{{#Wiki_filter:REGULATOh INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:8501210088 DOC~DATE: 85/01/15 NOTARIZED:
{{#Wiki_filter:REGULATOh   INFORMATION DISTRIBUTION               STEM (RIDS)
NO FACIL:50-315 Donald C.Cook Nuclear Power Planti Unit 1F Indiana 8 50-316 Donald CD Cook Nuclear Power Planti Unit 2i Indiana 8 AUTH, NAME AUTHOR AFFILIATION
ACCESSION NBR:8501210088         DOC ~ DATE: 85/01/15   NOTARIZED:         NO         DOCKET' FACIL:50-315 Donald C. Cook Nuclear Power Planti Unit 1F Indiana                     8 50-316 Donald CD Cook Nuclear Power Planti Unit 2i Indiana                   8   00316 AUTH, NAME         AUTHOR AFFILIATION
'LEXICHiM.P, Indiana 8 Michigan Electric Co.RECIP,NAME RECIPIENT AFFILIATION DENTONsH~RE Office of Nuclear Reactor Regulationg Director DOCKET'00316
'LEXICHiM.P,         Indiana 8 Michigan   Electric Co.
RECIP,NAME         RECIPIENT AFFILIATION DENTONsH ~ RE       Office of Nuclear Reactor Regulationg Director


==SUBJECT:==
==SUBJECT:==
Responds to RCS vent sys design (TMI Item II.B,1)in safety evaluation in SA Yar ga 830831 ltr,Commitment to rack out RCS vent sys breakers during normal operation withdrawn~DISTRIBUTION CODE: A006D COPIES RECE I YED: LTR ENCL SIZE: TITLE: OR Submittal:
Responds to RCS vent sys design (TMI Item II.B,1) in safety evaluation in SA Yar ga 830831 ltr,Commitment to rack out RCS vent sys breakers during normal operation withdrawn ~
TMI Action Plan Rgmt NUREG-0737 8 NUREG 0660 NOTES: OL:10/25/74 OL: 12/23/72 05000315 05000316 RECIPIENT ID CODE/NAME NRR ORB 1 BC 01 INTERNAL: ACRS 3Q ELD/HDS3 IE/DEPER/EPB NRR/DHFS DEPY29 NRR/DL/ORAB 18 NRR/DSI/AEB NRR/RAB 00 RGN2/DRSS/EPRPB COPIES LTTR ENC 7 10 1 1 3 1 3 1 1 1 1 RECIPIENT ID CODE/NAME ADM/LFMB IE/DEPER DIR 33 NRR PAULSONFH~NRR/DL DIR 14 NRR/DSI/ADRS 27 NRR/DSI/ASB NRR/DST DIR 30 RGN3 COP IE'S LTTR ENCL EXTERNAL: L'PDR NSIC 03 05 NRC PDR 02'OTAL NURSER OF COPIES REQUIRED: LTTR AI ENCL
DISTRIBUTION CODE: A006D       COPIES RECE I YED: LTR     ENCL             SIZE:
('II I I'Q M<I MI M M''I'Ml M l lII I I1 M I ll M Mt lr I'I I M h I I'(I II fIj li W I I l(I l 10 IN DIAN A 8 M I C H IGAN ELECTRIC COM PAN Y P.o.BOX 16631 COLUMBUS, OHIO 43216 January 15, 1985 AEP:NRC:0584E I Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Docket Nos;50-315 and 50-316-License"Nos.
TITLE: OR Submittal: TMI     Action Plan     Rgmt NUREG-0737 8 NUREG 0660 NOTES:                                                                                 05000315 OL:10/25/74 05000316 OL: 12/23/72 RECIPIENT         COPIES            RECIPIENT                COP IE'S ID CODE/NAME        LTTR ENC        ID CODE/NAME               LTTR ENCL NRR ORB 1 BC 01       7 INTERNAL: ACRS             3Q     10    1      ADM/LFMB ELD/HDS3               1            IE/DEPER DIR 33 IE/DEPER/EPB           3            NRR PAULSONFH ~
DPR-58 and DPR-74 NUREG-0737, ITEM II B.1,'.DELETE COMMITMENT TO RACK OUT REACTOR COOLANT SYSTEM VENT BREAKERS-Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555.
NRR/DHFS DEPY29         1            NRR/DL DIR      14 NRR/DL/ORAB 18         3            NRR/DSI/ADRS 27 NRR/DSI/AEB            1             NRR/DSI/ASB NRR     /RAB          1            NRR/DST DIR 30 00      1            RGN3 RGN2/DRSS/EPRPB        1 EXTERNAL: L'PDR             03                   NRC PDR NSIC          05 02'OTAL NURSER OF COPIES     REQUIRED: LTTR       AI   ENCL


