| issue date = 10/31/1986
| issue date = 10/31/1986
| title = Requests ASME Code Relief for Testing of Valves in Inservice Testing Program,Per 10CFR50.55(g)(6)(i).RHR Sys Valves Currently Subj to Quarterly Testing Per Section XI ASME Boiler & Pressure Vessel Code,1983 Edition.Fee Paid
| title = Requests ASME Code Relief for Testing of Valves in Inservice Testing Program,Per 10CFR50.55(g)(6)(i).RHR Sys Valves Currently Subj to Quarterly Testing Per Section XI ASME Boiler & Pressure Vessel Code,1983 Edition.Fee Paid
| author name = ALEXICH M P
| author name = Alexich M
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REQULATORV INFORMATION DISTRIBUTION SVSTEV (RIDS)I ACCE881bN NBR: 8611070886
{{#Wiki_filter:REQULATORV INFORMATION DISTRIBUTION SVSTEV       (RIDS)
%C.DATE: 86/10/31 NOTAR III NO DOCKET 0 FACIL: 50-315 Donald C.Cook Nuclear Poeer Pianti Unit i>Ind iana 5 05000315 50-3ih Donald C.Cook Nuclear Power Planti Unit 2>Indiana 5, 050003iLzI AUTH.NANE AUTHOR AFFILIATION ALEXICH>N.P.Indiana 5 Nichigan Electric Co.RECIP.NANE RECIPIENT AFFILIATION DENTONP H.R.Office of Nuclear Reactor Regulation>
I ACCE881bN NBR: 8611070886         %C. DATE: 86/10/31   NOTAR III   NO         DOCKET 0 FACIL: 50-315 Donald C. Cook Nuclear Poeer Pianti           Unit   i> Ind iana 5   05000315 50-3ih Donald C. Cook Nuclear Power Planti           Unit   2> Indiana   5, 050003iLzI AUTH. NANE             AUTHOR AFFILIATION ALEXICH> N. P.       Indiana 5 Nichigan Electric Co.
Director (post 85ii25  
RECIP. NANE           RECIPIENT AFFILIATION DENTONP H. R.         Office of Nuclear Reactor Regulation> Director (post 85ii25


==SUBJECT:==
==SUBJECT:==
Requests ASNE Code relief for testing of valves in inservice testing program~per iOCFR50.55(g)(b)(i).
Requests ASNE Code relief for testing of valves in inservice testing program~ per iOCFR50. 55(g)(b)(i). RHR sos valves currently sub'o quarterly testing per Section XI ASME Boiler 5 Pressure Vessel Codei i983 Edition. Fee paid.
RHR sos valves currently sub'o quarterly testing per Section XI ASME Boiler 5 Pressure Vessel Codei i983 Edition.Fee paid.DIETRIDUTION CODE:*047D COPIES RECEIVED: LTR/ENCL j SIZE: TITLE: OR Submittal:
DIETRIDUTION CODE: *047D COPIES RECEIVED: LTR / ENCL TITLE: OR Submittal: Inservice Inspection/Testing j  SIZE:
Inservice Inspection/Testing NOTES: REC I P IENT ID CODE/NAliE PNR-A ADTS PNR-A PD4 LA 4)IQQINQTON1 D INTERNAL: ADN/LFNB ELD/HDS3 NRR/TANB RQN3 COPIES LTTR ENCL i i 0 i i 0 i 0 i i i RECIP I ENT ID CODE/MANE PWR-A EB PWR-A PD4 PD Oi AEOD/PTB NRR/DSRO/EIB COPIES LTTR ENCL i i 5 5 i i i i i EXTERNAL LPDR NSIC 2 2 i NRC PDR 02~l I TOT'AL NUltBER OF COPIES REQUIRED: LTTR 20 ENCL i7 lt tl , 0'I X))g ff.ff.)")"'<X r t't If tr,).I<<tt''!I I tl)fX:.).)V f'));,Ct I ,,"f Pfi>ff w3'r'").u,.g rk't t I!I)))rt 3 v$""!)r Ktj)It I'!ll II ,!4 t>>I r r'!r bf J,j il"")<<t."5r))t r'I")r lt t)*"'l INDIANA 8 MICHIGAN ELECTRIC COMPANY P,O.BOX 16631 COLUMBUS, OHIO 43216 October 31, 1986 AEP:NRC:0969B Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 INSERVICE TEST (IST)-REQUEST FOR CODE RELIEF OF RHR VALVES Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.=20555
NOTES:
I REC P IENT       COPIES          RECIP I ENT          COPIES ID CODE/NAliE       LTTR ENCL      ID CODE/MANE          LTTR ENCL PNR-A ADTS               i    i    PWR-A EB                i    i PNR-A PD4 LA                   0    PWR-A PD4 PD Oi          5    5
: 4) IQQINQTON1 D         i INTERNAL: ADN/LFNB                   i   0     AEOD/PTB                i     i ELD/HDS3                  i   0     NRR/DSRO/EIB                   i NRR/TANB                  i   i                             i     i RQN3                          i EXTERNAL   LPDR                     2     2     NRC PDR         02 NSIC                          i
                                        ~l I
TOT'AL NUltBER OF COPIES REQUIRED:       LTTR   20   ENCL     i7


