IR 05000266/2024001

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000266/2024001 and 05000301/2024001
ML24100A790
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/11/2024
From: Billy Dickson
NRC/RGN-III/DORS/RPB2
To: Durbin M
Point Beach
References
IR 2024001
Download: ML24100A790 (1)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2024001 AND 05000301/2024001

Dear Michael Durbin:

On March 31, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On April 4, 2024, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Point Beach Nuclear Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Point Beach Nuclear Plant.

April 11, 2024 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Billy C. Dickson, Jr., Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2024001 and 05000301/2024001

Enterprise Identifier:

I-2024-001-0077

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

January 01, 2024 to March 31, 2024

Inspectors:

J. Masse, Resident Inspector

V. Petrella, Resident Inspector

M. Stafford, Senior Resident Inspector

Approved By:

Billy C. Dickson, Jr., Chief

Reactor Projects Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Account for Instrument Uncertainty Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000266,05000301/2024001-01 Open/Closed

[P.3] -

Resolution 71111.24 The inspectors identified a Green finding and an associated non-cited violation (NCV) of Title 10 CFR, Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, when the licensee failed to prescribe an instruction or procedure with the appropriate qualitative or quantitative acceptance criteria for determining that important activities have been satisfactorily accomplished. Specifically, the licensee failed to account for instrument uncertainty when calculating the technical specification value of sodium hydroxide in the spray additive tank.

Additional Tracking Items

Type Issue Number Title Report Section Status URI 05000266,05000301/20 23004-03 Potential Failure to Correct an

NRC Identified

Violation 71152A Closed

PLANT STATUS

Unit 1 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.

Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk-significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather with a blizzard moving through the area on January 12, 2024.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 motor driven auxiliary feedwater pump on January 23, 2024 (2)125 volt direct current station batteries and switchgear on February 2, 2024
(3) G-01 emergency diesel generator starting air system and fuel oil system on February 12, 2024
(4) G-04 emergency diesel generator starting air system, fuel oil system, and the glycol cooling system on February 13, 2024
(5) Unit 1 train A and B component cooling water loops on March 8, 2024

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire zones 552 and 553 on January 19, 2024
(2) Fire zones 225, 226, 227, and 228 on January 24, 2024

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on February 22, 2024.

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the: Unit 1 and Unit 2 residual heat removal pump cubicles

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) HX-13B spent fuel pool heat exchanger on March 28, 2024

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during the response to a plant process computer system indication failure on January 29, 2024, and during minor power changes to support turbine-driven auxiliary feedwater pump testing on February 8, 2024.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated an operator simulator evaluation on January 22, 2024.

71111.12 - Maintenance Effectiveness

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Fire protection foam used in barrier penetrations between fire areas

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 elevated risk due to the TS 3A, Turbine Trip Test Unit 1, on January 24, 2024
(2) Unit 1 elevated risk due to 1ICP 02.013, 4.16 KV Undervoltage Matrix Relays Surveillance Test, on January 2, 2024

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Operability determination for boric acid found inside 2W-1B1 fan cubicle, Containment Accident Recirculation Fan, on January 22, 2024
(2) Operability determination for the seal leakage on 1P-11B, Component Cooling Water Pump, on January 24, 2024
(3) Operability determination for voids found in piping for the 1P-10A and 1P-10B residual heat removal pumps on February 1, 2024
(4) Operability determination for elevated temperatures on 1P-11A, component cooling water pump, on March 8, 2024

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Battery and inverter room cooler modifications

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (2 Samples)

(1) OI 70, Service Water System Operation after a strainer backwash arm replacement on February 29, 2024
(2) Post-maintenance testing after various preventative maintenance activities on the G-02 emergency diesel generator on March 5, 2024

Surveillance Testing (IP Section 03.01) (5 Samples)

(1) Unit 1 train B engineered safety features logic testing, on January 18, 2024
(2) Unit 1 train B reactor protection system logic testing on January 18, 2024
(3) IT 05B, Containment Spray Pumps and Valves (Cold Shutdown) Unit 1, on January 22, 2024 (4)1ICP 02.032, 1P-29 Auxiliary Feedwater Suction Header Pressure Trip Channel Operability Test, on January 25, 2024
(5) Calculation of sodium hydroxide in the spray additive tank on February 1, 2024

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) Cold start of turbine-driven auxiliary feed pump, on February 8, 2024

71114.06 - Drill Evaluation

Required Emergency Preparedness Drill (1 Sample)

(1) Point Beach first quarter emergency preparedness and information technology cyber drill on January 16, 2024.

Additional Drill and/or Training Evolution (1 Sample)

The inspectors evaluated:

(1) Drill and exercise performance (DEP) opportunity during licensed operator requalification training on January 22,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) Unit 1 (January 1, 2023 through December 31, 2023)
(2) Unit 2 (January 1, 2023 through December 31, 2023)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)

(1) Unit 1 (January 1, 2023 through December 31, 2023)
(2) Unit 2 (January 1, 2023 through December 31, 2023)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)

(1) Unit 1 (January 1, 2023 through December 31, 2023)
(2) Unit 2 (January 1, 2023 through December 31, 2023)

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in pre-fire plan accuracy that might be indicative of a more significant safety issue. A minor violation identified as a part of this review is documented in the Results Section of this report.

INSPECTION RESULTS

Failure to Account for Instrument Uncertainty Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000266,05000301/2024001-01 Open/Closed

[P.3] -

Resolution 71111.24 The inspectors identified a Green finding and an associated non-cited violation (NCV) of Title 10 CFR, Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, when the licensee failed to prescribe an instruction or procedure with the appropriate qualitative or quantitative acceptance criteria for determining that important activities have been satisfactorily accomplished. Specifically, the licensee failed to account for instrument uncertainty when calculating the technical specification value of sodium hydroxide in the spray additive tank.

Description:

In the Point Beach 4th Quarter Integrated Inspection Report, 2023004 (ML24032A056), the NRC documented Unresolved Item 2023004-03 concerning a potential failure to correct a NRC identified violation. Specifically, the inspectors reviewed the corrective actions for NCV 2022002-01, issued in July 2022 (ML22208A123). The inspectors found that the licensee had failed to implement corrective actions to address this violation. Working with regional staff, the inspectors have determined that this represents a repeat violation of 10 CFR, Part 50, Appendix B, Criterion V. The following is a synopsis of this violation.

The spray additive system, supported by the containment spray system, assists in reducing the iodine fission product inventory in the containment atmosphere resulting from a design basis accident (DBA).

Radioiodine in its various forms is the fission product of primary concern in the evaluation of a DBA. It is absorbed by the spray from the containment atmosphere. To enhance the iodine absorption capacity of the spray, the spray solution is adjusted to an alkaline pH that promotes iodine hydrolysis. This process converts iodine to a nonvolatile form. Because of its stability when exposed to radiation and elevated temperatures, sodium hydroxide (NaOH) is the preferred spray additive. The NaOH added to the spray also ensures a pH value in the acceptable range of 7.0 to 10.5. The minimum pH in the containment sump needed to keep iodine in the iodate form is 7.0. A pH greater than 7 assures the continued iodine removal effectiveness. The maximum pH is based on equipment qualification considerations to minimize the occurrence of chloride and caustic stress corrosion on mechanical systems and components and is set to 10.5.

Technical Specification Surveillance Requirement (SR) 3.6.7.3 requires the licensee to determine the concentration of NaOH in the spray additive tank and perform this surveillance test every six

(6) months. The requirement is to verify that the spray additive tank NaOH solution concentration is greater than or equal to 30 percent and less than or equal to 33 percent by weight.

The licensee uses procedure CAMP 226, Sodium Hydroxide: H2SO4 Titration Method, to determine the concentration of sodium hydroxide in the sample. In the procedure, the licensee titrates the sample from the sodium hydroxide tank using sulfuric acid. After the titration, the licensee then calculates the percentage of NaOH. The procedure states, in part, that the 2-sigma precision and single measurement accuracy is approximately +/- 0.3

[percent] NaOH. This means that the instrument uncertainty of the titration is +/- 0.3 percent NaOH.

The work orders that direct the licensee to perform CAMP 226 contain the acceptance criteria from the technical specification surveillance requirement SR 3.6.7.3 of greater than or equal to 30 percent and less than or equal to 33 percent by weight. This acceptance criteria does not consider the instrument uncertainty discussed in CAMP 226.

The NRC inspectors and licensee did not find any evidence that the calculation 2000-0036, pH of Post LOCA Sump and Containment Spray, took instrument uncertainty into account.

Corrective Actions: Once the licensee became aware of the problem, they updated the asset change table and made assignments to progress the change through their system. The PM model work order has been updated and the procedure has been performed correctly for each unit.

Corrective Action References: Action Request (AR) 02430785 - SAT Analysis Work Order Documentation (NRC Identified), AR 02472083 - PMC in Screening for Extended Amount of Time and AR 02473217 - CA Untimely due to Inappropriate Closure to PMCR

Performance Assessment:

Performance Deficiency: The inspectors determined that the failure to prescribe an instruction or procedure with the appropriate qualitative or quantitative acceptance criteria for determining that important activities have been satisfactorily accomplished was a violation of 10 CFR Part 50, Appendix B, Criterion V, and was a performance deficiency. Specifically, the licensee did not consider the instrument uncertainty when determining the concentration of sodium hydroxide.

Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Specifically, the failure to not take into account the instrument uncertainty on the spray additive tank solution could result in the NaOH concentration being outside of the allowed band and therefore the system would not meet its design basis.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power.

Specifically, the inspectors determined the finding was of very low safety significance (Green)because the inspectors answered no to all the questions in Exhibit 3.C.

Cross-Cutting Aspect: P.3 - Resolution: The organization takes effective corrective actions to address issues in a timely manner commensurate with their safety significance. Specifically, the licensee closed their corrective action document to a work order change but failed to update the work order. The failure went unnoticed until the NRC questioned the status of the work order change.

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires in part, that instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished.

Contrary to the above, prior to October 25, 2023, the licensee failed to prescribe an appropriate instruction or procedure with the appropriate qualitative or quantitative acceptance criteria for determining that important activities have been satisfactorily accomplished. Specifically, in the work orders calculating sodium hydroxide concentration in the spray additive tank, the licensee did not consider the instrument uncertainty for determining this concentration, as specified in CAMP 226, Sodium Hydroxide: H2SO4 Titration Method.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

The disposition of this finding and associated violation closes URI:

05000266,05000301/2023004-03.

Unresolved Item (Closed)

Potential Failure to Correct an NRC Identified Violation URI 05000266,05000301/2023004-03 71152A

Description:

A finding/violation was identified as described above.

Corrective Action Reference(s): AR 02472083 - PMC in Screening for Extended Amount of Time and AR 02473217 - CA Untimely due to Inappropriate Closure to PMCR Minor Violation 71152S Failure to Perform Independent Assessment in Accordance with Written Checklist Minor Violation: The licensee's independent assessment, "PBN 21-006, Fire Protection,"

reviewed the Point Beach Fire Protection Program and its compliance with 10 CFR 50.48, "Fire protection." The assessment contained checklist items that direct the auditor to review elements that are related to the requirements of the fire protection program. Checklist item 6 contained an element that directed the auditor to perform the following:

Verify current and detailed pre-fire plans are available to the industrial fire brigade for all areas in which a fire could jeopardize the ability to meet NFPA 805, Section 1.5, performance criteria, including the following:

  • The plans detail the fire area configuration and fire hazards to be encountered in the fire area, along with any nuclear safety components and fire protection systems and features that are present.
  • The plans are available in the control room and made available to the plant industrial fire brigade.

The plans address coordination with other plant groups during fire emergencies.

Ref. NFPA 805, 3.4.2 The completed assessment results state:

Fire Plans are in the Control Room and the Fire Brigade Ready Area in a hard copy format. A physical walkdown by the auditor found both binders contained current revisions as required. Auditor validated no outstanding revisions to these pre-fire plans existed. The review and validation did not identify any gaps and is considered satisfactory.

The inspector noted that the assessment results do not specifically state how the auditor verified the plans detail the fire area configuration and fire hazards to be encountered in the fire area, along with any nuclear safety components and fire protection systems and features that are present.

The NRC inspectors have identified several cases where pre-fire plans (PFPs) contained discrepancies in their respective fire area configurations. Upon discovery of these discrepancies, the inspectors notified the licensee, and the licensee revised the PFPs accordingly. Below is a summary of some condition reports initiated due to the inspectors' questions:

  • AR 2410039, (P) PFP-2-CONT-FAC - PRE-FIRE PLAN UNIT 2 (DOCDIST)o 11/2/2021 - The Unit 2 containment PFP was updated because two oil collection tanks and two hose reels were in the wrong location, a ventilation duct was drawn as a walking path, and there was no opening drawn on 66' containment elevation that leads to the reactor head laydown area.

3/21/2022 - The auxiliary building PFP was updated to show the correct orientation of sprinklers and to add a flammable liquid cabinet.

3/23/2022 - The auxiliary building PFP was updated to add pump oil to the Fire category and note that transient combustibles may be present for maintenance.

  • AR 2424251, (S) PFP-1-CONT-FAC - PRE-FIRE PLAN UNIT 1 o

4/8/2022 - The Unit 1 containment PFP was updated to add the reactor coolant pump oil collection tank on the 10' platform, and draw obstacles that personnel must walk around.

8/2/2022 - The control building PFP was updated to draw a missing fire door on the map, and revise coloring to represent high risk fire areas.

2/7/2023 - The auxiliary building PFP was updated to add room names, add a subsoil drain, and make fire zone labels more clearly identify their respective zones.

  • AR 2463684, (S) PFP-1-TB-26 - PRE-FIRE PLAN UNIT 1 TURBINE o

8/2/2023 - The turbine building PFP was updated to include a missing dry chemical fire extinguisher, halon storage tanks, a flammable locker, and a flammable cabinet.

These condition reports and the lack of specific documentation in the independent assessment checklist element referenced led the inspectors to conclude that the auditor did not perform the assessment according to the written checklist.

The inspectors determined that failure to perform the independent assessment in accordance with the written checklist was a performance deficiency. Specifically, the auditor did not verify that the plans detail the fire area configuration and fire hazards to be encountered in the fire area, along with any nuclear safety components and fire protection systems and features that are present.

Point Beach Renewed Facility Operating License condition 4.F requires, in part, NextEra Energy Point Beach Units 1 and 2 shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c).

Point Beach's Fire Protection Plan: NP 1.9.14, Section 1.1 states, in part, that the Fire Protection Plan has been established to describe the overall Fire Protection Program (FPP)for the Point Beach Nuclear Plant (PBNP). NP 1.9.14, Section 4.12 states, in part, that the NextEra Quality Assurance Topical Report (QATR) (FPL-1) provides the quality assurance requirements for the PBNP. The following elements of the QATR apply to those items within the scope of the Fire Protection Program: Audits.

The NextEra QATR, Section C.3, Independent Assessment, states, in part, planning for independent assessments identifies the characteristics and activities to be assessed and the relevant performance and/or acceptance criteria. Independent assessments are then conducted using these predetermined criteria.

Contrary to the above, on August 27, 2021, the licensee did not conduct an independent assessment using the predetermined criteria. Specifically, independent assessment PBN 21-006, Fire Protection, checklist item #6 contained a predetermined criterion for the auditor to verify detailed pre-fire plans detail the fire area configuration and fire hazards to be encountered in the fire area, along with any nuclear safety components and fire protection systems and features that are present. However, the NRC inspectors found no evidence of verification of this predetermined criterion. The NRC inspectors also identified multiple errors which the audit could have caught. The licensee documented these errors under action requests: 2410039, 2422170, 2422453, 2424251, 2433350, 2447769, and 2463684.

Screening: The inspectors determined the performance deficiency was minor. The NRC inspectors screened the performance deficiency as minor because the NRC inspectors answered no to all the more than minor questions found in Inspection Manual Chapter (IMC)0612 Appendix B, "Issue Screening Directions." The NRC inspectors consulted example 4.i of IMC 0612 Appendix E, "Examples of Minor Issues," and concluded that the performance deficiency would be minor because the performance deficiency would not impact the ability of the licensee to manually fight a fire.

Enforcement:

The licensee has taken actions to restore compliance. This failure to comply with Point Beach Renewed Facility Operating License condition 4.F constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 4, 2024, the inspectors presented the integrated inspection results to Michael Durbin and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AOP-13C

Severe Weather Conditions

MI 32.20

FPL/Point Beach Nuclear Plant Snow Removal Plan

NP 7.2.29

External Events Program

71111.01

Procedures

OM 3.30

Operations Snow Emergency Staffing

Corrective Action

Documents

Resulting from

Inspection

2480169

G-01 Drawing Inconsistencies with Field Conditions

2/28/2024

110E018 Sheet 1

P&ID Auxiliary Coolant System

110E018 Sheet 2

P&ID Auxiliary Coolant System

110E018 Sheet 3

P&ID Auxiliary Coolant System

E-6, Sheet 1

25V DC Dist. System

E-6, Sheet 2

25 Volt D.C. System

E-6, Sheet 3

25V DC Dist. System

M-209 Sheet 12

P&ID EM. Diesel Air Starting Sys. Point Beach N.P. Unit 1&2

M-209 Sheet 15

P&ID Starting Air System Diesel Generator Building M-209

SH. 15 Point Beach N.P. Unit 1 & 2

M-217 Sheet 1

P&ID Auxiliary Feedwater System

107

M-219 Sheet 1

P&ID Fuel Oil System Point Beach N.P. Unit 1

M-219 Sheet 3

P&ID Fuel Oil System Diesel Generator Building Point

Beach N.P. Unit 1&2

M-2217

P&ID Auxiliary Feedwater System

Drawings

M-227 Sheet 2

P&ID Glycol Cooling System Diesel Generator Building Point

Beach N.P. Unit 1&2

Miscellaneous

DBD-19

25 VDC System Design Basis Document

CL 13E Part 2

Auxiliary Feedwater Valve Lineup Motor Driven

71111.04

Procedures

RMP 9046-1

Station Battery 92 Day, 12 Month Surveillance Tests

Corrective Action

Documents

Resulting from

Inspection

2477311

PFP-0-PAN - Pre-Fire Plan Protected Area North

01/23/2024

71111.05

Drawings

M2005-6-44,

Yellow Instrument Bus Fire Barrier Equip. Room "B" (226)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Sheet B

26' El. Ceiling

PBM-250

P&ID Battery & EE Room Rms. Vac.

PFP-0-PAB 26

Pre-Fire Plan Unit 1 & Unit 2 Auxiliary Building 26 ft

Fire Plans

PFP-0-PAN

Pre-Fire Plan Protected Area North (Inside the Fence)

Miscellaneous

FPEE 1999-009

Undampered Ventilation Ducts in Significant Fire Barriers in

the Control, Primary Auxiliary and Turbine Buildings

NP 1.9.14

Fire Protection Plan

Procedures

NP 8.4.11

Penetrating Barriers

Calculations

2014-0007

Allowable Flood Levels

ARP 1C20 A 1-4

Auxiliary Building -19ft Sump/Area Level High

NP 8.4.17

PBNP Flooding Program

71111.06

Procedures

PC 37

Plant Sump Alarm Tests (Semiannual)

Calculations

2016-0009

PBNP SFP Heat Exchanger Performance Calculation

Procedures

GL 89-13

Program

Document

GL 89-13 Program Document

71111.07A

Work Orders

40875661-01

Eddy Current Task 1 Work Standard

03/21/2024

Miscellaneous

PBN LOC 24A

001E

Licensed Operator Continuing Training

AOP-21

PPCS Malfunction

71111.11Q

Procedures

OP 2A

Normal Power Operation Unit 2

Corrective Action

Documents

2476908

Defective Fire Penetration Foam Kits

01/18/2024

DG-F02

Fire Barrier Penetration Seal Typical Detail Designs

Procedures

RMP 9393

Mixing and Installation of Two Component Silicones for Fire

Barriers

71111.12

Work Orders

40810325-23

Foam Seal Penetration M-2005-6-20-E27

01/22/2024

Work Activity Risk Management Plan for the Unit 1(2)

Turbine Trip Block Testing

01/24/2024

71111.13

Miscellaneous

Work Activity Risk Management Plan for the 1(2) ICP 02.013

4.16KV Undervoltage Matrix Relays 31-Day Surveillance

Test (TADOT)

01/02/2024

71111.15

Calculations

2010-0010

Acceptance Criteria for GAMP Sentinel Points

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2424405

High Motor Temperatures on 1P-11A

04/10/2022

2438454

1P-11A Motor Temp High

10/02/2022

2475191

~34 DPM Inboard Seal Leakage on 1P-11B, CCW Pump

2/22/2023

2475646

Boric Acid Found In 2W-1B1/1B2 Fan Cubicle

01/02/2024

2477201

Void Greater than NRI Found during UT Checks

01/22/2024

2477218

Void Greater than NRI Found during UT Checks

01/22/2024

Corrective Action

Documents

2480468

1P-11A-M CCW Pump Motor Temperature Elevated

03/04/2024

Corrective Action

Documents

Resulting from

Inspection

2477288

NRC Identified: 2W-1B1 ACC Fan Discharge Temperature

Trend

01/23/2024

110E018 Sheet 1

P&ID Auxiliary Coolant System

M-2215 Sheet 1

P&ID Heating & Ventilation Point Beach N.P. Unit 2

Drawings

PBA-1137

Piping Isometric 1-P10A & B RHR Pump Bypass

Boric Acid Leak Screening for 2W-1B1

EQCK-WEST-

008

Checklist for Environmental Qualification Assessment of

Electrical Equipment

EQMR-CCW

Equipment Qualification Maintenance Requirement

TLB-9

Component Cooling Water Surge

Miscellaneous

WCAP-16631-

NP-V1

Testing and Evaluation of Gas Transport to the Suction of

ECCS Pumps

Work Orders

40875121-01

1-TS-ECCS-002 Train B

01/22/2024

2002-0039

Fire Loading Calculation

Calculations

22-04502

Point Beach Auxiliary Building Battery & Inverter Rooms

Supplemental Cooling Calculation

Engineering

Changes

EC 296454

PAB Battery and Inverter Room Cooler Installation

71111.18

Miscellaneous

SL-017901

Fire Risk Evaluation of EC 296454 PAB Battery and Inverter

Room Cooler Installation

2000-0036

pH of Post LOCA Sump and Containment Spray

Calculations

97-0231

Auxiliary Feedwater Pump Low Suction Pressure Trip

Instrument Loop Uncertainty/Setpoint Calculation

71111.24

Corrective Action

2430785

SAT Analysis Work Order Documentation (NRC Identified)

06/27/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2472083

PMC in Screening for Extended Amount of Time

11/10/2023

2473217

CA Untimely due to Inappropriate Closure to PMCR

11/28/2023

2477533

Main Zurn Strainer Alarm

01/26/2024

2478619

Sections Reperformed during IT 09A

2/08/2024

Documents

2479695

Fuel Leak on Elbow Near F-180B G-02

2/21/2024

2471915

IST Program Inadequate Testing of MOVS

11/08/2023

2477742

Use of Fluke 289 in Calibrations - NRC Identified

01/29/2024

Corrective Action

Documents

Resulting from

Inspection

2479620

NRC Identified Completed Work Order Not in NAMS

2/21/2024

883D195 Sheet 7

Logic Diagrams Safeguards Actuation Signals

Drawings

M-207

P&ID Service Water

Miscellaneous

Internal Correspondence: M&TE Equivalency and Related

Items

2/12/2024

0-SOP-G02-001

Maintenance Operation For EDG G-02

1ICP 2.3B

Reactor Protection System Logic Train B Surveillance Test

1ICP 2.5B

Engineered Safety Features System Logic Train B Actuation

Logic Test

CAMP 226

Sodium Hydroxide: H2SO4 titration Method

CAMP 226

Sodium Hydroxide: H2SO4 titration Method

IT 09A

Cold Start of Turbine-Driven Auxiliary Feed Pump and Valve

Test (Quarterly) Unit 2

MA-AA-204-

1000-10001

Preventative Maintenance Change Request (PMCR)

OI 70

Service Water System Operation

PI-AA-104-1000

Condition Reporting

RMP 9043-23

Emergency Diesel Generator G-02 Mechanical Inspection

Procedures

TS 82

Emergency Diesel Generator G-02 Monthly

100

40769618-01

SAT NaOH SR 3.06.07.3

01/14/2022

40769627-01

SAT NaOH SR 3.06.07.3

01/14/2022

40792544-01

SAT NaOH SR 3.06.07.3

07/13/2022

40792548-01

SAT NaOH SR 3.06.07.3

07/13/2022

40819818-01

SAT NaOH SR 3.06.07.3

01/11/2023

Work Orders

40819820-01

SAT NaOH SR 3.06.07.3

01/11/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

40830496-01

IT-05B, Cont Spray Pump/Vlv Testing (CSD), "Task

Required to

10/25/2023

40844646-01

G-02, 12Y Group A PMs

2/20/2024

40844646-02

G-02, OPS PMT/RTS

2/21/2024

40847898-01

SAT NaOH SR 3.06.07.3

07/13/2023

40847905-01

SAT NaOH SR 3.06.07.3

07/13/2023

40873341-01

SAT NaOH SR 3.06.07.3

01/24/2024

40873344-01

SAT NaOH SR 3.06.07.3

01/24/2024

40873347-01

1ICP 2.3B -- Reactor Protection Logic Test - Train B

01/11/2024

40873352-01

1ICP 2.5B -- Safeguards Logic Test - Train B

01/11/2024

40875095-01

1ICP-2.32 -- 1P-29 Auxiliary Feedwater Suction Pressure

Trip

2/21/2024

40875191-02

SW-02912-BS Inspect Zurn Strainer

01/24/2024

40877343-01

IT-09A, 2P-29 AFP Cold Start Test/Valves

2/08/2024

40963338-01

SW-02912-BS; Replace Limit Switch

2/13/2024

40963338-02

SW-02912-BS; OPs PMT/RTS

01/31/2024

2476726

Unexpected Simulator Behavior During EP Drill

01/16/2024

2476761

Simulator Unexpectedly Set to Inactive During EP Drill

01/17/2024

2478166

Develop JPM for SRO Staff on Emergency Live Operator

Service

2/02/2024

2478169

Non DEP ERO Notification Would Have Been Late

2/02/2024

2478195

1Q24 EP Drill: SM Stumbled Announcement for Alert

2/02/2024

2478446

EP Drill - SM Stumbled Announcement for Alert

2/06/2024

Corrective Action

Documents

2479344

EPIP 2.1 - Notifications - ERO, State and Counties, and

NRC

2/16/2024

1Q24 EP and

Cyber Security

Drill Combined

Facility Critique

Powerpoint

2/12/2024

1Q24 EP and IT

Cyber Drill

Drill Spreadsheet

01/09/2024

71114.06

Miscellaneous

PBN LOC 24A

001E

As Found Training Scenario

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EP 5.0

Organizational Control of Emergencies

EP Appendix A

Emergency Response Organization Personnel Function and

Responsibility

EP Appendix B

Emergency Classification

EP-AA-101-1000

Nuclear Division Drill and Exercise Procedure

EPG 1.1

Performance Indicators (PI's) Guideline

EPIP 1.1

Course of Actions

EPIP 1.2

Emergency Classification

Procedures

EPIP 2.1

Notifications - ERO, State and Counties, and NRC

2391043

(P) PFP-0-PAB 8 - Pre-Fire Plan Primary (DOCDIST)

04/23/2021

2410039

(P) PFP-2-CONT-FAC - Pre-Fire Plan Unit 2 (DOCDIST)

11/02/2021

22170

PFP-0-PAB 8 Updates Needed, NRC Question

03/21/2022

22453

(S) PFP-0-PAB 8 Pre-Fire Plan Primary Auxiliary Building

03/23/2022

24251

(S) PFP-1-CONT-FAC - Pre-Fire Plan Unit 1

04/08/2022

2433350

(P) PFP-0-CB - Pre-Fire Plan Control BLDG (DOCDIST) -

REV 6

08/02/2022

2447769

PFP-0-PAB 8 - Pre-Fire Plan Primary Auxiliary (DOCDIST) -

R6

2/07/2023

Corrective Action

Documents

2463684

(S) PFP-1-TB-26 - Pre-Fire Plan Unit 1 Turbine

08/02/2023

Corrective Action

Documents

Resulting from

Inspection

2482046

NRC Potential Minor Violation-PBN 2021 FP Audit Not per

QATR

03/22/2024

NA-AA-203-1000

Performance of Nuclear Assurance Audits

NP 1.9.14

Fire Protection Plan

Procedures

PFP-SOG-001

Pre-Fire Plan Standard Operating Guidelines

71152S

Self-Assessments PBN 21-006

Nuclear Assurance Audit, Fire Protection

08/27/2021