ML102670183: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 November 19, 2010 LICENSEE: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 19, 2010 LICENSEE: Florida Power & Light Company (FPL) | ||
Florida Power & Light Company (FPL) FACILITY: | FACILITY: St. Lucie Units 1 and 2 and Turkey Point Units 3 and 4 SUB~IECT: | ||
St. Lucie Units 1 and 2 and Turkey Point Units 3 and 4 | |||
==SUMMARY== | ==SUMMARY== | ||
OF SEPTEMBER 16, 2010, MEETING WITH FPL REGARDING FORTHCOMING SUBMITTAL OF THE ST. LUCIE AND TURKEY POINT EXTENDED POWER | OF SEPTEMBER 16, 2010, MEETING WITH FPL REGARDING FORTHCOMING SUBMITTAL OF THE ST. LUCIE AND TURKEY POINT EXTENDED POWER UPRATES On September 16, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of FPL at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the forthcoming submittal of the St. Lucie Units 1 and 2 and Turkey Point Units 3 and 4 applications for extended power uprate (EPU). A list of attendees is provided as an enclosure and the licensee's meeting slides are available in the Agencywide Documents Access and Management System at Accession No. ML102600400. | ||
The purpose of the meeting was to discuss the forthcoming submittal of the St. Lucie Units 1 and 2 and Turkey Point Units 3 and 4 applications for extended power uprate (EPU). A list of attendees is provided as an enclosure and the licensee's meeting slides are available in the Agencywide Documents Access and Management System at Accession No. ML102600400. | |||
FPL presented information on how FPL was taking the NRC Draft Division of Safety Systems Interim Staff Guidance, DSS-ISG-201 0-01, "Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools," into account while performing criticality analyses of the spent fuel pools. FPL requested NRC staff feedback on FPL's approaches. | FPL presented information on how FPL was taking the NRC Draft Division of Safety Systems Interim Staff Guidance, DSS-ISG-201 0-01, "Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools," into account while performing criticality analyses of the spent fuel pools. FPL requested NRC staff feedback on FPL's approaches. | ||
FPL presented its approach for St. Lucie Unit 1, mentioning that the criticality analysis for the entire pool would be submitted with the application for the EPU. Also, the new approach would include adding neutron absorbers, simplifying patterns, and using more conservative assumptions that would reduce the effort to review the analysis. | FPL presented its approach for St. Lucie Unit 1, mentioning that the criticality analysis for the entire pool would be submitted with the application for the EPU. Also, the new approach would include adding neutron absorbers, simplifying patterns, and using more conservative assumptions that would reduce the effort to review the analysis. The licensee stated that neutron absorber panels similar to those used at Turkey Point are planned to be installed. | ||
The licensee stated that neutron absorber panels similar to those used at Turkey Point are planned to be installed. | The staff asked clarifying questions on several topics including: the types of control rods that would be used and the possibility that one could be misloaded or misplaced; controls on the use of input parameters in reload analyses; the types of axial burnup profiles; differences between Boraflex and Metamic inserts; assumptions in tolerance calculations; and calculation methods for fission product worth. | ||
The staff asked clarifying questions on several topics including: | FPL stated that the St. Lucie Unit 2 approach will be similar to St. Lucie Unit 1 with adjustments for fuel and rack differences. | ||
the types of control rods that would be used and the possibility that one could be misloaded or misplaced; controls on the use of input parameters in reload analyses; the types of axial burnup profiles; differences between Boraflex and Metamic inserts; assumptions in tolerance calculations; and calculation methods for fission product worth. FPL stated that the St. Lucie Unit 2 approach will be similar to St. Lucie Unit 1 with adjustments for fuel and rack differences. | The licensee stated that Turkey Point's License Amendment Request 207 regarding spent fuel pool criticality has already been submitted to the NRC for review. Turkey Point's analyses have several differences from the St. Lucie analyses. There is no radial zoning at Turkey Point and the Turkey Point calculations were performed using the PARAGON code for depletion calculations versus CASMOS at St. Lucie. | ||
The licensee stated that Turkey Point's License Amendment Request 207 regarding spent fuel pool criticality has already been submitted to the NRC for review. Turkey Point's analyses have several differences from the St. Lucie analyses. | |||
There is no radial zoning at Turkey Point and the Turkey Point calculations were performed using the PARAGON code for depletion calculations versus CASMOS at St. Lucie. | -2 The NRC staff asked questions on several portions of the Turkey Point criticality analyses including: degradation methods of Metamic; the treatment of flux suppressor assemblies; the temperatures used in the depletion calculations; the treatment of different fuel enrichment assemblies within the same region; and the amount of depletion uncertainty. | ||
-2 The NRC staff asked questions on several portions of the Turkey Point criticality analyses including: | |||
degradation methods of Metamic; the treatment of flux suppressor assemblies; the temperatures used in the depletion calculations; the treatment of different fuel enrichment assemblies within the same region; and the amount of depletion uncertainty. | |||
Members of the public were in attendance; however no Public Meeting Feedback forms were received from them. Please direct any inquiries to me at 301-415-2788, or Jason Paige at 301-415-5888. | Members of the public were in attendance; however no Public Meeting Feedback forms were received from them. Please direct any inquiries to me at 301-415-2788, or Jason Paige at 301-415-5888. | ||
Tracy J. Ort, Project Manager Plant Licensing Branch, 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389 List of cc w/encl: Distribution via LIST OF AUGUST 18. 2010. MEETING WITH FLORIDA POWER & LIGHT FORTHCOMING EXTENDED POWER UPRATE APPLICATION ST. LUCIE UNITS 1 AND 2 AND TURKEY POINT UNITS 3 AND Attending in person: Tom Abbatiello, FPL Steve Franzone, FPL Terry Jones, FPL Dale Lancaster, FPUNuciear Consultants Larry Nicholson, FPL Emilio Fuentes, FPL Claude Villard, FPL Stefan Anton, Holtec Tao He, Holtec Jay Leff, Holtec Doug Broaddus, NRC/NRR Eva Brown, NRC/NRR Davida Cunanan, NRC/NRR Joe Giitter, NRC/NRR Delores Greene, NRC/NRR Allen Howe, NRC/NRR Jason Paige, NRC/NRR Trace Orf, NRC/NRR Bill Ruland, NRC/NRR Tony Ulses, NRC/NRR Emma Wong, NRC/NRR Kent Wood, NRC/NRR Vefa Kucukboyaci, Westinghouse Ed Mercier, Westinghouse | Tracy J. Ort, Project Manager Plant Licensing Branch, 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389 | ||
degradation methods of Metamic; the treatment of flux suppressor assemblies; the temperatures used in the depletion calculations; the treatment of different fuel enrichment assemblies within the same region; and the amount of depletion uncertainty. | ==Enclosure:== | ||
List of Attendees cc w/encl: Distribution via Listserv | |||
LIST OF ATTENDEES AUGUST 18. 2010. MEETING WITH FLORIDA POWER & LIGHT COMPANY FORTHCOMING EXTENDED POWER UPRATE APPLICATION FOR ST. LUCIE UNITS 1 AND 2 AND TURKEY POINT UNITS 3 AND 4 Attending in person: Attending via telephone: | |||
Tom Abbatiello, FPL Jerry Burford, Entergy Steve Franzone, FPL Terry Jones, FPL Chris Wasik, FPL Dale Lancaster, FPUNuciear Consultants Larry Nicholson, FPL R. Lynn Fisher, FL Public Service Commission Emilio Fuentes, FPL David Rich, FL Public Service Commission Claude Villard, FPL William Freebairn, Nucleonics Week Stefan Anton, Holtec Tao He, Holtec Susan Salisbury, Palm Beach Post Jay Leff, Holtec Kurt Myers, St. Lucie County Public Safety & | |||
Doug Broaddus, NRC/NRR Communications Eva Brown, NRC/NRR Davida Cunanan, NRC/NRR Glenn Adams, Xcel Energy Joe Giitter, NRC/NRR Delores Greene, NRC/NRR Valerie Amore Allen Howe, NRC/NRR Thomas Saporito Jason Paige, NRC/NRR Trace Orf, NRC/NRR Bill Ruland, NRC/NRR Tony Ulses, NRC/NRR Emma Wong, NRC/NRR Kent Wood, NRC/NRR Vefa Kucukboyaci, Westinghouse Ed Mercier, Westinghouse ENCLOSURE | |||
