ML12072A343: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/12/2012
| issue date = 03/12/2012
| title = 3/6/2012 Summary of Meeting with Luminant Generation Company, LLC Regarding Planned Modifications to Resolve Fire Protection Circuit Interactions
| title = 3/6/2012 Summary of Meeting with Luminant Generation Company, LLC Regarding Planned Modifications to Resolve Fire Protection Circuit Interactions
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRS/EB-2
| author affiliation = NRC/RGN-IV/DRS/EB-2
| addressee name = Flores R
| addressee name = Flores R
Line 9: Line 9:
| docket = 05000445, 05000446
| docket = 05000445, 05000446
| license number = NPF-087, NPF-089
| license number = NPF-087, NPF-089
| contact person = Pick G A
| contact person = Pick G
| document type = Letter, Meeting Summary
| document type = Letter, Meeting Summary
| page count = 5
| page count = 5
}}
}}
=Text=
{{#Wiki_filter:UNITE D S TATE S NUC LEAR REGULATOR Y C OMMI S SI ON RE G IO N I V 1600 EAST LAMAR BLVD AR L INGTON , TEXAS 7 60 11 - 4511 March 12, 2012 Rafael Flores, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company, LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043
==SUBJECT:==
==SUMMARY==
OF MEETING WITH LUMINANT GENERATION COMPANY, LLC REGARDING PLANNED MODIFICATIONS TO RESOLVE FIRE PROTECTION CIRCUIT INTERACTIONS
==Dear Mr. Flores:==
This public meeting was conducted in Arlington, Texas on March 6, 2012, between the U.S. Nuclear Regulatory Commission and your staff. The participants discussed the scope and timeline for implementing modifications planned to resolve circuit faults related to multiple spurious operations.
This meeting was classified as a Category 1 public meeting, as communicated in the meeting notice (ML12048A861). It provided an opportunity for members of the public to discuss regulatory issues with the Nuclear Regulatory Commission after the business portion of the meeting, but before the meeting adjourned. No comments were brought forward by the public.
The attendance list for the meeting is included as Enclosure 1. A copy of the Luminant Generation Company, LLC planned modification schedule is provided in Enclosure 2.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosures, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
R. Flores                                    Should you have any questions concerning this matter, please contact me at 817 200-1137.
Sincerely,
                                          /RA/
Geoffrey Miller, Chief Engineering Branch 2 Division of Reactor Safety Dockets:      50-445; 50-446 Licenses:      NPF-87; NPF-89
==Enclosures:==
: 1. Attendance List
: 2. Luminant Generation Company, LLC Presentation Slides cc w/
==Enclosure:==
Electronic Distribution - Comanche Peak Nuclear Power Plant
R. Flores                                      Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Brian.Tindell@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Jason.Dykert@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource RIV/ETA: OEDO (Lydia.Chang@nrc.gov)
R:\_REACTORS\CP\CP MS MSO MODs 3-6-201-GAP.docx                      ADAMS ML12072A343 ADAMS:        No      Yes        SUNSI Review Complete        Reviewer Initials: GAP Publicly Available            Non-Sensitive Non-publicly Available        Sensitive DRS\EB2\SRI            DRP\PBA\BC                DRS\EB2\BC GPick                  WWalker                  GMiller
/RA/                    /RA/                      /RA/
03/07/2012              03/07/2012                03/12/2012 OFFICIAL RECORD COPY                                    T=Telephone    E=E-mail      F=Fax
  }}

Latest revision as of 06:50, 12 November 2019

3/6/2012 Summary of Meeting with Luminant Generation Company, LLC Regarding Planned Modifications to Resolve Fire Protection Circuit Interactions
ML12072A343
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/12/2012
From: Geoffrey Miller
NRC/RGN-IV/DRS/EB-2
To: Flores R
Luminant Generation Co
Pick G
References
Download: ML12072A343 (5)


Text

UNITE D S TATE S NUC LEAR REGULATOR Y C OMMI S SI ON RE G IO N I V 1600 EAST LAMAR BLVD AR L INGTON , TEXAS 7 60 11 - 4511 March 12, 2012 Rafael Flores, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company, LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043

SUBJECT:

SUMMARY

OF MEETING WITH LUMINANT GENERATION COMPANY, LLC REGARDING PLANNED MODIFICATIONS TO RESOLVE FIRE PROTECTION CIRCUIT INTERACTIONS

Dear Mr. Flores:

This public meeting was conducted in Arlington, Texas on March 6, 2012, between the U.S. Nuclear Regulatory Commission and your staff. The participants discussed the scope and timeline for implementing modifications planned to resolve circuit faults related to multiple spurious operations.

This meeting was classified as a Category 1 public meeting, as communicated in the meeting notice (ML12048A861). It provided an opportunity for members of the public to discuss regulatory issues with the Nuclear Regulatory Commission after the business portion of the meeting, but before the meeting adjourned. No comments were brought forward by the public.

The attendance list for the meeting is included as Enclosure 1. A copy of the Luminant Generation Company, LLC planned modification schedule is provided in Enclosure 2.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosures, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

R. Flores Should you have any questions concerning this matter, please contact me at 817 200-1137.

Sincerely,

/RA/

Geoffrey Miller, Chief Engineering Branch 2 Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89

Enclosures:

1. Attendance List
2. Luminant Generation Company, LLC Presentation Slides cc w/

Enclosure:

Electronic Distribution - Comanche Peak Nuclear Power Plant

R. Flores Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Brian.Tindell@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

Project Engineer, DRP/A (Jason.Dykert@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource RIV/ETA: OEDO (Lydia.Chang@nrc.gov)

R:\_REACTORS\CP\CP MS MSO MODs 3-6-201-GAP.docx ADAMS ML12072A343 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: GAP Publicly Available Non-Sensitive Non-publicly Available Sensitive DRS\EB2\SRI DRP\PBA\BC DRS\EB2\BC GPick WWalker GMiller

/RA/ /RA/ /RA/

03/07/2012 03/07/2012 03/12/2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax