IR 05000382/2018301: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML18348B239 | ||
| issue date = | | issue date = 12/14/2018 | ||
| title = | | title = NRC Examination Report 05000382/2018301 | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
Line 10: | Line 10: | ||
| license number = NPF-038 | | license number = NPF-038 | ||
| contact person = | | contact person = | ||
| | | document report number = ER 2018301 | ||
| document type = Letter, License-Operator | | document type = Letter, License-Operator Examination Report | ||
| page count = | | page count = 10 | ||
}} | }} | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:December 14, 2018 Mr. John Dinelli, Site Vice President Entergy Operations, Inc. | ||
17265 River Road Killona, LA 70057-0751 SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 | |||
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - | - NRC EXAMINATION REPORT 05000382/201 8 301 | ||
==Dear Mr. Dinelli:== | ==Dear Mr. Dinelli:== | ||
On November 14, 20 18, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Waterford Steam Electric Station, Unit 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 9, 2018, with Mr. Rob Simpson, Training Manager, and other members of your staff. | |||
A telephonic exit meeting was conduct ed on December 4, 2018, with Mr. John Signorelli, Regulatory Assurance Manager (Acting), who was provided the NRC licensing decisions. | |||
The | The examination included the evaluation of three applicant s for reactor operator license s , two applicant s for instant senior reactor operator license s, and five applicants for upgrade senior reactor operator license s. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (CF R) Part 55, and the appropriate licenses have been issued. | ||
There were no post-examination comments submitted by your staff. The Enclosure contains details of this report. | |||
No findings were identified during this examination | |||
. In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No.: | |||
50-382 License No.: NPF-38 Enclosure s: 1. Examination Report 05000382/2018301 w/Attachment: Supplemental Information 2. Simulator Fidelity Report | |||
ML18348B239 SUNSI Review: | |||
ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: TFarina Yes No Publicly Available Sensitive OFFICE OE:OB SOE:OB OE:OB HP: FCDB C:PBE C:OB NAME TFarina JKirkland MHayes CSteely NO'Keefe VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA by email/ /RA/ /RA/ DATE 12/10/18 12/11/18 12/10/18 12/13/18 12/14/18 12/14/18 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket No.: 05000382 License No.: NPF-38 Report No.: 05000382/2018 301 Licensee: Entergy Operations, Inc. | |||
Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, LA 70057 Dates: November 5 | |||
- December 4, 2018 Inspectors: | |||
T. Farina, Chief Examiner, Operations Engineer J. Kirkland, Senior Operations Engineer M. Hayes, Operations Engineer C. Steely, Health Physicist Approved By: | |||
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety | |||
2 | |||
=SUMMARY= | |||
ER 05000382/2018 301; November 5 | |||
- December 4, 2018; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report. | |||
NRC examiners evaluated the competency of three applicant s for reactor operator license s , two applicant s for instant senior reactor operator license s, and five applicant s for upgrade senior reactor operator license s at Waterford Steam Electric Station, Unit 3 | |||
. The licensee developed the examinations using NUREG | |||
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on November 14, 2018 | |||
. NRC examiners administered the operating tests on November 5 | |||
-9, 2018. The examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | |||
===A. NRC-Identified and Self-Revealing Findings=== | |||
None. | |||
===B. Licensee-Identified Violations=== | |||
None. | |||
3 | |||
=REPORT DETAILS= | |||
==OTHER ACTIVITIES (OA)== | |||
{{a|4OA5}} | |||
==4OA5 Other Activities (Initial Operator License Examination)== | |||
===.1 License Applications=== | |||
====a. Scope==== | |||
NRC examiners reviewed all license application s submitted to ensure each applicant satisfied relevant license eligibility requirements. | |||
Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on | |||
-the-job training, including control manipulations that provided significant reactivity changes. | |||
====b. Findings==== | |||
No findings were identifie d. | |||