==Dear Mr.Denton:==
0 lt tl
The purpose of this letter, submitted in accordance with 10 CFR 50.55a(g)(6)(i), is to request code relief for testing of certain valves in the Inservice Testing (IST)Program.These valves, which are part of the Residual Heat Removal (RHR)System, are presently subject to quarterly testing in accordance with the ASME Boiler and Pressure Vessel Code, Section XI, 1983 Edition, Subsection IWV, Article IWV-3000.However, it is believed that these valves cannot be full-or part-stroke exercised quarterly as required by the ASME Code when the Emergency Core Cooling System is required by Technical Specifications to be operable without significantly increasing the plant's jeopardy of inadvertently spraying down of containment or of causing undesirable fluctuations of suction pressure to the centrifugal charging pumps.Past testing methology reduced the RHR injection to two loops and provided safeguards to perform the test.Under pres'ent interpretation of operability, similar testing now would require the Unit to enter into T/S 3.0.3 and it is unlikely the testing could be completed in the 1 hour limitation of the 3.0.3 requirement thus resulting in commencement of plant shutdown to fulfill the requirements of T/S 3.0.3.The following are the valves for which we are requesting relief from quarterly testing: IMO-330 and IMO-331: Discharge lines from the outlet of the RHR heat exchangers for both the East and West RHR pumps going to the containment spray headers.IMO-340: Discharge from the East RHR pump (downstream of the heat exchanger) to the suction of the centrifugal charging pump.8611070286 861031 PDR ADOCK 05000315 P PDR)u4<v(y,s><
              ,                                                                                      tr,
~%~" II kg Mr.Harold R.Denton-2-AEP:NRC:0969B IMO-350: Discharge from the West RHR pump (downstream of the heat exchanger) to the suction of the safety injection pumps'etails as to the nature of the testing, as well as justification of our relief request, are provided in Attachment 1 to this letter.A composite system flow diagram is provided as Attachment 2 to this letter.We ask that your review of this request be performed on an expedited basis and that you respond to us by December 12, 1986.Relief is required for the Donald C.Cook Nuclear Plant, since the testing is scheduled to be performed for Unit 2 on December 20, 1986 and Unit 1 on December 28, 1986.If we are not granted relief by that date, we may be required to bring the unit to cold shutdown to perform such testing, which would require an outage estimated to last 4 days per unit and would constitute a loss of approximately
                                                                                                  ).I<<tt  '
$2,600,000 to the ratepayers of Indiana and Michigan Electric Company.Upon receipt of the above-requested relief, the D.C.Cook Nuclear Plant Units 1 and 2 IST Program will be revised to require these valves to be tested during cold shutdown at a frequency described in paragraph IWV-3412(a) of ASME Code, Section XI.A check in the amount of$150.00 is attached with this letter for the NRC processing of the aforementioned requests.This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
ff    'I X ))g    ff.            r
Very truly yours, M..Al ich)QK Vice President iOP~~cm Attachments cc: John E.Dolan W.G.Smith, Jr.-Bridgman R.C.Callen G.Bruchmann G.Charnoff NRC Resident Inspector-Bridgman
  .)" )"  '<X                                t' t If
,s,$~~Attachment 1 to AEP:NRC:0969B Page 1~Back round We are requesting code relief for valves IM0-330, 331, 340, and 350 because the plant configuration and time required for testing the valves may place the plant in a condition that may be inconsistent with the design basis and associated Technical Specification requirements.
                                                                          '!      I I                                                tl I                                          'r'
Previously we isolated part of one train while testing of these valves was being performed.
                )fX                                                ff w3      g                                                      t
By isolating one train to do the valve testing, operable flow paths are available to two reactor coolant loops rather than four which are available with the bypass valves open.We recently discovered that this may be inconsistent with the Technical Specification requirements for operable ECCS flow paths.Testing of valves IMO-330 and-331 opens a flow path from the RHR pumps to the containment spray headers which could spray containment in the event of an inadvertent actuation of the RHR pumps.To avoid the possibility of spraying containment, we require that an additional valve be closed upstream of the valve to be tested.In this configuration, it is possible to inject into only two of the four cold legs.Further, if the flow path is not isolated during testing, the required amount of RHR flow may not