 4.1-1 ROD POSITION INDICATOR SURVEILLANCE REQUIREMENTS Functional Unit Check Calibration Operational Test Individual Rod Position -S--- .-4R-Demand Position N/A ----R--

TURKEY POINT - UNITS 3 & 4 3/4 1-22 AMENDMENT NOS. t4-AND 4-32

REACTIVITY CONTROL SYSTEMS POSITION INDICATION SYSTEM - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.3 The group step counter demand position indicator shall be OPERABLE and capable of determining within

+/- 2 steps the demand position for each shutdown and control rod not fully inserted.

APPLICABILITY: MODES 3* **, 4* **, and 5* **

ACTION:

With less than the above required group step counter demand position indicator(s) OPERABLE, open the reactor trip system breakers.

SURVEILLANCE REQUIREMENTS 4.1.3.3.1 Each of the above required group step counter demand position indicator(s) shall be determined to be OPERABLE by movement of the associated control rod at least 10 steps in any one direction p 31

-4ays. lInsert 1 4.1.3.3.2 OPERABILITY of the group step counter demand position indicator shall be verified in accordance with--L Table 4.1-1.

  • With the Reactor Trip System breakers in the closed position.
    • See Special Test Exceptions Specification 3.10.5. "X-TURKEY POINT - UNITS 3 &4 3/4 1-23 AMENDMENT NOS. 4-49 AND 444-

REACTIVITY CONTROL SYSTEMS ROD DROP TIME LIMITING CONDITION FOR OPERATION 3.1.3.4 The individual full-length (shutdown and control) rod drop time from the fully withdrawn position shall be less than or equal to 2.4 seconds from beginning of decay of stationary gripper coil voltage to dashpot entry with:

a. Tavg greater than or equal to 500 0 F, and
b. All reactor coolant pumps operating.

APPLICABILITY: MODES 1 and 2.

ACTION:

With the drop time of any full-length rod determined to exceed the above limit, restore the rod drop time to within the above limit prior to proceeding to MODE 1 or 2.

SURVEILLANCE REQUIREMENTS 4.1.3.4 The rod drop time of full-length rods shall be demonstrated through measurement prior to reactor criticality:

a. For all rods following each removal of the reactor vessel head,
b. For specifically affected individual rods following any maintenance on or modification to the Control Rod Drive System which could affect the drop time of those specific rods, and C. At easten-eieepeF 18-iei s.

linsert TURKEY POINT - UNITS 3 & 4 3/41!-24 AMENDMENT NOS. 244-AND 2f8-

REACTIVITY CONTROL SYSTEMS CONTROL ROD INSERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.6 The control banks shall be limited in physical insertion specified in the Rod Bank Insertion Limits curve, defined in the CORE OPERATING LIMITS REPORT.

APPLICABILITY: MODES 1* and 2***

ACTION:

With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2 either:

a. Restore the control banks to within the limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or
b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position specified in the Rod Bank Insertion Limits curve, defined in the CORE OPERATING LIMITS REPORT, or
c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.3.6 The position of each control bank shall be determined to be within the insertion limits

--hours, except during time intervals when the Rod Insertion Limit Monitor is inoperable, then v individual rod positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

  • See Special Test Exceptions Specifications 3.10.2 and 3.10.3.
    • With Ke, greater than or equal to 1.0 TURKEY POINT - UNITS 3 & 4 3/4 !-26 AMENDMENT NOS. 2-3&AND 23-

POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS 4.2.1.1 The indicated AFD shall be determined to be within its limits during POWER OPERATION above 50% ofiK RATED THERMAL POWER by: +

a. Monitoring the indicated AFD for each OPERABLE excore channel:
1) ' once per. days when the alarm used to monitor the AFD is OPERABLE, and

'2) At least once per hour for the first 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after restoring the alarm used to monitor the AFD to OPERABLE status.*

b. Monitoring and logging the indicated AFD for each OPERABLE excore channel at leastenee per-hour for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 30 minutes thereafter, when the alarm used to monitor the AFD is inoperable. The logged values of the indicated AFD shall be assumed to exist during the interval preceding each logging. '1<

4.2.1. The target flux difference of each OPERABLE excore channel shall be determined by measurement at-least u,,*. per 92 Effectve Full Pwer, Days. The provisions of Specification 4.0.4 are not applicable.

4.2.1.3 fhe target flux difference shall be updated at ,east enee per 31 Effetive Full Pwer Day& by either determi g the target flux difference pursuant to Specification 4.2.1.2 above or by linear interpolation between the mo recently measured value and the predicted value at the end of the cycle life. The provisions of Specifi ation 4.0.4 are not applicable.

In accordance with the Surveillance Frequency Control Program, the

  • Performance of a functional test to demonstrate OPERABILITY of the alarm used to monitor the AFD may be substituted for this requirement.

TURKEY POINT - UNITS 3 & 4 3/4 2-2 AMENDMENT NOS. 156 and +5-

POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS 4.2.2.1 If [FQ]P as predicted by approved physics calculations is greater than [FQ]L and P is greater than PT* as defined in 4.2.2.2, FQ(Z) shall be evaluated by MIDS (Specification 4.2.2.2), BASE LOAD (Specification 4.2.2.3) or RADIAL BURNDOWN (Specification 4.2.2.4) to determine if FQ is within its limit [FQ]P = Predicted FQ).

If [FQ]P, is less than [FO]L or P is less than PT, FQ(Z) shall be evaluated to determine if FQ(Z) is within its limit as follows:

a. Using the movable incore detectors to obtain power distribution map at any THERMAL POWER greater than 5% of RATED THERMAL POWER.
b. Increasing the measured FQ(Z) component of the power distribution map by 3% to account for manufacturing tolerances and further increasing the value by 5% to account for measurement uncertainties. Verifying that the requirements of Specification 3.2.2 are satisfied.

M L

c. FQ(Z)< FQ(Z)

Where F Q (Z) is the measured FQ(Z) increased by the allowance for manufacturing tolerances L

and measurement uncertainty and F Q (Z) is the FQ limit defined in 3.2.2.

d. Measuring F Q (Z) according to the following schedule:
1. Prior to exceeding 75% of RATED THERMAL POWER,** after refueling,
2. pe. I -,e.he FLAT 09M Va.
e. With the relationship specified in Specification 4.2.2.1.c above not being satisfied:
1) Calculate
1) the Clcuatethe percent ercnt F Q(Z)excedsits (Z) exceeds its limit imi bythefollowing by thefo expression:

[F EQ1 M X100forP>_0.5

[FQ]L X K(Z)/P F- (Z) 1 X100forP < 0.5

[FQ]L X K(Z)/0.5

  • PT = Reactor power level at which predicted F0 would exceed its limit.
    • During power escalation at the beginning of each cycle, power level may be increased until a power level for extended operation has been achieved and power distribution map obtained.

TURKEY POINT - UNITS 3 &4 3/4 2-6 AMENDMENT NOS. 4-37-and +8-

POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS (Continued'

2) The following action shall be taken:

a) Comply with the requirements of Specification 3.2.2 for FM (Z) exceeding its limit by the percent calculated above.

4.2.2.2 MIDS Operation is permitted at power above PT where PT equals the ratio of [FQ]L divided by [FQ]P if the following Augmented Surveillance (Movable Incore Detection System, MIDS) requirements are satisfied:

a. The axial power distribution shall be measured by MIDS when required such that the limit of [FQ]L/P times K(Z) is not exceeded. FJ(Z) is the normalized axial power distribution from thimble j at core elevation (Z).
1) If Fj(Z) exceeds [Fj(Z)]s* as defined in the bases by _<4%, immediately reduce thermal power one percent for every percent by which [Fj(Z)], is exceeded.
2) If F1(Z) exceeds [Fj(Z)]s by > 4% immediately reduce thermal power below PT.

Corrective action to reduce Fj(Z) below the limit will permit return to thermal power not to exceed current PL** as defined in the bases.

b. Fj(Z) shall be determined to be within limits by using MIDS to monitor the thimbles Insert 1 required per Specification 4.2.2.2.c at the following frequencies.
1. ,and
2. Immediately following and as a minimum at 2, 4 and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> following the events listed below and every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter.
1) Raising the thermal power above PT, or
2) Movement of control-bank D more than an accumulated total of 15 steps in any one direction.
c. MIDS shall be operable when the thermal power exceeds PT with:
1) At least two thimbles available for which Rj and aj as defined in the bases have been determined.

[Fj(Z)]s is the alarm setpoint for MIDS.

    • PL is reactor thermal power expressed as a fraction of the Rated Thermal Power that is used to calculate

[Fj(Z)]s.

TURKEY POINT - UNITS 3 &4 3/4 2-7 AMENDMENT NOS. +8 and 47-2

POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS (Continued)

2. At least two movable detectors available for mapping Fj(Z).
3. The continued accuracy and representativeness of the selected thimbles shall be verified by using the most recent flux map to update the R for each selected thimble. The flux map must be updated at least o... per 31 full pcwcr days.

.ff..tiv.

where:

  • linsert 1 R= Total peaking factor from a full flux map ratioed to the axial peaking factor in a selected thimble.

j The thimble location selected for monitoring.

4.2.2.3 Base Load Base Load operation is permitted at powers above PT if the following requirements are satisfied:

a. Either of the following preconditions for Base Load operation must be satisfied.
1. For entering Base Load operation with power less than PT, a) Maintain THERMAL POWER between PT/1.05 and PT for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b) Maintain the AFD (Delta-I) to within a +/- 2% or +/- 3% target band for at least 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> per 24-hour period.

M c) After 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> have elapsed, take a full core flux map to determine FQ (Z) unless a valid full core flux map was taken within the time period specified in 4.2.2.1d.

d) Calculate PBL per 4.2.2.3b.

2. For entering Base Load operation with power greater than PT, a) Maintain THERMAL POWER between PT and the power limit determined in 4.2.2.2 for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and maintain Augmented Surveillance requirements of 4.2.2.2 during this period.

b) Maintain the AFD (Delta-I) to within a +/- 2% or +/- 3% target band for at least 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> per 24-hour period, TURKEY POINT - UNITS 3 & 4 3/4 2-8 AMENDMENT NOS. 4-3-7 and -+3-2

POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS 4.2.3.1 The provisions of Specification 4.0.4 are not applicable.

4.2.3.2 When a measurement of FN is taken, the measured FN shall be increased by 4% to account for AH H measurement error. '

4.2.3.3 This corrected FN shall be determined to be within its limit through incore flux mapping:

AH

a. Prior to operation above 75% of RATED THERMAL POWER after each fuel loading, and
b. At 'east enc poe3 E-ffeetive-Full Poewer Days.

TURKEY POINT - UNITS 3 & 4 3/,M 2-12 AMENDMENT NOS. +3-7-and 42-

POWER DISTRIBUTION LIMITS LIMITING CONDITION FOR OPERATION (Continued)

ACTION (Continued)

2. Reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and reduce the Power Range Neutron Flux-High Trip Setpoints to less than or equal to 55% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; and
3. Identify and correct the cause of the out-of -limit condition prior to increasing THERMAL POWER; subsequent POWER OPERATION above 50% of RATED THERMAL POWER may proceed provided that the QUADRANT POWER TILT RATIO is verified within its limit at least once per hour for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or until verified at 95% or greater RATED THERMAL POWER.
d. The provisions of Specifications 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.2.4.1 The QUADRANT POWER TILT RATIO shall be determined to be within the limit above 50% of RATED THERMAL POWER-by: sert 1

a. Ceeulatei,, the ratio at lcast 3,'ZZ per 7 days when the Power Range Upper Detector Hig.Flux Deviation and Power Range Lower Detector High Flux Deviation Alarms are OPERABLE, and the ratio at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during steady-state operation when either alarm is

/ ~~~~inoperaoe "'""-- B acltn Z 4.2.4.2 The QUADRANT POWER TILT RATIO shall be determined to be within the limit when above 75% of RATED THERMAL POWER with one Power Range channel inoperable by using the movable incore detectors to confirm that the normalized symmetric power distribution, obtained either from two sets of four symmetric thimble locations or full-core flux map, or by incore thermocouple map is consistent with the indicated QUADRANT POWER TILT RATIO at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.2.4.3 If the QUADRANT POWER TILT RATIO is not within its limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the POWER DISTRIBUTION LIMITS of 3.2.2 and 3.2.3 are within their limits, a Special Report in accordance with 6.9.2 shall be submitted within 30 days including an evaluation of the cause of the discrepancy.

In accordance with the Surveillance Frequency Control Program by calculating TURKEY POINT - UNITS 3 & 4 3/4 2-15 AMENDMENT NOS. 447 and 4-32

POWER DISTRIBUTION LIMITS 3/4.2.5 DNB PARAMETERS LIMITING CONDITION FOR OPERATION 3.2.5 The following DNB-related parameters shall be maintained within the following limits:

a. Reactor Coolant System Tavg is less than or equal to the limit specified in the COLR
b. Pressurizer Pressure is greater than or equal to the limit specified in the COLR*, and
c. Reactor Coolant System Flow >_270,000 gpm APPLICABILITY: MODE 1.

ACTION:

With any of the above parameters exceeding its limit, restore the parameter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less then 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.5.1 Reactor Coolant System Tavg and Pressurizer Pressure shall be verified to be within their limits encc per 12 hurGs.

  • /
  • lnsert 1 4.2.5.2 RCS flow rate shall be monitored for degradation at least encc pcr ,

4.2.5.3 The RCS flow rate indicators shall be subjected to a CHANNEL C TION 4.2.5.4 After each fuel loading, and atle 40" h1mths, the RCS flow rate shall be determined by precision heat balance after exceeding 90% RATED THERMAL POWER. The measurement instrumentation shall be calibrated within 90 days prior to the performance of the calorimetric flow measurement. The provisions of 4.0.4 are not applicable for performing the precision heat balance flow measurement.

  • Limit not applicable during either a THERMAL POWER ramp in excess of 5% of RATED THERMAL POWER per minute or a THERMAL POWER step in excess of 10% of RATED THERMAL POWER.

TURKEY POINT - UNITS 3 & 4 3/4 2-16 AMENDMENT NOS. 249 and 245

No changes this page, 3/4.3 INSTRUMENTATION For information only I 3/4.3.1 REACTOR TRIP SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1 As a minimum, the Reactor Trip System instrumentation channels and interlocks of Table 3.3-1 shall be OPERABLE.

APPLICABILITY: As shown in Table 3.3-1.

ACTION:

As shown in Table 3.3-1.

SURVEILLANCE REQUIREMENTS 4.3.1.1 Each Reactor Trip System instrumentation channel and interlock and the automatic trip logic shall be demonstrated OPERABLE by the performance of the Reactor Trip System Instrumentation Surveillance Requirement specified in Table 4.3-1.

TURKEY POINT - UNITS 3 & 4 3/4 3-1 AMENDMENT NOS. 178 AND 172

Replace each marked through Surveillance Frequency with "SFCP".

TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS m

TRIP 0

ANALOG ACTUATING MODES FOR

-H CHANNEL DEVICE WHICH CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE C:

FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST IS REQUIRED 90 1. Manual Reactor Trip N.A. N.A. N.A. "R*11) N.A.

.A. 1, 2, 3*, 4*, 5*

2. Power Range, Neutron Flux a, High Setpoint "E4,2, 4), N.A. N.A. 1,2

'*3, 4),

V44, 6),(a), (b)

,(4)(a), (b) b, Low Setpoint X(4) S/U(1) N.A. N.A. 1"**, 2 1 **, 2

3. Intermediate Range, N4) S/U(1) N.A. N.A.

Neutron Flux co S/U(1), k(g)

4. Source Range, Neutron Flux ý(4) N.A. N.A. 2**,3, 4, 5
  • (a), (b) "(a), (b)
5. Overtemperature AT N.A. N.A. 1,2 (b) V ), (b)
6. Overpower AT N.A. N.A. 1,2
7. Pressurizer Pressure--Low K-. N.A. N.A. 1 m

z

8. Pressurizer Pressure--High "K, N.A. N.A. 1,2
9. Pressurizer Water Level--High N.A. N.A. 1
10. Reactor Coolant Flow--Low \*, (b)

N.A. N.A. 1 m

z \,a(b) ), (b) z 11. Steam Generator Water Level-- N.A. N.A. 1,2 0 Low-Low C/)

z

Replace each marked through H

Surveillance Frequency with "SFCP".

TABLE 4.3-1 m REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS 0 TRIP ANALOG ACTUATING MODES FOR CHANNEL DEVICE WHICH

-N C CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST IS REQUIRED C,, 12. Steam Generator Water

'_s. 'a), (b) -,G<, (b)

N.A. N.A. 1,2 Level--Low Coincident with Steam/Feedwater Flow Mismatch

13. Undervoltage- 4.16 kV N.A. N.A. N.A. N.A.

Busses A and B

14. Underfrequency - Trip of N.A. N.A. N.A. N.A.

Reactor Coolant Pump Breakers(s) Open

15. Turbine Trip 1
a. Emergency Trip Header N.A. a), (b)

N.A. S/U(1, 10) N.A.

Pressure 1

b. Turbine Stop Valve N.A. N.A. S/U(1, 10) N.A.

Closure

16. Safety Injection Input from ESF N.A. N.A. N.A. N.A. 1,2
17. Reactor Trip System Interlocks
a. Intermediate Range Neutron Flux, P-6 N.A. 'X~4) N.A. N.A.
b. Low Power Reactor Trips Block, P-7 N.A. -P4,4) N.A. N.A. 1 (includes P-10 input and Turbine Inlet Pressure)
c. Power Range Neutron Flux, P-8 N.A. X(4) N.A. N.A.

Replace each marked through Surveillance Frequency with "SFCP".

-- TABLE 4.3-1 C

U REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS m

TRIP 0

ANALOG ACTUATING MODES FOR z

CHANNEL DEVICE WHICH CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE C-z FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST IS REQUIRED

--i C/)

17. Reactor Trip System Interlocks (Continued)

QO

d. Power Range Neutron Flux, P-10 N.A. X(4) N.A. N.A. 1,2
18. Reactor Coolant Pump N.A. N.A. N.A. N.A. 1 Breaker Position Trip
19. Reactor Trip Breaker N.A. N.A. N.A. X(7, 11) N.A. 1, 2, 3*, 4*, 5*

O~

20. Automatic Trip and Inter-lock Logic N.A. N.A. N.A. N.A. 'X(,14) 1, 2, 3*, 4*, 5*
21. Reactor Trip Bypass Breaker N.A. N.A. N.A. X013), X05) N.A. 1,2, 3*, 4*, 5*

m z

m z

-H z

0 z

No changes this page, INSTRUMENTATION For information only 1 3/4.3.2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2 The Engineered Safety Feature Actuation System (ESFAS) instrumentation channels and interlocks shown in Table 3.3-2 shall be OPERABLE with their Trip Setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3-3.

APPLICABILITY: As shown in Table 3.3-2.

ACTION:

a. With an ESFAS Instrumentation or Interlock Trip Setpoint less conservative than the value shown in the Trip Setpoint column but more conservative than the value shown in the Allowable Value column of Table 3.3-3, adjust the Setpoint consistent with the Trip Setpoint value within permissible calibration tolerance.
b. With an ESFAS Instrumentation or Interlock Trip Setpoint less conservative than the value shown in the Allowable Value column of Table 3.3-3, either:
1. Adjust the Setpoint consistent with the Trip Setpoint value of Table 3.3-3 and determine within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the affected channel is OPERABLE; or
2. Declare the channel inoperable and apply the applicable ACTION statement requirements of Table 3.3-2 until the channel is restored to OPERABLE status with its setpoint adjusted consistent with the Trip Setpoint value.
c. With an ESFAS instrumentation channel or interlock inoperable, take the ACTION shown in Table 3.3-2.

SURVEILLANCE REQUIREMENTS 4.3.2.1 Each ESFAS instrumentation channel and interlock and the automatic actuation logic and relays shall be demonstrated OPERABLE by performance of the ESFAS Instrumentation Surveillance Requirements specified in Table 4.3-2.

TURKEY POINT - UNITS 3 & 4 3/4 3-13 AMENDMENT NOS. 176 AND 170

Replace each marked through Surveillance Frequency with "SFCP". TABLE 4.3-2 H-C ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS m

TRIP

_0 0 ANALOG ACTUATING MODES CHANNEL DEVICE FOR WHICH CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE C

FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST # IS REQUIRED Z

--I 1. Safety Injection (n

__>K c~)

C~)

a. Manual Initiation N.A. N.A. N.A. N.A. 1,2,3 0)
b. Automatic Actuation N.A. N.A. N.A. N.A. x1) 1,2,3(3)

Logic and Actuation Relays

c. Containment Pressure-- N.A. N.A. N.A. W1) 1,2,3 High m

z

d. Pressurizer Pressure-- "s '&5) N.A. N.A. 1,2,3(3)

Low m N.A. N.A. 1,2,3(3)

e. High Differential z Pressure Between the \(5)

Z Steam Line Header and 0 any Steam Line Cl)

f. Steam Line Flow--High ~(b) N.A N.A 1,2,3(3)

Coincident with:

z Steam Generator Pressure--Low \()(b) N.A. N.A. 1,2,3(3) or Tavg--Low 'Gý5) N.A. N.A. 1,2,3(3)

Replace each marked through Surveillance Frequency with "SFCP". TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS H

C:

TRIP m

ANALOG ACTUATING MODES CHANNEL DEVICE FOR WHICH 0 CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE z

FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST # IS REQUIRED Z 2. Containment Spray cn

a. Automatic Actuation N.A. N.A. N.A. N.A. \(1) 1,2,3,4 W Logic and Actuation 90*

Relays

b. Containment Pressure-- N.A. N.A. 1,2,3 High-High Coincident with:

Containment Pressure--

C.,

High N.A. K N.A. 'M1,) 1,2,3

3. Containment Isolation
a. Phase "A" Isolation
1) Manual Initiation N.A. N.A. N.A. N.A. 1,2,3,4
2) Automatic Actua- N.A. N.A. N.A. N.A. h(i) 1,2,3,4 tion Logic and Actuation Relays m

z

3) Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.

m z b. Phase "B" Isolation z

0 1) Manual Initiation N.A. N.A. N.A. N.A. 1,2,3,4

2) Automatic Actua- N.A. N.A. N.A. N.A. XMi ) 1,2,3,4 tion Logic and z Actuation Relays

Replace each marked through Surveillance Frequency with "SFCP". TABLE 4.3-2 (Continued)

H ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS m

-< TRIP 0

ANALOG ACTUATING MODES z CHANNEL DEVICE ACTUATION FOR WHICH CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL LOGIC SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST TEST # IS REQUIRED z-z

-H: 3. Containment Isolation (Continued)

3) Containment Pressure--High-N.A. N.A. x 'M~1) 1,2,3 High Coincident with: Containment Pressure--High N.A. N.A. \1) 1,2,3
c. Containment Venti-lation Isolation C',3 1) Containment N.A. N.A. N.A. N.A. 1,2,3,4 Isolation Manual Phase A or Manual Phase B
2) Automatic Actua- N.A. N.A. N.A. N.A. N.A.

tion Logic and Actuation Relays m 3) Safety Injection See Item 1 above for all Safety Injection Surveillance Requirements.

z0

4) Containment Radio- )Q.. _t~lN.A. N.A. 1,2,3,4 m activity--High z

H 4. Steam Line Isolation z N.A.

