| title = IR 05000266-11-004, 05000301-11-004, on 7/01/2011 - 9/30/2011; Point Beach Nuclear Plant, Units 1 and 2; Follow-Up of Events; Component Design Bases Inspection
| title = IR 05000266-11-004, 05000301-11-004, on 7/01/2011 - 9/30/2011; Point Beach Nuclear Plant, Units 1 and 2; Follow-Up of Events; Component Design Bases Inspection
| author name = Kunowski M A
| author name = Kunowski M
| author affiliation = NRC/RGN-III/DRP/B5
| author affiliation = NRC/RGN-III/DRP/B5
| addressee name = Meyer L
| addressee name = Meyer L
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:November 2, 2011
[[Issue date::November 2, 2011]]


Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
==SUBJECT:==
 
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, NRC INTEGRATED INSPECTION REPORT 05000266/2011004; 05000301/2011004
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, NRC INTEGRATED INSPECTION REPORT 05000266/2011004; 05000301/2011004


==Dear Mr. Meyer:==
==Dear Mr. Meyer:==
Line 32: Line 30:
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/ Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27  
Sincerely,
/RA/ Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27  


===Enclosure:===
===Enclosure:===
Inspection Report 05000266/2011004; 05000301/2011004  
Inspection Report 05000266/2011004; 05000301/2011004 w/Attachment: Supplemental Information


===w/Attachment:===
REGION III Docket Nos: 05000266; 05000301 License Nos: DPR-24; DPR-27 Report No: 05000266/2011004; 05000301/2011004 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant, Units 1 and 2 Location: Two Rivers, WI Dates: July 1, 2011, through September 30, 2011 Inspectors: S. Burton, Senior Resident Inspector M. Thorpe-Kavanaugh, Resident Inspector K. Barclay, Kewaunee Resident Inspector E. Sanchez-Santiago, Reactor Engineer M. Phalen, Senior Health Physicist B. Palagi, Senior Operations Engineer D. Oliver, Operations Engineer J. Beavers, Emergency Preparedness Inspector D. Reeser, Operations Engineer B. Jose, Senior Reactor Engineer Approved by: Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects  
Supplemental Information cc w/encl: Distribution via ListServ Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos: 05000266; 05000301 License Nos: DPR-24; DPR-27 Report No: 05000266/2011004; 05000301/2011004 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant, Units 1 and 2 Location: Two Rivers, WI Dates: July 1, 2011, through September 30, 2011 Inspectors: S. Burton, Senior Resident Inspector M. Thorpe-Kavanaugh, Resident Inspector K. Barclay, Kewaunee Resident Inspector E. Sanchez-Santiago, Reactor Engineer M. Phalen, Senior Health Physicist B. Palagi, Senior Operations Engineer D. Oliver, Operations Engineer J. Beavers, Emergency Preparedness Inspector D. Reeser, Operations Engineer B. Jose, Senior Reactor Engineer Approved by: Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects  


Enclosure  
Enclosure  
Line 778: Line 776:


===Closed===
===Closed===
: 05000266/2011004-02;
: 05000266/2011004-02;  
: [[Closes finding::05000301/FIN-2011004-02]] NCV Failure to Perform an Operability Evaluation for Rod Drive  
: 05000301/2011004-02 NCV Failure to Perform an Operability Evaluation for Rod Drive
: Control System Failures (Section 4OA3.2)
Control System Failures (Section 4OA3.2)  
: [[Closes LER::05000301/LER-2010-003]]-00 LER Technical Specification Required Shutdown (Section 4OA3.2)
: 05000301/2010-003-00 LER Technical Specification Required Shutdown (Section 4OA3.2)  
: [[Closes LER::05000301/LER-2010-004]]-00 LER Manual Reactor Trip During Startup (Section 4OA3.3)  
: 05000301/2010-004-00 LER Manual Reactor Trip During Startup (Section 4OA3.3)  
: 05000266/2006006-08;
: 05000266/2006006-08;  
: [[Closes finding::05000301/FIN-2006006-08]] URI Safety-Related Equipment Not Protected from Tornado Missiles (Section 1R21)  
: 05000301/2006006-08 URI Safety-Related Equipment Not Protected from Tornado Missiles (Section 1R21)  
: 05000266/2011004-03;  
: 05000266/2011004-03;  
: 05000301/2011004-03; NCV Failure to Ensure Tornado Missile Protection for EDGs G01 and G02 Exhaust Stacks (Section 1R21)  
: 05000301/2011004-03; NCV Failure to Ensure Tornado Missile Protection for EDGs G01 and G02 Exhaust Stacks (Section 1R21)  
Line 794: Line 792:
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
The following is a partial list of documents reviewed during the inspection.
The following is a partial list of documents reviewed during the inspection.
: Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
: Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
: 1R01 Adverse Weather Protection
-
: AOP-13C; Severe Weather Conditions; Revision 22 - Station Log; Day and Mid Shift; September 29 - 30, 2011 1R04 Equipment Alignment
-
: CL 10B; Service Water Safeguards Lineup; Revision 66 - Drawing
: 018995; P&ID Service Water; Revision 76 -
: OI 70; Service Water System Operation; Revision 61 - Procedure Record For 0-SOP-DC-003; 125VDC D-03 And Component; September 29, 2011
- Procedure Record For 0-SOP-DC-005; 125 VDC Swing Buses And Components; September 29, 2011 1R05 Fire Protection
-
: AR01675265; Review Fire Brigade Member Opinion Of Aisle Widths - FP Index; Fire Protection Manual; Revision 61
- NFPA No. 27; Private Fire Brigades; 1975
- FPER; Fire Protection Evaluation Report; Revision 12 - Drawing
: 290584; Fire Barrier Location For Site Plan; Revision 4 - FHAR; Fire Hazards Analysis Report; Revision 5
- NP 4.2.32; Respiratory Protection Program; Revision 7
- FHAR
: FZ 550; Fire Area A38; Manhole No. 1; June 2009
- NP 5.2.11; Fire Protection Program Documentation; Revision 9
-
: PC 74; Attachment B, Fire Drill Evaluation; August 4, 2011 - FOP 1.1; Brigade Training; Revision 10 - OM 3.27; Control Of Fire Protection And Appendix R Safe Shutdown Equipment; Revision 40 - FEP 4.20; SITE; Revision 7 1R11 Licensed Operator Requalification Program
- 2010 Licensed Operator Written Examinations -
: AR 01676917; IP71111.11 Inspection Feedback On 2010 Written Examination
-
: AR01670029; Simulator Evaluations Not Clearly Documented
- Control Room Labels; August 4, 2011
-
: FP-T-SAT-40; Implementation Phase; Revision 12 -
: FP-T-SAT-71; NRC Exam Security Requirements; Revision 3 -
: FP-T-SAT-73; Licensed Operator Requalification Program Examinations; Revision 8
-
: FP-T-SAT-74; NRC Operator License Application And Renewal Requirements, Revision 5 -
: FP-T-SAT-80; Simulator Configuration Management; Revision 7
-
: FP-T-SAT-81; Simulator Testing And Documentation; Revision 5 - NP 1.10.1; Recordkeeping For NRC licensed Operators; Revision 8 
: Attachment -
: NUREG-1021; Operator Licensing Examinati on Standards For Power Reactors; Revision 9, Supplement 1 - OM 3.10; Operations Personnel Assignments And Scheduling; Revision 31 - OM 3.7; AOP And EOP Procedure Sets Use And Adherence; Revision 20 - Operating Test Administered Week Of 8/8/2010
- Ops 71111.11 Per Inspection Assessment; 5/9/2011-5/12/2011
- Simulator Performance tests, 2010/2011
- Simulator Review Committee Minutes, 1
st Quarter 2011; January 25, 2011 - Simulator Review Committee Minutes, 1
st Quarter 2010; February 4, 2010 - Simulator Review Committee Minutes, 2
nd Quarter 2011; June 16, 2011 - Simulator Review Committee Minutes, 3
rd Quarter 2010; August 30, 2010 - Simulator Review Committee Minutes, 4
th Quarter 2009; December 14, 2009 - Simulator Review Committee Minutes, 4
th Quarter 2010; December 9, 2010 - Simulator Review Committee Minutes; Multiple, Various Dates 2010/11 -
: TR-AA-200; Management Oversight Of Accredited Training Programs, Revision 2 - Training Review Committee - Curriculum; Multiple, Various Dates 2010/11 - Training Review Committee (TRC) Meeting Reports, Quarters 1, 2, 3, 4 2010 1R12 Maintenance Rule Effectiveness
-
: AR01653101; P-32A Service Water Pump Nears Alert Limit -
: AR01673906; 0P-032A SWP Motor Noisy Bearing
-
: AR01677962; Three Service Water Pumps Enter Alert
-
: AR01678121; Calibrate Instruments In Support Of SW Pump Retest
- Calculation Signature Sheet For Calculation No. 2002-0003, Revision 2; Service Water System Design Basis; January 14, 2011 - Calculation Signature Sheet For Calculation No. 2002-0003, Revision 2; Service Water System Design Basis; July 9, 2009 - PBNP 10
: CFR 50.59/72.48 Pre-Screening Review; Seat Leakage Monitoring Of SW Zurn Strainer Blowdown And Backwash Valves; August 16, 2011 - PBNP Condition Evaluation For CAP
: AR01653101 - PBNP Operations Written Work Order; WP No. 2011-051; Verify/Requantify Leakage Past
: SW-2911 And
: SW-2912 BS Drain Control Valves; August 16, 2011 - Procedure Record For
: IT-07A, P-32A Service Water Pump (Quarterly); August 17, 2011
- Procedure Record For
: IT-07B, P-32B Service Water Pump (Quarterly); August 17, 2011 - Procedure Record For
: IT-07C, P-32C Service Water Pump (Quarterly); August 17, 2011 1R13 Maintenance Risk Assessments and Emergent Work Control
-
: AR01670725; During Test Run Per 0-SOP-SA-001 ATT E, The Diesel Did Not Start As Expected -
: AR01672783;
: SW-4400B Relief Has Steady Stream Leakage - FSAR Section 8.9; UFSAR 2008 -
: NP 10.3.7; On-Line Safety Assessment; Revision 24
- NUREG/CR-6928; Industry-Average Performance For Components And Initiating Events At U.S. Commercial Nuclear Power Plants; INL/EXT-06-11119 -
: OP-AA-104-1007; Online Aggregate Risk; Revision 1 -
: OP-AA-104-1007; Online Aggregate Risk; Revision 2 -
: OP-AA-104-1010; Spent Fuel Pool Risk Management Guideline; Revision 0
- PB Station Unit 1; Daily Status Report; August 10, 2011
- PB Station Unit 2; Daily Status Report; August 10, 2011 
: Attachment -
: PBF-1564; Online And SFP Aggregate Risk Analysis; Revision 0 - PBNP System Engineering Summer Readiness Review; System:
: Instrument Air;
: February 14, 2011 - PBNP System Engineering Summer Readiness Review; System:
: Service Water;
: January 18, 2011 -
: PC 29; Gas Turbine And Auxiliary Diesel Load Test; Revision 51
- Procedure Record (Various) For
: PC 29; Gas Turbine And Auxiliary Diesel Load Test; September 15, 2011 - Safety Monitor Unit 1; August 9, 2011 09:01 - Safety Monitor Unit 1; August 9, 2011 10:01 - Safety Monitor Unit 1; August 9, 2011 23:59
- Safety Monitor Unit 1; September 11, 2011 21:20
- Safety Monitor Unit 1; September 12, 2011 22:14
- Safety Monitor Unit 1; September 13, 2011 20:48 - Safety Monitor Unit 1; September 15, 2011 21:50 - Safety Monitor Unit 1; September 16, 2011 18:25
- Safety Monitor Unit 1; September 17, 2011 20:56
- Safety Monitor Unit 1; September 18, 2011 16:35
- Safety Monitor Unit 2; August 9, 2011 09:01 - Safety Monitor Unit 2; August 9, 2011 10:01 - Safety Monitor Unit 2; August 9, 2011 23:59
- Safety Monitor Unit 2; September 12, 2011 22:14
- Safety Monitor Unit 2; September 13, 2011 20:48
- Safety Monitor Unit 2; September 15, 2011 21:50
- Safety Monitor Unit 2; September 16, 2011 18:24 - Safety Monitor Unit 2; September 17, 2011 20:56 - Safety Monitor Unit 2; September 18, 2011 16:35
- Site Certification Letter For Summer Readiness Period Per
: OP-AA-102-1002 Seasonal Readiness; Signed By L. Meyer May 24, 2011 - Top 5 Components Sorted By F-V And RAW For Zero Test & Maintenance Model And G-05 OOS; September 14, 2011 -
: WM-AA-1000; Work Activity Risk Management; Revision 8 1R15 Operability Evaluations
- Apparent Cause Evaluation For
: CR01670189; Revision 0 -
: AR01645462;
: TC-06637 Out Of Spec -
: AR01653573; P-32B Service Water Pump Vibration Increase
-
: AR01654852; Retest P-32B SW Pump Under
: IT 07B (CAP 1653573)
-
: AR01656372; Increasing Vibration Levels On 0P-032B Service Water Pump
-
: AR01658918; P-032B Increasing Vibration Trend -
: AR01661563; Pump Secured Due To Outbrd Turb Bearing Temp>250 Degrees F -
: AR01661834; Missed LR/GL89-13 Bearing Oil Cooler Inspection 2P-029T 2R31
-
: AR01667162; 1P-53 Air Amp Lines Hot
-
: AR01670189; 1P-29 Governor Displayed Erratic Operation
-
: AR01670196; 1P-29, TDAFW Pump, Outboard Turbine Bearing Temperature High
-
: AR01670510; 1P-29GOV-Z, Governor Valve Dimensions Out Of Criteria -
: AR01670548; 1P-29, TDAFW Pump, Outboard Turbine Bearing Temperature High -
: AR01670550; 1P-29 Gov. Shaft Has Increased Steam Leakage
-
: AR01673906; 0P-032A SWP Motor Noisy Bearing
-
: AR01677028; Containment Spray Pump Mechanical Seals Heat Generation Conc Attachment -
: AR01677580;
: POD 1183533 Conclusion In Question -
: AR01686906; Bechtel
: NCR 248 - Instrument Air Amplifier Failure
-
: AR01687347; 1Z 953 B IA Amplifier Running Constantly -
: EC 271873; Engineering Evaluation Of 2P-29-T Governor Valve Wear; Revision 0 - FSAR Section 9.1; Component Cooling Water (CC); UFSAR 2009
- Maintenance Rule Evaluation For
: AR1645462; W-12B Fan Start Issue; May 9, 2011
- PBNP Tower1 Temp 10 Meter; August 1 22:54:57
- PBNP Tower1 Temp 10 Meter; August 10, 2010 12:46:43
- PBNP Tower1 Temp 10 Meter; August 3, 2010 10:27:36 - PBNP Tower1 Temp 10 Meter; July 19, 2010 06:36:33 - PBNP Tower1 Temp 10 Meter; July 20, 2010 06:32:19
- PBNP Tower1 Temp 10 Meter; July 31, 2010 00:15:39
- PBNP Tower1 Temp 10 Meter; July 4, 2010 18:13:18
- PBNP Tower1 Temp 10 Meter; June 7, 2010 15:26:04 - PBNP Tower1 Temp 10 Meter; June 8, 2010 10:27:12 - PBNP Tower1 Temp 10 Meter; May 3, 2011 15:55:41
- PBNP Tower1 Temp 10 Meter; September 16, 2010 17:03:23
-
: POD 01677208; Containment Spray Pump Mechanical Seals Heat Generation Conc;
: Revision 0 - Technical Assessment For Reportability For
: AR1645462-02;
: TC-06637 Out Of Specification;
: Revision 0 1R19 Post-Maintenance Testing
- 10
: CFR 50.59/72.48 Pre-Screening Review; Engineering Design Change
: EC 12054, "Feedwater Regulating Valve Upgrade"; May 9, 2011 - 2ICP 02.019; Engineered Safety Features System Logic Trains A And B Shutdown Surveillance Test; Revision 13 -
: AR01663811; Received Unexpected Alarm:
: LOFWTT Channel Alert
-
: AR01672759; Maintenance Rule Unavailability Criteria Exceeded - AF -
: AR01683509;
: EC 258482 May Not Have Been Fully Implemented On The MFRV -
: AR01683692; TS B.3.7.3 Incorrect
-
: AR01685732; Missed PMT On U2 MFRV Limit Switches
-
: AR01685944; Verify Proper Operation Of MFRV Limit Switches For AMSAC
-
: CN-CPS-08-20; Westinghouse Electric Company LLC; Plant Operability Margin To Trip And EOC Coastdown Analysis For Point Beach Units 1 And 2 Extended Power Uprate Program;
: Revision 1  -
: CN-CPS-08-20; Westinghouse Electric Company LLC; Plant Operability Margin To Trip And EOC Coastdown Analysis For Point Beach Units 1 And 2 Extended Power Uprate Program;
: Revision 3 - CRN/ECN
: 271631; CRN ECN Initiation Optional Form; Westinghouse Calculation
: CN-CPS-08-20, Rev. 3, "Plant Operability Marg in To Trip And EOC Coastdown Analysis For Point Beach Units 1 And 2 Extended Power Uprate Program" -
: EC 12054:
: Design Description; Feedwater Regulating Valve Upgrade, Unit 2
- ESFAS Instrumentation 3.3.2; Unit 2 - Amendment No. 206
- ESFAS Instrumentation B 3.3.2; Unit 2 - Amendment No. 243
- FSAR Section 10.1; Steam And Power Conversion System; UFSAR 2009 - FSAR Section 5.2; Containment Isolation System; UFSAR 2010 - FSAR Section 7.2; Reactor Protection System; UFSAR 2010
- FSAR Section 7.3; Engineered Safety Features Actuation System; UFSAR 2010
- FSAR Section 7.4; Other Actuation Systems; UFSAR 2008 
: Attachment - FSAR Section 7.7; Control Systems; UFSAR 2008 -
: IT 09A; Cold Start Of Turbine-Driven Auxiliary Feed Pump And Valve Test (Quarterly) Unit 2;
: Revision 52 - MFIVs And MFRVs [And Associated Bypass Valves] B 3.7.3; Revision 3.1, December 1, 2005 - MFIVs, MFRVs, And MFRV Bypass Valves 3.7.3; Unit 2 - Amendment No. 245
- PBNP Operations Notebook; Unit 2 MFRV Operation; September 2, 2011
-
: POD 01683509-01;
: EC 258482 MFRV Auto Closure Not Fully Implemented; Revision 0
- Procedure Record For
: IT 09A; Cold Start Of Turbine-Driven Auxiliary Feed Pump And Valve Test (Quarterly) Unit 2; June 16, 2011 - Procedure Record For IT 9A; Cold Start Of TD Aux Feed Pump And Valve Test (Q) Unit 2; June 17, 2011 - Procedure Record For ORT 3A, Safety Injection Actuation With Loss Of Engineered Safeguards AC (Train A) Unit 2; May 8, 2011 - Procedure Record For ORT 3B, Safety Injection Actuation With Loss Of Engineered Safeguards AC (Train B) Unit 2; May 6, 2011 -
: SCR 2010-0002; 10
: CFR 50.59/72.48 Screening; Engineering Design Change
: EC 12054, Rev 2 "Feedwater Regulating Valve Upgrade"; May 9, 2011 -
: SCR 2011-0060; 10
: CFR 50.59/72.48 Screening;
: CN-CPS-08-20, Rev. 3, "Plant Operability Margin To Trip And EOC Coastdown Analysis For Point Beach Units 1 And 2 Extended Power Uprate Program"; May 10, 2011 - Station Log; September 5, 2011, Swing Shift
- WO Package
: 00371036 01; 2P-29-T / Replace Shaft Due To Minor Pitting; March 6, 2011
- WO Package
: 00380512 01; 2ICP 04.011-1, Main Feedwater Control Valves; June 16, 2011
- WO Package
: 40094408 01; 2N-16, Loss Of FW TT Annunciator Came In At P-20; June 24, 2011 1R21 Component Design Bases Inspection (71111.21)
-
: TIA 2011-011; Final - Task Interface Agreement (TIA) - Evaluation of Point Beach Nuclear Plant Tornado Missile Protection Licensing Basis; August 16, 2011 1R22 Surveillance Testing
-
: AR01669750; Inadvertent Boric Acid Flow Through Unit 1 CVCS -
: AR01670027;
: IT 02 Train B Produced Unexpected Results -
: AR01670485; 1CV-00355 Back Leakage Suspected
-
: AR01672461; Test Equipment Setup For TS Surveillance Is Inadequate
-
: AR0168786; 1SC-959 Failed Acceptance Criteria In
: IT-60
-
: AR01688787; 1WG-1786 Failed To Meet IST Criteria
- ASME
: OM-2009; Subsection ISTC; May 17, 1010 - FSAR Section 11.5; Radiation Monitoring System; UFSAR 2009 - FSAR Section 5.2; Containment Isolation System; UFSAR 2010
- FSAR Section 6.5; Leakage Detection Systems; UFSAR 2008
-
: IT-60; Containment Isolation Valves (Quarterly) Unit 1; Revision 42; Performed September 22, 2011 -
: IT-60; Containment Isolation Valves (Quarterly) Unit 1; Revision 42 -
: MRE 01669750;
: CV-0110A, BA To 1Z-1 BA Blender Inlet Flow Control Valve; August 15, 2011
- NP 3.2.4; Primary To Secondary Leak Rate Monitoring; Revision 7
-
: OI 55; Primary Leak Rate Calculation; Performed May 24, 2011
- Procedure Record For
: IT 02 Train B Unit 2; July 25, 2011
- Procedure Record For
: IT 02 Train B; High Head Safety Injection Pumps And Valves Train B
: Unit 2; July 5, 2011 
: Attachment - Procedure Record For
: IT 02 Train B; High Head Safety Injection Pumps And Valves Train B Unit 2; January 19, 2011 - Procedure Record For
: IT 21; Charging Pump & Check Valve Test (Q) U1; September 24, 2011 - Procedure Record For
: IT 60; Containment Isolation Valves (Q) U1; September 22, 2011
- RCS Leak Rate Data (Unit 1); July 13 To August 1, 2011
- Station Log, Mid Shift; July 18 To July 21, 2011
- Station Log, Mid Shift; September 22, 2011
- TRM 3.5.1; Chemical And Volume Control System; Unit 1 Revision 6 - TS 3.6.3; Containment Isolation Valves; Unit 1 - Amendment No. 201, Unit 2 - Amendment No. 206 - TS Bases B 3.6.3; Containment Isolation Valves; Unit 1 - Amendment No. 231, Unit 2 - Amendment No. 236 1EP2 Alert and Notification System Testing
- 2010 Manitowoc County And Kewaunee County Nuclear Emergency Planning Information Calendar - 2011 Manitowoc County And Kewaunee County Nuclear Emergency Planning Information Calendar - Alert And Notification Design Report; December 7, 1987 - EPMP 6.0; Alert And Notification System (ANS); Revision 11 1EP3 Emergency Response Organization Augmentation (71114.03)
- EP 8.0; Maintaining Emergency Preparedness; Revision 50 -
: EP-AA-100-1001; Guidelines For Maintaining Emergency Preparedness; Revision 1
- EPIP 2.1; Notifications - ERO, State And Counties, And NRC; Revision 44
- EPMP 3.2; Offsite And Onsite Personnel Training; Revision 16
- ERO Augmentation Drill Report; April 11, 2011
- ERO Augmentation Drill Report; April 6, 2010 - ERO Augmentation Drill Report; December 15, 2009 - ERO Augmentation Drill Report; December 7, 2010
- ERO Augmentation Drill Report; February 24, 2010
- ERO Augmentation Drill Report; January 25, 2011
- ERO Augmentation Drill Report; September 28, 2010
- PBN EP TP; Training Program Description; Revision 11 1EP5 Correction of Emergency Preparedness Weaknesses and Deficiencies
-
: AR1364257; Declining DEP Performance Indicator Trend -
: AR1393556; 07/14/2010 Drill AEOF Activation Timeliness Issue -
: AR1393556; Drill AEOF Activation Timeliness Issue -
: AR1394643; 2009 Offsite EAL Review Not Completed
-
: AR1396289; Inadvertent Siren Activation
-
: AR1399066; 10/26/2010 Drill Security EAL Wording Issue 
-
: AR1668559; ERO Positional Depth Issue -
: AR1669987; EAL HA5 Missing From Hot EAL Table -
: AR1672951; ANS Design Report Update Issue
-
: AR1674070; License Operator Requalification DEP Performance Issue
-
: AR1677122; 10
: CFR 50.54(t) Audit Frequency Issue
-
: AR1678337; Key ERO Participation Indicator Issue Attachment -
: AR1679015; NOS Deficiencies In EP Management Oversight -
: AR1679382; EPIP 1.2.1 Action Level Technical Basis Revision
-
: AR1680309; ERO Positional Depth Issue -
: AR1682785; DEP Performance Enhancing Experience Issue -
: AR1685405; EP Staff Training Documentation Missing
-
: AR1686027; ANS Siren Testing Not In Accordance With Approved Design Report
-
: AR1686388; Off-Hour Drill Commitment Removed from Emergency Plan
- EPMP 9.0; Equipment Important To Emergency Preparedness; Revision 0
- ERO Drill Report; July 14, 2010 - ERO Drill Report; July 20, 2011 - ERO Drill Report; May 5, 10
- ERO Drill Report; October 26, 2010
- ERO Drill Report; September 15, 2010
-
: FP-PA-ARP-01; Action Request Process; Revision 33 -
: NA-AA-202-1000; Audit Topic Selection And Scheduling; Revision 2 - Nuclear Oversight Audit; August 12, 2010
- Nuclear Oversight Audit; August 18, 2011 -
: PI-AA-204; Condition Identification And Screening Process; Revision 12 1EP6 Drill Evaluation
- Apparent Cause Evaluation For
: CR01674070; Revision 0 -
: AR01663060; Cycle 11C "As Found" Scenario Issue
-
: AR01670710; DR0711 - NES EP Accountability Drill Confusion
-
: AR01670713; DR0711 - Assembly & Accountability Disorganized In TB Lobby -
: AR01670890;
: DR 07-11 Unanticipated EAL Declaration -
: AR01671334;
: DR 07-11 Failure To Demonstrate Continuous Staffing
-
: AR01672285; DR0711 - NARS Form Issues During Drill
-
: AR01672300; Title:
: EP Drill Critique Time For TSC Was Limited 30 Mins
-
: AR01672309; Control Of Drill - Simulator Booth Access And Traffic -
: AR01672321; DR0711 - Emergency Response Facility Equipment Issues -
: AR01672326; Weaknesses In The EOF During EP Drill
-
: AR01672360; DR0711 - Status Boards Were Not Always Updated During Drill
-
: AR01672661; DR711 - TSC/OSC Relocation Issues
-
: AR01672807;
: DR 07-11 Telephone Response Center (TRC) Call Flow Issues
-
: AR01672843; DR711 Lesson Learned - Drill Participant Staffing Issues -
: AR01672847; DR711 Lesson Learned - Availability of PPCS Data In Alt TSC -
: AR01673001;
: DR 07-11 Delay In Getting Current Information To The TRC
-
: AR01673410; Emergency Plan Drill/Exercise Report Quality Questioned
-
: AR01673834; DR0711 - Hourly Updates Communicated Without Completing Form
-
: AR01674070; LOCT Cycle 11C Cancelled DEP Opportunities -
: AR01674071; EPIP 1.2.1 - Emergency Action Level Technical Basis -
: AR01679382; EPIP 1.2.1 Action Level Technical Basis Needs Revision
-
: AR01682142; EPIP 1.3 Contains Incorrect Information
-
: AR01685086; Drill And Exercise Performance Classification - Cycle 11C
-
: AR01685100; EAL Technical Basis Clarification
-
: AR01686887; Drill And Exercise Process Improvements -
: AR01686890; EPMP 9.0 Attachment C Clarification -
: AR01686983; Emergency Preparedness - Performance Enhancing Experience
-
: AR1682785; DEP Performance Enhancing Experience Issue
- Control Room Logs; July 20, 2011 
: Attachment - CSP -
: ST.0, Unit 1; Critical Safety Function Status Trees; Revision 5 - Drill Scenario Controller Handouts For August 31, 2011
- EOF/OSRPF Logs For Participants, Observers, And Controllers; July 20, 2011 - EPIP 1.1; Course Of Actions; Revision 60, Completed On August 31, 2011 - EPIP 1.2.1; Emergency Action Level Technical Basis; Revision 6
- EPIP 1.2; Emergency Classification; Revision 49
- EPIP 1.2; Emergency Classification; Revision 50
- EPIP 1.3; Dose Assessment And Protective Action Recommendations; Revision 40
- JPIC Logs For Participants And Controllers; July 20, 2011 -
: NPM 2011-0185; NextEra Energy Internal Correspondence From Emergency Preparedness To Point Beach Managers; Subject:
: Revised Planned Drill And Exercise Performance Opportunities For 2011; June 17, 2011 -
: NPM 2011-0227; Internal Correspondence From R. Johnson To J. Schleif; Subject: 
: July 20, 2011 ERO Drill Report; July 28, 2011 -
: NPM 2011-0262; Internal Correspondence From J. Schleif To M. Thorpe-Kavanaugh; Subject:
: ERO Drill Report From 7/20/11; August 22, 2011 - Nuclear Accident Report System Forms (Various) For Drill On July 20, 2011
- OSC Logs For Participants And Controllers; July 20, 2011
- PBNP Operations Notebook; FPB Matrix Clarification; August 2, 2011 - Point Beach Daily Quality Summary; July 26, 2011 - Point Beach Nuclear Oversight Report; RPT #
: PBN 11-013; Emergency Planning; August 18, 2011 - SEG No. PBN
: LOC 11C 001E; LOC Cycle 11C As-Found; May 26, 2011 - TSC Logs For Participants And Controllers; July 20, 2011 2RS2 Occupational ALARA Planning and Controls
-
: HP-2.5; Radiation Work Permit And ALARA Planning; Revision 36 -
: NP-4.2.29; Source Term Reduction Program; Revision 11
-
: RP-AA-104-1000; ALARA Implementing Procedure; Revision 02
-
: RP-AA-104-1001; Sentinel RWP Writer's Guide; Revision 02 2RS7 Radiological Environmental Monitoring Program
- CAMP 914; Routine Sewage Treatment Plant Sampling And Effluent Limitations; Revision 16 -
: CAP 01362533; Hard To Detect Nuclides In PBNP Effluents; July 2009 - HPCAL 1.33; Maintenance And Calibration Of Low Volume Air Samplers; Revision 16 - HPIP 3.58.1; Radiological Environmental Sampling; Revision 00
-