be delivered to the core, since flow will be partially diverted to the containment spray during the injection phase of the accident.Valve IMO-340 provides recirculation mode supply to the centrifugal charging pumps suction.When this valve is opened for test, it is possible that the suction to both centrifugal charging pumps will be subjected to initial conditions that are different from that assumed in the accident analysis.Valve IMO-350 provides recirculation mode supply to the safety injection pumps suction similar to valve IMO-340 for the centrifugal charging pumps.The detailed relief request is presented below.Detailed Relief Re uest and Ex lanation The code relief being requested for ASME Section XI, Category B valves IM0-330,-331,-340, and-350 is consistent with relief granted in response to the request made in our ISI/IST submittal (letter AEP:NRC:0969, dated December 31, 1985)for both the first and second ten-year inspection intervals for valves IM0-262,-263,-315,-316,-325, and-326.IST code relief for valves IM0-330,-331,-340, and-350 is necessary to avoid placing the plant in an unanalyzed condition or presenting a risk to plant equipment.
:. ).)V                                                                          rk't            I!      I
As an alternative, we propose to full-stroke exercise and time these.valves during cold shutdown at a frequency as described in paragraph IWV-3412(a) of ASME Code, Section XI.The reasons for this relief request are as follows: Valve IMO-340 This normally closed motor-operated valve is located in the RHR header supplying the centrifugal charging pumps suction lines.'he valve is required to open only during the recirculation phase of safety injection.
                                ,,  "f                          ")
tj<1a Attachment 1 to AEP:NRC:0969B Page 2 Reason for Chan e The valve cannot be part-stroke exercised during power operation because it is not equipped with intermediate stop capability.
f') );,Ct              Pfi>                        . u,.                                                 )))
The valve cannot be full-stroke exercised during power operation because: (1)It could possibly cause perturbations in the suction pressure of the operating centrifugal charging pump, which could also affect RCP seal injection and leak-off flow.(2)It is interlocked with containment sump isolation valve ICM-305 and SI miniflow valve IM0-262.Testing of this valve would require defeating interlocks with temporary jumpers.Valve IMO-350 This normally closed motor-operated valve is located in the RHR header to SI pumps suction lines.It is required to open only during the recirculation phase of safety injection.
r    Ktj rt    3                      v
Reason for Chan e The valve cannot be part-stroke exercised during power operation, because it is not equipped with intermediate stop capability.
                                                                  $ ""!)                                        )It I'!    ll II                                ,!                                                4 t>>
The valve should not be full-stroke exercised during power operation because it is interlocked with containment sump isolation valve ICM-306 and SI miniflow line valve IMO-263.The interlocks have to be defeated in order to test the valve.Valves IMO-330~331 These normally closed motor-operated valves are located in the RHR lines to provide RHR containment spray.They may be opened during the recirculation phase to supplement containment spray.Reason for"'Chan e They cannot be part-stroke exercised because the valves are not equipped with intermediate stop capability.
I r
These valves should not be full-stroke exercised during power operation because: (1)The valves are interlocked with ICM-305 and ICM-306 (which provide suction from the containment sump), which would be required to be defeated as described for IMO-340 and-350.(2)An actuation of the RHR pumps as a result of a spurious SI signal while the valves open would result in an inadvertent containment spray.This would require an extended outage for containment clean-up.
r'!    r
~(Attachment 1 to AEP:NRC:0969B 0 Page 3 Maintenance records at D.C.Cook have shown the above valves to be of a high reliability with little occurrence of failure.The only valve testing failure on record was a failure of IMO-340 on July 4, 1981.These records date back to 1979 for Unit 1 and 1978 for Unit 2.The testing requirements date from 1981.For the reasons'ited above, it is our belief that this exemption request is consistent with the current plant licensing basis and would not adversely affect the public health and safety.  
                                                                                                                                        )t bf  J,j il "")
~.t f r~II E4 4 Iy~~I~~~~4 N W~'I~~~~4 T'I~'~~~I Ii II C N~~l~~~~~~~~
                                                  <<t."5r )
i1\i e 4 I r~~~~ll~y A f I~tq S F}}
r 'I
                                                      ") r lt
* t)"'l
 