November 19, 2010 | |||
-2 The NRC staff asked questions on several portions of the Turkey Point criticality analyses including: degradation methods of Metamic; the treatment of flux suppressor assemblies; the temperatures used in the depletion calculations; the treatment of different fuel enrichment assemblies within the same region; and the amount of depletion uncertainty. | |||
Members of the public were in attendance; however no Public Meeting Feedback forms were received from them. Please direct any inquiries to me at 301-415-2788, or Jason Paige at 301-415-5888. | Members of the public were in attendance; however no Public Meeting Feedback forms were received from them. Please direct any inquiries to me at 301-415-2788, or Jason Paige at 301-415-5888. | ||
IRA! Tracy J. art, Project Manager Plant Licensing Branch, 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389 List of cc w/encl: Distribution via DISTRIBUTION: | IRA! | ||
PUBLIC RidsOgcRp LPL2-2 rtf RidsRgn2MailCenter RidsAcrsAcnw_MailCTR NSanfilippo, EDO RidsNrrDorl CSteger, NRR RidsNrrDss TOrt, NRR RidsNrrDssSrxb EBrown, NRR RidsNrrDorlLpl2-2 EWong, NRR RidsNrrPMTurkeyPoint KWood, NRR RidsNrrPMStLucie DGreene, NRR RidsNrrLABClayton DCunanan, NRR ADAMS Accession No ML102670183 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC DORLlLPL2-2/PM NAME TOrt BClayton DBroaddus TOrt DATE 11/12/2010 11/10/2010 11/18/2010 11/19/2010 OFFICIAL RECORD COpy}} | Tracy J. art, Project Manager Plant Licensing Branch, 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389 | ||
==Enclosure:== | |||
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION: | |||
PUBLIC RidsOgcRp LPL2-2 rtf RidsRgn2MailCenter RidsAcrsAcnw_MailCTR NSanfilippo, EDO RidsNrrDorl CSteger, NRR RidsNrrDss TOrt, NRR RidsNrrDssSrxb EBrown, NRR RidsNrrDorlLpl2-2 EWong, NRR RidsNrrPMTurkeyPoint KWood, NRR RidsNrrPMStLucie DGreene, NRR RidsNrrLABClayton DCunanan, NRR ADAMS Accession No ML102670183 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC DORLlLPL2-2/PM NAME TOrt BClayton DBroaddus TOrt DATE 11/12/2010 11/10/2010 11/18/2010 11/19/2010 OFFICIAL RECORD COpy}} |
Revision as of 12:53, 13 November 2019
ML102670183 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Turkey Point |
Issue date: | 11/19/2010 |
From: | Orf T Plant Licensing Branch II |
To: | Florida Power & Light Co |
Orf, T J, NRR/DORL/301-415-2788 | |
References | |
Download: ML102670183 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 19, 2010 LICENSEE: Florida Power & Light Company (FPL)
FACILITY: St. Lucie Units 1 and 2 and Turkey Point Units 3 and 4 SUB~IECT:
SUMMARY
OF SEPTEMBER 16, 2010, MEETING WITH FPL REGARDING FORTHCOMING SUBMITTAL OF THE ST. LUCIE AND TURKEY POINT EXTENDED POWER UPRATES On September 16, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of FPL at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the forthcoming submittal of the St. Lucie Units 1 and 2 and Turkey Point Units 3 and 4 applications for extended power uprate (EPU). A list of attendees is provided as an enclosure and the licensee's meeting slides are available in the Agencywide Documents Access and Management System at Accession No. ML102600400.
FPL presented information on how FPL was taking the NRC Draft Division of Safety Systems Interim Staff Guidance, DSS-ISG-201 0-01, "Staff Guidance Regarding the Nuclear Criticality Safety Analysis for Spent Fuel Pools," into account while performing criticality analyses of the spent fuel pools. FPL requested NRC staff feedback on FPL's approaches.
FPL presented its approach for St. Lucie Unit 1, mentioning that the criticality analysis for the entire pool would be submitted with the application for the EPU. Also, the new approach would include adding neutron absorbers, simplifying patterns, and using more conservative assumptions that would reduce the effort to review the analysis. The licensee stated that neutron absorber panels similar to those used at Turkey Point are planned to be installed.