==Dear Mr.Denton:==
('
1 This letter is 1n response to an item in the Safety Evaluat1on (SE)attached to Mr.Steven A.Varga's letter dated August 31, 1983.The SE stated that the RCS vent system design is acceptable provided certain items were resolved.-One of the items involved the restoration of continuous control power to the RCS vent system by deleting the comm1tment to rack out the related oirouit breakers during normal operation.
II I
Continuous power is needed for vent valve position indication in the control room.Pursuant to the requirements of your staff as presented in the SE, we hereby withdraw our commitment to rack out the RCS vent system breakers dur1ng normal operation.
I' Q M<I MI M
l M                    ''I 'Ml      M lII I
I1                      I ll M
M        Mt lr
    'I I
I M
h I
W I
I II I'(
I      fIj li l(
I l
10
 
IN DIANA 8 M IC H IGAN ELECTRIC COM PAN Y P.o. BOX 16631 COLUMBUS, OHIO 43216 January 15, 1985 AEP:NRC:0584E I
Donald C. Cook Nuclear Plant Unit Nos.      1 and 2 Docket Nos; 50-315 and 50-316-License"Nos. DPR-58 and DPR-74 NUREG-0737, ITEM    II  B.1, '.
DELETE COMMITMENT TO RACK OUT REACTOR COOLANT SYSTEM VENT BREAKERS-Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 .
 
==Dear Mr. Denton:==
 
1 This letter is 1n response to an item in the Safety Evaluat1on (SE) attached to Mr. Steven A. Varga's letter dated August 31, 1983. The SE stated that the RCS vent system design is acceptable provided certain items were resolved. - One of the items involved the restoration of continuous control power to the RCS vent system by deleting the comm1tment to rack out the related oirouit breakers during normal operation. Continuous power is needed for vent valve position indication in the control room.
Pursuant to the requirements of your staff as presented in the SE, we hereby withdraw our commitment to rack out the RCS vent system breakers dur1ng normal operation.
This document has been prepared following Corporate procedures which incorporate a reasonable set of oontrols to insure 1ts accuracy and completeness prior to signature by the undersigned.
This document has been prepared following Corporate procedures which incorporate a reasonable set of oontrols to insure 1ts accuracy and completeness prior to signature by the undersigned.
Very truly yours, 8501210088 850ii5 PDR ADOCK 05000315 PDR th Attachment M.P.Alexich Vice Presi'dent IP<g4 cc: John E.Dolan 01.G..Smith, Jr.-Bridgman R.C.Callen G.Bruchmann G.Charnoff NRC Resident Inspector-Bridgman 10 1 I I~~1 J 1 El~}}
Very truly yours, 850ii5 8501210088 05000315                                 M. P. Alexich PDR  ADOCK                                        Vice Presi'dent IP<g4 PDR th Attachment cc: John E. Dolan
: 01. G..Smith, Jr.   - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector     - Bridgman 10
 