: ICP 06.003; Meteorological And Circulating Water System Calibration; Revision 7
-
: ICP 06.055; Meteorological Tower Instrumentation Six-Month Calibration Procedure;
: Revision 05 -
: ICP 07.030; Meteorological Monitoring System 28-Day Inspection; Revision 01 - Low Volume Air Sampler Maintenance & Calibration Record; Selected Environmental Units; Dated March 2011 -
: NPM 2010-0249; Chemistry Self-Assessment Report; June 2010
-
: NPM 2011-0218; Evaluation Of Plant Nuclide Mix And RP Program Impacts; July 2011
-
: PI-AA-204; Condition Identification And Screening Process; Revision 12 - Point Beach Nuclear Oversight Report;
: PBN 10-22; Radiological Environmental Monitoring Program; September 2010 - Point Beach Nuclear Plant 50.75(g) File Index And Selected Files; July 2011
- Point Beach Nuclear Plant Annual Monitoring Report 2007 Revised; Issued December 2008 
: Attachment - Point Beach Nuclear Plant Annual Monitoring Report 2010; Issued April 2011 - Point Beach Nuclear Plant Environmental Manual; Revisions 19 And 23
- Point Beach Nuclear Plant Offsite Dose Calculation Manual; Revision 18
- Quick Hit Self-Assessment; Chemistry - REMP; July 2011 4OA1 Performance Indicator Verification
- 2Q/2011 Performance Indicators - Point Beach 1 And 2; MSPI Emergency AC Power System - 2Q/2011 Performance Indicators - Point Beach 1 And 2; MSPI, Heat Removal System - 2Q/2011 Performance Indicators - Point Beach 1 And 2; MSPI, High Pressure Injection System - 2Q/2011 Performance Indicators - Point Beach 1 And 2; MSPI; Residual Heat Removal System -
: AR01665915; CDE Not Updated For Baseline Change -
: AR01670874;
: OI 38 Does Not Provide Guidance For Opening SW Overboards - CAMP 410; Determination Of Radioactive Iodine And Iodine 131 Equivalents In Reactor Coolants; Revision 07 - CAMP 600.3; Primary Side Sampling Procedures: Hot Leg Liquid Sampling-Depressurized Liquid; Revision 05 - DEP Opportunities; October 1, 2010 - June 30, 2011 - EPG 1.0; Emergency Preparedness Drill Guideline; Revision 17 - EPG 1.1; Performance Indicators (PI's) Guideline; Revision 6
- ERO Personnel Participation; October 1, 2010 - June 30, 2011
- MSPI Derivation Report; MSPI Cooling Water S
ystem Unit 1; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI Cooling Water System Unit 1; Unavailability Index; March 2011 - MSPI Derivation Report; MSPI Cooling Wate
r System Unit 1; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI Cooling Wate
r System Unit 1; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI Cooling Water System Unit 1; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI Cooling Water System Unit 1; Unreliability Index; March 2011 - MSPI Derivation Report; MSPI Cooling Water System Unit 1; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI Cooling Water System Unit 1; Unreliability Index; September 2010 - MSPI Derivation Report; MSPI Cooling Water S
ystem Unit 2; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI Cooling Wate
r System Unit 2; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI Cooling Wate
r System Unit 2; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI Cooling Water System Unit 2; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI Cooling Water System Unit 2; Unreliability Index; March 2011 - MSPI Derivation Report; MSPI Cooling Water System Unit 2; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI Cooling Water System Unit 2; Unreliability Index; September 2010 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 1; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 1; Unavailability Index;
: March 2011 
: Attachment - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 1; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 1; Unreliability Index;
: March 2011 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 1; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 1; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 1; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 1; Unreliability Index; September 2010 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 2; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 2; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 2; Unavailability Index;
: March 2011 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 2; Unreliability Index;
: March 2011 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 2; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 2; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 2; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI Emergency AC Po wer System Unit 2; Unreliability Index; September 2010 - MSPI Derivation Report; MSPI Heat Removal System Unit 1; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI Heat Removal System Unit 1; Unavailability Index; March 2011 - MSPI Derivation Report; MSPI Heat Removal System Unit 1; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI Heat Removal System Unit 1; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI Heat Removal System Unit 1; Unreliability Index; June 2011
- MSPI Derivation Report; MSPI Heat Removal System Unit 1; Unreliability Index; March 2011 - MSPI Derivation Report; MSPI Heat Removal System Unit 1; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI Heat Removal System Unit 1; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI Heat Removal System Unit 2; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI Heat Removal System Unit 2; Unavailability Index; March 2011 - MSPI Derivation Report; MSPI Heat Removal System Unit 2; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI Heat Removal System Unit 2; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI Heat Removal System Unit 2; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI Heat Removal System Unit 2; Unreliability Index; March 2011 - MSPI Derivation Report; MSPI Heat Removal System Unit 2; Unreliability Index; December 2010 
: Attachment - MSPI Derivation Report; MSPI Heat Removal System Unit 2; Unreliability Index; September 2010 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 1; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 1; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 2; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 2; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 1; Unavailability Index;
: March 2011 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 1; Unreliability Index;
: March 2011 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 1; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 1; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 1; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 1; Unreliability Index; September 2010 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 2; Unavailability Index;
: March 2011 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 2; Unreliability Index;
: March 2011 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 2; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 2; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 2; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI High Pressure Injection System Unit 2; Unreliability Index; September 2010 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 1; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 1; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 1; Unavailability Index;
: March 2011 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 1; Unreliability Index;
: March 2011 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 1; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 1; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 1; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 1; Unreliability Index; September 2010 
: Attachment - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 2; Unavailability Index; June 2011 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 2; Unreliability Index; June 2011 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 2; Unavailability Index;
: March 2011 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 2; Unreliability Index;
: March 2011 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 2; Unavailability Index; December 2010 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 2; Unreliability Index; December 2010 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 2; Unavailability Index; September 2010 - MSPI Derivation Report; MSPI Residual Heat Re moval System Unit 2; Unreliability Index; September 2010 -
: NEI 99-02; Revision 6
- NP 3.2.2; Primary Water Chemistry Monitoring Program; Revision 22
-
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: EAC; June 2011; July 6, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; May 2011; June 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; April 2011; May 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; March 2011; April 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; February 2011; March 3, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; January 2011; Revision 1; April 14, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: EAC; January 2011; February 3, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; December 2010; January 4, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; November 2010; December 2, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; October 2010; November 2, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; September 2010; October 4, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: EAC; August 2010; September 2, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: EAC; July 2010; August 3, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SW; May 2011; June 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SW; April 2011; May 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SW; March 2011; April 1, 2011 
: Attachment -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: SW; February 2011; March 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: SW; January 2011; February 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SW; December 2010; January 3, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SW; November 2010; December 2, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SW; October 2010; November 2, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SW; September 2010; October 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: SW; August 2010; September 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SW; July 2010; August 2, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: CC; June 2011; July 6, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: CC; May 2011; June 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: CC; April 2011; May 3, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: CC; March 2011; April 4, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: CC; February 2011; March 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: CC; January 2011; February 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: CC; December 2010; January 6, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: CC; November 2010; December 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: CC; October 2010; November 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: CC; September 2010; October 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: CC; August 2010; September 3, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: RH; August 2010; October 4, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: RH; August 2010; Revision 1; October 5, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: RH; June 2011; Revision 0; July 5, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; May 2011; Revision 0; June 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; April 2011; Revision 0; May 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; March 2011; Revision 0; April 4, 2011 
: Attachment -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; February 2011; Revision 0; March 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification;
: System:
: RH; January 2011; Revision 0; February 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; December 2010; Revision 0; January 6, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; November 2010; Revision 0; December 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; October 2010; Revision 0; November 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; September 2010; Revision 0; October 5, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: RH; July 2010; Revision 0; August 3, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; June 2011; Revision 0; July 5, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; May 2011; Revision 0; June 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; April 2011; Revision 0; May 1, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; March 2011; Revision 0; April 4, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; February 2011; Revision 0; March 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; January 2011; Revision 0; February 2, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; December 2010; Revision 0; January 5, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; November 2010; Revision 0; December 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; October 2010; Revision 0; November 1, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; September 2010; Revision 0; October 4, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; August 2010; Revision 0; September 30, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: SI; July 2010; Revision 0; August 4, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; June 2011; Revision 0; July 6, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; April 2008 - May 2011; Revision 0; July 11, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; May 2011; Revision 0; June 10, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; April 2011; Revision 0; May 12, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; March 2011; Revision 0; April 11, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; February 2011; Revision 0; March 2, 2011 
: Attachment -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; January 2011; Revision 0; February 3, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; December 2010; Revision 0; January 17, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; November 2010; Revision 1; February 23, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; November 2010; Revision 0; December 2, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; October 2010; Revision 1; February 23, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; October 2010; Revision 0; November 2, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; September 2010; Revision 0; October 5, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; August 2010; Revision 2; February 23, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; August 2010; Revision 1; November 15, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; August 2010; Revision 0; September 30, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; July 2010; Revision 2; February 23, 2011 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; July 2010; Revision 1; November 15, 2010 -
: PBF-1650; Mitigating System Performance Index Monthly Unavailability And Verification; System:
: AF; July 2010; Revision 0; August 4, 2010 - Performance Indicator Data Collection, Review And Approval Records For RCS Activity, Occupational Radiation Safety, And Public Radiation Safety; First Quarter 2010 - Second Quarter 2011 - Point Beach MSPI Basis Document; Revision 16 - Point Beach MSPI Basis Document; Revision 16 - Recovery Plan; MSPI Cooling Water System; May 2011
- Siren System Availability Test Records; October 1, 2010 - June 30, 2011
-
: TID-14844; Calculation Of Distance Factors For Power And Test Reactor Sites; Atomic Energy Commission; Dated 1962 4OA2 Identification and Resolution of Problems
-
: AR01264841;
: LT-3317A Found Out Of Tolerance During Performance Of
: ICP 13 -
: AR01665431; West Flange Of Emersion Heater Erosion
-
: AR01665521;
: DA-00300 As Found Condition Had Loose Rust In Valve -
: AR01665523; P-208A Has Indication Of Fuel Leakage At Shaft Seal -
: AR01666334; Found
: LT-03317A Out Of Tolerance During
: ICP 13.007B-1
-
: AR01666371;
: DA-318 Failed To Seat During
: IT-100
-
: AR01666411; G-03 EDG Alarm Due To Low Starting Air Pressure
-
: AR01668894; Discrepancies Noted With DA Check Valve Identification
-
: CL 11A G-03; G-03 Diesel Generator Checklist; Revision 7 -
: DBD-16; Emergency Diesel Generator System; Revision 14 -
: ICP 13.007B-1; Emergency Diesel Generator G-03 Calibration Procedure; Revision 8
-
: IT 100 G-03; Seat Leakage Test Of Diesel Air Compressor Discharge Check Valves G-03; Tests Performed July 3, 2011, Times:
: 1136 And 1328 
: Attachment - Log Entries Report; June 27 To June 29, 2011 - Log Entries Report; May 3, May 11, May 18, And July 2, 2011
- MRE01614345; System:
: DA, Diesel Air;
: WO40066628; January 30, 2011 -
: NP 10.1.1; Tech Spec And Administrative LCO Action Condition Entry And Tracking;
: Revision 21 - Procedure Record And Field Copy Tracking; Procedure
: TS 83, Emergency Diesel Generator G-03 Monthly; July 2, 2011 - WO Package
: 40071538 03;
: DA-00323, Disassemble, Clean, And Inspect Check Valve; June 27, 2011 - EPG 1.1; Performance Indicators (PI's) Guideline; Revision 6 - EPG 1.0; Emergency Preparedness Drill Guideline; Revision 17
- Siren System Availability Test Records; October 1, 2010 - June 30, 2011
- ERO Personnel Participation; October 1, 2010 - June 30, 2011 - DEP Opportunities; October 1, 2010 - June 30, 2011 4OA3 Follow-Up of Events and Notices of Enforcement Discretion
-
: AR01401564; U2 Rod Control Urgent Alarm And Non-Urgent Alarm Came In Unit 2 - Design Change Pre-Job Brief;
: SCR 2011-0171;
: EC 273536; Temp Mod Prep Furmanite Repair Of 2CS-60B; August 6, 2011 - Design Input Consultation Form;
: EC 273536 - Furmanite Repair Of 2CS-60B Connection; August 6, 2011 - Design Package; Furmanite Repair Of Unit 2 "B" Main Feedwater Pump Recirculation Line; August 5, 2011 - Determination For The Use Of Not Applicable (NA) For Procedure Number
: TS-6, Rod Exercise Test Unit 2; December 12, 2010 - Drawing
: 085161; P&ID Feedwater System; Revision 52
-
: EC 273536; Design Input Checklist; Part A - Engineering Programs And Departmental Reviews -
: EC 273536; Design Input Checklist; Part B - Design Considerations, Requirements, And Standards -
: EC 273536; Modification Classification; Furmanite Repair Of 2CS-60B Connection; Revision 0 -
: EC 273536; Temporary Modification Extension; Furmanite Repair Of 2CS-60B Connection;
: Revision 1 -
: EC 273536; Temporary Modification Initiation; Furmanite Repair Of 2CS-60B Connection;
: Revision 2 -
: EN-AA-212-F02; Engineering Product Risk And Consequence Assessment; Revision 1 -
: FSC-N-3B (USA); Furmanite Compound Information Sheet; Revision 6, March 2000
-
: FSC-N-6B (USA); Furmanite Compound Information Sheet; Revision 6, March 2000 
-
: FSC-N-9A; Furmanite Compound Information Sheet; Revision 8
- Log Entries Report; December 9 To 16, 2010 - NAMS
: 40103777 Task 1; 2P-28B SGFP Recirc Line Drain 1
st Off Isolation; August 6, 2011 - NAMS
: 40103777 Task 11; 2P-28B SGFP Recirc Line Drain 1
st Off Isolation; August 10, 2011 - NAMS
: 40103777 Task 12; 2P-28B SGFP Recirc Line Drain 1
st Off Isolation; August 19, 2011 - Operational Decision Making; Unit 2 SGFP Mini Recirc Piping Drain Leakage; August 11, 2011
- Operations Notebook Entry; Crew Response To 2P-28B Mini Recirculation Line Leak; August 6, 2011 -
: PCR 1676374; Vendor Procedure N-2011126; Enclosure Installation Procedure; August 19, 2011 -
: PCR 1676374; Vendor Procedure N-2011126; Enclosure Installation Procedure; August 9, 2011 
: Attachment -
: SCR 2011-0171; Installation Of Furmanite Leak Sealing Enclosure On 2CS-60B; August 6, 2011 - Security Impact Review;
: 273536 - Temporary Furmanite Leak Sealant Injection Repair Of 2CS-60B Connection; Revision 0 - TS 6; Rod Exercise Test Unit 2; Performed December 10, 2010
- U2 Forced Outage After RDC Failure; Event Dates December 10 And December 15, 2010;
: January 28, 2011 4OA5 Other Activities
- JL Shepherd And Associated Calibration Certificate; Source 9121; Dated June 1991 - JL Shepherd And Associated Calibration Certificate; Source 9163; Dated July 1998
: Attachment
==LIST OF ACRONYMS==
: [[USED]] [[]]
: [[AC]] [[Alternating Current]]
: [[ADAMS]] [[Agencywide Document Access Management System]]
: [[ALARA]] [[As-Low-As-Is-Reasonably-Achievable]]
: [[ANS]] [[Alert and Notification System]]
: [[AR]] [[Action Request]]
: [[ASME]] [[American Society of Mechanical Engineers]]
: [[CAP]] [[Corrective Action Program]]
: [[CDBI]] [[Component Design Bases Inspection]]
: [[CFR]] [[Code of Federal Regulations]]
: [[CIV]] [[Containment Isolation Valve]]
: [[CLB]] [[Current Licensing Bases]]
: [[CR]] [[Condition Report]]
: [[DC]] [[Direct Current]]
: [[DNC]] [[Degraded/Non-Conforming Condition]]
: [[DRP]] [[Division of Reactor Projects]]
: [[EAL]] [[Emergency Action Level]]
: [[EDG]] [[Emergency Diesel Generator]]
: [[EP]] [[Emergency Preparedness]]
: [[ERO]] [[Emergency Response Organization]]
: [[FFDSAR]] [[Final Facility Description and Safety Analysis Report]]
: [[FSAR]] [[Final Safety Analysis Report]]
: [[IMC]] [[Inspection Manual Chapter]]
: [[IOD]] [[Immediate Operability Determination]]
: [[IP]] [[Inspection Procedure]]
: [[IPEEE]] [[Individual Plant Examination of External Events]]
: [[IR]] [[Inspection Report]]
: [[IST]] [[Inservice Testing]]
: [[LER]] [[Licensee Event Report]]
: [[LOCT]] [[Licensed Operator Continued Training]]
: [[LORT]] [[Licensed Operator Requalification Training]]
: [[MFRV]] [[Main Feedwater Regulating Valve]]
: [[MSPI]] [[Mitigating Systems Performance Index]]
: [[NCV]] [[Non-Cited Violation]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[NRC]] [[]]
: [[U.S.]] [[Nuclear Regulatory Commission]]
: [[ODCM]] [[Offsite Dose Calculation Manual]]
: [[PARS]] [[Publicly Available Records System]]
: [[PI]] [[Performance Indicator]]
: [[PIM]] [[Plant Issue Matrix]]
: [[PM]] [[Post-Maintenance]]
: [[PMT]] [[Post-Maintenance Testing]]
: [[PPR]] [[Performance Review Report]]
: [[PRA]] [[Probabilistic Risk Assessment]]
: [[RCE]] [[Root Cause Evaluation]]
: [[RCS]] [[Reactor Coolant System]]
: [[RDC]] [[Rod Drive Control]]
: [[RHR]] [[Residual Heat Removal]]
SAT Systems Approach to Training
SDP Significance Determination Process
Attachment
: [[SER]] [[Safety Evaluation Report]]
: [[SFP]] [[Spent Fuel Pool]]
: [[SI]] [[Safety Injection]]
: [[SSC]] [[Structure, System, and(or) Component]]
: [[SW]] [[Service Water]]
: [[TDAFW]] [[Turbine-Driven Auxiliary Feedwater]]
: [[TIA]] [[Task Interface Agreement]]
: [[TLD]] [[Thermoluminescent Dosimeter]]
: [[TPD]] [[Training Program Description]]
: [[TS]] [[Technical Specification]]
: [[URI]] [[Unresolved Item]]
WO Work Order
L. Meyer    -2-
 
In accordance with
: [[10 CFR]] [[2.390 of the]]
NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in
the
: [[NRC]] [[Public Document Room or from the Publicly Available Records System (]]
: [[PARS]] [[) component of NRC's document system (ADAMS).]]
: [[ADAMS]] [[is accessible from the]]
NRC Website
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,  /RA/  Michael A. Kunowski, Chief
Branch 5
Division of Reactor Projects
Docket Nos. 50-266; 50-301
License Nos. DPR-24; DPR-27
 
Enclosure: Inspection Report 05000266/2011004; 05000301/2011004  w/Attachment:  Supplemental Information cc w/encl: Distribution via ListServ
: [[DISTRI]] [[BUTION]]
: See next page
 
DOCUMENT NAME:  G:\DRPIII\1-Secy\1-Work In Progress\POI 2011-004.docx  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in th
e concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
: [[OFFICE]] [[]]
: [[RIII]] [[]]
: [[RIII]] [[]]
: [[RIII]] [[]]
: [[RIII]] [[]]
NAME MKunowski for
: [[JJ]] [[andovitz:cs MKunowski]]
: [[DATE]] [[11/02/11 11/02/11]]
: [[OFFICI]] [[AL]]
: [[RECORD]] [[]]
: [[COPY]] [[Letter to]]
: [[L.]] [[Meyer from M. Kunowski dated November 2, 2011]]
: [[SUBJEC]] [[T:]]
: [[POINT]] [[]]
: [[BEACH]] [[NUCLEAR PLANT,]]
: [[UNITS]] [[1]]
: [[AND]] [[2,]]
: [[NRC]] [[]]
INTEGRATED INSPECTION REPORT 05000266/2011004;
05000301/2011004
: [[DISTRI]] [[BUTION]]
: Amy Snyder
 
RidsNrrDorlLpl3-1 Resource
RidsNrrPMPointBeach
 
RidsNrrDirsIrib Resource Cynthia Pederson
Jennifer Uhle
Steven Orth
Jared Heck
 
Allan Barker
 
Carole Ariano Linda Linn
: [[DRPIII]] [[]]
DRSIII
Patricia Buckley
Tammy Tomczak
: [[ROP]] [[reports Resource]]
}}
}}

Revision as of 08:31, 29 June 2019

IR 05000266-11-004, 05000301-11-004, on 7/01/2011 - 9/30/2011; Point Beach Nuclear Plant, Units 1 and 2; Follow-Up of Events; Component Design Bases Inspection
ML11306A264
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/02/2011
From: Michael Kunowski
NRC/RGN-III/DRP/B5
To: Meyer L
Point Beach
References
IR-11-004
Download: ML11306A264 (61)


Text

November 2, 2011

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, NRC INTEGRATED INSPECTION REPORT 05000266/2011004; 05000301/2011004

Dear Mr. Meyer:

On September 30, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your Point Beach Nuclear Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on October 4, 2011, with you and members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, two findings of very low safety significance were identified by the NRC. The findings involved violations of NRC requirements. However, because of their very low safety significance and because they were entered into your corrective action program, the NRC is treating these findings as non-cited violations (NCVs) in accordance with Section 2.3.2 of the NRC Enforcement Policy. If you contest the subject or severity of any NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector Office at the Point Beach Nuclear Plant. In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Point Beach Nuclear Plant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Inspection Report 05000266/2011004; 05000301/2011004 w/Attachment: Supplemental Information

REGION III Docket Nos: 05000266; 05000301 License Nos: DPR-24; DPR-27 Report No: 05000266/2011004; 05000301/2011004 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant, Units 1 and 2 Location: Two Rivers, WI Dates: July 1, 2011, through September 30, 2011 Inspectors: S. Burton, Senior Resident Inspector M. Thorpe-Kavanaugh, Resident Inspector K. Barclay, Kewaunee Resident Inspector E. Sanchez-Santiago, Reactor Engineer M. Phalen, Senior Health Physicist B. Palagi, Senior Operations Engineer D. Oliver, Operations Engineer J. Beavers, Emergency Preparedness Inspector D. Reeser, Operations Engineer B. Jose, Senior Reactor Engineer Approved by: Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects

Enclosure

SUMMARY OF FINDINGS

IR 05000266/2011004, 05000301/2011004; 7/01/2011 - 9/30/2011; Point Beach Nuclear Plant, Units 1 and 2; Follow-Up of Events; Component Design Bases Inspection. This report covers a three-month period of inspection by resident inspectors and announced baseline inspections by regional inspectors. Two Green findings were identified by the inspectors. The findings were considered non-cited violations (NCVs) of NRC regulations. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

A. NRC-Identified

and Self-Revealed Findings

Cornerstone: Mitigating Systems

Green.

The inspectors identified a finding of very low safety significance and an associated NCV of 10 CFR 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the licensee's failure to perform an operability evaluation as required by procedure when degraded/non-conforming conditions were identified during a surveillance of the rod drive control system. Specifically, on December 10, 2010, the licensee documented rod trouble alarms in condition report 01401564, but did not identify the degraded/non-conforming condition or evaluate the condition relative to support functions for technical specifications (TSs) 3.1.4 and 3.1.6. The licensee entered this issue into its corrective action program for evaluation and development of corrective actions. The finding was determined to be more than minor in accordance with IMC 0612, "Power Reactor Inspection Reports," Appendix B, "Issue Screening," dated December 24, 2009, because it was associated with the Mitigating Systems Cornerstone attribute of equipment performance and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the failure to identify the degraded/non-conforming condition and assess the impact on operations and TS requirements resulted in latent conditions that had the potential to be of greater safety significance, and in this case resulted in the failure to evaluate the degraded/non-conforming condition relative to TSs 3.1.4 and 3.1.6. This finding has a cross-cutting aspect in the area of human performance, decision-making, because the licensee did not use conservative assumptions during related decision-making that adopted a requirement to demonstrate that the proposed action was safe in order to proceed (H.1(b)). (Section 4OA3.2)

Green.

The inspectors identified a finding of very low safety significance and associated NCV of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," involving the licensee's failure to ensure tornado missile protection for two of the emergency diesel generator (EDG) exhaust stacks, which were considered Class I components. The licensee entered this issue into the Corrective Action Program as AR 01678709.

The licensee's failure to ensure tornado missile protection for EDGs G01 and G02 exhaust stacks was a performance deficiency. The performance deficiency was determined to be more than minor because there was reasonable doubt the EDG exhaust stacks would remain functional to support EDG operation in the event tornado-induced missiles damaged the exhaust stacks The finding screened as very low safety significance because the finding was not a design or qualification deficiency, did not represent a loss of system safety function, and did not screen as potentially risk-significant due to a seismic, flooding, or severe weather initiating event. This finding was determined not to have a cross-cutting aspect. (Section 1R21.1.b.(1))

B. Licensee-Identified Violations

A violation of very low safety significance, which was identified by the licensee, has been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensee's corrective action program. This violation and corrective actions are listed in Section 4OA7 of this report.

REPORT DETAILS

Summary of Plant Status

Unit 1 operated at 100 percent power throughout the entire inspection period with the exception of an unplanned power reduction on July 20, 2011, to 94 percent power, for auxiliary feedwater pump testing.

Unit 2 began the period continuing to ascend to the new extended power uprate power level and then operated at the new 100 percent reactor power level for the remainder of the inspection period with small power reductions during routine surveillance testing.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, and Emergency Preparedness

1R01 Adverse Weather Protection

.1 Readiness for Impending Adverse Weather Condition - High Wind Conditions

a. Inspection Scope

Since high winds were forecast in the vicinity of the facility for September 29 and 30, 2011, the inspectors reviewed the licensee's overall preparations/protection for the expected weather conditions. The inspectors walked down the protected area and structures, in addition to the licensee's emergency alternating current (AC) power systems, because their safety-related functions could be affected or required as a result of high winds or the loss of offsite power. The inspectors evaluated the licensee staff's preparations against the site's procedures and determined that the staff's actions were adequate. During the inspection, the inspectors focused on plant-specific design features and the licensee's procedures used to respond to specified adverse weather conditions. The inspectors also toured the plant grounds to look for any loose debris that could become missiles during a tornado. The inspectors evaluated operator staffing and accessibility of controls and indications for those systems required to control the plant. Additionally, the inspectors reviewed the Final Safety Analysis Report (FSAR)and performance requirements for systems selected for inspection, and verified that operator actions were appropriate as specified by plant specific procedures. The inspectors also reviewed a sample of corrective action program (CAP) items to verify that the licensee identified adverse weather issues at an appropriate threshold and dispositioned them through the CAP in accordance with station corrective action procedures. Documents reviewed are listed in the Attachment to this report. This inspection constituted one readiness for impending adverse weather condition sample as defined in Inspection Procedure (IP) 71111.01-05.

b. Findings

No findings were identified.

4 Enclosure

1R04 Equipment Alignment

.1 Quarterly Partial System Walkdowns

a. Inspection Scope

The inspectors performed partial system walkdowns of the following risk-significant systems:

  • direct current (DC) bus 105 in-service when removing DC bus 305 for testing; and
  • SW systems including the supply to the EDG with the gas turbine generator out-of-service. The inspectors selected these systems based on their risk significance relative to the Reactor Safety Cornerstones at the time they were inspected. The inspectors attempted to identify any discrepancies that could impact the function of the systems and, therefore, potentially increase risk. The inspectors reviewed applicable operating procedures, system diagrams, FSAR, Technical Specification (TS) requirements, outstanding work orders (WOs), condition reports, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have rendered the systems incapable of performing their intended functions. The inspectors also walked down accessible portions of the systems to verify system components and support equipment were aligned correctly and operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no obvious deficiencies. The inspectors also verified that the licensee had properly identified and resolved equipment alignment problems that could cause initiating events or impact the capability of mitigating systems or barriers and entered them into the CAP with the appropriate significance characterization. Documents reviewed are listed in the Attachment to this report. These activities constituted four partial system walkdown samples as defined in IP 71111.04-05.

b. Findings

No findings were identified.

1R05 Fire Protection

.1 Routine Resident Inspector Tours

a. Inspection Scope

The inspectors conducted fire protection walkdowns which were focused on availability, accessibility, and the condition of firefighting equipment in the following risk-significant plant areas:

  • fire zone 552, SW pump room;
  • fire zone 553, circulating water pump room;
  • fire zone 554, circulating water pump room corridor; and
  • fire zone 555, circulating water pump house valve gallery. The inspectors reviewed areas to assess if the licensee had implemented a fire protection program that adequately controlled combustibles and ignition sources within the plant, effectively maintained fire detection and suppression capability, maintained passive fire protection features in good material condition, and implemented adequate compensatory measures for out-of-service, degraded, or inoperable fire protection equipment, systems, or features in accordance with the licensee's fire plan.

The inspectors selected fire areas based on their overall contribution to internal fire risk as documented in the plant's Individual Plant Examination of External Events with later additional insights, their potential to impact equipment which could initiate or mitigate a plant transient, or their impact on the plant's ability to respond to a security event.

Using the documents listed in the Attachment to this report, the inspectors verified that fire hoses and extinguishers were in their designated locations and available for immediate use; that fire detectors and sprinklers were unobstructed; that transient material loading was within the analyzed limits; and that fire doors, dampers, and penetration seals appeared to be in satisfactory condition. The inspectors also verified that minor issues identified during the inspection were entered into the licensee's CAP. Documents reviewed are listed in the Attachment to this report. These activities constituted four quarterly fire protection inspection samples as defined in IP 71111.05-05.

b. Findings

No findings were identified.

.2 Annual Fire Protection Drill Observation

a. Inspection Scope

On August 4, 2011, the inspectors observed a fire brigade activation for training. Based on this observation, the inspectors evaluated the readiness of the plant fire brigade to fight fires. The inspectors verified that the licensee staff identified deficiencies, openly discussed them in a self-critical manner at the drill debrief, and took appropriate corrective actions. Specific attributes evaluated were:

  • proper wearing of turnout gear and self-contained breathing apparatus;
  • proper use and layout of fire hoses;
  • employment of appropriate fire-fighting techniques;
  • sufficient firefighting equipment brought to the scene;
  • effectiveness of fire brigade leader communications, command, and control;
  • search for victims and propagation of the fire into other plant areas;
  • smoke removal operations;
  • utilization of pre-planned strategies;
  • adherence to the pre-planned drill scenario; and
  • drill objectives. Documents reviewed are listed in the Attachment to this report.

6 Enclosure These activities constituted one annual fire protection inspection sample as defined in IP 71111.05-05.

1R11 Licensed Operator Requalification Program

.1 Resident Inspector Quarterly Review

a. Inspection Scope

On July 6, 2011, the inspectors observed a crew of licensed operators in the plant's simulator during licensed operator requalification training (LORT) to verify that operator

performance was adequate, evaluators were identifying and documenting crew performance problems, and that training was being conducted in accordance with licensee procedures. The inspectors evaluated the following areas:

  • licensed operator performance;
  • crew's clarity and formality of communications;
  • ability to take timely actions in the conservative direction;
  • prioritization, interpretation, and verification of annunciator alarms;
  • correct use and implementation of abnormal and emergency procedures;
  • control board manipulations;
  • oversight and direction from supervisors; and
  • ability to identify and implement appropriate TS actions and Emergency Plan actions and notifications. The crew's performance in these areas was compared to pre-established operator action expectations and successful critical task completion requirements. Documents reviewed are listed in the Attachment to this report. This inspection constituted one quarterly licensed operator requalification program sample as defined in IP 71111.11.

b. Findings

No findings were identified.

.2 Annual Operating Test Results

a. Inspection Scope

The inspectors reviewed the overall pass/fail results of the Annual Operating Test, administered by the licensee from July 25 through August 31, 2011

, required by 10 CFR 55.59(a). The results were compared to the thresholds established in Inspection Manual Chapter (IMC) 0609, Appendix I, "Licensed Operator Requalification Significance Determination Process (SDP)," to assess the overall adequacy of the licensee's LORT program to meet the requirements of 10 CFR 55.59. This inspection constituted one biennial licensed operator requalification inspection sample as defined in IP 71111.11B.

7 Enclosure

b. Findings

No findings were identified.

.3 Biennial Review

a. Inspection Scope

The following inspection activities were conducted during the weeks of August 1, 2011, and August 8, 2011, to assess: 1) the effectiveness and adequacy of the facility licensee's implementation and maintenance of its systems approach to training (SAT)based LORT program, put into effect to satisfy the requirements of 10 CFR 55.59; 2) conformance with the requirements of 10 CFR 55.46 for use of a plant referenced simulator to conduct operator licensing examinations and for satisfying experience requirements; and 3) conformance with the operator license conditions specified in 10 CFR 55.53. Documents reviewed are listed in the Attachment to this report.

  • Facility Operating History and Licensee Training Feedback System (10 CFR 55.59(c); SAT Element 5 as Defined in 10 CFR 55.4): The inspectors evaluated the licensee's ability to assess the effectiveness of its LORT program and the ability to implement appropriate corrective actions to maintain its LORT program up-to-date. The inspectors reviewed documents related to the plant's operating history and associated responses (e.g., plant issue matrix (PIM) and performance review (PPR) reports; recent examination and inspection reports; and licensee event reports (LERs)). The inspectors reviewed the use of feedback from operators, instructors, and supervisors, as well as the use of feedback from plant events and industry experience information. The inspectors reviewed the licensee's quality assurance oversight activities, including licensee training department self-assessment reports.
  • Licensee Requalification Examinations (10 CFR 55.59(c); SAT Element 4 as Defined in 10 CFR 55.4): The inspectors reviewed the licensee's program for development and administration of the LORT biennial written examination and annual operating tests to assess the licensee's ability to develop and administer examinations that were acceptable for meeting the requirements of

10 CFR 55.59(a).

- The inspectors reviewed the methodology used to construct the examination, including content, level of difficulty, and general quality of the examination and test materials. The inspectors also assessed the level of examination material duplication from week-to-week for both, the operating tests conducted during the current year, as well as the written examinations administered in 2010. The inspectors reviewed a sample of the written examinations and associated answer keys to check for consistency and accuracy;

- The inspectors observed the administration of the annual operating test to assess the licensee's effectiveness in conducting the examinations, including the conduct of pre-examination briefings, evaluations of individual operator and crew performance, and post-examination analysis. The inspectors evaluated the performance of one crew in parallel with the facility evaluators during two dynamic simulator scenarios, and evaluated various licensed crew 8 Enclosure members concurrently with facility evaluators during the administration of several job performance measurements; and

- The inspectors assessed the adequacy and effectiveness of the remedial training conducted since the last requalification examinations and the training planned for the current examination cycle to ensure that they addressed weaknesses in licensed operator or crew performance identified during training and plant operations. The inspectors reviewed remedial training procedures and individual remedial training plans;

  • Conformance with Examination Security Requirements (10 CFR 55.49)
The inspectors observed and reviewed the licensee's overall licensed operator requalification examination security pr ogram related to examination physical security (e.g., access restrictions and simulator considerations) and integrity (e.g., predictability and bias) to verify compliance with 10 CFR 55.49, "Integrity of Examinations and Tests." The inspectors also reviewed the facility licensee's examination security procedure and the implementation of security and integrity measures (e.g., security agreements, sampling criteria, bank use, and test item repetition) throughout the examination process.
  • Conformance with Simulator Requirements (10 CFR 55.46): The inspectors assessed the adequacy of the licensee's simulation facility (simulator) for use in operator licensing examinations and for satisfying experience requirements.

The inspectors reviewed a sample of simulator performance test records (e.g., transient tests, malfunction tests, scenario-based tests, post-event tests, steady state tests, and core performance tests), simulator discrepancies, and the process for ensuring continued assurance of simulator fidelity in accordance with 10 CFR 55.46. The inspectors reviewed and evaluated the discrepancy corrective action process to ensure that simulator fidelity was being maintained.

Open simulator discrepancies were reviewed for importance relative to the impact on 10 CFR 55.45 and 55.59 operator actions as well as on nuclear and thermal hydraulic operating characteristics.

The inspectors reviewed the facility licensee's program for maintaining active operator licenses and to assess compliance with 10 CFR 55.53(e) and (f). The inspectors reviewed the procedural guidance and the process for tracking on-shift hours for licensed operators, and which control room positions were granted watch-standing credit for maintaining active operator licenses. Additionally, medical records for 12 licensed operators were reviewed for compliance with 10 CFR 55.53(i). This inspection constituted one biennial licensed operator requalification inspection sample as defined in IP 71111.11B.

b. Findings

(1) Unresolved Item Potential Failure to Correctly Implement a Systems Approach to Training (SAT) for the Licensed Operator Requalification Program.
Introduction:

The inspectors identified an Unresolved Item (URI) of compliance with 10 CFR 55.59(c), "Requalification Program Requirements." The inspectors were unable 9 Enclosure using available documentation to verify the implementation of the analysis and training elements of the Commission-approved SAT-based Licensed Operator Continued Training (LOCT) program.

Description:

The inspectors reviewed the licensee's procedures, training materials, and operator evaluation documentation pertaining to the LORT program to determine if the licensee was meeting the requirements of 10 CFR 55.59, "Requalification." The Point Beach Nuclear Plant Licensed Operator Continued Training Program Description (TPD) required the licensee to develop, maintain, and implement the

LOCT program using a SAT process as described in the TPD, to meet the requirements of 10 CFR 55.59(c). The TPD requires that the LOCT program content be composed of fixed and flexible components. Fixed components are defined by the TPD as tasks and/or topics that primarily address analyzed training needs and have been determined using the SAT process. The SAT process also determines on what frequency fixed tasks/topics should be taught, and the delivery method of the training.

Flexible components are those that are responsive to other identified training needs and are used to correct actual or potential weaknesses in the performance of licensed personnel. Plant design changes are one example of a flexible topic in the facility's TPD.

During the review of the licensee's Biennial and Long Range Training Plans, the inspectors identified that numerous fixed training tasks had been "exempted" to allow for scheduling constraints due to the licensee's extended power uprate project outages. The only documentation available suggests the tasks were exempted primarily due to time constraints with little regard to the effect of the exemptions on the remaining adequacy of the SAT-based program.

Site management contended that it was never their intent to remove the majority the "exempted" training tasks from the biannual training program and, in fact, had planned to return most if not all the material to the program. In support of this contention, the site developed a "white paper" explaining their decision making and included a list of 35 exempted topics/tasks that had already been trained on. Additionally, it was stated that all of the other exempted topics/tasks had now been rescheduled for completion.

This issue is a URI pending further NRC review of the licensee' s contention and to complete an adequate assessment of the statements in the "white paper" related to the exempted training, URI 05000266/2011004-01; 05000301/2011004-01, Potential Failure to Correctly Implement a Systems Approach to Training for the Licensed Operator Requalification Program.

1R12 Maintenance Effectiveness

.1 Routine Quarterly Evaluations

a. Inspection Scope

The inspectors evaluated degraded performance issues involving the following risk-significant systems:

  • EDG G03 air start system;
  • battery D305 testing; and
  • SW system. The inspectors reviewed events, such as where ineffective equipment maintenance had resulted in valid or invalid automatic actuations of engineered safeguards systems, and independently verified the licensee's actions to address system performance or condition problems in terms of the following:
  • implementing appropriate work practices;
  • identifying and addressing common cause failures;
  • scoping of systems in accordance with 10 CFR 50.65(b) of the maintenance rule;
  • characterizing system reliability issues for performance;
  • charging unavailability for performance;
  • trending key parameters for condition monitoring;
  • verifying appropriate performance criteria for structures, systems, and components (SSCs)/functions classified as (a)(2), or appropriate and adequate goals and corrective actions for systems classified as (a)(1). The inspectors assessed performance issues with respect to the reliability, availability, and condition monitoring of the system. In addition, the inspectors verified maintenance effectiveness issues were entered into the CAP with the appropriate significance characterization. Documents reviewed are listed in the Attachment to this report. This inspection constituted three quarterly maintenance effectiveness samples as defined in IP 71111.12-05.

b. Findings

No findings were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control

.1 Maintenance Risk Assessments and Emergent Work Control

a. Inspection Scope

The inspectors reviewed the licensee's evaluation and management of plant risk for the maintenance and emergent work activities affecting risk-significant and safety-related equipment listed below to verify that the appropriate risk assessments were performed prior to removing equipment for work:

  • risk management with the spent fuel pool (SFP) heat exchanger removed from service and the daily status reflecting the heat exchanger was in service and SW pump to be removed from service;
  • risk management of uncompleted summer readiness items;
  • risk management during unplanned gas turbine outage; and
  • risk management following gas turbine (G05) work available for PRA risk but not for Appendix R. These activities were selected based on their potential risk significance relative to the Reactor Safety Cornerstones. As applicable for each activity, the inspectors verified that risk assessments were performed as required by 10 CFR 50.65(a)(4) and were accurate and complete. When emergent work was performed, the inspectors verified that the plant risk was promptly reassessed and managed. The inspectors reviewed the scope of maintenance work, discussed the results of the assessment with the licensee's probabilistic risk analyst or shift technical advisor, and verified plant conditions were consistent with the risk assessment. The inspectors also reviewed TS requirements and walked down portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met.

Documents reviewed are listed in the Attachment to this report. These maintenance risk assessments and emergent work control activities constituted five samples as defined in IP 71111.13-05.

b. Findings

No findings were identified.

1R15 Operability Determinations and Functional Assessments

.1 Operability Evaluations

a. Inspection Scope

The inspectors reviewed the following issues:

  • operability evaluation of EDG G01 with temperature controller found out-of-specification;
  • operability evaluation of check valve DA-318 failed to seat during surveillance IT-100;
  • operability evaluation of battery D305;
  • operability evaluation for SW pump increasing vibrations;
  • LT-3317A found out-of-tolerance during performance of instrument control testing;
  • operability evaluation for issues with the air amplifier (air supply tank for valve operation) for 1P-53, the Unit 1 motor-driven auxiliary feedwater pump;
  • operability of the main feedwater regulating valves (MFRVs) after the extended power uprate partial modification installation. The inspectors selected these potential operability issues based on the risk significance of the associated components and systems. The inspectors evaluated the technical adequacy of the evaluations to ensure that TS operability was properly justified and the subject component or system remained available such that no unrecognized increase in 12 Enclosure risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the TS and FSAR to the licensee's evaluations to determine

whether the components or systems were operable. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. The inspectors determined, where appropriate, compliance with bounding limitations associated with the evaluations. Additionally, the inspectors reviewed a sampling of corrective action documents to verify that the licensee was identifying and correcting any deficiencies associated with operability evaluations. Documents reviewed are listed in the to this report. This operability inspection constituted nine samples as defined in IP 71111.15-05.

b. Findings

No findings were identified.

1R19 Post-Maintenance Testing

.1 Post-Maintenance Testing

a. Inspection Scope

The inspectors reviewed the following post-maintenance (PM) activities to verify that procedures and test activities were adequate to ensure system operability and functional capability:

  • post-maintenance testing (PMT) of TDAFW pump 2P-29 following pump overhaul (Unit 2);
  • PMT of MFRV circuitry work (Unit 2). These activities were selected based upon the SSCs' ability to impact risk. The inspectors evaluated these activities for the following (as applicable): the effect of testing on the plant had been adequately addressed; testing was adequate for the maintenance performed; acceptance criteria were clear and demonstrated operational readiness; test instrumentation was appropriate; tests were performed as written in accordance with properly reviewed and approved procedures; equipment was returned to its operational status following testing (temporary modifications or jumpers required for test performance were properly removed after test completion); and test

documentation was properly evaluated. The inspectors evaluated the activities against TSs, the FSAR, 10 CFR Part 50 requirements, licensee procedures, and various NRC generic communications to verify that t he test results adequately ensured that the equipment met the licensing basis and design requirements. In addition, the inspectors reviewed corrective action documents associated with PM tests to determine whether the licensee was identifying problems and entering them in the CAP and that the problems were being corrected commensurate with their importance to safety. Documents reviewed are listed in the Attachment to this report. This inspection constituted three post-maintenance testing samples as defined in IP 71111.19-05.

13 Enclosure

b. Findings

No findings were identified.

1R21 Component Design Bases Inspection

.1 (Closed) Safety-Related Equipment Not Protected from Tornado Missiles;

URI 05000266/2006006-08; 05000301/2006006-08

a. Inspection Scope

The inspectors followed up on a URI concerning lack of tornado missile protection for the exhaust stacks associated with emergency diesel generators G01 and G02. During a Component Design Bases Inspection documented in Inspection Report 05000266/2006006, the inspectors discovered the exhaust stacks had not been analyzed for the effects of tornado missiles. The inspectors raised a concern that tornado-induced missiles could damage the exhaust stacks to a sufficient extent that the exhaust flow would be restricted and the EDGs would not be capable of performing their required safety function. At the time of the inspection, the issue was left unresolved pending resolution of differences in interpretation between the NRC and the licensee of the original licensing basis concerning tornado missile protection for Class I components. Subsequently, Region III inspectors, after consulting NRR and reviewing several regulatory as well as licensee-specific documents, developed a concurrence Task Interface Agreement (TIA) 2011-011 (ML11228A257). In the TIA, the staff concluded the licensee committed to have all components protected from the forces caused by tornadoes, which included tornado missiles.

b. Findings

(1) Failure to Ensure Tornado Missile Protection for EDGs G01 and G02 Exhaust Stacks
Introduction:

The inspectors identified a finding of very low safety significance (Green) and associated NCV of 10 CFR Part 50, Appendix B, Criterion III, "Design Control,"

involving the licensee's failure to ensure tornado missile protection for two of the emergency diesel generator (EDG) exhaust stacks, which were considered Class I components. Specifically, the exhaust stacks of EDGs G01 and G02 were routed vertically from the EDG rooms, on the outside of the turbine building wall, with no tornado missile protection.

Description:

During the 2006 Component Design Bases Inspection (CDBI), the inspectors reviewed the design and configuration of the G01 and G02 EDGs.

These EDGs were considered one train for both Unit 1 and Unit 2 while the other EDGs (G03 and G04) were considered another train. The exhaust stacks for EDGs G01 and G02 were routed vertically from the EDG rooms, on the outside of the turbine building wall. The stacks are approximately 100 feet high and 26 inches in diameter. The inspectors discovered the exhaust stacks had not been analyzed for the effects of tornado missiles. The inspectors raised a concern that tornado-induced missiles could damage the exhaust stacks to a sufficient ex tent that the exhaust flow would be restricted and the EDGs would not be capable of performing their required safety function.

14 Enclosure At the time of the CDBI, the licensee believed that there were "-no explicit design criteria in the licensing basis for components to withstand tornado-induced missiles."

The inspectors disagreed with the licensee and documented the issue as a URI for further investigation.

Subsequently, Region III inspectors, after consulting NRR and reviewing several regulatory as well as licensee-specific documents, developed a concurrence Task Interface Agreement (TIA) 2011-011 (ML11228A257). In the TIA, the staff concluded the performance standards for electrical systems with respect to licensing bases were the same in both the Final Facility Description and Safety Analysis Report (FFDSAR, predecessor form the late 1960s-1970 to the Final Safety Analysis Report) and the Current Licensing Bases (CLB). Both require that components "-which are essential to the prevention and mitigation of the consequences of nuclear accidents, which could prevent undue risk to the health and safety of the public shall be designed, fabricated, and erected to performance standards that enable such systems and components to withstand, without undue risk to the health and safety of the public, the forces that might reasonably be imposed by the occurrence of an extraordinary natural phenomena such as earthquake, tornado-" The inspectors concluded the licensee committed to have all components protected from the forces caused by tornadoes, which includes tornado missiles. The statement in the operating license Safety Evaluation Report (SER), which only identified structures as being designed to withstand the consequences of tornado missiles, does not replace or supersede the commitment contained in the FFDSAR or the CLB. The licensee failed to fully evaluate and identify components required to withstand the forces exerted by natural phenomena located outside of structures that were designed to withstand tornado missiles.

This position is supported by the FFDSAR "Overall Plant Requirements (GDC 1 - GDC 5) which states that "-Similar measures are taken in the plant design to protect against high winds, flooding, and other natural phenomena-" where natural phenomena include tornadoes and tornado-generated missiles. With respect to the use of the Individual Pl ant Examination of External Events (IPEEE), the inspectors had several discussions with the NRR staff. In summary, the conclusions documented in the IPEEE regarding risk of a design or equipment performance attribute do not replace the need to meet a regulatory requirement or standard.

Analysis:

The inspectors determined the failure to ensure tornado missile protection for the EDGs G01 and G02 exhaust stacks was a performance deficiency.

The performance deficiency was determined to be more than minor in accordance with IMC 0612, "Power Reactor Inspection Reports," Appendix B, "Issue Screening," dated December 24, 2009, because it was associated with the Mitigating Systems Cornerstone attribute of Equipment Performance, and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, there was reasonable doubt the EDG exhaust stacks would remain functional to support EDG operation in the event tornado-induced missiles damaged the exhaust stacks.

The inspectors determined the finding could be evaluated using the SDP in accordance with IMC 0609, "Significance Determination Process," Attachment 0609.04, "Phase I -

Initial Screening and Characterization of Findings," Table 4a, for the Mitigating System Cornerstone, dated January 18, 2008. The finding screened as very low safety 15 Enclosure significance (Green) because the finding was not a design or qualification deficiency, did not represent a loss of system safety function, and did not screen as potentially risk-significant due to a seismic, flooding, or severe weather initiating event. Specifically, the addition of EDGs G03 and G04 (1995-96) provided additional electrical redundancy such that the loss of the EDGs G01 and G02 would be of very low safety significance. The inspectors determined that the finding did not have a cross-cutting aspect as it was not reflective of licensee's current performance.

Enforcement:

Title 10 CFR Part 50, Appendix B, Criterion III, "Design Control," requires, in part, that measures be established to assure that applicable regulatory requirements and the design basis, as defined in Part 50.2 and as specified in the license application, for those structures, systems, and components to which this appendix applies, are correctly translated into specifications, drawings, procedures, and instructions. Contrary to the above, since the early 1970s when both Units commended operation, the licensee's design control measures failed to meet the Class I design basis requirements for the EDGs G01 and G02 exhaust stacks. Specifically, the licensee failed to incorporate tornado missile protection for their EDGs G01 and G02 exhaust stacks, which are Class I components. Because this violation was of very low safety significance and because the issue was entered into the licensee's corrective action program, as AR 01678709, this violation is being treated as an NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy (NCV 05000266/2011004-03; NCV 05000301/2011004-03; Failure to Ensure Tornado Missile Protection for EDGs G01 and G02 Exhaust Stacks). Documents reviewed are listed in the Attachment to this report.

This URI is closed.

1R22 Surveillance Testing

.1 Surveillance Testing

a. Inspection Scope

The inspectors reviewed the test results for the following activities to determine whether risk-significant systems and equipment were capable of performing their intended safety function and to verify testing was conducted in accordance with applicable procedural

and TS requirements:

  • battery D305 terminal checks;
  • EDG G-03 monthly surveillance;
  • Unit 2 train B high head safety injection (SI) pumps and valves (inservice testing (IST));
  • Unit 1 quarterly containment isolation valve (CIV) surveillance; and
  • reactor coolant system (RCS) leakage calculation for back-leakage from Unit 1 chemical and volume control system valve, 1CV-355. The inspectors observed in-plant activities and reviewed procedures and associated records to determine the following:
  • did preconditioning occur;
  • were the effects of the testing adequately addressed by control room personnel or engineers prior to the commencement of the testing;
  • were acceptance criteria clearly stated, demonstrated operational readiness, and consistent with the system design basis;
  • plant equipment calibration was correct, accurate, and properly documented;
  • as-left setpoints were within required ranges; and the calibration frequency was in accordance with TSs, the FSAR, procedures, and applicable commitments;
  • measuring and test equipment calibration was current;
  • test equipment was used within the required range and accuracy; applicable prerequisites described in the test procedures were satisfied;
  • test frequencies met TS requirements to demonstrate operability and reliability; tests were performed in accordance with the test procedures and other applicable procedures; jumpers and lifted leads were controlled and restored where used;
  • test data and results were accurate, complete, within limits, and valid;
  • test equipment was removed after testing;
  • where applicable for IST activities, testing was performed in accordance with the applicable version of Section XI, American Society of Mechanical Engineers (ASME) Code, and reference values were consistent with the system design basis;
  • where applicable, test results not meeting acceptance criteria were addressed with an adequate operability evaluation or the system or component was declared inoperable;
  • where applicable for safety-related instrument control surveillance tests, reference setting data were accurately incorporated in the test procedure;
  • where applicable, actual conditions encountering high resistance electrical contacts were such that the intended safety function could still be accomplished;
  • prior procedure changes had not provided an opportunity to identify problems encountered during the performance of the surveillance or calibration test;
  • equipment was returned to a position or status required to support the performance of its safety functions; and
  • all problems identified during the testing were appropriately documented and dispositioned in the CAP.

Documents reviewed are listed in the Attachment to this report. This inspection constituted three routine surveillance testing samples, one inservice testing sample, one containment isolation valve testing sample, and one reactor coolant system leak detection inspection sample as defined in IP 71111.22, Sections -02 and

-05.

b. Findings

No findings were identified.

17 Enclosure Cornerstone: Emergency Preparedness

1EP2 Alert and Notification System Evaluation

.1 Alert and Notification System Evaluation

a. Inspection Scope

The inspectors held discussions with Emergency Preparedness (EP) staff regarding the operation, maintenance, and periodic testing of the Alert and Notification System (ANS) in the Point Beach plume pathway Emergency Planning Zone. The inspectors reviewed monthly trend reports and siren test failure records from November 2009 through August 2011. Information gathered during document reviews and interviews was used to determine whether the ANS equipment was maintained and tested in accordance with Emergency Plan commitments and procedures. Documents reviewed are listed in the Attachment to this report. This alert and notification system inspection constituted one sample as defined in IP 71114.02-05.

b. Findings

No findings were identified.

1EP3 Emergency Response Organization Augmentation Testing

.1 Emergency Response Organization Augmentation Testing

a. Inspection Scope

The inspectors reviewed and discussed with plant EP staff the emergency plan commitments and procedures that addressed the primary and alternate methods of initiating an Emergency Response Organization (ERO) activation to augment the on shift ERO as well as the provisions for maintaining the plant's ERO emergency telephone book. The inspectors also reviewed reports and a sample of corrective action program records of unannounced off-hour augmentation tests, which were conducted between November 2009 through August 2011, to determine the adequacy of post-drill critiques and associated corrective actions. The inspectors also reviewed a sample of the EP training records, approximately 12 records for ERO personnel, who were assigned to key and support positions, to determine the status of their training as it related to their assigned ERO positions. Documents reviewed are listed in the Attachment to this report. This ERO augmentation testing inspection constituted one sample as defined in IP 71114.03-05.

b. Findings

No findings were identified.

18 Enclosure

1EP5 Correction of Emergency Preparedness Weaknesses and Deficiencies

.1 Correction of Emergency Preparedness Weaknesses and Deficiencies

a. Inspection Scope

The inspectors reviewed a sample of Quality Assurance audits for 2009 and 2010 of the EP program to determine that these independent assessments met the requirements of 10 CFR 50.54(t). The inspectors also reviewed critique reports and samples of corrective action program records associated with the 2010 biennial exercise, as well as various EP drills conducted in 2010 and 2011, in order to determine that the licensee fulfilled its drill commitments and to evaluate the licensee's efforts to identify, track, and resolve concerns identified during these activities.

The inspectors reviewed a sample of EP items and corrective actions related to the facility's EP program and activities between November 2009 and July 2011 to determine whether corrective actions were completed in accordance with the sites corrective action program. Documents reviewed are listed in the Attachment to this report. This correction of emergency preparedness weaknesses and deficiencies inspection constituted one sample as defined in IP 71114.05-05.

b. Findings

No findings were identified.

1EP6 Drill Evaluation

.1 Emergency Preparedness Drill Observation

a. Inspection Scope

The inspectors evaluated the conduct of a routine licensee emergency drill on July 20, 2011, to identify any weaknesses and deficiencies in classification, notification, and protective action recommendation development activities. The inspectors observed emergency response operations in the Technical Support Center, emergency offsite facility, and the simulator to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures. The inspectors also attended the licensee drill critique to compare any inspector-observed weakness with those identified by the licensee staff in order to evaluate the critique and to verify whether the licensee staff was properly identifying weaknesses and entering them into the CAP. Documents reviewed are listed in the Attachment to this report. This inspection constituted one emergency preparedness drill sample as defined in IP 71114.06-05.

b. Findings

No findings were identified.

19 Enclosure

.2 Training Observation

a. Inspection Scope

The inspectors evaluated the conduct of a routine licensee tabletop emergency drill on August 31, 2011, to identify any weaknesses and deficiencies in classification, notification, and protective action recommendation development activities.

The inspectors observed the tabletop drill to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures. The inspectors also attended the licensee drill critique to compare any inspector-observed weakness with those identified by the licensee staff in order to evaluate the critique and to verify whether the licensee staff was properly identifying weaknesses and entering them into the CAP. Documents reviewed are listed in the Attachment to this report. This inspection constituted one emergency preparedness drill sample as defined in IP 71114.06-05.

b. Findings

No findings were identified.

RADIATION SAFETY

Cornerstones: Occupational and Public Radiation Safety

2RS2 Occupational As-Low-As-Is-Reasonably-Achievable (ALARA) Planning and Controls

(71124.02) The inspection activities supplement those documented in Inspection Reports 05000266/2010002; 05000301/2010002; and 05000266/2010004; 05000301/2010004. This constituted one complete sample as defined in IP 71124.02-05.

.1 Source Term Reduction and Control (02.04)

a. Inspection Scope

The inspectors used licensee records to determine the historical trends and current status of significant tracked plant source terms known to contribute to elevated facility aggregate exposure. The inspectors assessed whether the licensee had made allowances or developed contingency plans for expected changes in the source term as the result of changes in plant fuel performance issues or changes in plant primary

chemistry.

b. Findings

No findings were identified.

2RS7 Radiological Environmental Monitoring Program

This inspection constituted one complete sample as defined in IP 71124.07-05.

20 Enclosure

.1 Inspection Planning (02.01)

a. Inspection Scope

The inspectors reviewed the annual radiological environmental operating reports and the results of any licensee assessments since the last inspection to verify that the radiological environmental monitoring program was implemented in accordance with the TSs and Offsite Dose Calculation Manual (ODCM). This review included report changes to the ODCM with respect to environmental monitoring, commitments in terms of sampling locations, monitoring and measurement frequencies, land use census, inter-laboratory comparison program, and analysis of data. The inspectors reviewed the ODCM to identify locations of environmental monitoring stations. The inspectors reviewed the FSAR for information regarding the environmental monitoring program and meteorological monitoring instrumentation. The inspectors reviewed quality assurance audit results of the program to assist in choosing inspection "smart samples" and audits and technical evaluations performed on the vendor laboratory program. The inspectors reviewed the annual effluent release report and the 10 CFR Part 61, "Licensing Requirements for Land Disposal of Radioactive Waste," report, to determine if the licensee is sampling, as appropriate, for the predominant and dose-causing radionuclides likely to be released in effluents.

b. Findings

No findings were identified.

.2 Site Inspection (02.02)

a. Inspection Scope

The inspectors walked down select air sampling stations and thermoluminescent dosimeter (TLD) monitoring stations to determine whether they were located as described in the ODCM and to determine the equipment material condition.

Consistent with smart sampling, the air sampling stations were selected based on the locations with the highest X/Q, D/Q wind sectors, and TLDs were selected based on the most risk-significant locations (e.g., those that have the highest potential for public dose impact). For the air samplers and TLDs selected, the inspectors reviewed the calibration and maintenance records to verify that they demonstrated adequate operability of these components. Additionally, the review included the calibration and maintenance records of select composite water samplers. The inspectors performed an assessment of whether the licensee had initiated sampling of other appropriate media upon loss of a required sampling station. The inspectors observed the collection and preparation of environmental samples from different environmental media (e.g., ground and surface water, milk, vegetation, 21 Enclosure sediment, and soil) as available to verify that environmental sampling was representative of the release pathways as specified in the ODCM and that sampling techniques were in accordance with procedures. Based on direct observation and review of records, the inspectors assessed whether the meteorological instruments were operable, calibrated, and maintained in accordance with guidance contained in the FSAR, NRC Regulatory Guide 1.23, "Meteorological Monitoring Programs for Nuclear Power Plants," and licensee procedures. The inspectors assessed whether the meteorological data readout and recording instruments in the control room and, if applicable, at the tower were operable. The inspectors evaluated whether missed and/or anomalous environmental samples were identified and reported in the annual environmental monitoring report.

The inspectors selected events that involved a missed sample, inoperable sampler, lost TLD, or anomalous measurement to verify that the licensee has identified the cause and has implemented corrective actions. The inspectors reviewed the licensee's assessment of any positive sample results (i.e., licensed radioactive material detected above the lower limits of detection) and reviewed the associated radioactive effluent release data for released material. Inspectors selected SSCs that involve or could reasonably involve licensed material for which there was a credible mechanism for licensed material to reach ground water, and assessed whether the licensee had implemented a sampling and monitoring program sufficient to detect leakage of these SSCs to groundwater. The inspectors evaluated whether records, as required by 10 CFR 50.75(g), of leaks, spills, and remediation since the previous inspection were retained in a retrievable manner. The inspectors reviewed any significant changes made by the licensee to the ODCM as the result of changes to the land census, long-term meteorological conditions (3-year average), or modifications to the sampler stations since the last inspection.

They reviewed technical justifications for any changed sampling locations to verify that the licensee performed the reviews required to ensure that the changes did not affect its ability to monitor the impacts of radioactive effluent releases on the environment. The inspectors assessed whether the appropriate detection sensitivities with respect to TSs/ODCM were used for counting samples (i.e., the samples met the TSs/ODCM required lower limits of detection). The inspectors reviewed quality control charts for maintaining radiation measurement instrument status and actions taken for degrading detector performance. The inspectors reviewed the results of the licensee's inter-laboratory comparison program to verify the adequacy of environmental sample analyses. The inspectors assessed whether the inter-laboratory comparison test included the media/nuclide mix appropriate for the facility. The inspectors reviewed the licensee's determination of any bias to the data and the overall effect on the radiological environmental monitoring program.

b. Findings

No findings were identified.

22 Enclosure

.3 Identification and Resolution of Problems (02.03)

a. Inspection Scope

The inspectors assessed whether problems associated with the radiological environmental monitoring program were being identified by the licensee at an appropriate threshold and were properly addressed for resolution in the licensee's CAP.

Additionally, they assessed the appropriateness of the corrective actions for a selected sample of problems documented by the licensee that involved the radiological environmental monitoring program.

b. Findings

No findings were identified.

OTHER ACTIVITIES

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, and Emergency Preparedness

4OA1 Performance Indicator Verification

.1 Mitigating Systems Performance Index - Emergency Alternating Current (AC) Power

Systems

a. Inspection Scope

The inspectors sampled licensee submittals for the Mitigating Systems Performance Index (MSPI) - Emergency AC Power Systems performance indicator (PI) for Units 1 and 2 for the third quarter 2010 through the second quarter 2011. To determine the accuracy of the PI data, PI definitions and guidance contained in Nuclear Energy

Institute (NEI) document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, dated October 2009, were used. The inspectors reviewed the licensee's operator narrative logs, MSPI derivation reports, CRs, event reports, and NRC Integrated Inspection Reports (IRs) for the period July 2010 through June 2011 to validate the accuracy of the submittals. The inspectors reviewed the MSPI component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensee's CAP to determine if any problems had been identified with the PI data collected or transmitted for this indicator and none were identified. Documents reviewed are listed in the Attachment to this report. This inspection constituted two MSPI emergency AC power system samples as defined in IP 71151-05.

b. Findings

No findings were identified.

23 Enclosure

.2 Mitigating Systems Performance Index - High Pressure Injection Systems

a. Inspection Scope

The inspectors sampled licensee submittals for the MSPI - High Pressure Injection Systems PI for Units 1 and 2 for the third quarter 2010 through the second quarter 2011. To determine the accuracy of the PI data, PI definitions and guidance contained in NEI 99-02 were used. The inspectors reviewed the licensee's operator narrative logs, CRs, MSPI derivation reports, event reports, and NRC Integrated IRs for July 2010 through June 2011 to validate the accuracy of the submittals. The inspectors reviewed the MSPI component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensee's CAP to determine if any problems had been identified with the PI data collected or transmitted for this indicator and none were identified. Documents reviewed are listed in the Attachment to this report. This inspection constituted two MSPI high pressure injection system samples as defined in IP 71151-05.

b. Findings

No findings were identified.

.3 Mitigating Systems Performanc

e Index - Heat Removal Systems

a. Inspection Scope

The inspectors sampled licensee submittals for the MSPI - Heat Removal Systems PI for Units 1 and 2 for the third quarter 2010 through the second quarter 2011.

To determine the accuracy of the PI data, PI definitions and guidance contained in NEI 99-02 were used. The inspectors reviewed the licensee's operator narrative logs, CRs, event reports, MSPI derivation reports, and NRC Integrated IRs for July 2010 through June 2011 to validate the accuracy of the submittals. The inspectors reviewed the MSPI component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensee's CAP to determine if any problems had been identified with the PI data collected or transmitted for this indicator and none were identified. Documents reviewed are listed in the Attachment to this report. This inspection constituted two MSPI heat removal system samples as defined in IP 71151-05.

b. Findings

No findings were identified.

24 Enclosure

.4 Mitigating Systems Performance Index - Residual Heat Removal Systems

a. Inspection Scope

The inspectors sampled licensee submittals for the MSPI - Residual Heat Removal (RHR) Systems PI Units 1 and 2 for the third quarter 2010 through the second quarter 2011. To determine the accuracy of the PI data, PI definitions and guidance contained in NEI 99-02 were used. The inspectors reviewed the licensee's operator narrative logs, CRs, MSPI derivation reports, event reports, and NRC Integrated IRs for July 2010 through June 2011 to validate the accuracy of the submittals. The inspectors reviewed the MSPI component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensee's CAP to determine if any problems had been identified with the PI data collected or transmitted for this indicator and none were identified. Documents reviewed are listed in the Attachment to this report. This inspection constituted two MSPI RHR system samples as defined in IP 71151-05.

b. Findings

No findings were identified.

.5 Mitigating Systems Performance I

ndex - Support Cooling Water Systems

a. Inspection Scope

The inspectors sampled licensee submittals for the MSPI - Cooling Water Systems PI Units 1 and 2 for the third quarter 2010 through the second quarter 2011. To determine the accuracy of the PI data, PI definitions and guidance contained in NEI 99-02 were used. The inspectors reviewed the licensee's operator narrative logs, CRs, MSPI

derivation reports, event reports, and NRC Integrated IRs for the period of July 2010 through June 2011 to validate the accuracy of the submittals. The inspectors reviewed the MSPI component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensee's CAP to determine if any problems had been identified with the PI data collected or transmitted for this indicator and none were identified. Documents reviewed are listed in the Attachment to this report. This inspection constituted two MSPI cooling water system samples as defined in IP 71151-05.

b. Findings

No findings were identified.

25 Enclosure

.6 Reactor Coolant System (RCS) Specific Activity

a. Inspection Scope

The inspectors sampled licensee submittals for the RCS specific activity PI for Point Beach Nuclear Power Plant Units 1 and 2 for the first quarter 2010 through the second quarter 2011. The inspectors used PI definitions and guidance contained in NEI 99-02

to determine the accuracy of the PI data. The inspectors reviewed the licensee's RCS chemistry samples, TS requirements, CRs, event reports, and NRC Integrated IRs for the first quarter 2010 through the second quarter 2011 to validate the accuracy of the submittals. The inspectors also reviewed the licensee's CAP to determine if any problems had been identified with the PI data collected or transmitted for this indicator and none were identified. In addition to record reviews, the inspectors observed a chemistry technician obtain and analyze an RCS sample. Documents reviewed are listed in the Attachment to this report. This inspection constituted two reactor coolant system specific activity samples as defined in IP 71151-05.

b. Findings

No findings were identified.

.7 Occupational Exposure Control Effectiveness

a. Inspection Scope

The inspectors sampled licensee submittals for the occupational radiological occurrences PI for the first quarter 2010 through the second quarter 2011. The inspectors used PI definitions and guidance contained in NEI 99-02 to determine the accuracy of the PI data. The inspectors reviewed the licensee's assessment of the PI for occupational radiation safety to determine if indicator-related data was adequately assessed and reported. To assess the adequacy of the licensee's PI data collection and analyses, the inspectors discussed with radiation protection staff, the scope and breadth of its data review and the results of those reviews. The inspectors independently reviewed electronic personal dosimetry dose rate and accumulated dose alarms and dose reports and the dose assignments for any intakes that occurred during the time period reviewed to determine if there were potentially unrecognized occurrences.

The inspectors also conducted walkdowns of numerous locked high and very high radiation area entrances to determine the adequacy of the controls in place for these areas. Documents reviewed are listed in the Attachment to this report. This inspection constituted one occupational exposure control effectiveness sample as defined in IP 71151-05.

b. Findings

No findings were identified.

26 Enclosure

.8 Radiological Effluent Technical Specification/Offsite Dose Calculation Manual

Radiological Effluent Occurrences

a. Inspection Scope

The inspectors sampled licensee submittals for the radiological effluent TS/ ODCM radiological effluent occurrences PI for the first quarter 2010 through the second quarter 2011. The inspectors used PI definitions and guidance contained in NEI 99-02 to determine the accuracy of the PI data. The inspectors reviewed the licensee's CAP and selected individual reports generated since this indicator was last reviewed, to identify any potential occurrences such as unmonitored, uncontrolled, or improperly calculated effluent releases that may have impacted offsite dose. The inspectors reviewed gaseous effluent summary data and the results of associated offsite dose calculations for selected dates from the first quarter 2010 through the second quarter 2011 to determine if indicator results were accurately reported. The inspectors also reviewed the licensee's methods for quantifying gaseous and liquid effluents and determining effluent dose. Documents reviewed are listed in the Attachment to this report. This inspection constituted one Radiological Effluent Technical Specification/Offsite Dose Calculation Manual radiological effluent occurrences sample as defined in IP 71151-05.

b. Findings

No findings were identified.

.9 Drill/Exercise Performance

a. Inspection Scope

The inspectors sampled licensee submittals for the Drill/Exercise PI for the fourth quarter 2010 through second quarter 2011. To determine the accuracy of the PI data, PI definitions and guidance contained in NEI 99-02 were used. The inspectors reviewed licensee records to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes, including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during predesignated control room simulator training sessions, performance during the 2010 biennial exercise, and performance during other drills. Documents reviewed are listed in the Attachment to this report. This inspection constituted one drill/exercise performance sample as defined in IP 71151-05.

b. Findings

No findings were identified.

27 Enclosure

.10 Emergency Response Organization Drill Participation

a. Inspection Scope

The inspectors sampled licensee submittals for the ERO Drill Participation PI for the period from the fourth quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, dated October 2009, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2010 biennial exercise and other drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report. This inspection constituted one ERO drill participation sample as defined in IP 71151-05.

b. Findings

No findings were identified.

.11 Alert and Notification System

a. Inspection Scope

The inspectors sampled licensee submittals for the ANS PI for the fourth quarter 2010 through second quarter 2011. To determine the accuracy of the PI data, PI definitions and guidance contained in NEI 99-02 were used. The inspectors reviewed licensee records to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, and results of periodic ANS operability tests. Documents reviewed are listed in the Attachment to this report. This inspection constituted one alert and notification system sample as defined in IP 71151-05.

b. Findings

No findings were i d entified.

28 Enclosure

4OA2 Identification and Resolution of Problems

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, Occupational Radiation Safety, and Physical Protection

.1 Routine Review of Items Entered Into the CAP

a. Inspection Scope

As part of the various baseline inspection procedures discussed in previous sections of this report, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that they were being entered into the licensee's CAP at an appropriate threshold, that adequate attention was being given to timely corrective actions, and that adverse trends were identified and addressed. Attributes reviewed included: identification of the problem was complete and accurate; timeliness was

commensurate with the safety significance; evaluation and disposition of performance issues, generic implications, common causes, contributing factors, root causes, extent-of-condition reviews, and previous occurrences reviews were proper and adequate; and the classification, prioritization, focus, and timeliness of corrective actions were commensurate with safety and sufficient to prevent recurrence of the issue. Minor issues entered into the licensee's CAP as a result of the inspectors' observations are included in the Attachment to this report.

These routine reviews for the identification and resolution of problems did not constitute any additional inspection samples. Instead, by procedure, they were considered an integral part of the inspections performed during the quarter and documented in Section 1 of this report.

b. Findings

No findings were identified.

.2 Daily CAP Reviews

a. Inspection Scope

To assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the licensee's CAP. This review was accomplished through inspection of the station's daily condition report packages. These daily reviews were performed by procedure as part of the inspectors' daily plant status monitoring activities and, as such, did not constitute any separate inspection samples.

b. Findings

No findings were identified.

29 Enclosure Selected Issue Follow-Up Inspection: EDG G03 Starting Air System

c. Inspection Scope

During a review of items entered in the licensee's CAP, the inspectors identified various corrective action documents (action requests (ARs)) related to the G03 EDG starting air system. The inspectors noted that AR 01666371 identified DA-318, "G-03 EDG T-171 A/B Start Air Receiver Inlet Check Valve," as a nonsafety-related valve although design basis documents listed this component as safety-related. The inspectors found that the licensee failed to identify that the system was inoperable because of seismic considerations; however, due to the licensee being in the limiting condition for operation at the time, no findings were identified. Also, the inspectors determine that although this component was incorrectly classified in the AR, the actions taken to correct the deficiency associated with this component were adequate. Documents reviewed are listed in the Attachment to this report. This review constituted one in-depth problem identification and resolution sample as defined in IP 71152-05.

d. Findings

No findings were identified.

4OA3 Follow-Up of Events and Notices of Enforcement Discretion

.1 Feedwater System Leak

a. Inspection Scope

The inspectors reviewed the plant's response to a feedwater system leak in Unit 2 and associated non-code repair. Documents reviewed are listed in the Attachment to this report. This event follow-up review constituted one sample as defined in IP 71153-05.

b. Findings

No findings were identified.

.2 (Closed) Licensee Event Report (LER) 05000301/2010-003-00, "Technical Specification

Required Shutdown

"

Introduction:

The inspectors identified a finding of very low safety significance and an associated NCV of 10 CFR 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the licensee's failure to perform an operability evaluation when degraded/non-conforming conditions were identified relative to the Unit 2 rod drive control (RDC) system. Specifically , on December 10, 2010, condition report (CR) 01401564 identified rod failure alarms, but did not identify the degraded/non-conforming conditions or evaluate the condition relative to support functions for TSs 3.1.4 and 3.1.6.

30 Enclosure Discussion: On December 10, 2010, the licensee received rod control system alarms while performing TS surveillance TS-6, "Rod Exercise Test." Troubleshooting between December 10 and December 13, and an unsuccessful attempt to complete TS-6 on December 13, before expiration of the time period to complete the surveillance, resulted in the licensee's inability to satisfy the surveillance requirement. Subsequently, the licensee shut down Unit 2 because the RDC group alignment limits of TS 3.1.4 were not met.

The inspectors reviewed the licensee's evaluation of the issue and found that CR01401564 written on December 10 did not assess the degraded/non-conforming conditions until December 14, after Unit 2 was shut down. The inspectors found that the issue had been evaluated and documented in the station logs on December 11, but this evaluation did not identify or assess the cause of the alarms. The inspectors also found that TS 3.1.6, "Control Bank Insertion Limits," was applicable in the operational mode where the failure occurred. However, the licensee failed to evaluate the impact of the surveillance requirement on TS 3.1.6. Procedure PI-AA-205, "Condition Evaluation and Corrective Action," Revision 10, effective December 6, 2010, Step 4.4.1 states, in part, that, "If the CR evaluator determines that the condition represents a nonconforming/degraded condition to a Structure, System, or Component (SSC) that is either: 1. Required to be operable by Technical Specifications (TS) . . . then an Immediate Operability Determination (IOD)per EN-AA-203-1001 may also be required if additional supporting information is required." Considering the items not evaluated above, the inspectors concluded that an operability evaluation was not performed as required. The inspectors reviewed the corrective actions and root cause evaluation (RCE) for CR01401564 and CR01401858, "U2 Forced Outage after RDC Failure." The inspectors found that the corrective actions were adequate to address the cause of the condition. Corrective actions included multiple RDC logic card repairs, inspections of connections on the reactor head and nearby panel, repair of deficient connections, and the establishment of a repetitive task to periodically maintain the RDC logic cards and associated power supplies.

Analysis:

The inspectors determined that the failure to perform an operability evaluation for multiple conditions requiring an evaluation as required by procedure PI-AA-205 was a performance deficiency warranting further evaluation. The finding was determined to be more than minor in accordance with IMC 0612, "Power Reactor Inspection Reports," Appendix B, "Issue Screening," dated December 24, 2009, because it was associated with the Mitigating Systems Cornerstone attribute of equipment performance and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the failure to identify the degraded/non-conforming conditions (DNCs) and assess the degraded/non-conforming conditions' impact on operations and TS requirements resulted in latent conditions that had the potential to be of greater safety significance, and in this case resulted in the failure to evaluate the DNC relative to TS 3.1.6.

The inspectors determined the finding could be evaluated using the SDP in accordance with IMC 0609, "Significance Determination Process," Attachment 0609.04, "Phase 1 Initial Screening and Characterization of Findings," Tables 3b and 4a for the Mitigating 31 Enclosure Systems Cornerstone, dated January 10, 2008. The inspectors answered "No" to all the screening questions in the SDP Phase 1 Screening Worksheet in the Mitigating Systems column; therefore, this finding screened as having very low safety significance (Green). This finding has a cross-cutting aspect in the area of human performance, decision-making, because the licensee did not use conservative assumptions during related decision-making that adopted a requirement to demonstrate that the proposed action was safe in order to proceed. The inspectors identified that CR01401564 did not contain an operability evaluation, that the logs contained an unidentified DNC, and the root cause evaluation did not evaluate the cause of the control rods dropping into the core; and that each of these documents were reviewed by multiple layers of the organization. Most significantly, none of these documents contained an evaluation that reviewed the acceptability and the impact of this activity on the note in TS 3.1.6. (H.1(b))

Enforcement:

Title 10 CFR 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," states, in part, that activities affecting quality shall be prescribed and accomplished in accordance with the procedures. Contrary to this, on December 10, 2010, when equipment problems occurred during a surveillance of the RDC system, an activity affecting quality, the licensee failed to perform an operability evaluation as required by procedure PI-AA-205, Step 4.4.1. Because this violation was of very low safety significance and was entered into the licensee's CAP, as CR01401564 and CR01401858, this violation is being treated as an NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy (NCV 05000266/2011004-02; 05000301/2011004-02, Failure to Perform an Operability Evaluation for Rod Drive Control System Failures). Documents reviewed are listed in the Attachment to this report. This LER is closed.

This event follow-up review constituted one sample as defined in IP 71153-05.

.3 (Closed) LER 05000301/2010-004-00, "Manual Reactor Trip During Startup

" On December 15, 2010, and prior to criticality, the licensee initiated a manual reactor trip for Unit 2 when multiple groups of control rods inserted unexpectedly into the reactor core (LER 05000301/2010-004-00). The licensee entered these conditions into its CAP and performed an RCE to determine the cause of the failure. The licensee determined that the cause of this event and the cause of the December 10 th event (Section 4OA3.1) were common and evaluated these events in CR01401564 and CR01401858. This LER identified that nonsafety-related portions of the RDC system had failed resulting in rods inserting unexpectedly into the core. Based on a review of the licensee's RCE, the inspectors determined that no performance deficiencies of violations of regulatory requirements of safety significance existed. The inspectors had no other concerns associated with this event. This LER is closed. Documents reviewed are listed in the Attachm ent to this report. This event follow-up review constituted one sample as defined in IP 71153-05.

4OA5 Other Activities

.1 (Closed) Temporary Instruction 2515/179, "Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in the National Source Tracking System Pursuant to Title 10, Code of Federal Regulations, Part 20.2207

(10 CFR 20.2207)"

a. Inspection Scope

The inspectors confirmed that the licensee has reported the initial inventories of sealed sources pursuant to 10 CFR 20.2207 and verified that the National Source Tracking System database correctly reflected the Category 1 and 2 sealed sources in custody of the licensee. Inspectors interviewed personnel and performed the following:

  • reviewed the licensee's source inventory;
  • verified the presence of any Category 1 or 2 sources;
  • reviewed procedures for and evaluated the effectiveness of storage and handling of sources;
  • reviewed documents involving transactions of sources; and
  • reviewed adequacy of licensee maintenance, posting, and labeling of nationally tracked sources.

b. Findings

No findings were identified.

.2 Extended Power Uprate

a. Inspection Scope

The Component Design Bases Inspection (CDBI) documented in NRC inspection report 05000266/2011009; 05000301/2011009 included two plant modification samples.

Revision 0; and

  • EC-11795, "Unit 2 Containment Spray Piping Supports." This integrated report includes the following samples that can be credited to the EPU inspection procedure. Two samples are included in Section

1R15 - Operability Evaluations and Functional Assessments

.

  • operability evaluation for issues with the air amplifier (air supply tank for valve operation) for 1P-53, the Unit 1 motor-driven auxiliary feedwater pump; and
  • operability of the Unit 2 main feedwater regulating valves (MFRVs) after the extended power uprate partial modification installation.

33 Enclosure Two samples are included in Section

1R19 - Post-Maintenance Testing

.

  • PMT of MFRV circuitry work (Unit 2);

b. Findings

Two findings were documented in the CDBI report 05000266/2011009; 05000301/2011009.

4OA6 Management Meetings

.1 Exit Meeting Summary

On October 4, 2011, the inspectors presented the inspection results to Mr. L. Meyer and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.

.2 Interim Exit Meetings

Interim exits were conducted for:

  • the results of the radiation safety inspection conducted July 18 through 22, 2011, with Plant General Manager, Mr. T. Vehec, on July 22, 2011;
  • the results of the licensed operator requalification training program inspection with Mr. R. Harrsch, Operations Director (Acting Site Vice-President), on August 11, 2011;
  • the licensed operator requalification training biennial annual operating test results with Mr. L. Germann, Operations Continuing Training Instructor, via telephone on September 7, 2011; and
  • the results of the Emergency Preparedness program inspection were discussed with Mr. L. Meyer on September 15, 2011, and a subsequent interim exit was conducted with Mr. J. Schleif on September 29, 2011.
  • the resolution of unresolved item URI 05000266/2006006-08; 05000301/2006006-08 on October 26, 2011, with Mr. Jim Costedio and others. The inspectors confirmed that none of the potential report input discussed was considered proprietary. Proprietary material received during the inspection was returned to the licensee.

34 Enclosure

4OA7 Licensee-Identified Violations

The following violations of very low safety significance (Green) or Severity Level IV were identified by the licensee and are violations of NRC requirements which meet the criteria of the NRC Enforcement Policy, for being dispositioned as non-cited violations. Title 10 CFR 50, Appendix E, Section IV.B, states, in part, that, "emergency action levels shall be reviewed with the State and local governmental authorities on an annual basis." Contrary to this, the 2009 annual Emergency Action Level (EAL) review was not conducted with State and local governmental authorities. This event was documented in the licensee's CAP as entry 1394643; 2009 Offsite EAL Review Not Completed. This finding is of very low safety significance because it does not affect any of the licensee's EALs or processes by which they are classified. ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

T. Vehec, Plant Manager
C. Trezise, Engineering Director
R. Harrsch, Operations Director
J. Costedio, Licensing Manager
D. Craine, Radiation Protection Manager
R. Harrsch, Operations Director (Acting Site Vice-President)
R. Amundson, Operations Training General Supervisor
R. Bretton, Operations Training Supervisor
F. Flentje, Licensing Supervisor
C. Hill, Assistant Operations Manager-Training
D. Lauterbur, Training Manager
J. Pierce, Training
C. Riddings, Acting Maintenance Manager
J. Rogers, Operations Training Instructor
C. Sizemore, NextEra/FPL Fleet Operations Training Manager
G. Vickery, Work Management Manager (Acting Plant Manager)

Nuclear Regulatory Commission

M. Kunowski, Chief, Reactor Projects Branch 5
A. M. Stone, Chief, Engineering Branch 2, Division of Reactor Safety

Attachment

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED

Opened

05000266/2011004-01;
05000301/2011004-01 URI Potential Failure to Correctly Implement a Systems Approach to Training for the Licensed Operator

Requalification Program (Section 1R11.3)

05000266/2011004-02;
05000301/2011004-02 NCV Failure to Perform an Operability Evaluation for Rod Drive

Control System Failures (Section 4OA3.2)

05000266/2011004-03;
05000301/2011004-03; NCV Failure to Ensure Tornado Missile Protection for EDGs G01 and G02 Exhaust Stacks (Section 1R21)

Closed

05000266/2011004-02;
05000301/2011004-02 NCV Failure to Perform an Operability Evaluation for Rod Drive

Control System Failures (Section 4OA3.2)

05000301/2010-003-00 LER Technical Specification Required Shutdown (Section 4OA3.2)
05000301/2010-004-00 LER Manual Reactor Trip During Startup (Section 4OA3.3)
05000266/2006006-08;
05000301/2006006-08 URI Safety-Related Equipment Not Protected from Tornado Missiles (Section 1R21)
05000266/2011004-03;
05000301/2011004-03; NCV Failure to Ensure Tornado Missile Protection for EDGs G01 and G02 Exhaust Stacks (Section 1R21)

Discussed

None.

Attachment

LIST OF DOCUMENTS REVIEWED

The following is a partial list of documents reviewed during the inspection.

Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that