The staff asked clarifying questions on several topics including: the types of control rods that would be used and the possibility that one could be misloaded or misplaced; controls on the use of input parameters in reload analyses; the types of axial burnup profiles; differences between Boraflex and Metamic inserts; assumptions in tolerance calculations; and calculation methods for fission product worth.
FPL stated that the St. Lucie Unit 2 approach will be similar to St. Lucie Unit 1 with adjustments for fuel and rack differences.
The licensee stated that Turkey Point's License Amendment Request 207 regarding spent fuel pool criticality has already been submitted to the NRC for review. Turkey Point's analyses have several differences from the St. Lucie analyses. There is no radial zoning at Turkey Point and the Turkey Point calculations were performed using the PARAGON code for depletion calculations versus CASMOS at St. Lucie.
-2 The NRC staff asked questions on several portions of the Turkey Point criticality analyses including: degradation methods of Metamic; the treatment of flux suppressor assemblies; the temperatures used in the depletion calculations; the treatment of different fuel enrichment assemblies within the same region; and the amount of depletion uncertainty.
Members of the public were in attendance; however no Public Meeting Feedback forms were received from them. Please direct any inquiries to me at 301-415-2788, or Jason Paige at 301-415-5888.
Tracy J. Ort, Project Manager Plant Licensing Branch, 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES AUGUST 18. 2010. MEETING WITH FLORIDA POWER & LIGHT COMPANY FORTHCOMING EXTENDED POWER UPRATE APPLICATION FOR ST. LUCIE UNITS 1 AND 2 AND TURKEY POINT UNITS 3 AND 4 Attending in person: Attending via telephone:
Tom Abbatiello, FPL Jerry Burford, Entergy Steve Franzone, FPL Terry Jones, FPL Chris Wasik, FPL Dale Lancaster, FPUNuciear Consultants Larry Nicholson, FPL R. Lynn Fisher, FL Public Service Commission Emilio Fuentes, FPL David Rich, FL Public Service Commission Claude Villard, FPL William Freebairn, Nucleonics Week Stefan Anton, Holtec Tao He, Holtec Susan Salisbury, Palm Beach Post Jay Leff, Holtec Kurt Myers, St. Lucie County Public Safety &
Doug Broaddus, NRC/NRR Communications Eva Brown, NRC/NRR Davida Cunanan, NRC/NRR Glenn Adams, Xcel Energy Joe Giitter, NRC/NRR Delores Greene, NRC/NRR Valerie Amore Allen Howe, NRC/NRR Thomas Saporito Jason Paige, NRC/NRR Trace Orf, NRC/NRR Bill Ruland, NRC/NRR Tony Ulses, NRC/NRR Emma Wong, NRC/NRR Kent Wood, NRC/NRR Vefa Kucukboyaci, Westinghouse Ed Mercier, Westinghouse ENCLOSURE
November 19, 2010
-2 The NRC staff asked questions on several portions of the Turkey Point criticality analyses including: degradation methods of Metamic; the treatment of flux suppressor assemblies; the temperatures used in the depletion calculations; the treatment of different fuel enrichment assemblies within the same region; and the amount of depletion uncertainty.
Members of the public were in attendance; however no Public Meeting Feedback forms were received from them. Please direct any inquiries to me at 301-415-2788, or Jason Paige at 301-415-5888.
IRA!
Tracy J. art, Project Manager Plant Licensing Branch, 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsOgcRp LPL2-2 rtf RidsRgn2MailCenter RidsAcrsAcnw_MailCTR NSanfilippo, EDO RidsNrrDorl CSteger, NRR RidsNrrDss TOrt, NRR RidsNrrDssSrxb EBrown, NRR RidsNrrDorlLpl2-2 EWong, NRR RidsNrrPMTurkeyPoint KWood, NRR RidsNrrPMStLucie DGreene, NRR RidsNrrLABClayton DCunanan, NRR ADAMS Accession No ML102670183 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC DORLlLPL2-2/PM NAME TOrt BClayton DBroaddus TOrt DATE 11/12/2010 11/10/2010 11/18/2010 11/19/2010 OFFICIAL RECORD COpy