|
|
(6 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 12/31/1990 | | | issue date = 12/31/1990 |
| | title = Revised Monthly Operating Repts for Dec 1990 for St Lucie Units 1 & 2 | | | title = Revised Monthly Operating Repts for Dec 1990 for St Lucie Units 1 & 2 |
| | author name = BREEN J J | | | author name = Breen J |
| | author affiliation = FLORIDA POWER & LIGHT CO. | | | author affiliation = FLORIDA POWER & LIGHT CO. |
| | addressee name = | | | addressee name = |
Line 15: |
Line 15: |
| | page count = 2 | | | page count = 2 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:QF'ERATING DATA REPORT I |
| | DOCVET NQ 50 335 DATE igg) 4 COHPLETEO BY JAP hREEN OPERATING STATUS TELEPHONE 407/465/3550 |
| | : i. UNI'r NAME; sr, LucIE uNIT REF'ORTING PERIOD: DECEMBER 1998 1 |
| | : 3. LICENSED THERMAL F'OWER < MWT): 2700 NAMEPLATE RATING (GROSS MWE) i 850 5 DESXGN ELECTRICAL RATING (NET MWE): 830 6~ MAXIMUM DEPENDABLE CAF'ACITY (GROSS MWE) o 872 7o MAXIMUM DEF'ENDABLE CAPACITY ( NET MWE ) o 839 |
| | : 8. IF CHANGES OCCUR IN CAPACITY RATINGS <ITEMS NUMBER 3 THROUGH 7) |
| | SINCE LAST REPORT 1 GIVE REASONS t POWER LEVEL TO WHICH RESTRXCTEDE IF ANY (NET MWE) |
| | : 10. REASONS FOR RESTRICTIONS TF ANY: |
| | MONTHLY -YTD- CUMULATTUE ii, 12. |
| | HOURS XN REPORT PERXOD; NUMBER OF HOURS REACTOR WAS CRITICAL 744 744+0 8760 5569o9 122976.0 92958+5 13m REACTOR RESERVE SHUTDOWN HOURS OiO Oie 2 0543 14 HOURS GENERATOR ON-LINE 744iO 5467o4 92104.4 15'NIT RESERVE SHUTDOWN HOURS 0+0 OiO 39~3 16'ROSS THERMAL ENERGY GENERATED (MWH) 1951346 14284414 237242054 17'ROSS ELECTRICAL ENERGY GENERATED (MWH) 656140 4765570 78208640 18'ET ELECTRICAL ENERGY GENERATED <MWK) 623009 4493877 73892742 19 o UNIT SERVICE FACTOR 100+0 6Z.4 74 ' |
| | 20 o UNXT A VAXLABXLITYFACTOR 100oO 62.4 74.9 21'APACITY FACTOR (USXNG MDC NET) 99+8 61' 74 ' |
| | 22 CAF'ACITY FACTOR (USXNG DER NET) 100 61+8 73+4 |
| | ~3, UNIT FORCED OUTAGE RATE ~.O Q,3 |
| | : 4. sHuTDOWNS sCHEDuLED OVER NEXT 6 MONTHS : |
| | 25, XF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP: |
| | '9102260056 910214 PDR ADQCK 05000335 |
| | ~ |
| | R PDR |
| | |
| | OPERATING DATA REPORT DOCKET NO 50 38 DATE COMPLETED BY J~5. BREEN TELEPHONE 407/465/3550 OPERATING STATUS 1 ~ lJNXT NAME: ST ~ LUCIE lJNXT 2 REPORTING PERIOD: DECEMBER 1998 |
| | : 3. LICENSED THERMAL POWER (MWT) o 270() |
| | : 4. NAMEPI ATE RATING (GROSS MWE): 850 |
| | : 5. DESXGN ELECTRICAL RATING <NET MWE) o 830 6o MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)o 882 |
| | : 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 |
| | : 8. IF CHANGES OCCUR IN CAPAC1TY RATXNGS (XTEMS NUMBER 3 THROUGH 7) |
| | $ 1NCE LAST REPORT ~ GIVE REASONS LEVEL TO WHICH RESTRICTED~ XF ANY (NET MWE) |
| | 'OWER |
| | : 10. REASONS FOR RESTRICTIONS~ XF ANY'ONTHLY |
| | -YTD- CUMULATIVE 11 o HOURS XN REPORT PERIOD f 744 8760 64873.0 |
| | : 12. NUMBER OF HOURS REACTOR WAS CRITXCAL 704+0 6691.4 54860.3 13m REACTOR RESERVE SHUTDOWN HOURS 0' OoO 0 ~ 0 |
| | : 14. HOURS GENERATOR ON-LINE 649i8 6489i6 53844 ' |
| | 15'NIT RESERVE SHUTDOWN HOURS OiO OoO 0 ' |
| | 16+ GROSS THERMAL ENERGY GENERATED <MWH) 1575775 16991685 140789081 17 o GROSS ELECTRICAL ENERGY GENERATED (MWH) 531140 5645010 46896920 18'ET ELECTRICAL ENERGY GENERATED <MWH) 498905 5320989 44334103 19o UNXT SERVXCE FACTOR 87+3 74+1 83-() |
| | 20 ~ UNIT AVAXLABXLITYFACTOR 87i3 74oi 83.0'3.4 21 o CAPACITY FACTOR (USING MDC NET) 79i9 72e4 22+ CAPACITY FACTOR <USING DER NET) 80i8 73o2 83.i, 23+ UNXT FORCED OUTAGE RATE w.4 I o.X s.'I 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS ~ |
| | 25 o IF SHUT DOWN AT END OF REPORT PERIOD e ESTIMATED DATE OF STARTUP:}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
QF'ERATING DATA REPORT I
DOCVET NQ 50 335 DATE igg) 4 COHPLETEO BY JAP hREEN OPERATING STATUS TELEPHONE 407/465/3550
- i. UNI'r NAME; sr, LucIE uNIT REF'ORTING PERIOD: DECEMBER 1998 1
- 3. LICENSED THERMAL F'OWER < MWT): 2700 NAMEPLATE RATING (GROSS MWE) i 850 5 DESXGN ELECTRICAL RATING (NET MWE): 830 6~ MAXIMUM DEPENDABLE CAF'ACITY (GROSS MWE) o 872 7o MAXIMUM DEF'ENDABLE CAPACITY ( NET MWE ) o 839
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS <ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT 1 GIVE REASONS t POWER LEVEL TO WHICH RESTRXCTEDE IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS TF ANY:
MONTHLY -YTD- CUMULATTUE ii, 12.
HOURS XN REPORT PERXOD; NUMBER OF HOURS REACTOR WAS CRITICAL 744 744+0 8760 5569o9 122976.0 92958+5 13m REACTOR RESERVE SHUTDOWN HOURS OiO Oie 2 0543 14 HOURS GENERATOR ON-LINE 744iO 5467o4 92104.4 15'NIT RESERVE SHUTDOWN HOURS 0+0 OiO 39~3 16'ROSS THERMAL ENERGY GENERATED (MWH) 1951346 14284414 237242054 17'ROSS ELECTRICAL ENERGY GENERATED (MWH) 656140 4765570 78208640 18'ET ELECTRICAL ENERGY GENERATED <MWK) 623009 4493877 73892742 19 o UNIT SERVICE FACTOR 100+0 6Z.4 74 '
20 o UNXT A VAXLABXLITYFACTOR 100oO 62.4 74.9 21'APACITY FACTOR (USXNG MDC NET) 99+8 61' 74 '
22 CAF'ACITY FACTOR (USXNG DER NET) 100 61+8 73+4
~3, UNIT FORCED OUTAGE RATE ~.O Q,3
- 4. sHuTDOWNS sCHEDuLED OVER NEXT 6 MONTHS :
25, XF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP:
'9102260056 910214 PDR ADQCK 05000335
~
R PDR
OPERATING DATA REPORT DOCKET NO 50 38 DATE COMPLETED BY J~5. BREEN TELEPHONE 407/465/3550 OPERATING STATUS 1 ~ lJNXT NAME: ST ~ LUCIE lJNXT 2 REPORTING PERIOD: DECEMBER 1998
- 3. LICENSED THERMAL POWER (MWT) o 270()
- 4. NAMEPI ATE RATING (GROSS MWE): 850
- 5. DESXGN ELECTRICAL RATING <NET MWE) o 830 6o MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)o 882
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
- 8. IF CHANGES OCCUR IN CAPAC1TY RATXNGS (XTEMS NUMBER 3 THROUGH 7)
$ 1NCE LAST REPORT ~ GIVE REASONS LEVEL TO WHICH RESTRICTED~ XF ANY (NET MWE)
'OWER
- 10. REASONS FOR RESTRICTIONS~ XF ANY'ONTHLY
-YTD- CUMULATIVE 11 o HOURS XN REPORT PERIOD f 744 8760 64873.0
- 12. NUMBER OF HOURS REACTOR WAS CRITXCAL 704+0 6691.4 54860.3 13m REACTOR RESERVE SHUTDOWN HOURS 0' OoO 0 ~ 0
- 14. HOURS GENERATOR ON-LINE 649i8 6489i6 53844 '
15'NIT RESERVE SHUTDOWN HOURS OiO OoO 0 '
16+ GROSS THERMAL ENERGY GENERATED <MWH) 1575775 16991685 140789081 17 o GROSS ELECTRICAL ENERGY GENERATED (MWH) 531140 5645010 46896920 18'ET ELECTRICAL ENERGY GENERATED <MWH) 498905 5320989 44334103 19o UNXT SERVXCE FACTOR 87+3 74+1 83-()
20 ~ UNIT AVAXLABXLITYFACTOR 87i3 74oi 83.0'3.4 21 o CAPACITY FACTOR (USING MDC NET) 79i9 72e4 22+ CAPACITY FACTOR <USING DER NET) 80i8 73o2 83.i, 23+ UNXT FORCED OUTAGE RATE w.4 I o.X s.'I 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS ~
25 o IF SHUT DOWN AT END OF REPORT PERIOD e ESTIMATED DATE OF STARTUP: