{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 July 12, 2016 Mr. Ken Peters, Senior Vice President and Chief Nuclear Officer Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043
-4511   Ju ly 12, 2016 Mr. Ken Peters, Senior Vice President and Chief Nuclear Officer Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043


==SUBJECT:==
==SUBJECT:==
Line 24: Line 23:


==Dear Mr. Peters:==
==Dear Mr. Peters:==
This refers to the meeting conducted in Granbury, Texas on June 27, 2016, to discuss the safety performance at the Comanche Peak Nuclear Power Plant between January 1 and December 31, 2015. The meeting was conducted as an Open House to facilitate communications with the members of the public who attended. Various topics were discussed during the meeting including the Reactor Oversight Process and the annual safety performance of Comanche Peak for 201 5. Attendees present at the meeting were allowed to ask questions and comment on the proceedings.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
This refers to the meeting conducted in Granbury, Texas on June 27, 2016, to discuss the safety performance at the Comanche Peak Nuclear Power Plant between January 1 and December 31, 2015.
-rm/adams.html (the Public Electronic Reading Room).
The meeting was conducted as an Open House to facilitate communications with the members of the public who attended. Various topics were discussed during the meeting including the Reactor Oversight Process and the annual safety performance of Comanche Peak for 2015.
Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely, /RA/ Jeremy R. Groom, Chief Division of Reactor Projects Docket Nos.
Attendees present at the meeting were allowed to ask questions and comment on the proceedings.
50-445 , 50-446 License Nos. NPF
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-87 , NPF-89  
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely,
                                              /RA/
Jeremy R. Groom, Chief Division of Reactor Projects Docket Nos. 50-445, 50-446 License Nos. NPF-87, NPF-89


==Enclosure:==
==Enclosure:==
Attendance List
Attendance List


Enclosure}}
ML16194A496 Enclosure}}

Latest revision as of 17:52, 30 October 2019

Summary of Annual Performance Assessment Meeting and Public Open House Regarding Comanche Peak Nuclear Power Plant 2015 Performance
ML16194A496
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/12/2016
From: Jeremy Groom
NRC/RGN-IV/DRP
To: Peters K
Luminant Generation Co
jeremy groom
References
Download: ML16194A496 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 July 12, 2016 Mr. Ken Peters, Senior Vice President and Chief Nuclear Officer Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043

SUBJECT:

SUMMARY

OF ANNUAL PERFORMANCE ASSESSMENT MEETING AND PUBLIC OPEN HOUSE REGARDING COMANCHE PEAK NUCLEAR POWER PLANT 2015 PERFORMANCE

Dear Mr. Peters:

This refers to the meeting conducted in Granbury, Texas on June 27, 2016, to discuss the safety performance at the Comanche Peak Nuclear Power Plant between January 1 and December 31, 2015.

The meeting was conducted as an Open House to facilitate communications with the members of the public who attended. Various topics were discussed during the meeting including the Reactor Oversight Process and the annual safety performance of Comanche Peak for 2015.

Attendees present at the meeting were allowed to ask questions and comment on the proceedings.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely,

/RA/

Jeremy R. Groom, Chief Division of Reactor Projects Docket Nos. 50-445, 50-446 License Nos. NPF-87, NPF-89