===.2 Examination Development=== | |||
====a. Scope==== | |||
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating test s. | |||
====b. Findings==== | |||
NRC examiners provided outline, draft examination and post | |||
-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration. | |||
NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination | |||
. | |||
===.3 Operator Knowledge and Performance=== | |||
====a. Scope==== | |||
On November 14, 2018, the licensee proctored the administration of the written examinations to all ten applicants. The licensee staff graded the written examinations , analyzed the results, and presented their analysis and post examination comments to the NRC on November 28, 2018. | |||
The NRC examination team administered the various portions of the operating test s to all applicants on November 5 | |||
-9, 2018. | |||
====b. Findings==== | |||
No findings were identified. | |||
All applicants passed the written examination and all parts of the operating test. | |||
Th e final written examination s and post examination analysis and comments may be accessed in the ADAMS system under the accession numbers noted in the attachment. | |||
The examination team note d one generic weaknesses associated with applicant performance on the simulator JPM section of the operating test. | |||
The applicants displayed a weakness responding to an unrecoverable loss of Component Cooling Water (CCW) to Reactor Coolant Pumps while at power | |||
, caused by an inadvertent Containment Spray Actuation Signal (CSAS) | |||
. Specifically, three applicants tripped Reactor Coolant Pumps without first tripping the reactor while at 100% power, resulting in an automatic reactor trip. | |||
Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training. This weakness was entered into the licensee's corrective action program as Condition Report WT | |||
-WTWF3-2018-00099, Corrective Acti on 196. | |||
===.4 Simulation Facility Performance=== | |||
====a. Scope==== | |||
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | |||
====b. Findings==== | |||
No findings were identified. | |||
During one scenario run, High Pressure Safety Injection (HPSI) Pump B tripped unexpectedly during a large break LOCA. This did not affect the success path of the scenario however. The licensee has entered this into their corrective action program as Simulator Deficiency Report 18-0147. | |||
===.5 Examination Security=== | |||
====a. Scope==== | |||
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel. | |||
====b. Findings==== | |||
No findings were identified. | |||
5 4OA 6 Meetings, Including Exit Exit Meeting Summary The chief examiner presented the preliminary examination results to Mr. Rob Simpson, Training Manager, and other members of the staff on November 9, 2018 | |||
. A telephonic exit was conducted on December 4, 2018, between M r. Thomas Farina, Chief Examiner, and Mr | |||
. John Signorelli, Regulatory Assurance Manager (Acting) | |||
. The licensee did not identify any information or materials used during the examination as proprietary. | |||
=SUPPLEMENTAL INFORMATION= | |||
==KEY POINTS OF CONTACT== | |||
===Licensee Personnel=== | |||
: [[contact::R. Simpson]], Training Manager | |||
: [[contact::D. Constance]], Facility Reviewer | |||
: [[contact::J. Mendoza ]], Lead Examination Writer | |||
===NRC Personnel=== | |||
: [[contact::F. Ramirez]], Senior Resident Inspector | |||
: [[contact::C. Speer]], Resident Inspector | |||
==ADAMS DOCUMENTS REFERENCED== | |||
}} | }} |
Revision as of 04:38, 12 July 2019
ML18348B239 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 12/14/2018 |
From: | Vincent Gaddy Operations Branch IV |
To: | Dinelli J Entergy Operations |
References | |
ER 2018301 | |
Download: ML18348B239 (10) | |
Text
December 14, 2018 Mr. John Dinelli, Site Vice President Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751 SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3
- NRC EXAMINATION REPORT 05000382/201 8 301
Dear Mr. Dinelli:
On November 14, 20 18, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Waterford Steam Electric Station, Unit 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 9, 2018, with Mr. Rob Simpson, Training Manager, and other members of your staff.
A telephonic exit meeting was conduct ed on December 4, 2018, with Mr. John Signorelli, Regulatory Assurance Manager (Acting), who was provided the NRC licensing decisions.