INDIANA 8 MICHIGAN ELECTRIC COMPANY P,O. BOX 16631 COLUMBUS, OHIO 43216 October 31, 1986 AEP:NRC:0969B Donald C. Cook Nuclear Plant Unit Nos. 1 and        2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 INSERVICE TEST (IST) - REQUEST FOR CODE  RELIEF OF RHR VALVES Mr. Harold R. Denton,    Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.= 20555
 
==Dear Mr. Denton:==
 
The purpose  of this letter, submitted in accordance with 10 CFR 50.55a(g)(6)(i), is to request code relief for testing of certain valves in the Inservice Testing (IST) Program. These valves, which are part of the Residual Heat Removal (RHR) System, are presently subject to quarterly testing in accordance with the ASME Boiler and Pressure Vessel Code, Section XI, 1983 Edition, Subsection IWV, Article IWV-3000. However, it is believed that these valves cannot be full- or part-stroke exercised quarterly as required by the ASME Code when the Emergency Core Cooling System is required by Technical Specifications to be operable without significantly increasing the plant's jeopardy of inadvertently spraying down of containment or of causing undesirable fluctuations of suction pressure to the centrifugal charging pumps. Past testing methology reduced the RHR injection to two loops and provided safeguards to perform the test.
Under pres'ent interpretation of operability, similar testing now would require the Unit to enter into T/S 3.0.3 and it is unlikely the testing could be completed in the 1 hour limitation of the 3.0.3 requirement thus resulting in commencement of plant shutdown to fulfillthe requirements of T/S 3.0.3.
The  following are the valves for which    we  are requesting relief  from quarterly testing:
IMO-330 and IMO-331:      Discharge lines from the outlet of the RHR  heat exchangers  for both the    East and West RHR pumps going to the containment spray headers.
IMO-340:  Discharge from the East RHR pump (downstream of the heat exchanger)  to the suction of the centrifugal charging pump.
                                                                          )u4<
v(
8611070286 861031 PDR    ADOCK 05000315 P                    PDR                                                  y,s><
 
