| | Site | Start date | Title | Description |
|---|
| IR 05000266/2025003 | Point Beach | 22 December 2025 | Integrated Inspection Report 05000266/2025003 05000301/2025003 and 07200005/2025001 | |
| ML25350C263 | Point Beach | 22 December 2025 | Nuclear Plant - Integrated Inspection Report 05000266/2025003 05000301/2025003 and 07200005/2025001 | |
| ML25343A364 | Technical Specifications Task Force | 11 December 2025 | Final SE of TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents (EPID L-2024-PMP-0011) | |
| ML25283A007 | Point Beach | 9 October 2025 | Units 1 and 2, Periodic Update of the Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems (Redacted) | |
| ML25283A014 | Point Beach | 9 October 2025 | Units 1 and 2, Periodic Update of the Updated Final Safety Analysis Report, Appendix a, Station Blackout (SBO) (Redacted) | |
| ML25247A259 | Technical Specifications Task Force | 8 September 2025 | Final Traveler SE of TSTF-601 (ML25247A259) | |
| ML25213A183 | Comanche Peak | 27 August 2025 | Nuclear Power Plant, Unit Nos. 1 and 2 – Issuance of Amendment Nos. 193 and 193, Respectively, to Change Technical Specifications Consistent with TSTF-51, TSTF-471-A and TSTF-571 (EPID L-2024-LLA-0123) | |
| IR 05000397/2025002 | Columbia | 11 August 2025 | Integrated Inspection Report 05000397/2025002 | |
| ML25213A155 | Columbia | 11 August 2025 | Integrated Inspection Report 05000397/2025002 | |
| ML25178C910 | Vogtle | 3 July 2025 | SNC Slides - Pre-Submittal Meeting July 3, 2025, - Vogtle 3 and 4 - TS 3.7.6 LAR - Permanent | |