The examination included the evaluation of three applicant s for reactor operator license s , two applicant s for instant senior reactor operator license s, and five applicants for upgrade senior reactor operator license s. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (CF R) Part 55, and the appropriate licenses have been issued.
There were no post-examination comments submitted by your staff. The Enclosure contains details of this report.
No findings were identified during this examination
. In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No.:
50-382 License No.: NPF-38 Enclosure s: 1. Examination Report 05000382/2018301 w/Attachment: Supplemental Information 2. Simulator Fidelity Report
ML18348B239 SUNSI Review:
ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: TFarina Yes No Publicly Available Sensitive OFFICE OE:OB SOE:OB OE:OB HP: FCDB C:PBE C:OB NAME TFarina JKirkland MHayes CSteely NO'Keefe VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA by email/ /RA/ /RA/ DATE 12/10/18 12/11/18 12/10/18 12/13/18 12/14/18 12/14/18 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket No.: 05000382 License No.: NPF-38 Report No.: 05000382/2018 301 Licensee: Entergy Operations, Inc.
Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, LA 70057 Dates: November 5
- December 4, 2018 Inspectors:
T. Farina, Chief Examiner, Operations Engineer J. Kirkland, Senior Operations Engineer M. Hayes, Operations Engineer C. Steely, Health Physicist Approved By:
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety
2
SUMMARY
ER 05000382/2018 301; November 5
- December 4, 2018; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of three applicant s for reactor operator license s , two applicant s for instant senior reactor operator license s, and five applicant s for upgrade senior reactor operator license s at Waterford Steam Electric Station, Unit 3
. The licensee developed the examinations using NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on November 14, 2018
. NRC examiners administered the operating tests on November 5
-9, 2018. The examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
A. NRC-Identified and Self-Revealing Findings
None.
B. Licensee-Identified Violations
None.
3
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license application s submitted to ensure each applicant satisfied relevant license eligibility requirements.
Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on
-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identifie d.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating test s.
b. Findings
NRC examiners provided outline, draft examination and post
-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination
.
.3 Operator Knowledge and Performance
a. Scope
On November 14, 2018, the licensee proctored the administration of the written examinations to all ten applicants. The licensee staff graded the written examinations , analyzed the results, and presented their analysis and post examination comments to the NRC on November 28, 2018.
The NRC examination team administered the various portions of the operating test s to all applicants on November 5
-9, 2018.
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating test.
Th e final written examination s and post examination analysis and comments may be accessed in the ADAMS system under the accession numbers noted in the attachment.
The examination team note d one generic weaknesses associated with applicant performance on the simulator JPM section of the operating test.
The applicants displayed a weakness responding to an unrecoverable loss of Component Cooling Water (CCW) to Reactor Coolant Pumps while at power
, caused by an inadvertent Containment Spray Actuation Signal (CSAS)
. Specifically, three applicants tripped Reactor Coolant Pumps without first tripping the reactor while at 100% power, resulting in an automatic reactor trip.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training. This weakness was entered into the licensee's corrective action program as Condition Report WT
-WTWF3-2018-00099, Corrective Acti on 196.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
During one scenario run, High Pressure Safety Injection (HPSI) Pump B tripped unexpectedly during a large break LOCA. This did not affect the success path of the scenario however. The licensee has entered this into their corrective action program as Simulator Deficiency Report 18-0147.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
5 4OA 6 Meetings, Including Exit Exit Meeting Summary The chief examiner presented the preliminary examination results to Mr. Rob Simpson, Training Manager, and other members of the staff on November 9, 2018
. A telephonic exit was conducted on December 4, 2018, between M r. Thomas Farina, Chief Examiner, and Mr
. John Signorelli, Regulatory Assurance Manager (Acting)
. The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- R. Simpson, Training Manager
- D. Constance, Facility Reviewer
- J. Mendoza, Lead Examination Writer
NRC Personnel
- F. Ramirez, Senior Resident Inspector
- C. Speer, Resident Inspector