|
|
(6 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 09/02/2014 | | | issue date = 09/02/2014 |
| | title = Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2014006) | | | title = Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2014006) |
| | author name = Pruett T W | | | author name = Pruett T |
| | author affiliation = NRC/RGN-IV/DRP | | | author affiliation = NRC/RGN-IV/DRP |
| | addressee name = Chisum M R | | | addressee name = Chisum M |
| | addressee affiliation = Entergy Operations, Inc | | | addressee affiliation = Entergy Operations, Inc |
| | docket = 05000382 | | | docket = 05000382 |
| | license number = NPF-038 | | | license number = NPF-038 |
| | contact person = Werner G E | | | contact person = Werner G |
| | document report number = IR-2014-006 | | | document report number = IR-2014-006 |
| | document type = Inspection Plan, Letter | | | document type = Inspection Plan, Letter |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:ptember 2, 2014 |
| [[Issue date::September 2, 2014]]
| |
|
| |
|
| Mike Chisum, Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751
| | ==SUBJECT:== |
| | MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2014006) |
|
| |
|
| SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2014006)
| | ==Dear Mr. Chisum:== |
| | On August 14, 2014, the NRC completed its mid-cycle performance review of the Waterford Steam Electric Station, Unit 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of Waterford Steam Electric Station, Unit 3, during this period and its plans for future inspections at your facility. |
| | |
| | The NRC determined that overall, Waterford Steam Electric Station, Unit 3, was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Waterford Steam Electric Station, Unit 3, during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one White finding in the Mitigating Systems Cornerstone. In a letter to you dated April 2, 2014, the NRC updated its assessment of Waterford Steam Electric Station, Unit 3, to be in the Regulatory Response Column of the ROP Action Matrix beginning the fourth quarter of 2013 based on the White finding. |
| | |
| | As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. |
| | |
| | Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. |
| | |
| | The enclosed inspection plan lists the inspections scheduled through December 31, 2015. |
| | |
| | Routine inspections performed by resident inspectors are not included in the inspection plan. |
|
| |
|
| ==Dear Mr. Chisum:==
| | The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. |
| On August 14, 2014, the NRC completed its mid-cycle performance review of the Waterford Steam Electric Station, Unit 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRC's assessment of Waterford Steam Electric Station, Unit 3, during this period and its plans for future inspections at your facility. The NRC determined that overall, Waterford Steam Electric Station, Unit 3, was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Waterford Steam Electric Station, Unit 3, during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one White finding in the Mitigating Systems Cornerstone. In a letter to you dated April 2, 2014, the NRC updated its assessment of Waterford Steam Electric Station, Unit 3, to be in the Regulatory Response Column of the ROP Action Matrix beginning the fourth quarter of 2013 based on the White finding. As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
| | |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Please contact Mr. Gregory Werner at 817 200-1574 with any questions you have regarding this letter. |
| | |
| | Sincerely, |
| | /RA/ |
| | Troy Pruett Acting Director Division of Reactor Projects Docket No.: 50-382 License No.: NPF-38 Enclosure: Waterford Steam Electric Station, Unit 3 Inspection/Activity Plan |
|
| |
|
| The enclosed inspection plan lists the inspections scheduled through December 31, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Mr. Gregory Werner at 817 200-1574 with any questions you have regarding this letter.
| | ML14240A123 SUNSI Review ADAMS Publicly Available Non-Sensitive By: GWerner Yes No Non-Publicly Available Sensitive OFFICE RIV/PE/DRP RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME JMelfi/dll GWerner/dll AVegel TPruett SIGNATURE /RA/ /RA/CYoung /RA/VGaddy /RA/ |
| | for for DATE 8/21/14 8/21/14 8/22/14 8/22/14 |
|
| |
|
| Sincerely,/RA/ Troy Pruett Acting Director Division of Reactor Projects Docket No.: 50-382 License No.: NPF-38
| | Letter to Mike Chisum from Troy Pruett dated September 2, 2014 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2014006) |
| | DISTRIBUTION: |
| | Regional Administrator (Marc.Dapas@nrc.gov) |
| | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) |
| | Acting DRP Director (Troy.Pruett@nrc.gov) |
| | Acting DRP Deputy Director (Michael.Hay@nrc.gov) |
| | DRS Director (Anton.Vegel@nrc.gov) |
| | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| | Senior Resident Inspector (Francis.Ramirez@nrc.gov) |
| | Resident Inspector (Chris.Speer@nrc.gov) |
| | Administrative Assistant (Linda.Dufrene@nrc.gov) |
| | Branch Chief (Greg.Werner@nrc.gov) |
| | Senior Project Engineer (Cale.Young@nrc.gov) |
| | Project Engineer (Jim.Melfi@nrc.gov) |
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| | RIV State Liaison Officer (Bill.Maier@nrc.gov) |
| | Project Manager (Mike.Orenak@nrc.gov) |
| | Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) |
| | R4DRPBC@nrc.gov R4DRSBC@nrc.gov Director, DIRS, NRR (Scott.Morris@nrc.gov) |
| | Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov) |
| | Acting Director, DORL, NRR (Louise.Lund@nrc.gov) |
| | Acting Deputy Director, DORL (Michael.Markley@nrc.gov) |
| | Director, NSIR/DPR (Rob.Lewis@nrc.gov) |
| | Chief, PLB IV, DORL, NRR (Eric.Oesterle@nrc.gov) |
| | Regional Counsel (Karla.Fuller@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | Technical Support Assistant (Loretta.Williams@nrc.gov) |
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| | RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) |
| | ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Waterford Steam Electric Station, Unit 3 |
|
| |
|
| ===Enclosure:===
| | Page 1 of 2 Waterford 08/22/2014 14:03:06 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB1-21T - COMPONENT DESIGN BASIS INSPECTION 9 3 10/06/2014 10/10/2014 IP 7111121 Component Design Bases Inspection 3 10/20/2014 10/24/2014 IP 7111121 Component Design Bases Inspection 3 11/03/2014 11/07/2014 IP 7111121 Component Design Bases Inspection EP-1 - EP PERFORMANCE INDICATORS 1 3 11/17/2014 11/21/2014 IP 71151-EP01 3 11/17/2014 11/21/2014 IP 71151-EP02 3 11/17/2014 11/21/2014 IP 71151-EP03 EP-2 - BIENNIAL EP INSPECTION 1 3 11/17/2014 11/21/2014 IP 7111402 Alert and Notification System Testing 3 11/17/2014 11/21/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3 11/17/2014 11/21/2014 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 11/17/2014 11/21/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RS 24 - RADIATION SAFETY 2 3 11/17/2014 11/21/2014 IP 71124.02 Occupational ALARA Planning and Controls 3 11/17/2014 11/21/2014 IP 71124.04 Occupational Dose Assessment EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 3 01/26/2015 01/30/2015 IP 7111105T Fire Protection [Triennial] |
| Waterford Steam Electric Station, Unit 3 Inspection/Activity Plan
| | 3 02/09/2015 02/13/2015 IP 7111105T Fire Protection [Triennial] |
| | RS 5678 - RADIATION SAFETY - TEAM 4 3 01/12/2015 01/16/2015 IP 71124.05 Radiation Monitoring Instrumentation 3 01/12/2015 01/16/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3 01/12/2015 01/16/2015 IP 71124.07 Radiological Environmental Monitoring Program 3 01/12/2015 01/16/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EXAM - INITIAL OPERATOR EXAM 4 3 08/17/2015 08/21/2015 X02546 INITIAL EXAM WAT(09/2014) |
| | 3 09/14/2015 09/18/2015 X02546 INITIAL EXAM WAT(09/2014) |
| | EP-2 - HAB EXERCISE INSPECTION 5 3 06/22/2015 06/26/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 06/22/2015 06/26/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event EP-3 - EP PERFORMANCE INDICATORS 2 3 06/22/2015 06/26/2015 IP 71151-EP01 3 06/22/2015 06/26/2015 IP 71151-EP02 3 06/22/2015 06/26/2015 IP 71151-EP03 This report does not include INPO and OUTAGE activities. |
|
| |
|
| SUNSI Review By: GWerner ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/PE/DRP RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME JMelfi/dll GWerner/dll AVegel TPruett SIGNATURE /RA/ /RA/CYoung for /RA/VGaddy for /RA/ DATE 8/21/14 8/21/14 8/22/14 8/22/14 Letter to Mike Chisum from Troy Pruett dated September 2, 2014
| | This report shows only on-site and announced inspection procedures. |
|
| |
|
| SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2014006) DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Francis.Ramirez@nrc.gov) Resident Inspector (Chris.Speer@nrc.gov) Administrative Assistant (Linda.Dufrene@nrc.gov) Branch Chief (Greg.Werner@nrc.gov) Senior Project Engineer (Cale.Young@nrc.gov) Project Engineer (Jim.Melfi@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) RIV State Liaison Officer (Bill.Maier@nrc.gov) Project Manager (Mike.Orenak@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) R4DRPBC@nrc.gov R4DRSBC@nrc.gov Director, DIRS, NRR (Scott.Morris@nrc.gov) Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov) Acting Director, DORL, NRR (Louise.Lund@nrc.gov) Acting Deputy Director, DORL (Michael.Markley@nrc.gov) Director, NSIR/DPR (Rob.Lewis@nrc.gov) Chief, PLB IV, DORL, NRR (Eric.Oesterle@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Waterford Steam Electric Station, Unit 3 Page 1 of 208/22/201414:03:06Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWaterfordInspection / Activity Plan09/01/2014-12/31/2015EB1-21T-COMPONENT DESIGN BASIS INSPECTION9 3 IPComponent Design Bases Inspection711112110/06/201410/10/2014 3 IPComponent Design Bases Inspection711112110/20/201410/24/2014 3 IPComponent Design Bases Inspection711112111/03/201411/07/2014EP-1-EP PERFORMANCE INDICATORS1 3 IP71151-EP0111/17/201411/21/2014 3 IP71151-EP0211/17/201411/21/2014 3 IP71151-EP0311/17/201411/21/2014EP-2-BIENNIAL EP INSPECTION1 3 IPAlert and Notification System Testing711140211/17/201411/21/2014 3 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/2014 3 IPEmergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/2014RS 24-RADIATION SAFETY2 3 IPOccupational ALARA Planning and Controls71124.0211/17/201411/21/2014 3 IPOccupational Dose Assessment71124.0411/17/201411/21/2014EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION4 3 IPFire Protection [Triennial]7111105T01/26/201501/30/2015 3 IPFire Protection [Triennial]7111105T02/09/201502/13/2015RS 5678-RADIATION SAFETY - TEAM4 3 IPRadiation Monitoring Instrumentation71124.0501/12/201501/16/2015 3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0601/12/201501/16/2015 3 IPRadiological Environmental Monitoring Program71124.0701/12/201501/16/2015 3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0801/12/201501/16/2015EXAM-INITIAL OPERATOR EXAM4 3 INITIAL EXAM WAT(09/2014)X0254608/17/201508/21/2015 3 INITIAL EXAM WAT(09/2014)X0254609/14/201509/18/2015EP-2-HAB EXERCISE INSPECTION5 3 IPEmergency Action Level and Emergency Plan Changes711140406/22/201506/26/2015 3 IPExercise Evaluation - Hostile Action (HA) Event711140706/22/201506/26/2015EP-3-EP PERFORMANCE INDICATORS2 3 IP71151-EP0106/22/201506/26/2015 3 IP71151-EP0206/22/201506/26/2015 3 IP71151-EP0306/22/201506/26/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | Page 2 of 2 Waterford 08/22/2014 14:03:06 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site INSP - OPERATOR REQUAL INSPECTION 3 3 07/27/2015 07/31/2015 IP 7111111B Licensed Operator Requalification Program EB1-17T - TRIENNIAL PERMANENT PLANT MODS & 5059 3 3 10/19/2015 10/30/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications RS 12 PI - RADIATION SAFETY 2 3 10/26/2015 10/30/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 10/26/2015 10/30/2015 IP 71124.02 Occupational ALARA Planning and Controls 3 10/26/2015 10/30/2015 IP 71151-OR01 3 10/26/2015 10/30/2015 IP 71151-PR01 71111.08 - WATERFORD ISI 1 3 11/02/2015 11/13/2015 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities. |
|
| |
|
| Page 2 of 208/22/201414:03:06Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWaterfordInspection / Activity Plan09/01/2014-12/31/2015INSP-OPERATOR REQUAL INSPECTION3 3 IPLicensed Operator Requalification Program7111111B07/27/201507/31/2015EB1-17T-TRIENNIAL PERMANENT PLANT MODS & 50593 3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/19/201510/30/2015RS 12 PI-RADIATION SAFETY2 3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/26/201510/30/2015 3 IPOccupational ALARA Planning and Controls71124.0210/26/201510/30/2015 3 IP71151-OR0110/26/201510/30/2015 3 IP71151-PR0110/26/201510/30/201571111.08-WATERFORD ISI1 3 IPInservice Inspection Activities - PWR7111108P11/02/201511/13/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | This report shows only on-site and announced inspection procedures. |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 ML23261B1852023-09-14014 September 2023 Notification of Inspection and Request for Information IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23146A1342023-05-26026 May 2023 Information Request, Security IR 2023402 ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) IR 05000382/20220122022-09-16016 September 2022 Digital Instrumentation and Control Modification Inspection Report 05000382/2022012 ML22229A5362022-08-23023 August 2022 Inspection Plan Transmittal Letter-2022 Mid-Cycle-Final ML22187A0362022-07-11011 July 2022 Notification of NRC Design Bases Assurance Inspection (Programs) (05000382/2022013) and Request for Information ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1802022-05-0202 May 2022 WF3 Cpcs RF24 