          ~%
  ~
    " II kg
 
Mr. Harold R. Denton                                                  AEP:NRC:0969B IMO-350:    Discharge from the West RHR pump (downstream of the heat exchanger)  to the suction of the safety injection pumps'etails as  to the nature of the testing, as well as justification of our relief request, are provided in Attachment 1 to this letter. A composite system flow diagram is provided as Attachment 2 to this letter.
We ask that your review of this request be performed on an expedited basis and that you respond to us by December 12, 1986. Relief is required for the Donald C. Cook Nuclear Plant, since the testing is scheduled to be performed for Unit 2 on December 20, 1986 and Unit 1 on December 28, 1986.
If  we are not granted relief by that date, we may be required to bring the unit to cold shutdown to perform such testing, which would require an outage estimated to last 4 days per unit and would constitute a loss of approximately $ 2,600,000 to the ratepayers of Indiana and Michigan Electric Company.
Upon  receipt of the above-requested relief, the     D. C. Cook        Nuclear Plant Units 1 and 2 IST Program will be revised to require these valves to be tested during cold shutdown at a frequency described in paragraph IWV-3412(a) of ASME Code, Section XI.
A check in the amount of $ 150.00 is attached with this             letter for the NRC  processing of the aforementioned requests.
This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, M.. Al ich )QK Vice President  iOP~~
cm Attachments cc:  John E. Dolan W. G. Smith,   Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC  Resident Inspector    - Bridgman
 
,s, $~ ~
Attachment    1 to AEP:NRC:0969B                                Page 1
          ~Back  round We are requesting code relief for valves IM0-330, 331, 340, and 350 because  the plant configuration and time required for testing the valves may place the plant in a condition that may be inconsistent with the design basis and associated Technical Specification requirements.     Previously we isolated part of one train while testing of these valves was being performed. By isolating one train to do the valve testing, operable flow paths are available to two reactor coolant loops rather than four which are available with the bypass valves open. We recently discovered that this may be inconsistent with the Technical Specification requirements for operable ECCS flow paths.
Testing of valves IMO-330 and -331 opens a flow path from the RHR pumps  to the containment spray headers which could spray containment in the event of an inadvertent actuation of the RHR pumps. To avoid the possibility of spraying containment, we require that an additional valve be closed upstream of the valve to be tested. In this configuration,        it is possible to inject into only two of the four cold legs. Further,        if flow path is not isolated during testing, the required amount of RHR flow the may not be delivered to the core, since flow will be partially diverted to the containment spray during the injection phase of the accident.
Valve IMO-340 provides recirculation mode supply to the centrifugal charging pumps suction. When this valve is opened for test,        it is possible that the suction to both centrifugal charging pumps will be subjected to initial conditions that are different from that assumed in the accident analysis.
Valve IMO-350 provides recirculation    mode supply to the safety injection    pumps suction similar to valve IMO-340 for the centrifugal charging pumps.
The detailed relief request is presented below.
Detailed Relief    Re uest and  Ex lanation The code relief being requested for ASME Section XI, Category B valves IM0-330, -331, -340, and -350 is consistent with relief granted in response to the request made in our ISI/IST submittal (letter AEP:NRC:0969, dated December 31, 1985) for both the first and second ten-year inspection intervals for valves IM0-262, -263, -315, -316, -325, and -326. IST code relief for valves IM0-330, -331, -340, and -350 is necessary to avoid placing the plant in an unanalyzed condition or presenting a risk to plant equipment. As an alternative, we propose to full-stroke exercise and time these. valves during cold shutdown at a frequency as described in paragraph IWV-3412(a) of ASME Code, Section XI. The reasons for this relief request are as follows:
Valve IMO-340 This normally closed motor-operated valve is located in the RHR header supplying the centrifugal charging pumps suction lines.'he valve is required to open only during the recirculation phase of safety injection.
 
tj <1a Attachment  1  to AEP:NRC:0969B                                    Page  2 Reason  for Chan e The  valve cannot be part-stroke exercised during power operation because    it  is not equipped with intermediate stop capability. The valve cannot be full-stroke exercised during power operation because:
(1)  It could possibly cause perturbations in the suction pressure of the operating centrifugal charging pump, which could also affect RCP seal injection and leak-off flow.
(2)    It is interlocked with containment sump isolation valve ICM-305 and SI miniflow valve IM0-262.
Testing of this valve would require defeating interlocks with temporary jumpers.
Valve IMO-350 This normally closed motor-operated valve is located in the RHR header to SI pumps suction lines.       It  is required to open only during the recirculation phase of safety injection.
Reason  for Chan e The   valve cannot be part-stroke exercised during power operation, because      it is not equipped with intermediate stop capability. The valve should not be full-stroke exercised during power operation because      it interlocked with containment sump isolation valve is ICM-306 and SI miniflow line valve IMO-263. The interlocks have to be defeated in order to test the valve.
Valves IMO-330
            ~331              These    normally closed motor-operated valves are located in the RHR lines to provide RHR containment spray. They may be opened during the recirculation phase to supplement containment spray.
Reason  for"'Chan  e They cannot be    part-stroke exercised because the valves are not equipped with intermediate stop capability.
These valves should not be full-stroke exercised during power operation because:
(1)    The valves are    interlocked with  ICM-305 and ICM-306 (which  provide suction from the containment sump), which would be required to be defeated as described for IMO-340 and -350.
(2)  An  actuation of the RHR pumps as a result of a spurious SI signal while the valves open would result in an inadvertent containment spray. This would require an extended outage for containment clean-up.
 