0

a. Manual Initiation N.A. N.A. N.A. 1,2,3 N.A.
b. Automatic Actuation N.A. N.A. N.A. "M(l) 1,2,3(3)

Logic and Actuation z Relays

Replace each marked through Surveillance Frequency with "SFCP". TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS m TRIP ANALOG ACTUATING MODES 0 CHANNEL DEVICE FOR WHICH z CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST # IS REQUIRED Z

4. Steamline Isolation (Continued)

C/) c. Containment Pressure-- N.A. N.A. 'M~1) 1,2,3 High-High Coincident with:

Containment Pressure-- N.A. N.A ~P4Q) 1,2,3 High

d. Steam Line Flow--High X(3)

", a)(b) N.A. N.A. 1,2,3 Coincident with:

Cl)

Steam Generator Pressure--Low \(3) ý(5)(a)(b) N.A. N.A. 1,2,3 W, or Tavg--Low N.A. N.A. 1,2,3

5. Feedwater Isolation
a. Automatic Actuation N.A. N.A. N.A. N.A. 1,2,3 Logic and Actuation Relays Z b. Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.

Il "b)

c. Steam Generator Water "* a)b) N.A. N.A. 1,2,3 z Level--High-High

--i z 6. Auxiliary Feedwater (2) 09

a. Automatic Actuation N.A. N.A. N.A. N.A. 1,2,3 Logic and Actuation Relays

)(b)

,,*

z b. Steam Generator )Ra(b)

N.A. N.A. 1,2,3 N~K Water Level--Low-Low

Replace each marked through Surveillance Frequency with "SFCP". TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS m

TRIP ANALOG ACTUATING MODES 0 CHANNEL DEVICE FOR WHICH z ACTUATION CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST # IS REQUIRED C

z 6. Auxiliary Feedwater (Continued)

Cl-i c. Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.

d. Bus Stripping N.A. N.A. N.A. 1,2,3
e. Trip of All Main N.A. N.A. N.A. N.A. 1.2 Feedwater Pump Breakers.
7. Loss of Power
a. 4.16 kV busses A N.A. "R, N.A. N.A. 1,2,3,4 and B (Loss of C,,

Voltage)

b. 480V Load Centers N.A. NM,(1) N.A. 1,2,3,4 3A, 3B, 3C, 3D and 4A, 4B, 4C, 4D Z Undervoltage m Coincident with:

z Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.

m z

-I z

c. 480V Load Centers 3A, 3B, 3C, 3D and K N.A. N.A. 1,2,3,4 0 4A, 4B, 4C, 4D Degraded Voltage z

Replace each marked through Surveillance Frequency with "SFCP".

TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION

-H C SURVEILLANCE REQUIREMENTS TRIP ANALOG ACTUATING MODES 0 CHANNEL DEVICE FOR WHICH m

H CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE

--I z FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST # IS REQUIRED co C" 8. Engineering Safety 90 Features Actuation System Interlocks

.P.

a. Pressurizer Pressure N.A. ý(5) N.A. N.A. 1,2,3(3)
b. Tavg--Low N.A. X_ N.A. N.A. 1,2,3(3)
9. Control Room Ventilation Isolation
a. Automatic Actuation N.A. N.A. N.A. N.A. N.A.

Logic and Actuation Relays

b. Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.
c. Containment "& 1_RM. N.A. N.A. (4)

Radioactivity--High

d. Containment Isolation N.A. N.A. N.A. N.A. 1,2,3,4 Manual Phase A or Manual Phase B mz
e. Control Room Air N.A. N.A. All Intake Radiation Level m

Z z

Ii 0

0 z

INSTRUMENTATION No changes this page, For information only' 3/4.3.3 MONITORING INSTRUMENTATION RADIATION MONITORING FOR PLANT OPERATIONS LIMITING CONDITION FOR OPERATION 3.3.3.1 The radiation monitoring instrumentation channels for plant operations shown in Table 3.3-4 shall be OPERABLE with their Alarm/Trip Setpoints within the specified limits.

APPLICABILITY: As shown in Table 3.3-4.

ACTION:

a. With a radiation monitoring channel Alarm/Trip Setpoint for plant operations exceeding the value shown in Table 3.3-4, adjust the Setpoint to within the limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or declare the channel inoperable.
b. With one or more radiation monitoring channels for plant operations inoperable, take the ACTION shown in Table 3.3-4.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.1 Each radiation monitoring instrumentation channel for plant operations shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and ANALOG CHANNEL OPERATIONAL TEST for the MODES and at the frequencies shown in Table 4.3-3.

TURKEY POINT - UNITS 3 & 4 3/4 3-35 AMENDMENT NOS. 137 AND 132

lTABLE 3.3-4 (Continued)

ACTION STATEMENTS (Continued)

ACTION 27 - In MODES 5 or 6 (e-peet during CORE ALTERATION or movement of irradiated fuel within the containment): With the number of OPERABLE Channels less than the Minimum Channels OPERABLE requirement perform the following:

.1) Obtain and analyze appropriate grab samples at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and

2) Monitor containment atmosphere with area radiation monitors.

Otherwise, isolate all penetrations that provide direct access from the containment atmosphere to the outside atmosphere.

During CORE ALTERATION or movement of irradiated fuel within the containment: With the number of OPERABLE Channels less than the Minimum Channels OPERABLE requirements, comply with ACTION statement requirements of Specification 3.9.9 and 3.9.13.

ACTION 28 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, immediately suspend operations in the Spent Fuel Pool area involving spent fuel manipulations.

TURKEY POINT - UNITS 3 & 4 3/4 3-38 AMENDMENT NOS. 1 AND 4-32

Replace each marked through cXTABLE Surveillance Frequency with "SFCP". 4.3-3 m RADIATION MONITORING INSTRUMENTATION FOR PLANT OPERATIONS SURVEILLANCE REQUIREMENTS 0

ANALOG MODES FOR I CHANNEL WHICH c CHANNEL CHANNEL OPERATIONAL SURVEILLANCE z FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED U')

1. Containment
a. Containment Atmosphere -R-- All Radioactivity--High
b. RCS Leakage Detection
1) Particulate Radio- -&-- -R- - 1, 2, 3, 4 activity
2) Gaseous Radioactivity _S-- -R--- -Q- 1, 2, 3, 4
2. Spent Fuel Pool Areas
a. Unit 3 Radioactivity--High Gaseous --S- -R-
b. Unit 4 (Plant Vent)

Radioactivity--High

> Gaseous#

r (SPING and PRMS) ----

0 z

--

  • With irradiated fuel in the fuel storage pool areas.

0 O' # Unit 4 Spent Fuel Pool Area is monitored by Plant Vent radioactivity instrumentation.

z

INSTRUMENTATION MOVABLE INCORE DETECTORS LIMITING CONDITION FOR OPERATION 3.3.3.2 The Movable Incore Detection System shall be OPERABLE with:

a. At least 16 detector thimbles when used for recalibration and check of the Excore Neutron Flux Detection System and monitoring the QUANDRANT POWER TILT RATIO*, and at least 38 detector thimbles when used for monitoring FNH FQ(Z) and FY(Z).
b. A minimum of two detector thimbles per core quadrant, and
c. Sufficient movable detectors, drive, and readout equipment to map these thimbles.

APPLICABLITY: When the Movable Incore Detection System is used for:

a. Recalibration of the Excore Neutron Flux Detection System, or
b. Monitoring the QUADRANT POWER TILT RATIO*, or
c. Measurement of FNH, FQ(Z) and Fxl(Z).

ACTION:

With the Movable Incore Detection System inoperable, do not use the system for the above applicable monitoring or calibration functions. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.2 The Movable Incore Detection System shall be demonstrated OPERABLE at Ieas e r 24 hg'-s by normalizing each detector output when required for:

a. Recalibration of the Excore Neutron Flux Detection System, or
b. Monitoring the QUADRANT POWER TILT RATIO*, or lFnsert 1i
c. Measurement of FNH, FQ(Z) and Fxy(Z).
  • Exception to the 16 detector thimble requirement of monitoring the QUADRANT POWER TILT RATIO is acceptable when performing Specification 4.2.4.2 using two sets of four symmetric thimbles.

TURKEY POINT - UNITS 3 & 4 3/4 3-40 AMENDMENT NOS. 1--7-AND 1-3

INSTRUMENTATION No changes this page,

[For information only ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.3 The accident monitoring instrumentation channels shown in Table 3.3-5 shall be OPERABLE.

APPLICABILITY: As shown in Table 3.3-5.

ACTION:

a. As shown in Table 3.3-5.
b. The provisions of Specification 3.0.4 are not applicable to ACTIONS in Table 3.3-5 that require a shutdown.
c. Separate Action entry is allowed for each Instrument.

SURVEILLANCE REQUIREMENTS 4.3.3.3 Each accident monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK and CHANNEL CALIBRATION at the frequencies shown in Table 4.3-4.

TURKEY POINT - UNITS 3 &4 3/4 3-41 AMENDMENT NOS. 227 AND 223

Replace each marked through Surveillance Frequency with "SFCPR.

TABLE 4.3-4 ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL CHANNEL INSTRUMENT CHECK CALIBRATION

1. Containment Pressure (Wide Range) -m- -R-
2. Containment Pressure (Narrow Range) -f-
3. Reactor Coolant Outlet Temperature - THOT W (Wide Range)
4. Reactor Coolant Inlet Temperature - TCOLD -

(Wide Range)

5. Reactor Coolant Pressure - Wide Range M -R-
6. Pressurizer Water Level -- R-
7. Auxiliary Feedwater Flow Rate -MR----
8. Reactor Coolant System Subcooling Margin Monitor -- -R--
9. PORV Position Indicator (Primary Detector) --M- -R-
10. PORV Block Valve Position Indicator M
11. Safety Valve Position Indicator (Primary Detector) M -R--
12. Containment Water Level (Narrow Range) Ml
13. Containment Water Level (Wide Range) M -- R-
14. In Core Thermocouples (Core Exit Thermocouples) -R-M---
15. Containment - High Range Area Radiation Monitor *
16. Reactor Vessel Level Monitoring System
17. Neutron Flux, Backup NIS (Wide Range) M -R---
18. DELETED
19. High Range - Noble Gas Effluent Monitors
a. Plant Vent Exhaust M -R-
b. Unit 3 - Spent Fuel Pit Exhaust -M--- -
c. Condenser Air Ejectors -M-
20. RWST Water Level M -R--
21. Steam Generator Water Level (Narrow Range) -W -R-
22. Containment Isolation Valve Position Indication
  • Acceptable criteria for calibration are provided in Table II.F. 1-3 of NUREG-0737.

TURKEY POINT - UNITS 3 &4 3/4. 3-46 AMENDMENT NOS. 2-6-AND 2*e-

No changes this page, INSTRUMENTATION For information only I EXPLOSIVE GAS MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.6 The explosive gas monitoring instrumentation channels shown in Table 3.3-8 shall be OPERABLE with their Alarm/Trip Setpoints set to ensure that the limits of Specification 3.7.8 are not exceeded.

APPLICABILITY: As shown in Table 3.3-8 ACTION:

a. With an explosive gas monitoring instrumentation channel Alarm/Trip Setpoint less conservative than required by the above specification, declare the channel inoperable or change the setpoint so it is acceptably conservative.
b. With less than the minimum number of explosive gas monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-8. Restore the inoperable instrumentation to OPERABLE status within 30 days and, if unsuccessful prepare and submit a special report to the Commission within 30 days to explain why this inoperability was not corrected in a timely manner.
c. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.6 Each explosive gas monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, CHANNEL CALIBRATION and ANALOG CHANNEL OPERATIONAL TEST at the frequencies shown in Table 4.3-6.

TURKEY POINT - UNITS 3 & 4 3/4 3-47 AMENDMENT NOS. 188 AND 182

Replace each marked through

- Surveillance Frequency with "SFCP".

CZ XTABLE 4.3-6 m

EXPLOSIVE GAS MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS 0

z ANALOG MODES FOR z CHANNEL WHICH CHANNEL SOURCE CHANNEL OPERATIONAL SURVEILLANCE IS INSTRUMENT CHECK CHECK CALIBRATION TEST REQUIRED

1. GAS DECAYTANK SYSTEM (Explosive Gas Monitoring System)
a. Hydrogen and Oxygen Monitors ---- N.A. X0 1,2) -M-
  • TABLE NOTATION During GAS DECAY TANK SYSTEM operation.

(1) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal.

a. One volume percent hydrogen, balance nitrogen, and
b. Four volume percent hydrogen, balance nitrogen.

> (2) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:

m z a. One volume percent oxygen, balance nitrogen, and m b. Four volume percent oxygen, balance nitrogen.

z

-H z

0 z

3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 REACTOR COOLANT LOOPS AND COOLANT CIRcULATION STARTUP AND POWER OPERATION LIMITING CONDITION FOR OPERATION 3.4.1.1 All reactor coolant loops shall be in operation.

APPLICABILITY: MODES I and 2.

ACTION:

With less than the above required reactor coolant loops in operation, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.1.1 The above required reactor coolant loops shall be verified in operation and circulating reactor coolant at-least ounc.-p 12Iiuur.

Ilnsert 1 TURKEY POINT - UNITS 3 & 4 3/4 4-1 AMENDMENT NOS.--137AND4 REACTOR COOLANT SYSTEM HOT STANDBY LIMITING CONDITION FOR OPERATION 3.4.1.2 All of the reactor coolant loops listed below shall be OPERABLE with all reactor coolant loops in operation when the Reactor Trip breakers are closed and two reactor coolant loops listed below shall be OPERABLE with at least one reactor coolant loop in operation when the Reactor Trip breakers are open:*

a. Reactor Coolant Loop A and its associated steam generator and reactor coolant pump,
b. Reactor Coolant Loop B and its associated steam generator and reactor coolant pump, and
c. Reactor Coolant Loop C and its associated steam generator and reactor coolant pump.

APPLICABILITY: MODE 3 ACTION:

a. With less than the above required reactor coolant loops OPERABLE, restore the required loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. With less than three reactor coolant loop in operation and the Reactor Trip breakers in the closed position, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> open the Reactor Trip breakers.
c. With no reactor coolant loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required reactor coolant loop to operation.

SURVEILLANCE REQUIREMENTS 4.4.1.2.1 At least the above required reactor coolant pumps, if not in operation, shall be determined OPERABLE neee per 7- day- by verifying correct breaker alignments and indicated power availabil.

4.4.1.2.2 The required steam generators shall be determined OPERABLE b erifying secondary side water level to be greater than or equal to 10% at lcas' zncz por 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.2.3 The required reactor coolant loo shall be verifie i operation and circulating reactor coolant at-east-ocrc pcr 12 houre.

  • '-*lnsert 1f
  • All reactor coolant pumps may be deenergized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided: (1) no operations are permitted that would cause dilution of the Reactor Coolant System boron concentration, and (2) core outlet temperature is maintained at least 1OF below saturation temperature.

TURKEY POINT - UNITS 3 &4 3/4 4-2 AMENDMENT NOS. 97-AND-1-REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS 4.4.1.3.1 The required reactor coolant pump(s), if not in operation, shall be determined OPERABLE eneepff 4-days-by verifying correct breaker alignments and indicated power availabilit 4.4.1.3.2 The required steam generator(s) shall be determined OPERAB by verifying secondary side water level to be greater than or equal to 10% at least oence Pc 12 h.. rz.

4.4.1.3.3 At least one reactor coolant or RHR looT shall be verifie n operation and circulating reactor coolant at e .......

a elII 41; qA t

-'*.[Insert 1 TURKEY POINT - UNITS 3 & 4 3/4 4-4 AMENDMENT NOS. i-37 AND 432-

REACTOR COOLANT SYSTEM COLD SHUTDOWN - LOOPS FILLED LIMITING CONDITION FOR OPERATION 3.4.1.4.1 At least one residual heat removal (RHR) loop shall be OPERABLE and in operation*, and either:

a. One additional RHR loop shall be OPERABLE**, or
b. The secondary side water level of at least two steam generators shall be greater than 10%.

APPLICABILITY: MODE 5 with reactor coolant loops filled***.

ACTION:

a. With one of the RHR loops inoperable or with less than the required steam generator water level, immediately initiate corrective action to return the inoperable RHR loop to OPERABLE status or restore the required steam generator water level as soon as possible.
b. With no RHR loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required RHR loop to operation.

SURVEILLANCE REQUIREMENTS 4.4.1.4.1.1 The secondary side water level of at least two steam generators when required shall be determined to be within limits at least per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.4.1.2 At least one RHR loop sh~abe determined to be in operation and circulating reactor coolant a-teast

  • The RHR pump may be deenergized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided: (1) no operations are permitted that would cause dilution of the Reactor Coolant System boron concentration, and (2) core outlet temperature is maintained at least 10°F below saturation temperature.
    • One RHR loop may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other RHR loop is OPERABLE.

TURKEY POINT - UNITS 3 &4 3/4 4-5 AMENDMENT NOS. 1--AND 4K

REACTOR COOLANT SYSTEM COLD SHUTDOWN - LOOPS NOT FILLED LIMITING CONDITION FOR OPERATION 3.4.1.4.2 Two residual heat removal (RHR) loops shall be OPERABLE* and at least one RHR loop shall be in operation.**

APPLICABILITY: MODE 5 with reactor coolant loops not filled.

ACTION:

a. With less than the above required RHR loops OPERABLE, immediately initiate corrective action to return the required RHR loops to OPERABLE status as soon as possible.
b. With no RHR loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required RHR loop to operation.

SURVEILLANCE REQUIREMENTS 4.4.1.4.2 At least one RHR loop shall be determined to be in operation and circulating reactor coolant a-4easA oInsert 1 One RHR loop may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other RHR loop is OPERABLE.

    • The RHR pump may be deenergized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided: (1) no operations are permitted that would cause dilution of the Reactor Coolant System boron concentration, and (2) core outlet temperature is maintained at least 1OF below saturation temperature.

TURKEY POINT - UNITS 3 & 4 3/4 4-6 AMENDMENT NOS. 4,7 AND 432-

REACTOR COOLANT SYSTEM 3/4.4.3 PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.3 The pressurizer shall be OPERABLE with a water volume of less than or equal to 92% of indicated level, and at least two groups of pressurizer heaters each having a capacity of at least 125 kW and capable of being supplied by emergency power.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a. With only one group of pressurizer heaters OPERABLE, restore at least two groups to OPERABLE status within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s** or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the Reactor Trip System breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.3.1 The pressurizer water volume shall be determined to be within its limit -tI c p. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.3.2 The capacity of each of the above required groups of pressurizer heate shall be verified to be at least '4/

125 kw at ,ea-st ocme- per, 1L .

1 i Qt 14 days if the inoperability is associated with an inoperable diesel generator.

TURKEY POINT - UNITS 3 & 4 3/4 4-9 AMENDMENT NOS.-?ý-AND 2.2

7Insert 1 REACTOR COOLANT SYSTEM ELLIEF VALVES S VEILLANCE REQUIREMENT Each block valve shall be demonstrated OPERABLE at least e.. per 92 days. by operating the valve through one complete cycle of full travel unless the block valve is closed with power removed in order to meet the requirements of Specification 3.4.4 or is closed to provide an isolation function.

TURKEY POINT - UNITS 3 & 4 3/4 4-10Oa AMENDMENT NOS. 1-" AND REACTOR COOLANT SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following Reactor Coolant System Leakage Detection Systems shall be OPERABLE:

a. The Containment Atmosphere Gaseous or Particulate Radioactivity Monitoring System, and
b. A Containment Sump Level Monitoring System.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a. With both the Particulate and Gaseous Radioactivity Monitoring Systems inoperable, operation may continue for up to 7 days provided:
1) A Containment Sump Level Monitoring System is OPERABLE;
2) Appropriate grab samples are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />;
3) A Reactor Coolant System water inventory balance is performed at least once per 8*

hours except when operating in shutdown cooling mode; and

4) Containment Purge, Exhaust and Instrument Air Bleed valves are maintained closed.** >1<

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b. With no Containment Sump Level Monitoring System operable, restore at least one Containment Sump Level Monitoring System to OPERABLE status within 7 days, or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.6.1 The Leakage Detection System shall be demonstrated OPERABLE by:

a. Containment Atmosphere Gaseous and Particulate Monitoring System-performance of CHANNEL CHECK, CHANNEL CALIBRATION and ANALOG CHANNEL OPERATIONAL TEST at the frequencies specified in Table 4.3-3, and
b. Containment Sump Level Monitoring System-performance of CHANNEL CALIBRATIO at-least-on ce pei :i8 nniTth-,s

[Insert 1 1

  • Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.
    • Instrument Air Bleed valves may be opened intermittently under administrative controls.

TURKEY POINT - UNITS 3 & 4 3/4 4-18 AMENDMENT NOS. -249 AND-24 REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION (Continued)-

2. The leakage* from the remaining isolating valves in each high pressure line having a valve not meeting the criteria of Table 3.4-1, as listed in Table 3.4-1, shall be determined and recorded daily. The positions of the other valves located in the high pressure line having the leaking valve shall be recorded daily unless they are manual valves located inside containment.

Otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d. With any Reactor Coolant System Pressure Isolation Valve leakage greater than 5 gpm, reduce leakage to below 5 gpm within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.6.2.1 Reactor Coolant System operational leakages shall be demonstrated to be within each of the above limits by:

a. Monitoring the containment atmosphere gaseous or particulate radioactivity monitor at least eRee

-per 12 hutirs.

b. Monitoring the containment sump level .aI etT.Insert 1
c. Performance of a Reactor Coolant System water inventory balance + -or 72***

-haors; and _7

d. Monitoring the Reactor Head Flange Leakoff System at let .... r h s and
e. Verifying primary-to-secondary leakage is < 150 gallons per day through any one SG at-lea-s 4<

4.4.6.2.2 Each Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1 shall be Insert 1 - demonstrated OPERABLE by verifying leakage* to be within its limit:

a. At least orceer 18 menthS.
b. Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 7 days or more and if leakage testing has not been performed in the previous 9 months, and
c. Prior to returning the valve to service following maintenance, repair or replacement work on the valve.
  • To satisfy ALARA requirements, leakage may be measured indirectly (as from the performance of pressure indicators) if accomplished in accordance with approved procedures and supported by computations showing that the method is capable of demonstrating valve compliance with the leakage criteria.
    • Not applicable to primary-to-secondary leakage.
  • Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

TURKEY POINT - UNITS 3 & 4 3/4 4-20 AMENDMENT NOS.--3-AND2 REACTOR COOLANT SYSTEM No changes this page, YFor information only 3/4.4.7 CHEMISTRY LIMITING CONDITION FOR OPERATION 3.4.7 The Reactor Coolant System chemistry shall be maintained within the limits specified in Table 3.4-2.

APPLICABILITY: At all times.

ACTION:

MODES 1, 2, 3 and 4:

a. With any one or more chemistry parameter in excess of its Steady-State Limit but within its Transient Limit, restore the parameter to within its Steady-State Limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; and
b. With any one or more chemistry parameter in excess of its Transient Limit, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

At All Other Times:

With the concentration of either chloride or fluoride in the Reactor Coolant System in excess of its Steady-State Limit for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or in excess of its Transient Limit, reduce the pressurizer pressure to less than or equal to 500 psig, if applicable, and perform an engineering evaluation to determine the effects of the out-of-limit condition on the structural integrity of the Reactor Coolant System; determine that the Reactor Coolant System remains acceptable for continued operation prior to increasing the pressurizer pressure above 500 psig or prior to proceeding to MODE 4.

SURVEILLANCE REQUIREMENTS 4.4.7 The Reactor Coolant System chemistry shall be determined to be within the limits by analysis of those parameters at the frequencies specified in Table 4.4-3.

TURKEY POINT - UNITS 3 & 4 3/4 4-23 AMENDMENT NOS. 137 AND 132

Replace each marked through Surveillance Frequency with "SFCP".

I TABLE 4.4-3 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS SURVEILLANCE REQUIREMENTS PARAMETER SAMPLE AND ANALYSIS FREQUENCY Dissolved Oxygen* At 'east 5 times per week not to exeeed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> betweGn sampler, Chloride** At 'east 5 times pef wock r-not te exceed 72 h,-rs be..Aeen samples Fluoride** At least 5 timer, p@r wak not to exceo-Rd- 722 hGLurc betvwzcn ,=amplea

  • Not required with average reactor coolant temperature less than or equal to 250'F.
    • Not required when reactor is defueled and RCS forced circulation is unavailable.

TURKEY POINT - UN!TS 3 & 4 3/4 4-25 AMENDMENT NOS. - AND 143-2

REACTOR COOLANT SYSTEM No change this page, Ifor information only I 3/4.4.8 SPECIFIC ACTIVITY LIMITING CONDITION FOR OPERATION 3.4.8 The specific activity of the primary coolant shall be limited to:

a. Less than or equal to 0.25 microcuries per gram DOSE EQUIVALENT 1-131, and
b. Less than or equal to 447.7 microcuries per gram DOSE EQUIVALENT XE-1 33.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With the specific activity of the reactor coolant greater than 0.25 microcuries per gram DOSE EQUIVALENT 1-131, verify DOSE EQUIVALENT 1-131 is less than or equal to 60 microcuries per gram once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
b. With the specific activity of the reactor coolant greater than 0.25 microcuries per gram DOSE EQUIVALENT 1-131, but less than or equal to 60 microcuries per gram, operation may continue for up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> while efforts are made to restore DOSE EQUIVALENT 1-131 to within the 0.25 microcuries per gram limit. Specification 3.0.4 is not applicable.
c. With the specific activity of the reactor coolant greater than 0.25 microcuries per gram DOSE EQUIVALENT 1-131 for greater than or equal to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval, or greater than 60 microcuries per gram DOSE EQUIVALENT 1-131, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
d. With the specific activity of the reactor coolant greater than 447.7 microcuries per gram DOSE EQUIVALENT XE-1 33, operation may continue for up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> while efforts are made to restore DOSE EQUIVALENT XE-133 to within the 447.7 microcuries per gram limit.

Specification 3.0.4 is not applicable.

e. With the specific activity of the reactor coolant greater than 447.7 microcuries per gram DOSE EQUIVALENT XE-133 for greater than or equal to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.8 The specific activity of the reactor coolant shall be determined to be within the limits by performance of the sampling and analysis program of Table 4.4-4.

TURKEY POINT - UNITS 3 & 4 3/4 4-26 AMENDMENT NOS. 244 AND 240

TABLE 4.4-4 REACTOR COOLANT SPECIFIC ACTIVITY SAMPLE AND ANALYSIS PROGRAM m

TYPE OF MEASUREMENT SAMPLE AND ANALYSIS MODES IN WHICH SAMPLE 0

z AND ANALYSIS FREQUENCY AND ANALYSIS REQUIRED

1. NOT USED C
2. Tritium Activity 1,2,3,4 Determination

-ch, 3. Isotopic Analysis for 1,2,3,4 DOSE EQUIVALENT 1-131 b) One sample between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following a Insert 1 THERMAL POWER change exceeding 15% of the RATED THERMAL POWER within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.

4. Radiochemical Isotopic 1,2,3,4 Determination Including co Gaseous Activity
5. Isotopic Analysis for DOSE 1,2,3,4 EQUIVALENT XE-133

> 6. NOT USED m

z m

z0 z

o 0

z

REACTOR COOLANT SYSTEM OVERPRESSURE MITIGATING SYSTEMS SURVEILLANCE REQUIREMENTS 4.4.9.3.1 Each PORV shall be demonstrated OPERABLE by:

a. Performance of an ANALOG CHANNEL OPERATIONAL TEST* on the PORV actuation channelf but excluding valve operation, within 31 days prior to entering a condition in which the PORV is required OPERABLE and at least once per 31 days thereafter when the PORV is required OPERABLE.
b. Performance of a CHANNEL CALIBRATION on the PORV actuation channel ,2t lpst encc per
c. Verifying the PORV block valve is open at loact onco por 72 hauwrwhen the PORV is being used for overpressure protection.
d. While the PORVs are required to be OPERABLE, the backup nitrogen supply shall be verified OPERABLE at*ls e 4.4.9.3.2 The 2.20 square inch vent shall e verified to be open at least once per 12 heurs** when the vent(s) is4h.

being used for overpressure protectionY' 4.4.9.3.3 Verify the high pressure injec on fl w path to the RCS is isolated at least Qnce per 24 hors by closed valves with power removed or by locked lose manual valv Insert 1 Not required to be met until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after decreasing RCS cold leg temperature to < 2750 F.

    • Except when the vent pathway is provided with a valve which is locked, sealed, or otherwise secured in the open position, then verify these valves open at least once per 31 days.

TURKEY POINT - UNITS 3 & 4 3/4 4-37 AMENDMENT NOS. 2-G8 AND-202

REACTOR COOLANT SYSTEM 3/4.4.11 REACTOR COOLANT SYSTEM VENTS LIMITING CONDITION FOR OPERATION 3.4.11 At least one Reactor Coolant System vent path consisting of at least two vent valves in series and powered from emergency busses shall be OPERABLE and closed at each of the following locations:

a. Reactor vessel head, and
b. Pressurizer steam space APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With one of the above Reactor Coolant System vent paths inoperable, STARTUP and/or POWER OPERATION may continue provided the inoperable vent path is maintained closed with power removed from the valve actuator of all the vent valves in the inoperable vent path; restore the inoperable vent path to OPERABLE status within 30 days, or, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With both Reactor Coolant System vent paths inoperable; maintain the inoperable vent path closed with power removed from the valve actuators of all the vent valves in the inoperable vent paths, and restore at least one of the vent paths to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Insert E1R SURVEILLANCE REQUIREMENTS 4.4.11 Each Reactor Coolant System vent path shall be demonstrated OPERABLE at least oncc p8r 18 monRthS by:

a. Verifying all manual isolation valves in each vent path are locked in the open position,
b. Cycling each vent valve through at least one complete cycle of full travel from the control room, and
c. Verifying flow through the Reactor Coolant System vent paths during venting.

TURKEY POINT - UNITS 3 & 4 3/4 4-39 AMENDMENT NOS. 4---7AND 442

3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.1 ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each Reactor Coolant System (RCS) accumulator shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3*.

ACTION:

a. With one accumulator inoperable, except as a result of boron concentration not being within limits, restore the inoperable accumulator to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With one accumulator inoperable due to the boron concentration not being within the limits, restore boron concentration back to the required limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.1.1 Each accumulator shall be demonstrated OPERABLE: 1st

a. At 'east uonc per 12 ho~s oy:
1) Verifying the borated water volume in each accumulator is between 6520 and 6820 gallons, and
2) Verifying that the nitrogen cover pressure in each accumulator is between 600 and 675 psig, and
3) Verifying that each accumulator isolation valve is open by control room indication (power may be restored to the valve operator to perform this surveillance if redundant indicator is inoperable).
  • Pressurizer pressure above 1000 psig.

TURKEY POINT - UNITS 3 & 4 3/4 5-1 AMENDMENT NOS. 4-86-AND W4

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) b.

ir At 'east zn.. pe. 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than equal to 1% of tank volume by verifying the boron concentration of the solution in the water-filled accumulator is between 2300 and 2600 ppm; Insert 1 c. .V49,t O,,c POP 3! d@.;' when the RCS pressure is above 1000 psig, by verifying that the power to the isolation valve operator is disconnected by a locked open breaker.

d. , each accumulator check valve shall be checked for operability.

TURKEY POINT - UNITS 3 &4 3/4 5-2 AMENDMENT NOS. A-9"AND 24-5

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS 4.5.2 Each ECCS component and flow path shallbe demonstrated OPERABLE:

a. At lesat once per 12 h1u.ro by verifying by control room indication that the following valves are in the indicad positions with power to the valve operators removed:

Valve Nu ber Valve Function Valve Position 864A a d B Supply from RWST to ECCS Open 862A nd B RWST Supply to RHR pumps Open 863 and B RHR Recirculation Closed

/

888A and B H.H.S.I. to Hot Legs Closed CV-758* RHR HX Outlet Open To permit temporary operation of these valves for surveillance or maintenance purposes, power may be restored to these valves for a period not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. .At lest .n.. per 31 days by.

Verifying that the ECCS piping is full of water by venting the ECCS pump casings and S1 ,, accessible discharge piping,

2) Verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position, and
3) Verifying that each RHR Pump develops the indicated differential pressure applicable to the operating conditions in accordance with Figure 3.5-1 when tested pursuant to Specification 4.0.5.
c. Aset -one-p 92 days- by:
1) Verifying that each SI pump develops the indicated differential pressure applicable to the operating conditions when tested pursuant to Specification 4.0.5.

SI pump >_1083 psid at a metered flowrate > 300 gpm (normal alignment or Unit 4 SI pumps aligned to Unit 3 RWST), or

> 1113 psid at a metered flowrate > 280 gpm (Unit 3 SI pumps aligned to Unit 4 RWST).

  • Air Supply to HCV-758 shall be verified shut off and sealed closed once per 31 days.

TURKEY POINT - UNITS 3 &4 3/4 5-5 AMENDMENT NOS. 494-AND 8&5-r-

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS

d. By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. The visual inspection shall be performed:
1) For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and
2) At least once daily of the areas affected within containment by containment entry and during the 4, final entry when CONTAINMENT INTEGRITY is established.
e. At least en per months by:
1) Verifying automatic isolation and interlock action of the RHR system from the Reactor Coolant System by ensuring that with a simulated or actual Reactor Coolant System pressure signal greater than or equal to 525 psig the interlocks cause the valves to automatically close and prevent the valves from being opened, and Isert 1 2) Verifying correct interlock action to ensure that the RWST is isolated from the RHR System during RHR System operation and to ensure that the RHR System cannot be pressurized from the Reactor Coolant System unless the above RWST Isolation Valves are closed.
3) A visual inspection of the containment sump and verifying that the suction inlets are not restricted by debris and that the sump components (trash racks, screens, .etc.) show no evidence of structural distress or abnormal corrosion.
f. At least once per 18 months, during shutdown, by:
1) Verifying that each automatic valve in the flow path actuates to its correct position on Safety Injection actuation test signal, and
2) Verifying that each of the following pumps start automatically upon receipt of a Safety Injection actuation test signal:

a) Safety Injection pump, and b) RHR pump.

TURKEY POINT - UNITS 3 & 4 3/4 5-7 AMENDMENT NOS. 1-84-AND 1-8--

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS

g. By verifying the correct position of each electrical and/or mechanical position stop for the following ECCS throttle valves:
1) Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following completion of each valve stroking operation or maintenance on the valve when the ECCS components are required to be OPERABLE, and A* I*
2) -f. IrlT--.r I I~lf~l7 RHR S RHR S ys~tem Valve Islumber Insert 1 HCV-*--758 MOV-*-872 TURKEY POINT - UNITS 3 & 4 3/4 5-8 AMENDMENT NOS. 43"8 AND 1"

EMERGENCY CORE COOLING SYSTEMS 3/4.5.4 REFUELING WATER STORAGE TANK LIMITING CONDITION FOR OPERATION 3.5.4 For single Unit operation, one refueling water storage tank (RWST) shall be OPERABLE or for dual Unit operation two RWSTs shall be OPERABLE with:

a. A minimum indicated borated water volume of 320,000 gallons per RWST,
b. A boron concentration between 2400 ppm and 2600 ppm,
c. A minimum solution temperature of 39°F, and
d. A maximum solution temperature of 100°F.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With less than the required number of RWST(s) OPERABLE, restore the tank(s) to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.4 The required RWST(s) shall be demonstrated OPERABLE:

a. 1 by:

and lInsert 1 1) Verifying the indicated borated water volume in the tank,

2) Verifying the boron concentration of the water.
b. By verifying the RWST temperature is within limits whenever the outside air temperature is less than 39°F or greater than 1 00°F at the following frequencies:
1) Within one hour upon the outside temperature exceeding its limit for consecutive 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br />, and
2) At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while the outside temperature exceeds its limit.

TURKEY POINT - UNITS 3 & 4 3/4 5-10 AMENDMENT NOS. 249 AND 245

3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT CONTAINMENT INTEGRITY LIMITING CONDITION FOR OPERATION 3.6.1.1 Primary CONTAINMENT INTEGRITY shall be maintained.*

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

Without primary CONTAINMENT INTEGRITY, restore CONTAINMENT INTEGRITY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.1.1 CONTAINMENT INTEGRITY shall be demonstrated:

a.**PRABLEcontanm by verifying that all penetrations** not capable of being closed by PERABLE containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in their closed positions-,

b. By verifying that each containment air lock is in compliance with the requirements of Specification 3.6.1.3.

insert 1--7 Exception may be taken under Administrative Controls for opening of valves and airlocks necessary to perform surveillance, testing requirements and/or corrective maintenance. In addition, Specification 3.6.4 shall be complied with.

    • Except valves, blind flanges, and deactivated automatic valves which are located inside the containment and are locked, sealed or otherwise secured in the closed position. These penetrations shall be verified closed during each COLD SHUTDOWN except that such verification need not be performed more often than once per 92 days.

TURKEY POINT - UNITS 3 & 4 3/4 6-1 AMENDMENT NOS.t2-z-AND 2t9-

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a. Following each closing, at the frequency specified in the Containment Leakage Rate Testing Program, by verifying that the seals have not been damaged and have seated properly by vacuum testing the volume between the door seals in accordance with approved plant procedures.
b. By conducting overall air lock leakage tests in accordance with the Containment Leakage Rate Testing Program.
c. At leoat once per 24 monthls by verifying that only one door in each air lock can be opened at a time.

Insert 1 TURKEY POINT - UNITS 3 & 4 3/4 6-5 AMENDMENT NOS. 24-3 AND 2e7

CONTAINMENT SYSTEMS INTERNAL PRESSURE LIMITING CONDITION FOR OPERATION 3.6.1.4 Primary containment internal pressure shall be maintained between -2 and +1 psig.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With the containment internal pressure outside of the limits above, restore the internal pressure to within the limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.1.4 The primary containment internal pressure shall be determined to be within the limits at least -enee pe Insert 1 TURKEY POINT - UNITS 3 & 4 3/4 6-6 AMENDMENT NOS. 249-AND 245

CONTAINMENT SYSTEMS AIR TEMPERATURE LIMITING CONDITION FOR OPERATION 3.6.1.5 Primary containment average air temperature shall not exceed 125 0 F and shall not exceed 120'F by more than 336 equivalent hours* during a calendar year.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With the containment average air temperature greater than 125 0 F or greater than 120OF for more than 336 equivalent hours* during a calendar year, reduce the average air temperature to within the applicable limit within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.1.5 The primary containment average air temperature shall be the arithmetical average of the temperatures at the following locations and shall be determined at !east once Per ,:2 hou-rs:

Approximate Location

a. 00 Azimuth 58 feet elevation Insert 1 D::. 12 Azi-*.muth 58 Teet elevation
c. 2400 Azimuth 58 feet elevation
  • Equivalent hours are determined from actual hours using the time-temperature relationships that support the environmental qualification requirements of 10 CFR 50.49.

TURKEY POINT - UNITS 3 & 4 3/4 6-7 AMENDMENT NOS. +-H AND-4-3 CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.7 Each containment purge supply and exhaust isolation valve shall be OPERABLE and:

a. The containment purge supply and exhaust isolation valves shall be sealed closed to the maximum extent practicable but may be open for purge system operation for pressure control, for environmental conditions control, for ALARA and respirable air quality considerations for personnel entry and for surveillance tests that require the valve to be open.
b. The purge supply and exhaust isolation valves shall not be opened wider than 33 or 30 degrees, respectively (90 degrees is fully open).

APPLICABILITY: MODES 1, 2, 3, AND 4.

ACTION:

a. With a containment purge supply and/or exhaust isolation valve(s) open for reasons other than given in 3.6.1.7.a above, close the open valve(s) or isolate the penetration(s) within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With a containment purge supply and/or exhaust isolation valve(s) having a measured leakage rate exceeding the limits of Specification 4.6.1.7.2, restore the inoperable valve(s) to OPERABLE status or isolate the penetrations such that the measured leakage rate does not exceed the limits of Specification 4.6.1.7.2 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.1.7.1 Each containment purge supply and exhaust isolation valve shall be verified to be sealed closed or open in accordance with Specification 3.6.1.7.a at l' cr ,31F... days.

4.6.1.7.2 At 'east enee P.r FAA~ths, each containm nt purge supply and exhaust isolation valve shall be demonstrated OPERABL verifying that the me ured leakage rate is less than or equal to 0.05 La when pressurized to Pa.

4.6.1.7.3 At least cnr, pr 18 mznths, the c anical stop on each containment purge supply and exhaust isolation valve shall b rified to be in place a d that the valves will open no more than 33 or 30 degrees, respectively.

TURKEY POINT - UNITS 3 & 4 3/46-11 AMENDMENT NOS. 4-37 AND 432-

CONTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two independent Containment Spray Systems shall be OPERABLE with each Spray System capable of taking suction from the RWST and manually transferring suction to the containment sump via the RHR System.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With one Containment Spray System inoperable restore the inoperable Spray System to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With two Containment Spray Systems inoperable restore at least one Spray System to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore both Spray Systems to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.2.1 Each Containment Spray System shall be demonstrated OPERABLE:

a. .t lent once per 31 day-s by verifying that each valve (manual, power-operated, or automatic) in the fl path that is not locked, sealed, or otherwise secured in position, is in its correct position an'that power is available to flow path components that require power for operation;
b. y verifying that on recirculation flow, each pump develops the indicated differential pressure, when tested pursuant to Specification 4.0.5:

Containment Spray Pump >241.6 psid while aligned in recirculation mode.

IInsert 1 TURKEY POINT - UNITS 3 & 4 3/4 6-12 AMENDMENT NOS. +-37-AND 1 CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS (.Continued)

c. At Ie once p-r-18rmonths during shutdown by:

Verifying that each automatic valve in the flow path actuates to its correct position on a containment spray actuation test signal, and ilnsert 1 2) Verifying that each spray pump starts automatically on a containment spray actuation test signal. The manual isolation valves in the spray lines at the containment shall be locked closed for the performance of these tests.

d.st oe per !0 years by performing an air or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.

TURKEY POINT - UNITS 3 & 4 3/46-13 AMENDMENT NOS. 465 AND 4-59

CONTAINMENT SYSTEMS EMERGENCY CONTAINMENT COOLING SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.2 Three emergency containment cooling units shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

a. With one of the above required emergency containment cooling units inoperable restore the inoperable cooling unit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With two or more of the above required emergency containment cooling units inoperable, restore at least two cooling units to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore all of the above required cooling units to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.2.2 Each emergency containment cooling unit shall be demonstrated OPERABLE:

a. At least e,,e p...31 days by starting each cooler unit from the control room and verifying that e unit motor reaches the nominal operating current for the test conditions and operates for at ast 15 minutes.

/b., At least enee pr 1 8 moneth by:

1) Verifying that two emergency containment cooling units start automatically on a safety 1 .sert injection (SI) test signal, and
2) Verifying a cooling water flow rate of greater than or equal to 2000 gpm to each cooler.

TURKEY POINT - UNITS 3 &4 3/4 6-!4 AMENDMENT NOS. 4-94 AND +&&

CONTAINMENT SYSTEMS 3/4.6.2.3 RECIRCULATION pH CONTROL SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.3 The Recirculation pH Control System shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With the Recirculation pH Control System inoperable, restore the buffering agent to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the next 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.2.3 The Recirculation pH Control System shall be demonstrated OPERABLE:

a. At least zene per 18°mcnths by:
1. Verifying that the buffering agent baskets are in place and intact; nert 2. Collectively contain > 7500 pounds (154 cubic feet) of sodium tetraborate decahydrate, or equivalent.

TURKEY POINT - UNITS 3 & 4 3/4 6-15 AMENDMENT NOS. 2 AND 253

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMEN- (QContinued) 4.6.4.2 Each isolation ve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at east oARco 'Re '.. mem4ts by:

a. Verifying that on a Phase "A" Isolation test signal, each Phase "A" isolation valve actuates to its isolation position;
b. Verifying that on a Phase "B"Isolation test signal, each Phase "B" isolation valve actuates to its isolation position; and
c. Verifying that on a Containment Ventilation Isolation test signal, each purge, exhaust and instrument air bleed valve actuates to its isolation position.

4.6.4.3 The isolation time of each power-operated or automatic valve shall be determined to be within its limit when tested pursuant to Specification 4.0.5.

TURKEY POINT - UNITS 3 & 4 3/4 6-18 AMENDMENT NOS. 1-3 AND PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 Two independent auxiliary feedwater trains including 3 pumps as specified in Table 3.7-3 and associated flowpaths shall be OPERABLE.

APPLICA84-L-T: MODES 1, 2 and 3 ACTION: APPLICABILITY

1) With one of the two required independent auxiliary feedwater trains inoperable, either restore the inoperable train to an OPERABLE status within 72. hours, or place the affected unit(s) in at least HOT STANDBY within the next 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s* and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
2) With both required auxiliary feedwater trains inoperable, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> either restore both trains to an OPERABLE status, or restore one train to an OPERABLE status and follow ACTION statement 1 above for the other train. If neither train can be restored to an OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, verify the OPERABILITY of both standby feed-water pumps and place the affected unit(s) in at least HOT STANDBY within the next 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s* and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Otherwise, initiate corrective action to restore at least one auxiliary feedwater train to an OPERABLE status as soon as possible and follow ACTION statement 1 above for the other train.
3) With a single auxiliary feedwater pump inoperable, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, verify OPERABILITY of two independent auxiliary feedwater trains, or follow ACTION statements 1 or 2 above as applicable.

Upon verification of the OPERABILITY of two independent auxiliary feedwater trains, restore the inoperable auxiliary feedwater pump to an OPERABLE status within 30 days, or place the operating unit(s) in at least HOT STANDBY within 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s* and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The provisions of Specification 3.0.4 are not applicable during the 30 day period for the inoperable auxiliary feedwater pump.

SURVEILLANCE REQUIREMENTS 4.7.1.2.1 The required independent auxiliary feedwater trains shall be demonstrated OPERABLE:

a. ... ....... .. days on a STAGGERED TEST BASIS by:

Verifying by control panel indication and visual observation of equipment that each steam turbine-driven pump operates for 15 minutes or greater and develops a flow of greater than or LInsert 1

  • If this ACTION applies to both units simultaneously, be in at least HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

TURKEY POINT - UNITS 3 & 4 3/4 7-3 AMENDMENT NOS. 447 AND +3-

PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM SURVEILLANCE REQUIREMENTS (Continued) equal to 373 gpm to the entrance of the steam generators. The provisions of Specification 4.0.4 are not applicable for entry into MODES 2 and 3;

2) Verifying by control panel indication and visual observation of equipment that the auxiliary feedwater discharge valves and the steam supply and turbine pressure valves operate as required to deliver the required flow during the pump performance test above;
3) Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position; and
4) Verifying that power is available to those components which require power for flow path operability.

b.e ° . . '-^ by:

1) Verifying that each automatic valve in the flow path actuates to its correct position upon Insert 1 Jreceipt of each Auxiliary Feedwater Actuation test signal, and
2) Verifying that each auxiliary feedwater pump receives a start signal as designed automatically upon receipt of each Auxiliary Feedwater Actuation test signal.

4.7.1.2.2 An auxiliary feedwater flow path to each steam generator shall be demonstrated OPERABLE following each COLD SHUTDOWN of greater than 30 days prior to entering MODE 1 by verifying normal flow to each steam generator.

TURKEY POINT - UNITS 3 & 4 3/4 7-4 AMENDMENT NOS. +57 AND 4-32--

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.7.1,3 The condensate storage tank (CST) system shall be demonstrated OPERABLE at lcast ,eon per 12 196HtFeby verifying the indicated water volume is within its limit when the tank is the supply source for the auxiliary feedwater pump Inoser 1 TURKEY POINT - UNITS 3 & 4 3/4 7-7 AMENDMENT NOS. "94 AND -8&

PLANT SYSTEMS No change this page, for information only SPECIFIC ACTIVITY LIMITING CONDITION FOR OPERATION 3.7.1.4 The specific activity of the Secondary Coolant System shall be less than or equal to 0.10 microCurie/gram DOSE EQUIVALENT 1-131.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With the specific activity of the Secondary Coolant System greater than 0.10 microCurie/gram DOSE EQUIVALENT 1-131, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.4 The specific activity of the Secondary Coolant System shall be determined to be within the limit by performance of the sampling and analysis program of Table 4.7-1.

TURKEY POINT - UNITS 3 & 4 3/4 7-8 AMENDMENT NOS. 137 AND 132

TABLE 4.7-1 SECONDARY COOLANT SYSTEM SPECIFIC ACTIVITY SAMPLE AND ANALYSIS PROGRAM TYPE OF MEASUREMENT SAMPLE AND ANALYSIS AND ANALYSIS FREQUENCY

1. Gross Radioactivity At 'east em Determination
2. Isotopic Analysis for DOSE a) Once per 31 days, when-EQUIVALENT 1-131 Concentration ever the gross radio-activity determination indicates concentrations greater than 10% of the allowable limit for radioiodines.

b) Once per 6 months, when-ever the gross radio-activity determination indicates concentrations less than or equal to 10%

of the allowable limit for radioiodines.

TURKEY POINT - UNITS 3 & 4 3/47-9 AMENDMENT NOS. 1-8;7 AND 2

PLANT SYSTEMS STANDBY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.6 Two Standby Steam Generator Feedwater Pumps shall be OPERABLE* and at least 145,000 gallons of,/

water (indicated volume), shall be in the Demineralized Water Storage Tank.** I'"

APPLICABILITY: MODES 1, 2 and 3 ACTION:

a. With one Standby Steam Generator Feedwater Pump inoperable, restore the inoperable pump to available status within 30 days or submit a SPECIAL REPORT per 3.7.1.6d.
b. With both Standby Steam Generator Feedwater Pumps inoperable, restore at least one pump to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or:
1. Notify the NRC within the following 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and provide cause for the inoperability and plans to restore pump(s) to OPERABLE status and,
2. Submit a SPECIAL REPORT per 3.7.1.6d.
c. With less than 145,000 gallons of water indicated in the Demineralized Water Storage Tank restore the available volume to at least 145,000 gallons indicated within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or submit a SPECIAL REPORT pert -

3.7.1.6d.

d. If a SPECIAL REPORT is required per the above specifications submit a report describing the cause of the inoperability, action taken and a schedule for restoration within 30 days in accordance with 6.9.2.

SURVEILLANCE REQUIREMENTS 4.7.1.6.1 The Demineralized Water Storage tank water volume shall be'determined to be within limits atleeast once per 21' hcurasr-4.7.1.6.2 A-es verify the standby feedwater pumps are OPERABLE by testing in recirculation on a STAGGERED TEST BASIS.Insert 4.7.1.6.3 At 'east an verify operability of the respective standby steam generator feedwater pump by starting each pump and providing feedwater to the steam generators.

  • These pumps do not require plant safety related emergency power sources for operability and the flowpath is normally isolated.
    • The Demineralized Water Storage Tank is non-safety grade.

TURKEY POINT - UNITS 3 & 4 3/4 7-11 AMENDMENT NOS. 24,9-AND-245-

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.7.1.6.4 The diesel engine for the diesel-driven Standby Steam Generator Feedwater Pump shall be demonstrated OPERABLE:

a. s--one evr 34-da, by testing with the associated standby steam generator feedwater

__ p in recirculation.

Insert 1

b. .-*8t .. e ........ ,by subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.

TURKEY POINT - UNITS 3 & 4 3/4 7-11 a AMENDMENT NOS. 1s-4-AND 4-S&

PLANT SYSTEMS 3/4.7.1.7 FEEDWATER ISOLATION LIMITING CONDITION FOR OPERATION 3.7.1.7 Six Feedwater Control Valves (FCVs) both main and bypass and six Feedwater Isolation Valves (FIVs) both main and bypass shall be OPERABLE.*

APPLICABILITY: MODES 1, 2 and 3**

ACTION:

a. With one or more FCVs inoperable, restore operability, or close or isolate the inoperable FCVs within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verify that the inoperable valve(s) is closed or isolated at least once per 7 days or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With one or more FIVs inoperable, restore operability, or close or isolate the inoperable FIV(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verify that the inoperable valve(s) is closed or isolated at least once per 7 days or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With one or more bypass valves in different steam generator flow paths inoperable, restore operability, or close or isolate the inoperable bypass valve(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verify that the inoperable valve(s) is closed or isolated at least once per 7 days or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. With two valves in the same steam generator flow paths inoperable, restore operability, or isolate the affected flowpath within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.. /1

//

SURVEILLANCE REQUIREMENTS 4.7.1.7 Each FCV, FIV and bypass valve shall be demonstrated OPERABLE:

a. At least ever 18 months by:
1) Verifying that each FCV, FIV and bypass valve actuates to the isolation position on an Insert 1 actual or simulated actuation signal.
b. In accordance with the Inservice Testing Program by:
1) Verifying that each FCV, FIV and bypass valve isolation time is within limits.
  • Separate Condition entry is allowed for each valve.
    • The provisions of specification 3.0.4 and 4.0.4 are not applicable.

TURKEY POINT - UNITS 3 & 4 3/4 7-11 b AMENDMENT NOS.-24" AND 24-a

PLANT SYSTEMS 3/4,7.2 COMPONENT COOLING WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7,2 The Component Cooling Water System (CCW) shall be OPERABLE with:

a. Three CCW pumps, and
b. Two CCW heat exchangers.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With only two CCW pumps with independent power supplies OPERABLE, restore the inoperable CCW pump to OPERABLE status within 30 days or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. The provisions of Specification 3.0.4 are not applicable.
b. With only one CCW pump OPERABLE or with two CCW pumps OPERABLE but not from independent power supplies, restore two pumps from independent power supplies to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c. With less than two CCW heat exchangers OPERABLE, restore two heat exchangers to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7,2 The Component Cooling Water System (CCW) shall be demonstrated OPERABLE:

a. At least .... pr 1 hors, by verifying that two heat exchangers and one pump are capable of re ving design basis heat loads.

Insert 1 TURKEY POINT - UNITS 3 &4 3/4 7-12 AMENDMENT NOS. 4-37-AND +32-

SURVEILLANCE REQUIREMENTS (Continued)

b. At"4pa.t

...... pe. 31 dly*- by: (1) verifying that each valve (manual, power-operated, or At'rmatic) servicing safety-related equipment that is not locked, sealed, or otherwise secured in position is in its correct position and (2) verifying by a performance test the heat exchanger Insert 1 surveillance curves.*

c. At ',-st ,nee per 18 menth during shutdown, by verifying that:
1) Each automatic valve servicing safety-related equipment actuates to its correct position on a Sl test signal, and
2) Each Component Cooling Water System pump starts automatically on a SI test signal.
3) Interlocks required for CCW operability are OPERABLE.
  • Technical specification 4.7.2.b(2) is not applicable for entry into MODE 4 or MODE 3, provided that:
1) Surveillance 4.7.2.b(2) is performed no later than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after reaching a Reactor Coolant System Tavg of 547 0 F, and
2) MODE 2 shall not be entered prior to satisfactory performance of this surveillance.

TURKEY POINT - UNITS 3 & 4 3/4 7-13 AMENDMENT NOS. 446 AND 44-3

PLANT SYSTEMS 3/4.7.3 INTAKE COOLING WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.3 The Intake Cooling Water System (ICW) shall be OPERABLE with:

a. Three ICW pumps, and
b. Two ICW headers.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With only two ICW pumps with independent power supplies OPERABLE, restore the inoperable ICW pump to OPERABLE status within 14 days or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. The provisions of Specification 3.0.4 are not applicable.
b. With only one ICW pump OPERABLE or with two ICW pumps OPERABLE but not from independent power supplies, restore two pumps from independent power supplies to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c. With only one ICW header OPERABLE, restore two headers to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.3 The Intake Cooling Water System (ICW) shall be demonstrated OPERABLE:

a. --- pa- "3 dy by verifying that each valve (manual, power-operated, or automatic) e.icing safety-related equipment that is not locked, sealed, or otherwise secured in position is in Insert 1 its correct position; and
b. uring shutdown, by verifying that:
1) Each automatic valve servicing safety-related equipment actuates to its correct position on a SI test signal, and
2) Each Intake Cooling Water System pump starts automatically on a SI test signal.
3) Interlocks required for system operability are OPERABLE.

TURKEY POINT - UNITS 3 & 4 3/4 7-14 AMENDMENT NOS. 2-AND 2 PLANT SYSTEMS 3/4.7.4 ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION 3.7.4 The ultimate heat sink shall be OPERABLE with an average supply water temperature less than or equal to 100° F.

APPLICABILITY: MODES 1. 2, 3. and 4.

ACTION:

With the requirements of the above specification not satisfied, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and In COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This ACTION shall be applicable to both units simultaneously.

SURVEILLANCE REQUIREMENTS 4.7.4 The ultimate heat sink shall be determined OPERABLE at least once per 24 ho'-rs by verifying the average supply water temperature* to be within* ii

  • Insert 1 t
  • Portable monitors may be used to measure the temperature.

TURKEY POINT - UNITS 3 & 4 3/4 7-15 AMENDMENT NOS. 2e&AND +94-

PLANT SYSTEMS 3/4.7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION (continued)

b. With the Control Room Emergency Ventilation System inoperable due to an inoperable CRE boundary, immediately suspend all movement of irradiated fuel in the spent fuel pool, and immediately initiate action to implement mitigating actions, and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, verify mitigating actions ensure CRE occupant radiological and chemical hazards will not exceed limits, and CRE occupants are protected from smoke hazards, and restore CRE boundary to OPERABLE status within 90 days, or:
1) With the requirements not met, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
2) If this ACTION applies to both units simultaneously, be in HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

MODES 5 and 6:

c. With the Control Room Emergency Ventilation System inoperable++, immediately suspend all operations involving CORE ALTERATIONS, movement of irradiated fuel in the spent fuel pool, or positive reactivity changes. This ACTION shall apply to both units simultaneously.

SURVEILLANCE REQUIREMENTS 4.7.5 The Control Room Emergency Ventilation System shall be demonstrated OPERABLE:

a. A once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air temperature is less than or equal to
b. , ,-+/- o , by initiating, from the control room, flow through the HEPA filters and Insert 1 charcoal adsorbers and verifying that the system operates for at least 15 minutes***;

c .. or (1) after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of system operation, or (2) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (3) following exposure of the filters to effluents from painting, fire, or chemical release in any ventilation zone communicating with the system that may have an adverse effect on the functional capability of the system, or (4) after complete or partial replacement of a filter bank by:

++ If action per ACTIONS a.4, a.6, a.7, a.8, or a.9 is taken that permits indefinite operation and the system is placed in recirculation mode, then CORE ALTERATIONS, movement of irradiated fuel in the spent fuel pool, and positive reactivity changes may resume.

      • As the mitigation actions of TS 3.7.5 Action a.5 may include the use of the compensatory filtration unit, the unit shall meet the surveillance requirements of TS 4.7.5.b, by manual initiation from outside the control room and TS 4.7.5.c and d.

TURKEY POINT - UNITS 3 & 4 3/4 7-16b AMENDMENT NOS. 25--AND 240

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

1) Verifying that the air cleanup system satisfies the in-place penetration and bypass leakage testing acceptance criteria of greater than or equal to 99% DOP and halogenated hydrocarbon removal at a system flow rate of 1000 cfm +/-1 0%***.
2) Verifying, within 31 days after removal, that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, and analyzed per ASTM D3803 - 1989 at 30 0C and 95% relative humidity, meets the methyl iodide penetration criteria of less than 2.5% or the charcoal be replaced with charcoal that meets or exceeds the stated performance requirement***, and
3) Verifying by a visual inspection the absence of foreign materials and gasket deterioration***.

d.1 At eoast eree per 12 months by verifying that the pressure drop across the combined HEPA filters charcoal adsorber banks is less than 6 inches Water Gauge while operating the system at a flow rate of 1000 cfm +/-1 0%***; f1 N d.2 On STAGGERED TEST BASIS evepy 36 miniths , test the supply fans (trains A and B) and measurej, CRE pressure relative to external areas adjacent to the CRE boundary. 4K lInsert 1 -_ . ,

t. once

... p, ............ by . t on a Containment Phase A" Isolation test signal the system matically switches into the recirculation mode of operation, f At least once erability of the kitchen and toilet area exhaust dampers, and

g. By performing required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
      • As the mitigation actions of TS 3.7.5 Action a.5 may include the use of the compensatory filtration unit, the unit shall meet the surveillance requirements of TS 4.7.5.b, by manual initiation from outside the control room and TS 4.7.5.c and d.

TURKEY POINT - UNITS 3 & 4 3/4 7-17 AMENDMENT NOS. 24f--AND 244

PLANT SYSTEMS 3/4.7.7 SEALED SOURCE CONTAMINATION LIMITING CONDITION FOR OPERATION 3.7.7 Each sealed source containing radioactive material either in excess of 100 microCuries of beta and/or gamma emitting material or 5 microCuries of alpha emitting material shall be free of greater than or equal to 0.005 microCurie of removable contamination.

APPLICABILITY: At all times.

ACTION:

a. With a sealed source having removable contamination in excess of the above limits, immediately withdraw the sealed source from use and either:
1. Decontaminate and repair the sealed source, or
2. Dispose of the sealed source in accordance with Commission Regulations.
b. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.7.1 Test Requirements - Each sealed source shall be tested for leakage and/or contamination by:

a. The licensee, or
b. Other persons specifically authorized by the Commission or an Agreement State.

The test method shall have a detection sensitivity of at least 0.005 microCurie per test sample.

4.7.7.2 Test Frequencies - Each category of sealed sources (excluding startup sources and fission detectors previously subjected to core flux) shall be tested at the frequency described below.

a. Sources in use - At 'east en.. per 6 ... nth. for all sealed sources containing radioactive materials:
1) With a half-life greater than 30 s (excluding Hydrogen 3), and
2) In any form other than gas.

TURKEY POINT - UNITS 3 & 4 3/4 7-22 AMENDMENT NOS. 4G-7ý-AND +a2-

ELECTRICAL POWER SYSTEMS In~sert 1I SU RVEILLANCE REQUIREMENTS \

4.8.1.1.1 Each of the above required sta up transformers and their associated circuits shall be:

a. Determined OPERABLE .s -t c 7 days by verifying correct breaker alignments, indicated power availability, and
b. Demonstrated OPERABLE at 'Part on.c per 418 month& while shutting down, by transferring manually unit power supply from the auxiliary transformer to the startup transformer.

TURKEY POINT - UNITS 3 & 4 3/4 8-4a AMENDMENT NOS. 2e-2. AND 4 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE*:

a. ,- ....... per days on a STAGGERED TEST BASIS by:

1 Verifying the fuel volume in the day and skid-mounted fuel tanks (Unit 4-day tank only),

2) Verifying the fuel volume in the fuel storage tank,
3) Verifying the lubricating oil inventory in storage,
4) Verifying the diesel starts and accelerates to reach a generator voltage and frequency of 3950-4350 volts and 60 + 0.6 Hz. Once per 184 days, these conditions shall be reached within 15 seconds after the start signal fro m normal conditions. For all other starts, warmup procedures, such as idling and gradual acceleration as recommended by the manufacturer may be used. The diesel generator shall be started for this test by using one of the following signals:

a) Manual, or b) Simulated loss-of-offsite power by itself, or c) Simulated Ioss-of-offsite power in conjunction with an ESF Actuation test signal, or d) An ESF Actuation test signal by itself.

5) Verifying the generator is synchronized, loaded** to 2300 - 2500 kW (Unit 3), 2650-2850 kW (Unit 4)***, operates at this loaded condition for at least 60 minutes and for Unit 3 until automatic transfer of fuel from the day tank to the skid mounted tank is demonstrated, and the cooling system is demonstrated OPERABLE.
6) Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.
  • All diesel generator starts for the purpose of these surveillances may be proceeded by a prelube period as recommended by the manufacturer.
    • May include gradual loading as recommended by the manufacturer so that the mechanical stress and wear on the diesel engine is minimized.
      • Momentary transients outside these load bands do not invalidate this test.

TURKEY POINT - UNITS 3 & 4 3/4 8-5 AMENDMENT NOS. 249 AND 245

Fl1 FC'_TPIC'A1 PCWXA)FP _qV~TPftA5q SURVEILLANCE REQUIREMENTS (Continued)

b. Demonstrating at least once pzr 92 days that a fuel trans pump starts automatically and transfers fuel from the storage system to the day tank,
c. At least an,, per 31 day, and after each operation of the diesel where the period of operation s greater than or equal to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> by checking for and removing accumulated water from the day and skid-mounted fuel tanks (Unit 4-day tank only);

d At ',et ,-0, per 31 days by checking for and removing accumulated water from the fuel oil st ge tanks; By verifying fuel oil properties of new fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.

rt 1

_ By verifying fuel oil properties of stored fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.

g. At least cee per 18 mo.tl..s, during shutdown (applicable to only the two diesel generators associated with the unit):
1) Deleted 2)* Verifying the generator capability to reject a load of greater than or equal to 380 kw while maintaining voltage at 3950-4350 volts and frequency at 60 +/- 0.6 Hz; 3)* Verifying the generator capability to reject a load of greater than or equal to 2500 kW (Unit 3), 2874 kW (Unit 4) without tripping. The generator voltage shall return to less than or equal to 4784 volts within 2 seconds following the load rejection;
4) Simulating a loss-of-offsite power by itself, and:

a) Verifying deenergization of the emergency busses and load shedding from the emergency busses, and

b. Verifying the diesel starts on the auto-start signal, energizes the emergency busses with any permanently
  • For the purpose of this test, warmup procedures, such as idling, gradual acceleration, and gradual loading as recommended by the manufacturer may be used.

TURKEY POINT - UNITS 3 & 4 3/4 8-6 AMENDMENT NOS. 24.-AND 245-

No change this page, for information only ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) connected loads within 15 seconds, energizes the auto-connected shutdown loads-through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the auto-connected shutdown loads. After automatic load sequencing, the steady-state voltage and frequency of the emergency busses shall be maintained at 3950-4350 volts and 60 +/- 0.6 Hz during this test.

5) Verifying that on an ESF Actuation test signal, without Ioss-of-offsite power, the diesel generator starts on the auto-start signal and operates on standby for greater than or equal to 5 minutes. The generator voltage and frequency shall be 3950-4350 volts and 60 +/- 0.6 Hz within 15 seconds after the auto-start signal; the steady-state generator voltage and frequency shall be maintained within these limits during this test;
6) Simulating a loss-of-offsite power in conjunction with an ESF Actuation test signal, and:

a) Verifying deenergization of the emergency busses and load shedding from the emergency busses; b) Verifying the diesel starts on the auto-start signal; energizes the emergency busses with any permanently connected loads within 15 seconds, energizes the auto-connected emergency (accident) loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads. After automatic load sequencing, the steady-state voltage and frequency of the emergency busses shall be maintained at 3950-4350 volts and 60,+/- 0.6 Hz during this test; and c) Verifying that diesel generator trips that are made operable during the test mode of diesel operation are inoperable.

7)* # Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to 2550-2750 kW (Unit 3), 2950-3150 kW (Unit 4)** and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to 2300-2500 kW (Unit 3), 2650-2850 kW (Unit 4)**. The generator voltage and frequency shall be 3950-4350 volts and 60 +/- 0.6 Hz within 15 seconds after the start signal; the steady-state generator voltage and frequency

  • For the purpose of this test, warmup procedures, such as idling, gradual acceleration, and gradual loading as recommended by the manufacturer may be used.
    • Momentary transients outside these load bands do not invalidate this test.
  1. This test may be performed during POWER OPERATION TURKEY POINT - UNITS 3 &4 .3148-7 AMENDMENT NOS. 249 AND 245

No change this page, for information only ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) shall be maintained within these limits during this test. Within 5 minutes after completing this 24-hour test, verify the diesel starts and accelerates to reach a generator voltage and frequency of 3950-4350 volts and 60 +/- 0.6 Hz within 15 seconds after the start signal.**

8) Verifying that the auto-connected loads to each diesel generator do not exceed 2500 kW (Unit 3), 2874 kW (Unit 4);
9) Verifying the diesel generator's capability to:

a) Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restoration of offsite power, b) Transfer its loads to the offsite power source, and c) Be restored to its standby status.

10) Verifying that the diesel generator operating in a test mode, connected to its bus, a simulated Safety Injection signal overrides the test mode by: (1) returning the diesel generator to standby operation, and (2) automatically energizing the emergency loads with offsite power;,
11) Verifying that the fuel transfer pump transfers fuel from the fuel storage tank (Unit 3), fuel storage tanks (Unit 4) to the day tanks of each diesel associated with the unit via the installed cross-connection lines;
12) Verifying that the automatic load sequence timer is OPERABLE with the interval between each load block within +/- 10% of its design interval;
13) Verifying that the diesel generator lockout relay prevents the diesel generator from starting;
    • If verification of the diesel's ability to restart and accelerate to a generator voltage and frequency of 3950-4350 volts and 60 +/- 0.6 Hz within 15 seconds following the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> operation test of Specification. 4.8.1.1.2.g.7) is not satisfactorily completed, it is not necessary to repeat the 24-hour test.

Instead, the diesel generator may be operated between 2300-2500 kW Unit 3, 2650-2850 kW (Unit 4) for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or until operating temperature has stabilized (whichever is greater). Following the

  • 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s/operating temperature stabilization run, the EDG is to be secured and restarted within 5 minutes to confirm its ability to achieve the required voltage and frequency within 15 seconds.

TURKEY POINT - UNITS 3 & 4 3/4 8-8 AMENDMENT NOS. 249 AND 245

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (continued)~

h. At lepst once peF 10 yesars or after any modifications which could affect diesel generator S-rependence by starting all required diesel generators simultaneously and verifying that all required diesel generators provide 60 - 0.6 Hz frequency and 3950-4350 volts in lInsert 1 less than or equal to 15 seconds: and
1) Draining each fuel oil storage tank, removing the accumulated sediment and cleaning the tank.*
2) For Unit 4 only, performing a pressure test of those portions of the diesel fuel oil system designed to Section III, subsection ND of the ASME Code in accordance with Section Xl of the ASME Boiler and Pressure Vessel Code and applicable Addenda.

4.8.1.1.3 Reports - (Not Used)

  • A temporary Class III fuel storage system containing a minimum volume of 38,000 gallons of fuel oil may be used for up to 10 days during the performance of Surveillance Requirement 4.8.1.1.2i. I for the Unit 3 storage tank while Unit 3 is in Modes 5, 6, or defueled. If the diesel fuel oil storage tank is not returned to service within 10 days, Technical Specification 3.8.1.1 Action b and 3.8.1.2 Action apply to Unit 4 and Unit 3 respectively.

TURKEY POINT - UNITS 3 &4 3/4 8-9 AMENDMENT NOS. -249 AND 45

D.C. SOURCES LIMITING CONDITION FOR OPERATION ACTION: (Continued)

b. With one of the required battery banks inoperable, or with none of the full-capacity chargers associated with a battery bank OPERABLE, restore all battery banks to OPERABLE status and at least one charger associated with each battery bank to OPERABLE status within two hours* or be in at least HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This ACTION applies to both units simultaneously.

SURVEILLANCE REQUIREMENTS 4.8.2.1 Each 125-volt battery bank and its associated full capacity charger(s) shall be demonstrated OPERABLE:

a. n eFrF days by verifying that:
1) The parameters in Table 4.8-2 meet the Category A limits, and The total battery terminal voltage is greater than or equal to 129 volts on float charge and the battery charger(s) output voltage is > 129 volts, and If two battery chargers are connected to the battery bank, verify each battery charger is supplying a minimum of 10 amperes, or demonstrate that the battery charger supplying less than 10 amperes will accept and supply the D.C. bus load independent of its associated battery charger.

. nz, 02.ordays and within 7 days after a battery discharge with battery terminal voltage r05 volts (108.6 volts for spare battery D-52), or battery overcharge with battery terminal above 143 volts, by verifying that:

The parameters in Table 4.8-2 meet the Category B limits, The average electrolyte temperature of every sixth cell is above 60 0 F, and 4-There is no visible corrosion at either terminals or connectors, or verify battery connection\,6 resistance is:

Battery Connection Limit (Micro-Ohms) 3B, 4A inter-cell / termination < 29 inter-cell (brace locations) < 30 transition cables < 125 or total battery connections < 1958 Ba ery Connection Limit (Micro-Ohms) 3A, B, D-52 inter-cell / termination < 35 inter-cell (brace locations) < 40 transition cables < 125 or total battery connections < 2463 C. At gast ence per 18 months by verifying that:

1) The cells, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration,
  • Can be extended to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if the oppsite unit is in MODE 5 or 6 and each of the remaining required battery chargers is capable of being powered from its associated diesel generator(s).

TURKEY POINT - UNITS 3 &4 3/4 8-14 AMENDMENT NOS. 25iý AND 24-

D.C. SOURCES SURVEILLANCE REOUIREMENTS (Continued)s

2) The cell-to-cell and terminal connections are clean, tight, and coated with anticorrosion material,
3) Each 400 amp battery charger (associated with Battery Banks 3A and 4B) will supply at least 400 amperes at > 129 volts for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and each 300 amp battery charger (associated with Battery Banks 3B and 4A) will supply at least 300 amperes at _>129 volts for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and
4) Battery Connection resistance is:

Battery Connection Limit (Micro-Ohms) 3B, 4A inter-cell / termination < 29 inter-cell (brace locations) < 30 transition cables < 125 or total battery connections < 1958 Battery Connection Limit (Micro-Ohms) 3A, 4B, D-52 inter-cell / termination < 35 inter-cell (brace locations) < 40 transition cables < 125 or total battery connections <2463

d. ,t I8c p ronths, during shutdown**, by verifying that the battery capacity is ade e to supply and maintain in OPERABLE status all of the actual or simulated emergency I ds for the design duty cycle when the battery is subjected to a battery service test.
e. At least once per 12 months, during shutdown**, by giving performance discharge tests of battery capacity to any battery that shows signs of degradation or has reached 85% [75% for Batteries 4B and D52 (Spare) when used in place of Battery 4B] of service life expected for the application. Degradation is indicated when the battery capacity drops more than 10% [7% for Ilnsert 1 Batteries 4B and D52 (Spare) when used in place of Battery 4B] of rated capacity from its )

average on previous performance tests, or is below 90% [93% for Batteries 48 and D52 (Spare) when used in place of Battery 4B] of the manufacturer's rating.

T. A la i ,

no p. , ,, ,t, , , durinrg UI.WULU wI , by V*iilyiiiy LIIaL LI)e baLttry .LpaILy Is dL. 1e . I.

80% [87% for Batteries 4B and D52 (Spare) when used in place of Battery 4B] of the manufacturer's rating when subjected to a performance discharge test. Once per 60-month interval this performance discharge test may be performed in lieu of the battery service test required by Specification 4.8.2.1.d.

    • Except that the spare battery bank D-52, and any other battery out of service when spare battery bank D-52 is in service may be tested with simulated loads during operation.

TURKEY POINT - UNITS 3 & 4 3/4 8-15 AMENDMENT NOS. 526AND M48

ONSITE POWER DISTRIBUTION LIMITING CONDITION FOR OPERATION (Continued)

ACTION: (Continued) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This ACTION applies to both units simultaneously.

d. With one D.C. bus not energized from its associated battery bank or associated charger, reenergize the D.C. bus from its associated battery bank within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s* or be in at least HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This ACTION applies to both units simultaneously.

SURVEILLANCE REQUIREMENTS 4.8.3.1 The specified busses shall be determined energized and aligned in the required manner at least-enee-pef-

--- days by verifying correct breaker alignment and indicated voltage on the busses Insert 1

  • Can be extended to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ifthe opposite unit is in MODE 5 or 6 and each of the remaining required battery chargers is capable of being powered from its associated diesel generator(s).

TURKEY POINT - UNITS 3 &4 3/4 8-20 AMENDMENT NOS.--3! AND i-

ONSITE POWER DISTRIBUTION SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.3.2 As a minimum, the following electrical busses shall be energized in the specified manner:

a. One train of A.C. emergency busses associated with the unit (3.8.3.1a. or b.) consisting of one 4160-volt and three 480-volt A.C. emergency busses load centers* and three (four for Unit 4 Train A) vital sections of motor control center busses,
b. Two 120-volt A.C. vital busses for the unit energized from their associated inverters** connected to their respective D.C. busses, and
c. Three 125-volt D.C. busses energized from their associated battery banks.

APPLICABILITY MODES 5*** and 6***.

ACTION:

With any of the above required electrical busses not energized in the required manner, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity changes, or movement of irradiated fuel, initiate corrective action to energize the required electrical busses in the specified manner as soon as possible, and within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, depressurize and vent the RCS through at least a 2.2 square inch vent.

SURVEI LLANCE REQUIREMENTS 4.8.3.2 The specified busses shall be determined energized in the required manner at lcast ence por 7 days by verifying correct breaker alignment and indicated voltage on the busse Ilnsert 11

  • With the opposite unit in MODE 1, 2, 3, or 4, the 480-volt load centers can only be cross-tied upon issuance of an engineering evaluation to prevent exceeding required electrical components maximum design ratings and to ensure availability of the minimum required equipment.
    • A backup inverter may be used to replace the normal inverter provided the normal inverter on the same DC bus for the opposite unit is not replaced at the same time.
      • CAUTION - If the opposite unit is in MODES 1, 2, 3, or 4, see the corresponding Limiting Condition for Operation 3.8.3.1.

TURKEY POINT - UNITS 3 & 4 3/4 8-23 AMENDMENT NOS. 45-AND 440-

3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met; either:

a. A Keft of 0.95 or less, or
b. A boron concentration of greater than or equal to 2300 ppm.

APPLICABILITY: MODE 6.*

ACTION:

With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes and initiate and continue boration at greater than or equal to 16 gpm of a solution containing greater than or equal to 3.0 wt% (5245 ppm) boron or its equivalent until KIf is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2300 ppm, whichever is the more restrictive.

SURVEILLANCE REQUIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to:

a. Removing or unbolting the reactor vessel head, and
b. Withdrawal of any full-length control rod in excess of 3 feet from its fully inserted position within the reactor vessel.

4.9.1.2 The boron concentration of the Reactor Coolant System and the refueling canal shall be determined by chemical analysis at least mcc pe 72 h.U.S.

4.9.1.3 Valves isolating unbb and secured in position by mechanical stops or by removal of air or

  • The reactor shall be maintained in MODE 6 whenever fuel is in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.
    • The primary water supply to the boric acid blender may be opened under administrative controls for makeup.

TURKEY POINT - UNITS 3 & 4 3/4 9-1 AMENDMENT NOS.-2-4 AND 246-

REFUELING OPERATIONS 3/4.9.2 INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, one primary Source Range Neutron Flux Monitor with continuous visual indication in the control room and audible indication in the containment and control room, and one of the remaining three Source Range Neutron Flux Monitors (one primary or one of the two backup monitors) with continuous visual indication in the control room shall be OPERABLE.

APPLICABILITY: MODE 6.

ACTION:

a. With one of the above required monitors inoperable or not operating, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes.
b. With both of the above required monitors inoperable or not operating, determine the boron concentration of the Reactor Coolant System at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

-SURVEILLANCE REQUIREMENTS 4.9.2 Each required Source Range Neutron Flux Monitor shall be demonstrated OPERABLE by performance of:

a. A CHANNEL CHECK last on- per 12 hnrsir
b. An ANALOG CHANNEL OPRATIONAL TEST within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to the initial start of CORE ALTERATIONS, and
c. An ANALOG CHANNEL 0 FERATIONAL TEST at leastne Der-7d TURKEY POINT - UNITS 3 &4 3/4 9-2 AMENDMENT NOS. 4-37 AND 4-3 REFUELING OPERATIONS 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION HIGH WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.1 At least one residual heat removal (RHR) loop shall be OPERABLE and in operation.*

APPLICABILITY: MODE 6, when the water level above the top of the reactor vessel flange is greater than or equal to 23 feet.

ACTION:

With no RHR loop OPERABLE and in operation, suspend all operations involving an increase in the reactor decay heat load or a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required RHR loop to OPERABLE and operating status as soon as possible. Close all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.9.8.1.1 At least one RHR loop shall be verified in operation and circulating reactor coolant at a flow rate of greater than or equal to 3000 gpm t o r 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.9.8.1.2 The RHR flow indicator shall be subjecte a CHANNEL CALIBRATION at least enee p*,

18u IIi Il1,.7S.1

  • The required RHR loop may be removed from operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause reduction of the Reactor Coolant System boron concentration.

TURKEY POINT - UNITS 3 & 4 3/4 9-8 AMENDMENT NOS. 8-89-AND 48 REFUELING OPERATIONS LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2 Two independent residual heat removal (RHR) loops shall be OPERABLE, and at least one RHR loop shall be in operation*. 1y APPLICABILITY: MODE 6, when the water level above the top of the reactor vessel flange is less than 23 feet.

ACTION:

a. With less than the required RHR loops OPERABLE, immediately initiate corrective action to return the required RHR loops to OPERABLE status, or to establish greater than or equal to 23 feet of water above the reactor vessel flange, as soon as possible.
b. With no RHR loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required RHR loop to operation. Close all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.9.8.2 At least one RHR loop shall be verified in operation and circulating reactor coolant at a flow rate of greater than or equal to 3000 gpm at least once per 1*2 heurs.

IInser 1I

  • One required RHR loop may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing, provided that the other RHR loop is OPERABLE and in operation.

TURKEY POINT - UNITS 3 & 4 3/4 9-9 AMENDMENT NOS. 229-AND 2*,x5

REFUELING OPERATIONS 3/4.9.11 WATER LEVEL - STORAGE POOL LIMITING CONDITION FOR OPERATION 3.9.11 The water level shall be maintained greater than or equal to elevation 56' - 10" the spent fuel storage pool.*

APPLICABILITY: Whenever irradiated fuel assemblies are in the storage pool.

ACTION:

a. With the requirements of the above specification not satisfied, suspend all movement of fuel assemblies and crane operations with loads in the fuel storage areas and restore the water level to within its limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
b. The provisions of Specification 3.0.3 are not applicable.

Insert 1 S VEILLANCE REQUIREMENTS 4.9.11 The water level in the storage pool shall be determined to be at least its minimum required depth at4eest-

..... 7 daywhen

,e, irradiated fuel assemblies are in the fuel storage pool.

  • The requirements of this specification may be suspended for more than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to perform maintenance provided a 10 CFR 50.59 evaluation is prepared prior to suspension of the above requirement and all movement of fuel assemblies and crane operation with loads in the fuel storage areas are suspended. If the level is not restored within 7 days, the NRC shall be notified within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

TURKEY POINT - UNITS 3 & 4 3/4 9-12 AMENDMENT NOS. 224-AND249-

REFUELING OPERATIONS 3/4.9.14 SPENT FUEL STORAGE LIMITING CONDITION FOR OPERATION 3.9.14 The following conditions shall apply to spent fuel storage:

a. The minimum boron concentration in the Spent Fuel Pit shall be 2300 ppm.
b. The combination of initial enrichment, burnup, and cooling time of each fuel assembly stored in the Spent Fuel Pit shall be in accordance with Specification 5.5.1.

APPLICABILITY: At all times when fuel is stored in the Spent Fuel Pit.

ACTION:

a. With boron concentration in the Spent Fuel Pit less than 2300 ppm, suspend movement of spent ",,/

fuel in the Spent Fuel Pit and initiate action to restore boron concentration to 2300 ppm or AN greater.

b. With condition b not satisfied, suspend movement of additional fuel assemblies into the Spent Fuel Pit and restore the spent fuel storage configuration to within the specified conditions.

c, The provisions of Specification 3.0.3 are not applicable.

SURVEI LLANCE REQUIREMENTS 4.9.14.1 The boron concentration of the Spent Fuel Pit shall be verified to be 2300 ppm or greater at least en-eee per month, 4.9.14.2 A representative sample of inservice Metamic inserts shall be visually inspected in accord ce with the Metamic Surveillance Program described in UFSAR Section 16.2. The surveillance ogram ensures that the performance requirements of Metamic are met over the surveillance i erval.

TURKEY POINT - UNITS 3 & 4 3/4 9-15 AMENDMENT NOS. 249 AND 24t

SPECIAL TEST EXCEPTIONS 3/4.10.3 PHYSICS TESTS LIMITING CONDITION FOR OPERATION 3.10.3 The limitations of Specifications 3.1.1.3, 3.1.1.4, 3.1.3.1, 3.1.3.5, and 3.1.3.6 may be suspended during the performance of PHYSICS TESTS provided:

a. The THERMAL POWER does not exceed 5% of RATED THERMAL POWER,
b. The Reactor Trip Setpoints on the OPERABLE Intermediate and Power Range channels are set at less than or equal to 25% of RATED THERMAL POWER, and
c. The Reactor Coolant System lowest operating loop temperature (Tavg) is greater than or equal to 531°F.

APPLICABILITY: MODE 2.

ACTION:

a. With the THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the Reactor trip breakers.
b. With a Reactor Coolant System operating loop temperature (Ta,) less than 531 OF, restore Tavg to within its limit within 15 minutes or be in at least HOT STANDBY within the next 15 minutes.

SURVEILLANCE REQUIREMENTS 4.10.3.1 The THERMAL POWER shall be determined to be less than or equal to 5% of RATED THERMAL POWER at lcost encc per hour during PHYSICS TESTS.

4.10.3.2 ach Intermediate and Power Range channel shall be subjected to an ANALOG CHANNEL OPERAT NAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating PHYSICS TESTS.

4.10.3 The Reactor Coolant System temperature (Tavg) shall be determined to be greater than or equal to 5310

/at lcast oR-cc per 30 minutcs during PHYSICS TESTS.

[insert 1 TURKEY POINT - UNITS 3 & 4 3/4 10-3 AMENDMENT NOS. 4-AND 4-2

ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)

3. If crack indications are found in any portion of a SG tube not excluded above, then the next inspection for each affected and potentially affected SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever results in more frequent inspections). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
e. Provisions for monitoring operational primary-secondary leakage.
k. Control Room Envelope Habitability Program A Control Room Envelope (CRE) Habitability Program shall be established and implemented to ensure that CRE habitability is maintained such that, with an OPERABLE Control Room Emergency Ventilation System (CREVS), CRE occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge. The program shall ensure that adequate radiation protection is provided to permit access and occupancy of the CRE under design basis accident (DBA) conditions without personnel receiving radiation exposures in excess of 5 rem total effective dose equivalent (TEDE) for the duration of the accident.

The program shall include the following elements:

a. The definition of the CRE and the CRE boundary.
b. Requirements for maintaining the CRE boundary in its design condition including configuration control and preventive maintenance.
c. Requirements for (i) determining the unfiltered air inleakage past the CRE boundary into the CRE in accordance with the testing methods and at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors," Revision 0, May 2003, and (ii)assessing CRE habitability at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0.
d. Measurement, at designated locations, of the CRE pressure relative to external areas adjacent to the CRE boundary during the pressurization mode of operation of the CREVS, operating at the flow rate required by Surveillance Requirement 4.7.5.d, at a Frequency of 18 months. Additionally, the supply fans (trains A and B) will be tested on a staggered test basis (defined in Technical Specification definition 1.29 every 36 months).

The results shall be trended and the CRE boundary assessed every 18 months.

e. The quantitative limits on unfiltered air inleakage into the CRE. These limits shall be stated in a manner to allow direct comparison to the unfiltered air inleakage measured by the testing described in paragraph c. The unfiltered air inleakage limit for radiological challenges is the inleakage flow rate assumed in the licensing basis analyses of DBA consequences. Unfiltered air inleakage limits for hazardous chemicals must ensure that exposure of CRE occupants to these hazards will be within the assumptions in the licensing basis.

Insert 2 f. The provisions of Specification 4.0.2 are applicable to the Frequencies for assessing CRE habitability, determining CRE unfiltered inleakage, and measuring CRE pressure and assessing the CRE boundary as required by paragraphs c and d, respectively.

6.8.5 DELETED TURKEY POINT - UNITS 3 & 4 6-1 8c AMENDMENT NOS. mný5&AND 7M4

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 4 Attachment 4 Turkey Point Nuclear Plant License Amendment Request No. LAR-229 Technical Specifications Bases Marked-Up Pages For Information Only This coversheet plus 19 pages.