1 I
I
            ~ ~
1 J
1 El ~}}

Latest revision as of 12:46, 22 October 2019

Responds to RCS Vent Sys Design (TMI Item II.B.1) in Safety Evaluation Encl in SA Varga 830831 Ltr.Commitment to Rack Out RCS Vent Sys Breakers During Normal Operation Withdrawn
ML17334A862
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/15/1985
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.1, TASK-TM AEP:NRC:0584E, AEP:NRC:584E, NUDOCS 8501210088
Download: ML17334A862 (4)


Text

REGULATOh INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:8501210088 DOC ~ DATE: 85/01/15 NOTARIZED: NO DOCKET' FACIL:50-315 Donald C. Cook Nuclear Power Planti Unit 1F Indiana 8 50-316 Donald CD Cook Nuclear Power Planti Unit 2i Indiana 8 00316 AUTH, NAME AUTHOR AFFILIATION

'LEXICHiM.P, Indiana 8 Michigan Electric Co.

RECIP,NAME RECIPIENT AFFILIATION DENTONsH ~ RE Office of Nuclear Reactor Regulationg Director

SUBJECT:

Responds to RCS vent sys design (TMI Item II.B,1) in safety evaluation in SA Yar ga 830831 ltr,Commitment to rack out RCS vent sys breakers during normal operation withdrawn ~

DISTRIBUTION CODE: A006D COPIES RECE I YED: LTR ENCL SIZE:

TITLE: OR Submittal: TMI Action Plan Rgmt NUREG-0737 8 NUREG 0660 NOTES: 05000315 OL:10/25/74 05000316 OL: 12/23/72 RECIPIENT COPIES RECIPIENT COP IE'S ID CODE/NAME LTTR ENC ID CODE/NAME LTTR ENCL NRR ORB 1 BC 01 7 INTERNAL: ACRS 3Q 10 1 ADM/LFMB ELD/HDS3 1 IE/DEPER DIR 33 IE/DEPER/EPB 3 NRR PAULSONFH ~

NRR/DHFS DEPY29 1 NRR/DL DIR 14 NRR/DL/ORAB 18 3 NRR/DSI/ADRS 27 NRR/DSI/AEB 1 NRR/DSI/ASB NRR /RAB 1 NRR/DST DIR 30 00 1 RGN3 RGN2/DRSS/EPRPB 1 EXTERNAL: L'PDR 03 NRC PDR NSIC 05 02'OTAL NURSER OF COPIES REQUIRED: LTTR AI ENCL

('

II I

I' Q M<I MI M

l M I 'Ml M lII I

I1 I ll M

M Mt lr

'I I

I M

h I

W I

I II I'(

I fIj li l(

I l

10

IN DIANA 8 M IC H IGAN ELECTRIC COM PAN Y P.o. BOX 16631 COLUMBUS, OHIO 43216 January 15, 1985 AEP:NRC:0584E I

Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos; 50-315 and 50-316-License"Nos. DPR-58 and DPR-74 NUREG-0737, ITEM II B.1, '.

DELETE COMMITMENT TO RACK OUT REACTOR COOLANT SYSTEM VENT BREAKERS-Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 .

Dear Mr. Denton:

1 This letter is 1n response to an item in the Safety Evaluat1on (SE) attached to Mr. Steven A. Varga's letter dated August 31, 1983. The SE stated that the RCS vent system design is acceptable provided certain items were resolved. - One of the items involved the restoration of continuous control power to the RCS vent system by deleting the comm1tment to rack out the related oirouit breakers during normal operation. Continuous power is needed for vent valve position indication in the control room.

Pursuant to the requirements of your staff as presented in the SE, we hereby withdraw our commitment to rack out the RCS vent system breakers dur1ng normal operation.

This document has been prepared following Corporate procedures which incorporate a reasonable set of oontrols to insure 1ts accuracy and completeness prior to signature by the undersigned.

Very truly yours, 850ii5 8501210088 05000315 M. P. Alexich PDR ADOCK Vice Presi'dent IP<g4 PDR th Attachment cc: John E. Dolan