~ (
Attachment  1  to AEP:NRC:0969B 0      Page 3 Maintenance records at D. C. Cook have shown the above valves to be of a high reliability with  little occurrence of failure. The only valve testing failure on record was a failure of IMO-340 on July 4, 1981. These records date back to 1979 for Unit 1 and 1978 for Unit 2. The testing requirements date from 1981.
For the reasons'ited above,  it  is our belief that this exemption request is consistent with the current plant licensing basis and would not adversely affect the public health and safety.
 
          ~ .t f
r ~
II E4
 
4 Iy
                                ~ ~
I
                    ~ ~ ~ ~
4 N                                  W  ~ '
I ~
                                    ~ ~
      ~ 4 T'
I
                                                      ~ '
                                          ~ ~
              ~ I Ii II                C N
                                                                ~ ~ l  ~ ~
                                                              ~ ~    ~ ~
~ ~
 
i1
        \
i e 4 I r
        ~      ~
        ~        ll
            ~
      ~  y A
f I
      ~ tq S
F}}

Latest revision as of 12:43, 22 October 2019

Requests ASME Code Relief for Testing of Valves in Inservice Testing Program,Per 10CFR50.55(g)(6)(i).RHR Sys Valves Currently Subj to Quarterly Testing Per Section XI ASME Boiler & Pressure Vessel Code,1983 Edition.Fee Paid
ML17334B009
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/31/1986
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0969B, AEP:NRC:969B, NUDOCS 8611070286
Download: ML17334B009 (11)


Text

REQULATORV INFORMATION DISTRIBUTION SVSTEV (RIDS)

I ACCE881bN NBR: 8611070886 %C. DATE: 86/10/31 NOTAR III NO DOCKET 0 FACIL: 50-315 Donald C. Cook Nuclear Poeer Pianti Unit i> Ind iana 5 05000315 50-3ih Donald C. Cook Nuclear Power Planti Unit 2> Indiana 5, 050003iLzI AUTH. NANE AUTHOR AFFILIATION ALEXICH> N. P. Indiana 5 Nichigan Electric Co.

RECIP. NANE RECIPIENT AFFILIATION DENTONP H. R. Office of Nuclear Reactor Regulation> Director (post 85ii25

SUBJECT:

Requests ASNE Code relief for testing of valves in inservice testing program~ per iOCFR50. 55(g)(b)(i). RHR sos valves currently sub'o quarterly testing per Section XI ASME Boiler 5 Pressure Vessel Codei i983 Edition. Fee paid.

DIETRIDUTION CODE: *047D COPIES RECEIVED: LTR / ENCL TITLE: OR Submittal: Inservice Inspection/Testing j SIZE:

NOTES:

I REC P IENT COPIES RECIP I ENT COPIES ID CODE/NAliE LTTR ENCL ID CODE/MANE LTTR ENCL PNR-A ADTS i i PWR-A EB i i PNR-A PD4 LA 0 PWR-A PD4 PD Oi 5 5

4) IQQINQTON1 D i INTERNAL: ADN/LFNB i 0 AEOD/PTB i i ELD/HDS3 i 0 NRR/DSRO/EIB i NRR/TANB i i i i RQN3 i EXTERNAL LPDR 2 2 NRC PDR 02 NSIC i