Inspection Plan ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email IR 05000382/20210062022-03-0202 March 2022 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2021006) ML21327A4542021-11-22022 November 2021 ISI PWR RFI ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 IR 05000382/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Waterford Steam Electric Station - Unit 3, (Report 05000382/2021005) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21196A5302021-07-19019 July 2021 Wat 2021010 RFI Letter 21N_05 Gap ML21195A0692021-07-13013 July 2021 Staton, Unit 3 - Notification of Digital Instrumentation and Control Modification Inspection and Request for Information ML21159A2262021-06-0808 June 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection 05000382/2021003 and Request for Information ML21125A6522021-05-0606 May 2021 Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information ML21061A3432021-02-25025 February 2021 Request for Information: Waterford-3, Dated January 6, 2021, Inspection Report 05000382/2021-001 Occupational Radiation Safety Inspection-2 ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 IR 05000382/20200052020-09-0101 September 2020 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2020005) ML20125A3212020-05-0404 May 2020 WAT2020410 Inspection Document Request ML20055E1122020-03-0303 March 2020 WAT2019006 Annual Assessment Letter IR 05000382/20190052019-08-30030 August 2019 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3, Report 05000382/2019005 ML19113A2952019-04-25025 April 2019 Notification of Inspection (NRC Inspection Report 05000382/2019003 and Request for Information IR 05000382/20180062019-03-0404 March 2019 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2018006) ML19035A6342019-02-0404 February 2019 Notification of NRC Design Bases Assurance Inspection (Programs) (05000382/2019010) and Initial Request for Information IR 05000382/20180052018-08-31031 August 2018 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2018005) IR 05000382/20170062018-03-0101 March 2018 Annual Assessment Letter for Waterford Steam Electric Station Unit 3, (Report 05000382/2017006) IR 05000382/20170052017-08-28028 August 2017 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2017005) IR 05000382/20160062017-03-0101 March 2017 Annual Assessment Letter for Inspection Report 05000382/2016006 IR 05000382/20170012017-02-24024 February 2017 Waterford Steam Electric Station, Unit 3 - Notification of NRC Triennial Heat Sink Performance Inspection (05000382/2017001) and Request for Information ML17055A6702017-02-24024 February 2017 Notification of NRC Triennial Heat Sink Performance Inspection (05000382/2017001) and Request for Information IR 05000382/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2016005) ML16237A0652016-08-31031 August 2016 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2016005) IR 05000382/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2016401) IR 05000382/20150062016-03-0202 March 2016 Annual Assessment Letter for Waterford Unit 3 (Report 05000382/2015006) IR 05000382/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2015401) IR 05000382/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2015005) ML15149A2562015-05-28028 May 2015 Notification of Inspection (NRC Integrated Inspection Report 05000382/2015003)And Request for Information IR 05000382/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2014006) IR 05000382/20130012014-03-0404 March 2014 Annual Assessment Letter for Waterford Steam Electric Station (Report 05000382/2013001) IR 05000382/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382-13-006) 2024-08-21
[Table view] Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000382/20230032023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 2024-09-06
[Table view] |
Text
ptember 2, 2014
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2014006)
Dear Mr. Chisum:
On August 14, 2014, the NRC completed its mid-cycle performance review of the Waterford Steam Electric Station, Unit 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of Waterford Steam Electric Station, Unit 3, during this period and its plans for future inspections at your facility.
The NRC determined that overall, Waterford Steam Electric Station, Unit 3, was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Waterford Steam Electric Station, Unit 3, during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one White finding in the Mitigating Systems Cornerstone. In a letter to you dated April 2, 2014, the NRC updated its assessment of Waterford Steam Electric Station, Unit 3, to be in the Regulatory Response Column of the ROP Action Matrix beginning the fourth quarter of 2013 based on the White finding.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.
Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Gregory Werner at 817 200-1574 with any questions you have regarding this letter.
Sincerely,
/RA/
Troy Pruett Acting Director Division of Reactor Projects Docket No.: 50-382 License No.: NPF-38 Enclosure: Waterford Steam Electric Station, Unit 3 Inspection/Activity Plan
ML14240A123 SUNSI Review ADAMS Publicly Available Non-Sensitive By: GWerner Yes No Non-Publicly Available Sensitive OFFICE RIV/PE/DRP RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME JMelfi/dll GWerner/dll AVegel TPruett SIGNATURE /RA/ /RA/CYoung /RA/VGaddy /RA/
for for DATE 8/21/14 8/21/14 8/22/14 8/22/14
Letter to Mike Chisum from Troy Pruett dated September 2, 2014 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2014006)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Francis.Ramirez@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
Administrative Assistant (Linda.Dufrene@nrc.gov)
Branch Chief (Greg.Werner@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Jim.Melfi@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
RIV State Liaison Officer (Bill.Maier@nrc.gov)
Project Manager (Mike.Orenak@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
R4DRPBC@nrc.gov R4DRSBC@nrc.gov Director, DIRS, NRR (Scott.Morris@nrc.gov)
Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)
Acting Director, DORL, NRR (Louise.Lund@nrc.gov)
Acting Deputy Director, DORL (Michael.Markley@nrc.gov)
Director, NSIR/DPR (Rob.Lewis@nrc.gov)
Chief, PLB IV, DORL, NRR (Eric.Oesterle@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Waterford Steam Electric Station, Unit 3
Page 1 of 2 Waterford 08/22/2014 14:03:06 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB1-21T - COMPONENT DESIGN BASIS INSPECTION 9 3 10/06/2014 10/10/2014 IP 7111121 Component Design Bases Inspection 3 10/20/2014 10/24/2014 IP 7111121 Component Design Bases Inspection 3 11/03/2014 11/07/2014 IP 7111121 Component Design Bases Inspection EP-1 - EP PERFORMANCE INDICATORS 1 3 11/17/2014 11/21/2014 IP 71151-EP01 3 11/17/2014 11/21/2014 IP 71151-EP02 3 11/17/2014 11/21/2014 IP 71151-EP03 EP-2 - BIENNIAL EP INSPECTION 1 3 11/17/2014 11/21/2014 IP 7111402 Alert and Notification System Testing 3 11/17/2014 11/21/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3 11/17/2014 11/21/2014 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 11/17/2014 11/21/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RS 24 - RADIATION SAFETY 2 3 11/17/2014 11/21/2014 IP 71124.02 Occupational ALARA Planning and Controls 3 11/17/2014 11/21/2014 IP 71124.04 Occupational Dose Assessment EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 3 01/26/2015 01/30/2015 IP 7111105T Fire Protection [Triennial]
3 02/09/2015 02/13/2015 IP 7111105T Fire Protection [Triennial]
RS 5678 - RADIATION SAFETY - TEAM 4 3 01/12/2015 01/16/2015 IP 71124.05 Radiation Monitoring Instrumentation 3 01/12/2015 01/16/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3 01/12/2015 01/16/2015 IP 71124.07 Radiological Environmental Monitoring Program 3 01/12/2015 01/16/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EXAM - INITIAL OPERATOR EXAM 4 3 08/17/2015 08/21/2015 X02546 INITIAL EXAM WAT(09/2014)
3 09/14/2015 09/18/2015 X02546 INITIAL EXAM WAT(09/2014)
EP-2 - HAB EXERCISE INSPECTION 5 3 06/22/2015 06/26/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 06/22/2015 06/26/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event EP-3 - EP PERFORMANCE INDICATORS 2 3 06/22/2015 06/26/2015 IP 71151-EP01 3 06/22/2015 06/26/2015 IP 71151-EP02 3 06/22/2015 06/26/2015 IP 71151-EP03 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Waterford 08/22/2014 14:03:06 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site INSP - OPERATOR REQUAL INSPECTION 3 3 07/27/2015 07/31/2015 IP 7111111B Licensed Operator Requalification Program EB1-17T - TRIENNIAL PERMANENT PLANT MODS & 5059 3 3 10/19/2015 10/30/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications RS 12 PI - RADIATION SAFETY 2 3 10/26/2015 10/30/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 10/26/2015 10/30/2015 IP 71124.02 Occupational ALARA Planning and Controls 3 10/26/2015 10/30/2015 IP 71151-OR01 3 10/26/2015 10/30/2015 IP 71151-PR01 71111.08 - WATERFORD ISI 1 3 11/02/2015 11/13/2015 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.