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 55 of 192 PROCEDURE NO,:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 39 of 176) 3/4.1.3 (Continued)

TS 3.1.3.2 Action a.2.c) requires the use of the Movable Incore Detector System to verify rod position prior to increasing thermal power above 50 percent Rated Thermal Power (RTP) and within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of reaching 100 percent RTP. These provisions are intended to establish and confirm the position of the rod with the inoperable RPI to ensure that power distribution requirements are NOT violated.

The ACTION Statements which permit limited variations from the basic requirements are accompanied by additional restrictions which ensure that the original design criteria are met. Misalignment of a rod requires measurement of peaking factors and a restriction in THERMAL POWER. These restrictions provide assurance of fuel rod integrity during continued operation. In addition, those safety analyses affected by a misaligned rod are reevaluated to confirm that the results remain valid during future operation.

The maximum rod drop time restriction is consistent with the assumed rod drop time used in the safety analyses. Measurement with Tavg greater than or equal to 500OF and with all Reactor Coolant Pumps operating ensures that the measured drop times will be representative of insertion times experienced during a Reactor Trip at operating conditions.

Control rod positions and OPERABILITY of the Rod Position Indicators are required to be verified on a nominal basis of e,-ee per 12 h'-rc with more frequent verifications required if an automatic monitoring channel is inoperable. These verification frequencies are adequate for assuring that the applicable LCOs are satisfied.

REVISION NO.: PROCEDURE TITLE: PAGE:

PROCEDURE NO.: TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 65 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 49 of 176) 3/4.2.5 DNB Parameters The limits on the DNB-related parameters assure that each of the parameters are maintained within the normal steady-state envelope of operation assumed in the transient and accident analyses. The limits are consistent with the initial UFSAR assumptions and have been analytically demonstrated adequate to maintain a minimum DNBR above the applicable design limits throughout each analyzed transient.

The limits for Tavg and pressurizer pressure have been moved to the COLR. The measured RCS flow value of 270,000 gpm corresponds to a Thermal Design Flow of 260,700 gpm with an allowance of 3.5% to accommodate calorimetric measurement uncertainty.

The ,2 H-O periodic surveillance of these parameters through instrument readout is sufficient to ensure that the parameters are restored within their limits following load changes and other expected transient operation. The 1.8 Re*h periodic measurement of the RCS total flow rate is adequate to ensure that the DNB-related flow assumption is met and to ensure correlation of the flow indication channels with measured flow. The indicated percent flow surveillance z,-. a 1 2 huF ba.*,a will provide sufficient verification that flow degradation has NOT occurred. An indicated percent flow which is greater than the thermal design flow plus instrument channel inaccuracies and parallax errors is acceptable for the 12 he'.'

surveillance on RCS flow. To minimize measurement uncertainties it is assumed that the RCS flow channel outputs are averaged.

REVISION NO.: PROCEDURE TITLE: PAGE:

--9---- TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 66 O1 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 50 of 176) 3/4.3 Instrumentation 3/4.3.1

&

3/4.3.2 Reactor Trip System and Engineered Safety Features Actuation System Instrumentation The OPERABILITY of the Reactor Trip System and the Engineered Safety Features Actuation System instrumentation and interlocks ensures that: (1) The associated ACTION and/or Reactor trip will be initiated when the parameter monitored by each channel or combination thereof reaches its Setpoint (2) The specified coincidence logic is maintained, (3) Sufficient redundancy is maintained to permit a channel to be out of-service for testing or maintenance (due to plant specific design, pulling fuses and using jumpers may be used to place channels in trip), and (4) Sufficient system functional capability is available from diverse parameters.

The OPERABILITY of these systems is required to provide the overall reliability, redundancy, and diversity assumed available in the facility design for the protection and mitigation of accident and transient conditions. The integrated operation of each of these systems is consistent with the assumptions used in the safety analyses. The Surveillance Requirements specified for these systems ensure that the overall system functional capability is maintained comparable to the original design standards. The periodic surveillance tests the

. m.......m ,feze, are sufficient to demonstrate this capability.

Surveillances for the analog RPS/ESFAS Protection and Control rack instrumentation have been extended to "-"4e"Fe in accordance with WCAP-10271, Evaluation of Surveillance Frequencies and Out of Service Times for the Reactor Protection Instrumentation System, and supplements to that report as generically approved by the NRC and documented in their SERs (Letters to the Westinghouse Owner's Group from the NRC dated February 21, 1985, February 22, 1989, and April 30, 1990).

Under some pressure and temperature conditions, certain surveillances for Safety Injection cannot be performed because of the system design.

Allowance to change modes is provided under these conditions as long as the surveillances are completed within specified time requirements.

REVISION NO.: PROCEDURE TITLE: PAGE:

-

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 81 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 65 of 176) 3/4.4.2 (Continued)

In MODE 5 only one Pressurizer Code Safety is required for overpressure protection. In lieu of an actual OPERABLE Code Safety Valve, an unisolated and unsealed vent pathway (i.e., a direct, unimpaired opening, a vent pathway with valves locked open and/or power removed and locked on an open valve) of equivalent size can be taken credit for as synonymous with an OPERABLE Code Safety.

Demonstration of the safety valves lift settings will occur only during shutdown and will be performed in accordance with the provisions of the ASME OM Code. The Pressurizer Code Safety Valves lift settings allows a +2%, -3% setpoint tolerance for OPERABILITY; however, the valves are reset to within +/-1% during the surveillance to allow for drift.

3/4.4.3 Pressurizer The l.Hetrr periodic surveillance is sufficient to ensure that the maximum water volume parameter is restored to within its limit following expected transient operation. The maximum water volume (1133 cubic feet) ensures that a steam bubble is formed and thus the RCS is NOT a hydraulically solid system. The requirement that both backup pressurizer heater groups be OPERABLE enhances the capability of the plant to control Reactor Coolant System pressure and establish natural circulation.

3/4.4.4 Relief Valves The opening of the power-operated relief valves (PORVs) fulfills NO safety-related function and NO credit is taken for their operation in the safety analysis for MODE 1, 2 or 3. Equipment necessary to establish PORV operability in Modes 1 and 2 is limited to Vital DC power and the Instrument Air system. Equipment necessary to establish block valve operability is limited to an AC power source. Each PORV has a remotely operated block valve to provide a positive shutoff capability should a PORV fail in the open position.

REVISION NO.: PROCEDURE TITLE: PAGE:

_ 9_ _ TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 99 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 83 of 176) 3/4.4.6.2 (Continued)

Action d.

With one or more RCS Pressure Isolation Valves with leakage greater than 5 gpm, the leakage must be reduced to below 5 gpm within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or the reactor must be brought to at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The allowable outage times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. In MODE 5, the pressure stresses acting on the RCPB are much lower, and further deterioration is much less likely.

Surveillance Requirements SR 4.4.6.2.1 Verifying Reactor Coolant System leakage to be within the LCO limits ensures the integrity of the Reactor Coolant Pressure Boundary is maintained. PRESSURE BOUNDARY LEAKAGE would at first appear as UNIDENTIFIED LEAKAGE and can only be positively identified by inspection. It should be noted that leakage past seals and gaskets is NOT PRESSURE BOUNDARY LEAKAGE. UNIDENTIFIED LEAKAGE and IDENTIFIED LEAKAGE are determined by performance of a Reactor Coolant System water inventory balance.

a. & b.

These SRs demonstrate that the RCS operational leakage is within the LCO limits by monitoring the containment atmosphere gaseous or particulate radioactivity monitor and the containment sump level at le@19t eme pe 12 hom

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 100 of 192 PROCEDURE NO.:

0-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 84 of 176) 3/4.4.6.2 (Continued)

C.

The RCS water inventory balance must be performed with the reactor at steady state operating conditions and near operating pressure. The Surveillance is modified by two notes. Note ***states that this SR is NOT required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowance provides sufficient time to collect and process all necessary data after stable plant conditions are established.

Steady state operations is required to perform a proper inventory balance since calculations during maneuvering are NOT useful. For RCS operational leakage determination by water inventory balance, steady state is defined as stable RCS pressure, temperature, power level, Pressurizer and makeup tank levels, makeup and letdown, and Reactor Coolant Pump seal injection and return flows.

An early warning of PRESSURE BOUNDARY LEAKAGE or UNIDENTIFIED LEAKAGE is provided by the automatic systems that monitor containment atmosphere radioactivity, containment normal sump inventory and discharge, and reactor head flange leak-off. It should be noted that leakage past seals and gaskets is NOT PRESSURE BOUNDARY LEAKAGE. These leakage detection systems are specified in LCO 3.4.6.1, Reactor Coolant System Leakage Detection Systems.

Note ** states that this SR is NOT applicable to primary-to-secondary leakage because leakage of 150 gallons per day cannot be measured accurately by an RCS water inventory balance.

The 72.4&6 frequency is a reasonable interval to trend leakage and recognizes the importance of early leakage detection in the prevention of accidents.

d.

This SR demonstrates that the RCS Operational Leakage is within the LCO limits by monitoring the Reactor Head Flange Leak-off System at loe t .... e p,. . h24 . .

REVISION NO.: PROCEDURE TITLE: PAGE:

--9--

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 101 PROCEDURE NO.:

0-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 85 of 176) 3/4.4.6.2 (Continued) e.

This SR verifies that primary-to-secondary leakage is less than or equal to 150 gpd through any one SG. Satisfying the primary-to-secondary leakage limit ensure that the operational leakage performance criterion in the Steam Generator Program is met. If this SR is NOT met, compliance with LCO 3.4.5, Steam Generator (SG)

Tube Integrity, should be evaluated. The 150-gpd limit is measured at room temperature as described in Reference 5. The operational leakage rate limit applies to leakage through any one SG. If it is NOT practical to assign the leakage to an individual SG, all the primary to secondary leakage should be conservatively assumed to be from one SG.

The SR is modified by Note ***, which states that the Surveillance is NOT required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation. For RCS primary to-secondary leakage determination, steady state is defined as stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and reactor coolant pump seal injection and return flows.

The surveillance frequency 4-e is a reasonable interval to trend primary to secondary leakage and recognizes the importance of early leakage detection in the prevention of accidents. The primary-to-secondary leakage is determined using continuous process radiation monitors or radiochemical grab sampling in accordance with the EPRI guidelines (Ref. 5).

SR 4.4.6.2.2 It is apparent that when pressure isolation is provided by two in-series check valves and when failure of one valve in the pair can go undetected for a substantial length of time, verification of valve integrity is required. Since these valves are important in preventing overpressurization and rupture of the ECCS low pressure piping, which could result in a LOCA that bypasses containment, these valves should be tested periodically to ensure low probability of gross failure.

REVISION NO.: PROCEDURE TITLE: PAGE:

--9---

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 104 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 88 of 176) 3/4.4.8 (Continued)

The RCS Specific activity satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii).

The iodine specific activity in the reactor coolant is limited to 0.25 pCi/gm DOSE EQUIVALENT 1-131, and the noble gas specific activity in the reactor coolant is limited to 447.7 pCi/gm DOSE EQUIVALENT XE-1 33. The limits on specific activity ensure that the offsite and Control Room doses will meet the appropriate SRP acceptance criteria.

The SLB, SGTR, Locked Rotor, and RCCA Ejection Accident analyses show that the calculated doses are within limits. Violation of the LCO may result in reactor coolant activity levels that could, in the event of any one of these accidents, lead to doses that exceed the acceptance criteria.

The ACTIONS permit limited operation when DOSE EQUIVALENT 1-131 is greater than 0.25 pCi/gm and less than 60 pCi/gm. The Actions require sampling within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following to establish a trend.

One surveillance requires performing a gamma isotropic analysis as a measure of noble gas specific activity of the reactor coolant atleeea-cnzc Per 7 days. This measurement is the sum of the degassed gamma activities and the gaseous gamma activities in the sample taken. This surveillance provides an indication of any increase in the noble gas specific activity.

A second surveillance is performed to ensure that iodine specific activity remains within the LCO limit cncc pcr 14 day. during normal operation and following fast power changes when iodine spiking is more apt to occur. The frequency between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a power change of greater than 15% RATED THERMAL POWER within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, is established because the iodine levels peak during this time following iodine spike initiation.

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 122 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 106 of 176) 3/4.5.2 & 3/4.5.3 (Continued)

When PC-600/-601 are calibrated, a test signal is supplied to each circuit to check operation of the relays and annunciators operated by subject controllers. This test signal will prevent MOVs 862A, 862B, 863A, 863B from opening. Therefore, it is appropriate to tag out the MOV breakers, and enter Technical Specification Action Statement 3.5.2.a. and 3.6.2.1 when calibrating PC-600/-601.

With the RCS temperature below 3500 F, operation with less than full redundant equipment is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the limited core cooling requirements.

TS 3.5.2, Action g. provides an allowed outage/action completion time (AOT) of up to 7 days to restore an inoperable RHR Pump to OPERABLE status, provided the affected ECCS Subsystem is inoperable only because its associated RHR Pump is inoperable. This 7 day AOT is based on the results of a deterministic and probabilistic safety assessment, and is referred to as a Risk-Informed AOT Extension. Planned entry into this AOT requires that a Risk Assessment be performed in accordance with the Configuration Risk Management Program (CRMP), which is described in the administrative procedure that implements the Maintenance Rule pursuant to 10CFR50.56.

TS Surveillance 4.5.2.a requires that each ECCS component and flow path be demonstrated operable at least ....... 12 he by verifying by Control Room indication that the valves listed in Section 4.5.2.a are in the indicated positions with power to the valve operators removed. Verifying Control Room indication applies to the valve position and NOT to the valve operator power removal. The breaker position may be verified by either the off condition of the breaker position indication light in the Control Room, or the verification of the locked open breaker position in the field. Verifying that power is removed to the applicable valve operators can be accomplished by direct field indication of the breaker (locked in the open position), or by observation of the breaker position status lamp in the Control Room (lamp is off when breaker is open). Surveillance Requirements for throttle valve position stops prevent total pump flow from exceeding runout conditions when the system is in its minimum resistance configuration.

REVISION NO.: PROCEDURE TITLE: PAGE:

_9_ _ TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 123 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 107 of 176) 3/4.5.2 & 3/4.5.3 (Continued)

ECCS "accessible discharge piping" is defined as discharge piping outside of containment in accordance with NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems interpretation. High point vents (current or added) outside of containment on the HHSI and RHR Systems priodc r piping are considered accessible. These valves must be included In= venting procedure to comply with Technical Specification Surveillance Requirement 4.5.2.b.1. This clarification was added as a corrective action to CR# 2009-18558.

In the RHR test, differential head is specified in feet. This criteria will allow for compensation of test data with water density due to varying temperature.

ECCS pump testing for the SI and RHR Pumps accounts for possible underfrequency conditions, i.e., the results of pump testing performed at 60 Hz is then adjusted to reflect possible degraded grid conditions (60+/-0.6) to the lower limit (59.4 Hz).

CAUTION Interim Compensatory Measure TS 3.5.2 Action 'a' has been determined to be non-conservative with respect to the safety analysis as it allows up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for restoration of the inoperable flow path despite inoperability of both ECCS trains during this period.

Therefore, until appropriate changes to TS 3/4.5.2 via LAR 212 are approved and implemented, TS 3.0.3 shall be entered vice TS 3.5.2 Action 'a' in the event that the suction flow path from the RWST to the ECCS is inoperable.

Reference AR 1811016.

Technical Specifications Surveillance Requirement 4.5.2.e.3 requires that each ECCS component and flow path be demonstrated OPERABLE ev'-

48weI.tha by visual inspection which verifies sump components (trash racks, screens, etc.) show NO evidence of structural distress or abnormal corrosion. The strainer modules are rigid enough to provide both functions as trash racks and screens without losing their structural integrity and particle efficiency. Therefore, strainer modules are functionally equivalent to trash racks and screens. Accordingly, the categorical description, sump components, is broad enough to require inspection of the strainer modules.

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 133 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 117 of 176) 3/4.6.2.2 (Continued)

The allowable out-of-service time requirements for the Containment Cooling System have been maintained consistent with that assigned other inoperable ESF equipment and do NOT reflect the additional redundancy in cooling capability provided by the Containment Spray System. The frequency The surveillance requirement for ECC flo verified by correlating the test configuration value with the de i asis assumptions for system configuration and flow. Am 13,-8 ,. 9,vil ,*,"to,tr.l is acceptable based on the use of water from the CCW system, which results in a low risk of heat exchanger tube fouling.

3/4.6.2.3 Recirculation PH Control System The Recirculation pH Control System is a passive safeguard consisting of 10 stainless steel wire mesh baskets (2 large and 8 small) containing sodium tetra borate decahydrate (NaTB) located in the containment basement (14' elevation). The initial containment spray will be boric acid solution from the Refueling Water Storage Tank. The recirculation pH control system adds NaTB to the Containment Sump when the level of boric acid solution from the Containment Spray and the coolant lost from the Reactor Coolant System rises above the bottom of the buffering agent baskets. As the sump level rises, the NaTB will begin to dissolve. The addition of NaTB from the buffering agent baskets ensures the containment sump pH will be greater than 7.0. The resultant alkaline pH of the spray enhances the ability of the recirculated spray to scavenge fission products from the containment atmosphere. The alkaline pH in the recirculation sump water minimizes the evolution of iodine and minimizes the occurrence of chloride and caustic stress corrosion on stainless steel piping systems exposed to the solution.

The OPERABILITY of the recirculation pH control system ensures that there is sufficient NaTB available in the containment to ensure a sump pH greater than 7.0 during the recirculation phase of a postulated LOCA. The baskets will NOT interact with surrounding equipment during a seismic event.

REVISION NO.: PROCEDURE TITLE: PAGE:

-

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 135 of 192 PROCEDURE NO.:

0-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 119 of 176) 3/4.6.2.3 (Continued)

To satisfy the surveillance requirement, the two large baskets and eight small baskets must contain a combined mass greater than 7500 Ibm of NaTB. As shown in the above table, this will ensure the sump pH exceeds 7.0 at the onset of spray recirculation and for the duration of the analyzed 30-day period. The large baskets have a length and width of 54 inches, and a height of 33.25 inches and are elevated 3.5 inches above the containment floor. The smaller baskets have a length and width of 36 inches and a height of 30 inches and are elevated 4.5 inches above the containment floor.

Varying basket dimensions or elevation (e.g. basket leg height) impacts the surface to volume ratio and changes the time the NaTB is in contact with containment sump water. For instance, shorter legs would allow the NaTB to contact containment sump water sooner, therefore increasing the pH at the onset of recirculation. Longer legs, however, would reduce the pH at the onset of recirculation. The level of NaTB in the baskets required to provide an equilibrium sump solution pH greater than 7.0 is 14.75 inches from the top of the "

basket; 18.50 inches for the large baskets and 15.25 inches for the small baskets from the bottom of the basket. The 1, e,,,th frequency for Surveillance Requirement 4.6.2.3 is sufficient to ensure that the stainless steel buffering agent baskets are intact and contain the required quantity of NaTB.

REVISION NO.: PROCEDURE TITLE: PAGE:

- TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 139 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 123 of 176) 3/4.7.1.2 Auxiliary Feedwater System The OPERABILITY of the Auxiliary Feedwater System ensures that the Reactor Coolant System can be cooled down to less than 350'F from normal operating conditions in the event of a total Loss-Of-Offsite Power. Steam can be supplied to the pump turbines from either or both units through redundant steam headers. Two D.C. motor operated valves and one A.C. motor operated valve on each unit isolate the three main steam lines from these headers. Both the D.C.

and A.C. motor operated valves are powered from safety-related sources. Auxiliary feedwater can be supplied through redundant lines to the safety-related portions of the main feedwater lines to each of the steam generators. Air operated fail closed flow control valves are provided to modulate the flow to each steam generator. Each Steam Driven Auxiliary Feedwater Pump has sufficient capacity for single and two unit operation to ensure that adequate feedwater flow is available to remove decay heat and reduce the Reactor Coolant System temperature to less than 350°F when the Residual Heat Removal System may be placed into operation.

ACTION statement 2 describes the actions to be taken when both Auxiliary Feedwater Trains are inoperable. The requirement to verify the availability of both Standby Feedwater Pumps is to be periodic accomplished by verifying that both pumps have successfully passed thei ,,,t,,y surveillance tests within the last surveillance interval. The requirement to complete this action before beginning a unit shutdown is to ensure that an alternate feedwater train is available before putting the affected unit through a transient. If NO alternate feedwater trains are available, the affected unit is to stay at the same condition until an auxiliary feedwater train is returned to service, and then invoke ACTION statement 1 for the other train. If both Standby Feedwater Pumps are made available before one Auxiliary Feedwater Train is returned to an OPERABLE status, then the affected units shall be placed in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 140 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical SDecification Bases (Page 124 of 176) 3/4.7.1.2 (Continued)

ACTION statement 3 describes the actions to be taken when a single Auxiliary Feedwater Pump is inoperable. The requirement to verify that two independent Auxiliary Feedwater Trains are OPERABLE is to be accomplished by verifying that the requirements for Table 3.7-3 have been successfully met for each train within the last surveillance interval.

The provisions of Specification 3.0.4 are NOT applicable to the third auxiliary feedwater pump provided it has NOT been inoperable for longer than 30 days. This means that a units can change OPERATIONAL MODES during a unit's heatup with a single Auxiliary Feedwater Pump inoperable as long as the requirements of ACTION Statement 3 are satisfied.

The specified flow rate acceptance criteria conservatively bounds the limiting AFW flow rate modeled in the single unit Loss Of Normal Feedwater analysis. Dual unit events such as a two unit Loss Of Offsite Power require a higher pump flow rate, but it is NOT practical to test both units simultaneously. The m, 4lp4h'flow surveillance test specified in 4.7.1.2.1.1 is considered to be a general performance test for the AFW system and does NOT represent the limiting flow requirement for AFW. Check valves in the AFW system that require full stroke testing under limiting flow conditions are tested under Technical Specification 4.0.5.

The -hthly testing of the Auxiliary Feedwater Pumps will verify their OPERABILITY. Proper functioning of the turbine admission valve and the operation of the pumps will demonstrate the integrity of the system.

Verification of correct operation will be made both from instrumentation within the Control Room and direct visual observation of the pumps.

REVISION NO.: PROCEDURE TITLE: PAGE:

'IS' TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 144 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 128 of 176) 3/4.7.1.6 (Continued)

The Standby Steam Generator Feedwater Pumps are NOT designed to NRC requirements applicable to Auxiliary Feedwater Systems and NOT required to satisfy Design Basis Events requirements. These pumps may be out of service for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before initiating formal notification because of the extremely low probability of a demand for their operation.

The guidelines for NRC notification in case of both pumps being out of service for longer than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are provided in applicable plant procedures, as a voluntary 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> notification.

Adequate demineralized water for the Standby St am Feedwater system will be verified hei9. The Demineralized Water Storage Tank provides a source of water to several systems and therefore, requires daily verification.

The Standby Steam Generator Feedwater Pumps will be verified OPERABLE me.th.y on a STAGGERED TEST BASIS by starting and operating them in the recirculation mode. Also, during each unit's refueling outage, each Standby Steam Generator Feedwater Pump will be started and aligned to provide flow to the nuclear unit's steam generators.

This surveillance regimen will thus demonstrate operability of the entire flow path, backup non-safety grade power supply and pump associated with a unit at least each refueling outage. The pump, motor driver, and normal power supply availability would typically be demonstrated by operation of the pumps in the recirculation mode monthly on a staggered test basis.

The diesel engine driver for the B Standby Steam Generator Feedwater Pump will be verified operable lllll ....... 94 days on a staggered test basis perfor an by Steam Generator Feedwater Pump.

pe.dl i ion, an inspection will be performed on the diesel Qat4eastQ~.

-in accordance with procedures prepared in conjunction with its manufacture's recommendations for the diesel's class of service.

This inspection will ensure that the diesel driver is maintained in good operating condition consistent with FPLs overall objectives for system reliability.

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 146 o1 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 130 of 176) 3/4.7.1.7 (Continued)

Inoperable FCVs and FIVs that are closed or isolated must be verified on a periodic basis that they are closed or isolated. This is necessary to ensure that the assumptions in the safety analysis remain valid.

The 7 day Completion Time is reasonable in view of valve status indications available in the Control Room, and other administrative controls, to ensure that these valves are closed or isolated.

With two valves in the same flow path inoperable, there may be NO redundant system to operate automatically and perform the required safety function. Although the Containment can be isolated with the failure of two valves in parallel in the same flow path, the double failure can be an indication of a common mode failure in the valves of this flow path, and as such, is treated the same as a loss of the isolation capability of this flow path. Under these conditions, affected valves in each flow path must be restored to OPERABLE status, or the affected flow path isolated within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. This action returns the system to the condition where at least one valve in each flow path is performing the required safety function. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time is reasonable, based on operating experience, to complete the actions required to close the FCV or FIV, or otherwise isolate the affected flow path.

SR 4.7.1.7.a verifies that each FCV, FIV, and bypass line valve will actuate to its isolation position on an actuation or simulated actuation signal. The 18-I*mth Frequency is based on a refueling cycle interval and the potential for an unplanned transient if the Surveillance were performed with the reactor at power. Operating experience has shown that these components usually pass this Surveillance when performed at the 18 month Frequency. Therefore, the frequency was concluded to be acceptable from a reliability standpoint.

SR 4.7.1.7.b verifies that the closure time of each FCV, FIV, and bypass line valve, when tested in accordance with the Inservice Testing Program, is within the limits assumed in the accident and containment analyses. This SR is normally performed upon returning the unit to operation following a refueling outage. These valves should NOT be tested at power, since even a part stroke exercise increases the risk of a valve closure with the unit generating power. This is consistent with the ASME Code Section XI (Ref. 3), quarterly stroke requirements during operation in MODES 1 and 2.

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 169 O1 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 153 of 176) 3/4.8.1, 3/4.8.2 & 3/4.8.3 (Continued)

A thermographic examination of high-risk potential ignition sources in the Cable Spreading Room and the Control Room, Restriction of planned hot work in the Cable Spreading Room and Control Room during the extended AOT, and Establishment of a continuous fire watch in the Cable Spreading Room when in the extended AOT.

In addition to the predetermined restrictions, assessments performed in accordance with the provisions of the Maintenance Rule (a)(4) will ensure that any other risk significant configurations are identified before removing an EDG from service for pre-planned maintenance.

A configuration risk management program has been established at Turkey Point 3 and 4 via the implementation of the Maintenance Rule and the On line Risk Monitor to ensure the risk impact of out of service equipment is appropriately evaluated prior to performing any maintenance activity.

The Surveillance Requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory Guides 1.9, Selection of Diesel Generator Set Capacity for Standby Power Supplies, March 10, 1971; 1.108, Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants, Revision 1, August 1977; and 1.137, Fuel-oil Systems for Standby Diesel Generators, Revision 1, October 1979.

The EDG Surveillance testing requires that each EDG be started from normal conditions ol"n pc" 1F1

°day, with NO additional warmup procedures.

Normal conditions in this instance are defined as the pre-start temperature and lube oil conditions each EDG normally experiences with the continuous usE of prelube systems and immersion heaters.

periodically

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 173 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 157 of 176) 3/4.8.1, 3/4.8.2 & 3/4.8.3 (Continued)

Failure to meet any of the above limits is cause for rejecting the new fuel oil, but does NOT represent a failure to meet the Limiting Condition for Operation of TS 3.8.1.1, since the new fuel oil has NOT been added to the Diesel Fuel Oil Storage Tanks.

Within 30 days following the initial new fuel oil sample, the fuel oil is analyzed to establish that the other properties specified in Table 1 of ASTM-D975-81 are met when tested in accordance with ASTM-D975-81 except that the analysis for sulfur may be performed in accordance with ASTM-D1552-79 or ASTM-D2622-82. The 30 day period is acceptable because the fuel oil properties of interest, even if they are NOT within limits, would NOT have an immediate effect on EDG operation. The Diesel Fuel Oil Surveillance in accordance with the Diesel Fuel Oil Testing Program will ensure the availability of high quality diesel fuel oil for the EDGs.

Lubricity Specification for Ultra Low Sulfur Diesel Fuel Oil To ensure that Ultra Low Sulfur Diesel fuel (15 pm sulfur, S15) is acceptable for use in the Emergency Diesel Generators, a test is added in the Diesel Fuel Oil Testing Program that validates, satisfactory lubricity (

Reference:

Engineering Evaluation PTN-ENG-SEMS-06-0035).

The test for lubricity is based on ASTM D975-06, testing per ASTM D6079, using the High Frequency Reciprocating Rig (HFRR) test at 60 degrees C and the acceptance criterion requires a wear scar NO 3 larger than 520 microns.

Ott least... ever;y -.. dys, a sample of fuel oil is obtained from the storage tanks in accordance with ASTM-D2276-78. The particulate contamination is verified to be less than 10 mg/liter when checked in accordance with ASTM-D2276-78, Method A. It is acceptable to obtain a field sample for subsequent laboratory testing in lieu of field testing.

Fuel oil degradation during long term storage shows up as an increase in particulate, due mostly to oxidation. The presence of particulate does NOT mean the fuel oil will NOT burn properly in a diesel engine.

The particulate can cause fouling of filters and fuel oil injection equipment, however, which can cause engine failure.

REVISION NO.: PROCEDURE TITLE: PAGE:

TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 182 of 192 PROCEDURE NO.:

O-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 166 of 176) 3/4.9 Refueling Operations 3/4.9.1 Boron Concentration The limitations on reactivity conditions during REFUELING ensure that:

(1) The reactor will remain subcritical during CORE ALTERATIONS, and (2) A uniform boron concentration is maintained for reactivity control in the water volume having direct access to the reactor vessel.

These limitations are consistent with the initial conditions assumed for the boron dilution incident in the safety analyses. With the required valves closed during refueling operations the possibility of uncontrolled boron dilution of the filled portion of the RCS is precluded. This action prevents flow to the RCS of unborated water by closing flow paths from sources of unborated water. The boration rate requirement of 16 gpm of 3.0 wt% (5245 ppm) boron or equivalent ensures the capability to restore the SHUTDOWN MARGIN with one OPERABLE charging pump.

The OPERABILITY of the Source Range Neutron Flux Monitors ensures that redundant monitoring capability is available to detect changes in the reactivity condition of the core. There are four source range neutron flux channels, two primary, and two backup. All four channels have visual and alarm indication in the Control Room and interface with the containment evacuation alarm system. The primary source range neutron flux channels can also generate reactor trip signals and provide audible indication of the count rate in the Control Room and containment. At least one primary source range neutron flux channel to provide the required audible indication, in addition to its other functions, and one of the three remaining source range channels shall be OPERABLE to satisfy the LCO.

3/4.9.2 Instrumentation T.S. surveillance requirement 4.9.2.b and c states: edicall Each required Source Range Neutron Flux Monitor shall be demonstrated OPERABLE by performance of:

b. An ANALOG CHANNEL OPERATIONAL TEST within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to the initial start of CORE ALTERATIONS, and
c. An ANALOG CHANNEL OPERATIONAL TEST at eoa.t e.e.e ,pe,

-- ay..

.o

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 5 Attachment 5 Turkey Point Nuclear Plant License Amendment Request No. LAR-229 No Significant Hazards Consideration Determination Page 1 of 3

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 5 No Significant Hazards Consideration Description of Amendment Request:

The change requests the adoption of an approved change to the Standard Technical Specifications (STS) for Westinghouse Plants (NUREG-1431) to allow relocation of specific TS surveillance frequencies to a licensee-controlled program. The proposed change is described in Technical Specification Task Force (TSTF) Traveler, TSTF-425, Revision 3 (ADAMS Accession No. ML090800642) related to the Relocation of Surveillance Frequencies to Licensee Control -

RITSTF Initiative 5b and was described in the Notice of Availability published in the Federal Register on July 6, 2009 (74 FR 31966).

The proposed changes are consistent with NRC-approved industry/ TSTF Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b."

The proposed change relocates surveillance frequencies to a licensee-controlled program, the Surveillance Frequency Control Program. This change is applicable to licensees using probabilistic risk guidelines contained in NRC approved Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies," (ADAMS Accession No. ML071360456).

Surveillance frequencies that have a set periodicity will be relocated to the Surveillance Frequency Control Program controlled by the licensee. Accordingly, changes to the periodicity can be made without prior NRC approval, provided they are made within the constraints of the Program. These constraints include, but are not limited to an engineering evaluation, an assessment of the risk associated with the change, and a review by an independent decision-making panel.

Basis for proposed no significant hazards consideration:

As required by 10 CFR 50.91(a), the FPL analysis of the issue of no significant hazards consideration is presented below:

1. Does the proposed change involve a significant increase in the probability or consequences of any accident previously evaluated?

Response: No The proposed change relocates the specified frequencies for periodic surveillance requirements to licensee control under a new Surveillance Frequency Control Program.

Surveillance frequencies are not an initiator to any accident previously evaluated. As a result, the probability of any accident previously evaluated is not significantly increased.

The systems and components required by the technical specifications for which the surveillance frequencies are relocated are still required to be operable, meet the acceptance criteria for the surveillance requirements, and be capable of performing any mitigation function assumed in the accident analysis. As a result, the consequences of any accident previously evaluated are not significantly increased.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of any accident previously evaluated.

Page 2 of 3

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 5

2. Does the proposed change create the possibility of a new or different kind of accident from any previously evaluated?

Response: No The proposed changes relocate the surveillance frequencies for Surveillance Requirements that have a set periodicity from the TS to a licensee controlled Surveillance Frequency Control Program. This change does not alter any existing surveillance frequencies. Within the constraints of the Program, the licensee will be able to change the periodicity of these surveillance requirements. Relocating the surveillance frequencies does not impact the ability of structures, systems or components (SSCs) from performing there design functions, and thus, does not create the possibility of a new or different kind of accident from any previously evaluated.

No new or different accidents result from utilizing the proposed change. The changes do not involve a physical alteration of the plant (i.e., no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. In addition, the changes do not impose any new or different requirements. The changes do not alter assumptions made in the safety analysis assumptions and current plant operating practice.

Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in the margin of safety?

Response: No The design, operation, testing methods, and acceptance criteria for systems, structures, and components (SSCs), specified in applicable codes and standards (or alternatives approved for use by the NRC) will continue to be met as described in the plant licensing basis (including the final safety analysis report and bases to TS), since these are not affected by changes to the surveillance frequencies. Similarly, there is no impact to safety analysis acceptance criteria as described in the plant licensing basis. To evaluate a change in the relocated surveillance frequency, FPL will perform a probabilistic risk evaluation using the guidance contained in NRC-approved NEI 04-10, Revision 1 in accordance with the TS Surveillance Frequency Control Program. NEI 04-10, Revision 1, methodology provides reasonable acceptance guidelines and methods for evaluating the risk increase of proposed changes to surveillance frequencies consistent with Regulatory Guide (RG) 1.177, An Approach for Plant-Specific Risk-Informed Decision-Making: Technical Specifications.

Therefore, the proposed changes do not involve a significant reduction in a margin of safety.

Based upon the discussion above, FPL concludes that the requested change does not involve a significant hazards consideration as set forth in 10 CFR 50.92(c), Issuance of Amendment.

Page 3 of 3

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 Attachment 6 Turkey Point Nuclear Plant License Amendment Request No. LAR-229 Cross-Reference Between TSTF-425 and Turkey Point Technical Specifications Page 1 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement 3.1 Reactivity Control Systems 3.1.1, Shutdown Margin (SDM)

Verify SDM to be within limits specified in the COLR. SR 3.1.1.1 -----

When in MODES I or 2 with keffrr1 ... control bank 4.1.1.1.1.b withdrawalis within limits of specification 3.1.3.6.

When in MODES 3 or 4, .-. considerationof the following 4.1.1.1.1 .e factors:

SDM hall be determined to be within limit ... by 4.1.1.2.b considerationof the following factors:

3.1.2, Core Reactivity pVerify measured vSR core reactivity is within +/-1% Ak/k of 3.1.2.1 41112 predicted values._______________________ ______________________

3.1.4, Rod Group Alignment Limits Verify individual rod positions within alignment limit. SR 3.1.4.1 4.1.3.1.1 Verify rod freedom of movement by moving each rod not SR 3.1.4.2 4.1.3.1.2 fully inserted in the core >10 steps in either direction.

Verify demand position indicating system and analog ----- 4.1.3.2.1 position indicatingsystem agree within allowable deviation.

Perform channel check, channel calibrationand analog 4.1.3.2.2 channel operationaltest - individualrod position. Table 4.1-1 Channel check and analog channel operationaltest - 4.1.3.2.2 demand position. Table 4.1-1 Verify group demand position indicatoroperable by 4.1.3.3.1 movement of associatedcontrol rod.

Verify rod drop time of full length rods ----- 4.1.3.4.c 3.1.5, Shutdown Bank Insertion Limits Verify each shutdown bank is within the insertion limit I SR 3.1.5.1 4.1.3.5.b specified in the COLR. I 3.1.6, Control Bank Rod Insertion Limits Verify each control bank position is within the limits specified SR 3.1.6.2 4.1.3.6 in the COLR Verify sequence and overlap limits specified in the COLR SR 3.1.6.3 are met for control banks not fully withdrawn from the core.

3.1.8, Physics Test Exceptions - MODE 2 Verify RCS lowest loop temperature >[531]OF. SR 3.1.8.2 4.10.3.3 Verify thermal power is < 5% RTP. SR 3.1.8.3 4.10.3.1 Verify SDM within limits specified in the COLR. SR 3.1.8.4 4.10.1.1 TURKEY POINT TECHNICAL SPECIFICATIONS 3/4.1.2, BorationSystem - Flowpath - Shutdown Verify each valve in the flow path that is not locked, sealed,- 4 1 2.1.b

.

or otherwise secured in position is in correctposition.

Page 2 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement 3/4.1.2, Boration System - Flowpath - Operating Verify each valve in the flow path that is not locked, sealed, -------- 4.1.2.2.b or otherwise secured in position is in correctposition. _

Verify the flowpath ... delivers at least 16 gpm to the RCS. -- .... 14.1.2.2.c 3/4.1.2, Boration System - Borated Water Sources - Shutdown Verify boron concentration. -----

.4.1.2.4.a. 1 Verify indicated borated water volume. -----

.4.1.2.4.a.2 Verify temperature of boric acid tanks room >_620 F, when it is- ------ 4.1.2.4.a.3 source of borated water 3/4.1.2, Boration System - Borated Water Sources - Operating Verify boron concentration. -----

.4.1.2.5.a. 1 Verify indicated borated water volume. -----

.4.1.2.5.a.2 Verify temperature of boric acidtanks room >620 F, when it is- ------ 4.1.2.5.a.3 source of borated water 3.2 Power Distribution Limits 3.2.1, Heat Flux Hot Channel Factor Verify Fc%(Z) are within limits SR 3.2.1.1 4.2.2.1.d.2 Determine Fj(Z) using Moveable Incore Detectors ----- 4.2.2.2.b.1 Update flux map ----- 4.2.2.2.c.3 3.2.2, Nuclear Enthalpy Rise Hot Channel Factor Verify FNAH is within limits SR 3.2:2.1 J 4.2.3.3.b 3.2.3, Axial Flux Difference Verify AFD within limits SR 3.2.3.1 4.2.1.1.a.1 Determine target flux difference ----- 4.2.1.2 Update target flux difference ----- 4.2.1.3 3.2.4, Quadrant Power Tilt Ratio Verify QPTR within limits by calculation F SR 3.2.4.1 4.2.4.1 a TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement 3.3 Instrumentation 3.3.1, Reactor Trip System Instrumentation 4.3.1.1, Table 4.3-1 Functional Units - 2a, 2b, SR 3.3.1.1 3n4 5,6,7a 8 ,, ,

Perform Channel Check 3, 4,5, 6,7, 8, 9,10, 11, 12 Compare Calorimetric Heat Balance to Power SR 3.3.1.2 4.3.1.1, Table 4.3-1 Range Channel - Adjust as necessary Functional Unit - 2a Incore Detector validation SR 3.3.1.3 -----

Perform Trip Actuating Device Operational Test 4.3.1.1, Table 4.3-1 (TADOT) SR 3.3.1.4 Functional Units - 18, 19, 21 Page 3 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement 4.3.1.1, Table 4.3-1 Perform Actuation Logic Test SR 3.3.1.5 FuncT al Unt-2 Functional Unit - 20 Calibrate excore channels SR 3.3.1.6 4.3.1.1, Table 4.3-1 Functional Unit - 2a -----

4.3.1.1, Table 4.3-1 Perform Channel Operational Test (COT) SR 3.3.1.7 Functional Units - 2a, 4, 5, 6,7, 8,9, 10, 11, 12 Perform COT SR 3.3.1.8 -----

Perform TADOT SR 3.3.1.99----

4.3.1. 1, Table 4.3-1 Perform Channel Calibration SR 3.3.1.10 Functional Units - 9, 10, 11, 12, 13, 14, 15a, 15b Perform Channel Calibration 4.3.1.1, Table 4.3-1 SR 3.3.1.11 Functional Units - 2b, 3, 4, 5, 17a, 17b, 17c, 17d Perform Channel Calibration SR 3.3.1.12 4.3.1.1, Table 4.3-1 Functional Units - 6, 7, 8 4.3.1.1, Table 4.3-1 Perform COT SR 3.3.1.13 Functional Units - 17a, 17b, 17c, 17d Perform TADOT SR 3.3.1.14 4*3*1*1,Table4.3-1 Functional Units- 1, 16 Perform RTS Response Time Test SR 3.3.1.16 3.3.2, Engineered Safety Feature Actuation System Instrumentation 4.3.2.1, Table 4.3-2 Functional Units - ld,, le,7c, SR 3.3.2.1 if,3c4t S 6-Perform C hannel C heck 1f, 3c4, 4d, 5c, 6b, 7b, 7c, 9c, 9e 4.3.2.1, Table 4.3-2 Functional Unitsb - 1lb, 1lc, b, 4b, Perform Actuation Logic Test SR 3.3.2.2 2a, 2bt 3 2a, 2b, 3a2, 3b2, 3b3, 4b, 4c, 5a, 6a Perform Actuation Logic Test SR 3.3.2.3 -----

4.3.2.1, Table 4.3-2 Perform Master Relay Test SR 3.3.2.4 Functional Units - lb, 2a, 3a2, 3b2, 4b, 5a, 6a 4.3.2.1, Table 4.3-2 Functional Units - ld, le, Pf, 3c4, 4d, 5c, 6b, 8a, 8b, 9c, 9e 4.3.2.1, Table 4.3-2 Perform Slave Relay Test SR 3.3.2.6 Functional Units - lb, 2a, 3a2, 3b2, 4b, 5a, 6a 4.3.2.1, Table 4.3-2 Perform TADOT SR 3.3.2.7 Functional Units - 6d, 7a, 7b, 7c Page 4 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement 4.3.2.1, Table 4.3-2 Functional Units- la, 2b, Perform TADOT SR 3.3 2.8 3al, 3b1, 3b3, 3d, 4a, 4c, 6e, 9d 4.3.2.1, Table 4.3-2 Functional Units - lc, ld, Perform Channel Calibration SR 3.3.2.9 le, if, 2b, 3b3, 3c4, 4c, 4d, 5c, 6b, 6d, 7a, 7b, 7c, 8a, 8b, 9c, 9e Perform ESFAS Response Time Test SR 3.3.2.10 3.3.3, Post Accident Monitoring Instrumentation Perform Channel Check SR 3.3.3.1 4.3.3.3, Table 4.3-4 Perform Channel Calibration SR 3.3.3.2 4.3.3.3, Table 4.3-4 3.3.4, Remote Shutdown System Perform Channel Check SR 3.3.4.1 -----

Verify control circuit and transfer switch SR 3.3.4.2 -----

Perform Channel Calibration SR 3.3.4.3 -----

Perform TADOT SR 3.3.4.4 -----

3.3.5, Loss of Power Diesel Generator Start Instrumentation Perform Channel Check SR 3.3.5.1 ----

Perform TADOT SR 3.3.5.2 .....

Perform Channel Calibration SR 3.3.5.3 .....

3.3.6, Containment Purge and Exhaust Isolation Instrumentation Perform Channel Check SR 3.3.6.1 -----

Perform Actuation Logic Test SR 3.3.6.2 -----

Perform Master Relay Test SR 3.3.6.3 -----

Perform Actuation Logic Test SR 3.3.6.4 -----

Perform Master Relay Test SR 3.3.6.5 -----

Perform COT SR 3.3.6.6 -----

Perform Slave Relay Test SR 3.3.6.7 -----

Perform TADOT SR 3.3.6.8 -----

Perform Channel Calibration SR 3.3.6.9 3.3.7, Control Room Emergency Filtration System Actuation Instrumentation Perform Channel Check SR 3.3.7.1 -----

Perform COT SR 3.3.7.2 -----

Perform Actuation Logic Test SR 3.3.7.3 -----

Perform Master Relay Test SR 3.3.7.4 -----

Perform Actuation Logic Test SR 3.3.7.5 -----

Perform Master Relay Test SR 3.3.7.6 -----

Perform Slave Relay Test SR 3.3.7.7 -----

Perform TADOT SR 3.3.7.8 -----

Perform Channel Calibration SR 3.3.7.9 -----

Page 5 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement 3.3.8, Fuel Building Air Cleanup System Actuation Instrumentation Perform Channel Check SR 3.3.8.1 -----

Perform COT SR 3.3.8.22... -

Perform Actuation Logic Test SR 3.3.8.33----

Perform TADOT SR 3.3.8.44----

Perform Channel Calibration SR 3.3.8.5 -----

3.3.9, Boron Dilution Protection System Perform Channel Check SR 3.3.9.1 -----

Perform COT SR 3.3.9.2 Perform Channel Calibration SR 3.3.9.3 -----

TURKEY POINT TECHNICAL SPECIFICATIONS 3/4.3.3, Monitoring Instrumentation Radiation Monitoring Instrumentation 4.3.3.1 Table 4.3-3 Perform Channel Check Perform Analog Channel OperationalTest ----- 4.3.3.1, Table 4.3-3 Perform ChannelCalibration ----- 4.3.3.1, Table 4.3-3 Normalize moveable incore detectors ----- 4.3.3.2 Explosive Gas Monitoring Instrumentation 4.3.3.6, Table 4.3-6 Perform ChannelCheck Perform Analog Channel OperationalTest ----- 4.3.3.6, Table 4.3-6 Perform Channel Calibration ----- 4.3.3.6, Table 4.3-6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement . Requirement 3.4 Reactor Coolant System 3.4.1, RCS Pressure, Temperature, and Flow DNB Limits Verify pressurizer pressure > limit in COLR. SR 3.4.1.1 4.2.5.1 Verify RCS average temperature > limit in COLR. SR 3.4.1.2 4.2.5.1 Verify RCS total flow rate > limit. SR 3.4.1.3 4.2.5.2 Verify RCS flow using precision heat balance SR 3.4.1.4 4.2.5.4 Perform Channel Calibration- RCS flow indicators ----- 4.2.5.3 3.4.2, RCS Minimum Temperature for Criticality Verify RCS Tavg SR 3.4.2.1 3.4.3, RCS Pressure and Temperature (PIT) Limits Verify pressure temperature and heatup and cooldown rates SR 3.4.3.1 3.4.4, RCS Loops - MODES 1 and 2 Verify RCS loops in operation SR 3.4.4.1 4.4.1.1 3.4.5, RCS Loops - MODE 3 Verify RCS loops in operation SR 3.4.5.1 4.4.1.2.3 Verify steam generator secondary side water level SR 3.4.5.2 4.4.1.2.2 Verify correct breaker alignment and power available SR 3.4.5.3 4.4.1.2.1 Page 6 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement 3.4.6, RCS Loops - MODE 4 Verify RHR or RCS loop in operation SR 3.4.6.1 4.4.1.3.3 Verify steam generator secondary side water level SR 3.4.6.2 4.4.1.3.2 Verify correct breaker alignment and power available SR 3.4.6.3 4.4.1.3.1 3.4.7, RCS Loops - MODE 5 - Loops Filled Verify RHR or RCS loop in operation SR 3.4.7.1 4.4.1.4.1.2 Verify steam generator secondary side water level SR 3.4.7.2 4.4.1.4.1.1 Verify correct breaker alignment and power available SR 3.4.7.3 3.4.8, RCS Loops - MODE 5 - Loops Not Filled Verify RHR loop in operation SR 3.4.8.1 4.4.1.4.2 Verify correct breaker alignment and power available SR 3.4.8.2 3.4.9, Pressurizer Verify water level <- [92]% SR 3.4.9.1 4.4.3.1 Verify heater capacity SR 3.4.9.2 4.4.3.2 Verify heater emergency power supply SR 3.4.9.3 -----

3.4.11, Pressurizer Power Operated Relief Valves (PORVs)

Cycle PORV block valves SR 3.4.11.1 4.4.4 Cycle PORVs SR 3.4.11.2 -----

Cycle solenoid air control and check valves SR 3.4.11.3 -----

Verify PORV and block valve emergency power supply SR 3.4.11.4 -----

3.4.12, Low Temperature Overpressure Protection (LTOP) System Verify maximum of one HPSI pump injecting to RCS SR 3.4.12.1 4.4.9.3.3 Verify maximum of one charging pump injecting to RCS SR 3.4.12.2 4.4.9.3.3 Verify ECCS accumulators isolated SR 3.4.12.3 4.4.9.3.3 Verify RHR suction valves open SR 3.4.12.4 -----

Verify RCS vent open SR 3.4.12.5 4.4.9.3.2 Verify PORV block valve open SR 3.4.12.6 4.4.9.3.1.c Verify RHR suction isolation valve locked open with power SR 3.4.12.7 removed Channel Operational Test - PORV SR 3.4.12.8 4.4.9.3.1.a Channel Calibration - PORV SR 3.4.12.9 4.4.9.3.1.b Verify backup nitrogen supply 4.4.9.3.1.d 3.4.13, RCS Operational Leakage Perform water inventory balance SR 3.4.13.1 4.4.6.2.1.c Verify primary to secondary leakage SR 3.4.13.2 4.4.6.2.1.e Monitor containment atmosphere ----- 4.4.6.2.1.a Monitor containment sump level ----- 4.4.6.2.1.b Monitorreactor head flange leakoff system ----- 4.4.6.2.1 .d 3.4.14, RCS Pressure Isolation Valve (PIV) Leakage Verify PIV leakage SR 3.4.14.1 4.4.6.2.2.a Verify RHR autoclosure interlock prevents valves from SR 3.4.14.2 -

opening Verify RHR autoclosure interlock closes valves SR 3.4.14.3 -----

Page 7 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement 3.4.15, RCS Leakage Detection Instrumentation Perform Channel Check - containment atmosphere SR 3.4.15.1 radioactivity monitor 4.4.6.1, Perform Channel Operational Test - containment atmosphere SR 3.4.15.2 Table 4.3-3 radioactivity monitor Perform Channel Calibration - containment sump monitor SR 3.4.15.3 4.4.6.1.b Perform Channel Calibration - containment atmosphere SR 3.4.15.4 4.4.6.1, radioactivity monitor Table 4.3-3 Perform Channel Operational Test - containment air cooler SR 3.4.15.5 condensate flow rate monitor 3.4.16, RCS Specific Activity Determine gross specific activity SR 3.4.16.1 4.4.8, Table 4.4-4 Determine Dose Equivalent 1-131 SR 3.4.16.2 4.4.8, Table 4.4-4 Determine E-Bar SR 3.4.16.3 -----

Tritium determination ----- 4.4.8, Table 4.4-4 Determine Dose Equivalent XE-133 ----- 4.4.8, Table 4.4-4 3.4.17, RCS Loop Isolation Valves Verify valves open SR 3.4.17.1 3.4.19, RCS Loops - Test Exceptions Verify Thermal Power > P-7 SR 3.4.19.1 .....

TURKEY POINT TECHNICAL SPECIFICATIONS 3/4.4.7, Chemistry Dissolved oxygen, Chloride, Fluoride 4.4.7 , Table 4.4-3 3/4.4.9.2, RCS Vents Verify vent path 4.4.11 3.5 Emergency Core Cooling Systems (ECCS) 3.5.1, Accumulators Verify isolation valve open SR 3.5.1.1 4.5.1.1.a.3 Verify water volume SR 3.5.1.2 4.5.1.1.a.1 Verify nitrogen cover pressure SR 3.5.1.3 4.5.1.1.a.2 Verify boron concentration SR 3.5.1.4 4.5.1.1.b Verify power removed from isolation valve operator SR 3.5.1.5 4.5.1.1.c Check valve operability ----- 4.5.1.1. d 3.5.2, ECCS - Operating Verify valve positions with power removed SR 3.5.2.1 4.5.2.a Verify flow path valve positions SR 3.5.2.2 4.5.2.b.2 Verify piping full of water SR 3.5.2.3 4.5.2.b.1 Verify valve automatic actuations SR 3.5.2.5 4.5.2.f.1 Verify automatic pump starts SR 3.5.2.6 4.5.2.f.2.a 4.5.2.f.2.b Verify throttle valve positions SR 3.5.2.7 4.5.2.g.2 Inspect containment sump suction inlets SR 3.5.2.8 4.5.2.e.3 RHR Pump IST ----- 4.5.2.b.3 Page 8 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement SI Pump IST ----- 4.5.2.c.1 RHR automatic closure interlock ----- 4.5.2.e. 1 RWS T isolation from RHR interlock ----- 3.5.2.e.2 3.5.4, Refueling Water Storage Tank (RWST)

Verify water temperature SR 3.5.4.1 -----

Verify water volume SR 3.5.4.2 4.5.4.a.1 Verify boron concentration SR 3.5.4.3 4.5.4.a.2 3.5.5, Seal Injection Flow Verify throttle valve position SR 3.5.5.1 .

3.5.6, Boron Injection Tank Verify water temperature SR 3.5.6.1 -----

Verify water volume SR 3.5.6.2 -----

Verify boron concentration SR 3.5.6.3 -----

3.6 Containment Systems 3.6.2, Containment Air Locks Verify only one door can be opened SR 3.6.2.2 4.6.1,3.c 3.6.3, Containment Isolation Valves Verily [42] inch purge valves closed SR 3.6.3.1 4.6.1.7.1 Verily [8] inch purge valves closed SR 3.6.3.2 -----

Verify manual isolation valves and blind flanges position SR 3.6.3.3 4.6.1.1.a Verify automatic valve isolation time SR 3.6.3.5 -----

Cycle check valves SR 3.6.3.6 -----

Perform leakage test on purge valves SR 3.6.3.7 4.6.1.7.2 Verify automatic valve actuations SR 3.6.3.8 4.6.4.2.a 4.6.4.2.b 4.3.4.2.c Cycle check valves SR 3.6.3.9 -----

Verify purge valve opening restricted SR 3.6.3.10 4.6.1.7.3 Verify leakage thru shield building bypass paths SR 3.6.3.11 -----

3.6.4, Containment Pressure Verify pressure SR 3.6.4.1 4.6.1.4 3.6.5, Containment Air Pressure Verify average air temperature SR 3.6.5.1 4.6.1.5 3.6.6, Containment Spray and Cooling Systems Verify valve positions SR 3.6.6.1 4.6.2.1. a Operate cooling train fans SR 3.6.6.2 4.6.2.2.a Verify cooling train cooling water flow SR 3.6.6.3 4.6.2.2.b.2 Verify automatic valves actuate SR 3.6.6.5 4.6.2.1.c.1 Verify automatic containment spray pump starts SR 3.6.6.6 4.6.2.1 .c.2 Verify automatic cooling train start SR 3.6.6.7 4.6.2.2.b.1 Verify spray nozzle unobstructed SR 3.6.6.8 4.6.2.1.d 3.6.7, Spray Additive System Verify valve positions SR 3.6.7.1 Page 9 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement Verify tank volume SR 3.6.7.2 -----

Verify NaOH concentration SR 3.6.7.3 -----

Verify automatic valves actuate SR 3.6.7.4 -----

Verify spray additive flow rate SR 3.6.7.5 -----

3.6.9, Hydrogen Mixing System Operate train . SR 3.6.9.1 -----

Verify train flow rate SR 3.6.9.2 -----

Verify automatic train start SR 3.6.9.3 -----

3.6.11, Iodine Cleanup System Operate train SR 3.6.11.1 -----

Verify automatic train start SR 3.6.11.3 -----

Verify bypass damper can be opened SR 3.6.11.44----

TURKEY POINT TECHNICAL SPECIFICATIONS 3/4.6.2.3, RecirculationpH Control System Buffenng agent baskets in place ... 4.6.2.3.a. 1 Buffering agent quantity 4.6.2.3.a.2 3.7 Plant Systems 3.7.2, Main Steam Isolation Valves Verify automatic valve actuation SR 3.7.2.2 3.7.3, Main Feedwater Isolation Valves (MFIVs) and Main Feedwater Regulation Valves (MFRVs)

Verify automatic valve actuation SR 3.7.3.2 4.7.1.7.a.1 3.7.4, Atmospheric Dump Valves (ADVs)

Cycle ADVs SR 3.7.4.1 Cycle ADV block valves SR 3.7.4.2 3.7.5, Auxiliary Feedwater (AFW) System Verify valve positions SR 3.7.5.1 4.7.1.2.1.a.3 Verify automatic valve actuations SR 3.7.5.3 4.7.1.2.1 .b.1 Verify automatic pump starts SR 3.7.5.4 4.7.1.2.1.b.2 Operate steam-driven pump ----- 4.7.1.2.1.a. 1 Verify steam-driven pump valve positions ----- 4.7.1.2.1 .a.2 Verify power available ----- 4.7.1.2.1.a.4 3.7.6, Condensate Storage Tank (CST)

Verify tank level [SR 3.7.6.1 4.7.1.3 3.7.7, Component Cooling Water (CCW) System Verify valve positions SR 3.7.7.1 4.7.2.b Verify automatic valve actuations SR 3.7.7.2 4.7.2.c.1 Verify automatic pump starts SR 3.7.7.3 4.7.2.c.2 Verify capability to remove heat ----- 4.7.2.a Verify CCW interlocks ----- 4.7.2.c.3 3.7.8, Service Water System (SWS)

Verify valve positions I SR 3.7.8.1 4.7.3.a Verify automatic valve actuations SR 3.7.8.2 4.7.3.b.1 Page 10 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement Verify automatic pump starts SR 3.7.8.3 4.7.3.b.2 Verify SSW interlocks ----- 4.7.3.b.3 3.7.9, Ultimate Heat Sink (UHS)

Verify water level SR 3.7.9.1 .....

Verify water temperature SR 3.7.9.2 4.7.4 Operate cooling tower fans SR 3.7.9.3 -----

Verify automatic fan starts SR 3.7.9.4 -----

3.7.10, Control Room Emergency Filtration System (CREFS)

Operate trains SR 3.7.10.1 4.7.5.b Verify automatic train actuations SR 3.7.10.3 4.7.5.e Filter/Charcoaltesting ----- 4.7.5.c Pressuredrop across HEPAs ----- 4.7.5.d. 1 Maintain negative pressure ----- 4.7.5.d.2 Verify kitchen and toilet dampers ----- 4.7.5.f 3.7.11, Control Room Emergency Air Temperature Control System (CREATCS)

Verify capability to remove heat I SR 3.7.11.1 4.7.5.a 3.7.12, ECCS Pump Room Exhaust Air Cleanup System (PREACS)

Operate trains SR 3.7.12.1 -----

Verify automatic train actuations SR 3.7.12.3 -----

Verify train can maintain negative pressure SR 3.7.12.4 -----

Verify filter bypass can be closed SR 3.7.12.5 -----

3.7.13, Fuel Building Air Cleanup System (FBACS)

Operate trains SR 3.7.13.1 -----

Verify automatic train actuations SR 3.7.13.3 -----

Verify train can maintain negative pressure SR 3.7.13.4 -----

Verify filter bypass can be closed SR 3.7.13.5 .....

3.7.12, Penetration Room Exhaust Air Cleanup System (PREACS)

Operate trains SR 3.7.14.1 -----

Verify automatic train actuations SR 3.7.14.3 -----

Verify train can maintain negative pressure SR 3.7.14.4 -----

Verify filter bypass can be closed SR 3.7.14.5 -----

3.7.15, Fuel Storage Pool Water Level Verify pool water level SR 3.7.15.1 4.9.11 3.7.16, Fuel Storage Pool Concentration Verify pool water boron concentration SR 3.7.16.1 4.9.14.1 37.18, Secondary Specific Activity Dose Equivalent 1-131 SR 3.7.18.1 -----

Gross activity determination 4.7.1.4 Table 4.7-1 TURKEY POINT TECHNICAL SPECIFICATIONS 3/4.7.1.6, Standby FeedwaterSystem Demineralizedwater tank volume 4.7.1.6.1 Page 11 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement Operate pumps ----- 4.7.1.6.2 Feedsteam generatorswith pumps ----- 4.7.1.6.3 Operate diesel driven pump ----- 4.7.1.6.4.a Diesel inspection ----- 4.7.1.6.4.b 3/4.7.7, Sealed Source Contamination Test sources in use . 4.7.7.2.a 3.8 Electrical Power Systems 3.8.1, AC Sources 4.8.1.1.1.a 4.8.1.1 .. a Verify correct breaker alignment and indicated power SR 3.8.1.1 4.8.1.1.2.a.6 Verify starts from standby conditions SR 3.8.1.2 4.8.1.1.2.a.4 Verify DG is synchronized and loaded SR 3.8.1.3 4.8.1.1.2.a.5 Verify day tank volume SR 3.8.1.4 4.8.1.1.2.a.1 Check for and remove accumulated water SR 3.8.1.5 4.8.1.1.2.c Verify fuel oil transfer system operates SR 3.8.1.6 4.8.1.1.2.b Verify diesel starts from standby condition SR 3.8.1.7 4.8.1.1.2.a.4 Verify transfer of AC power sources SR 3.8.1.8 4.8.1.1.1.b Verify DG rejects a load SR 3.8.1.9 4.8.1.1.2.g.2 Verify DG does not trip on load rejection SR 3.8.1.10 4.8.1.1.2.g.3 Verify on a loss of power signal SR 3.8.1.11 4.8.1.1.2.g.4 Verify on an ESF actuation signal SR 3.8.1.12 4.8.1.1.2.g.5 Verify DG's noncritical automatic trips are bypassed SR 3.8.1.13 Verify DG operates for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.8.1.14 4.8.1.1.2.g.7 Verify DG state voltage and frequency SR 3.8.1.15 4.8.1.1.2.g.7 Verify DG synchronizes SR 3.8.1.16 4.8.1.1.2.g.9 Verify ESF overrides test mode SR 3.8.1.17 4.8.1.1.2.g.10 Verify interval between each sequenced load block. SR 3.8.1.18 4.8.1.1.2.g.12 Verify on LOOP with an ESF SR 3.8.1.19 4.8.1.1.2.g.6 Verify simultaneously start SR 3.8.1.20 4.8.1.1.2.h Verify auto-connectedloads ----- 4.8.1.1.2.g.8 Verify fuel oil transferpump transfers oil ----- 4.8.1.1.2.g. 11 Verify DG lockout relay ----- 4.8.1.1.2.g. 13 Clean fuel oil storage tank ----- 4.8.1.1.2.i. 1 Fuel oil system pressure test (Unit 4 only) ----- 4.8.1.1.2.i.2 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air Verify fuel oil storage tank volume SR 3.8.3.1 4.8.1.1.2.a.2 Verify lubricating oil inventory SR 3.8.3.2 4.8.1.1.2.a.3 Verify DG air start receiver pressure SR 3.8.3.4 -----

Check for and remove accumulated water SR 3.8.3.5 4.8.1.1.2.d 3.8.4, DC Sources - Operating Verify battery terminal voltage SR 3.8.4.1 4.8.2.1.a.2 Verify each battery charge supplies SR 3.8.4.2 4.8.2.1.c.3 Page 12 of 13

Turkey Point Units 3 and 4 L-2014-033 Docket Nos. 50-250 and 50-251 Attachment 6 TSTF-425 Turkey Point Surveillance Requirements Surveillance Surveillance Requirement Requirement Verify battery capacity is adequate SR 3.8.4.3 4.8.2.1.d 3.8.6, Battery Parameters Verify battery float current SR 3.8.6.1 4.8.2.1.a.3 Verify battery pilot cell float voltage SR 3.8.6.2 4.8.2.1.a.1 Verify battery connected cell electrolyte level SR 3.8.6.3 4.8.2.1.a.1 Verify battery pilot cell temperature SR 3.8.6.4 4.8.2.1 .a.1 Verify battery connected cell float voltage SR 3.8.6.5 4.8.2.1 .b.1 Verify battery capacity % of the manufacturer's rating SR 3.8.6.6 4.8.2.1.f Verify battery cell temperature ----- 4.8.2.1.b.2 Inspect battery for visible corrosion 4.8.2.1.b.3 Inspect battery for damage or deterioration ----- 4.8.2.1 .c.1 Verify cell to cell and terminal connections ----- 4.8.2.1 .c.2 Verify battery connection resistance ----- 4.8.2.1.c.4 3.8.7, Inverters - Operating Verify inverter voltage and alignment SR 3.8.7.1 3.8.8, Inverters - Shutdown Verify inverter voltage and alignment SR 3.8.8.1 3.8.9, Distribution System - Operating Verify breaker alignments and voltage. SR 3.8.9.1 4.8.3.1 3.8.10, Distribution System - Shutdown Verify breaker alignments and voltage SR 3.8.10.1 4.8.3.2 3.9 Refueling Operations 3.9.1, Boron Concentration Verify boron concentration SR 3.9.1.1 4.9.1.2 3.9.2, Unborated Water Source Isolation Valves Verify valve positions SR 3.9.2.1 4.9.1.3 3.9.3, Nuclear Instrumentation Perform Channel Check - Source Range SR 3.9.3.1 4.9.2.a Perform Channel Calibration - Source Range SR 3.9.3.2 -----

Perform Analog Channel OperationalTest ----- 4.9.2.c 3.9.4, Containment Penetrations Verify penetration status SR 3.9.4.1 4.9.4 Verify purge valve actuation SR 3.9.4.2 .....

3.9.5, Residual Heat Removal (RHR) and Coolant Circulation - High Water Level Verify one RHR loop in operation SR 3.9.5.1 4.9.8.1.1 Perform Channel Calibration- RHR flow indicator I ----- 4.9.8.1.2 3.9.6, Residual Heat Removal (RHR) and Coolant Circulation - Low Water Level Verify one RHR loop in operation SR 3.9.6.1 4.9.8.2 Verify breaker alignment and power available SR 3.9.6.2 .....

3.9.7, Refueling Cavity Water Level Verify refueling cavity level SR 3.9.7.1 4.9.10 Page 13 of 13