~l I

TOT'AL NUltBER OF COPIES REQUIRED: LTTR 20 ENCL i7

0 lt tl

, tr,

).I<<tt '

ff 'I X ))g ff. r

.)" )" '<X t' t If

'! I I tl I 'r'

)fX ff w3 g t

. ).)V rk't I! I

,, "f ")

f') );,Ct Pfi> . u,. )))

r Ktj rt 3 v

$ ""!) )It I'! ll II ,! 4 t>>

I r

r'! r

)t bf J,j il "")

<<t."5r )

r 'I

") r lt

  • t)"'l

INDIANA 8 MICHIGAN ELECTRIC COMPANY P,O. BOX 16631 COLUMBUS, OHIO 43216 October 31, 1986 AEP:NRC:0969B Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 INSERVICE TEST (IST) - REQUEST FOR CODE RELIEF OF RHR VALVES Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.= 20555

Dear Mr. Denton:

The purpose of this letter, submitted in accordance with 10 CFR 50.55a(g)(6)(i), is to request code relief for testing of certain valves in the Inservice Testing (IST) Program. These valves, which are part of the Residual Heat Removal (RHR) System, are presently subject to quarterly testing in accordance with the ASME Boiler and Pressure Vessel Code,Section XI, 1983 Edition, Subsection IWV, Article IWV-3000. However, it is believed that these valves cannot be full- or part-stroke exercised quarterly as required by the ASME Code when the Emergency Core Cooling System is required by Technical Specifications to be operable without significantly increasing the plant's jeopardy of inadvertently spraying down of containment or of causing undesirable fluctuations of suction pressure to the centrifugal charging pumps. Past testing methology reduced the RHR injection to two loops and provided safeguards to perform the test.

Under pres'ent interpretation of operability, similar testing now would require the Unit to enter into T/S 3.0.3 and it is unlikely the testing could be completed in the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limitation of the 3.0.3 requirement thus resulting in commencement of plant shutdown to fulfillthe requirements of T/S 3.0.3.

The following are the valves for which we are requesting relief from quarterly testing:

IMO-330 and IMO-331: Discharge lines from the outlet of the RHR heat exchangers for both the East and West RHR pumps going to the containment spray headers.

IMO-340: Discharge from the East RHR pump (downstream of the heat exchanger) to the suction of the centrifugal charging pump.

)u4<

v(

8611070286 861031 PDR ADOCK 05000315 P PDR y,s><

~%

~

" II kg

Mr. Harold R. Denton AEP:NRC:0969B IMO-350: Discharge from the West RHR pump (downstream of the heat exchanger) to the suction of the safety injection pumps'etails as to the nature of the testing, as well as justification of our relief request, are provided in Attachment 1 to this letter. A composite system flow diagram is provided as Attachment 2 to this letter.

We ask that your review of this request be performed on an expedited basis and that you respond to us by December 12, 1986. Relief is required for the Donald C. Cook Nuclear Plant, since the testing is scheduled to be performed for Unit 2 on December 20, 1986 and Unit 1 on December 28, 1986.

If we are not granted relief by that date, we may be required to bring the unit to cold shutdown to perform such testing, which would require an outage estimated to last 4 days per unit and would constitute a loss of approximately $ 2,600,000 to the ratepayers of Indiana and Michigan Electric Company.

Upon receipt of the above-requested relief, the D. C. Cook Nuclear Plant Units 1 and 2 IST Program will be revised to require these valves to be tested during cold shutdown at a frequency described in paragraph IWV-3412(a) of ASME Code,Section XI.

A check in the amount of $ 150.00 is attached with this letter for the NRC processing of the aforementioned requests.

This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, M.. Al ich )QK Vice President iOP~~

cm Attachments cc: John E. Dolan W. G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector - Bridgman

,s, $~ ~

Attachment 1 to AEP:NRC:0969B Page 1

~Back round We are requesting code relief for valves IM0-330, 331, 340, and 350 because the plant configuration and time required for testing the valves may place the plant in a condition that may be inconsistent with the design basis and associated Technical Specification requirements. Previously we isolated part of one train while testing of these valves was being performed. By isolating one train to do the valve testing, operable flow paths are available to two reactor coolant loops rather than four which are available with the bypass valves open. We recently discovered that this may be inconsistent with the Technical Specification requirements for operable ECCS flow paths.

Testing of valves IMO-330 and -331 opens a flow path from the RHR pumps to the containment spray headers which could spray containment in the event of an inadvertent actuation of the RHR pumps. To avoid the possibility of spraying containment, we require that an additional valve be closed upstream of the valve to be tested. In this configuration, it is possible to inject into only two of the four cold legs. Further, if flow path is not isolated during testing, the required amount of RHR flow the may not be delivered to the core, since flow will be partially diverted to the containment spray during the injection phase of the accident.

Valve IMO-340 provides recirculation mode supply to the centrifugal charging pumps suction. When this valve is opened for test, it is possible that the suction to both centrifugal charging pumps will be subjected to initial conditions that are different from that assumed in the accident analysis.

Valve IMO-350 provides recirculation mode supply to the safety injection pumps suction similar to valve IMO-340 for the centrifugal charging pumps.

The detailed relief request is presented below.

Detailed Relief Re uest and Ex lanation The code relief being requested for ASME Section XI, Category B valves IM0-330, -331, -340, and -350 is consistent with relief granted in response to the request made in our ISI/IST submittal (letter AEP:NRC:0969, dated December 31, 1985) for both the first and second ten-year inspection intervals for valves IM0-262, -263, -315, -316, -325, and -326. IST code relief for valves IM0-330, -331, -340, and -350 is necessary to avoid placing the plant in an unanalyzed condition or presenting a risk to plant equipment. As an alternative, we propose to full-stroke exercise and time these. valves during cold shutdown at a frequency as described in paragraph IWV-3412(a) of ASME Code,Section XI. The reasons for this relief request are as follows:

Valve IMO-340 This normally closed motor-operated valve is located in the RHR header supplying the centrifugal charging pumps suction lines.'he valve is required to open only during the recirculation phase of safety injection.

tj <1a Attachment 1 to AEP:NRC:0969B Page 2 Reason for Chan e The valve cannot be part-stroke exercised during power operation because it is not equipped with intermediate stop capability. The valve cannot be full-stroke exercised during power operation because:

(1) It could possibly cause perturbations in the suction pressure of the operating centrifugal charging pump, which could also affect RCP seal injection and leak-off flow.

(2) It is interlocked with containment sump isolation valve ICM-305 and SI miniflow valve IM0-262.

Testing of this valve would require defeating interlocks with temporary jumpers.

Valve IMO-350 This normally closed motor-operated valve is located in the RHR header to SI pumps suction lines. It is required to open only during the recirculation phase of safety injection.

Reason for Chan e The valve cannot be part-stroke exercised during power operation, because it is not equipped with intermediate stop capability. The valve should not be full-stroke exercised during power operation because it interlocked with containment sump isolation valve is ICM-306 and SI miniflow line valve IMO-263. The interlocks have to be defeated in order to test the valve.

Valves IMO-330

~331 These normally closed motor-operated valves are located in the RHR lines to provide RHR containment spray. They may be opened during the recirculation phase to supplement containment spray.

Reason for"'Chan e They cannot be part-stroke exercised because the valves are not equipped with intermediate stop capability.

These valves should not be full-stroke exercised during power operation because:

(1) The valves are interlocked with ICM-305 and ICM-306 (which provide suction from the containment sump), which would be required to be defeated as described for IMO-340 and -350.

(2) An actuation of the RHR pumps as a result of a spurious SI signal while the valves open would result in an inadvertent containment spray. This would require an extended outage for containment clean-up.

~ (

Attachment 1 to AEP:NRC:0969B 0 Page 3 Maintenance records at D. C. Cook have shown the above valves to be of a high reliability with little occurrence of failure. The only valve testing failure on record was a failure of IMO-340 on July 4, 1981. These records date back to 1979 for Unit 1 and 1978 for Unit 2. The testing requirements date from 1981.

For the reasons'ited above, it is our belief that this exemption request is consistent with the current plant licensing basis and would not adversely affect the public health and safety.