IR 05000266/2024420

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420
ML24156A113
Person / Time
Site: Point Beach  
Issue date: 06/05/2024
From: Clark J
Security Performance Evaluation Branch
To: Durbin M
Point Beach
References
DPR-024, DPR-027 IR 2024420
Download: ML24156A113 (1)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000266/2024420 AND 05000301/2024420

Dear Michael Durbin:

On April 25, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2024420 and 05000301/2024420

Enterprise Identifier: I-2024-420-0004

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant, Units 1 and 2

Location:

Two Rivers, WI

Inspection Dates:

April 01, 2024, to April 26, 2024

Inspectors:

C. Roundtree, Team Leader, NSIR

T. Barry, Senior Physical Security Inspector, NSIR

C. Bustamante, Physical Security Inspector, NSIR

N. Egan, Senior Physical Security Inspector, RIII

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126128.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 25, 2024, the inspectors presented the security baseline inspection results to Michael Durbin and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

A/R 02480325

01-02480325 22

24 Security Force On Force Action Items

03/04/2024

A/R 02483092

Procedure Terminology Enhancement

04/02/2024

A/R 02483093

Security Training Needs Analysis NFS LP-Room Clearing

04/02/2024

A/R 02484784

Controller/Player Actions Not In Accordance With

Expectations

04/23/2024

A/R 02484787

Gai-Tronics Needs To Have Adjustment

04/23/2024

A/R 02484788

Gai-Tronics Needs Maintenance

04/24/2024

A/R 02484789

Roof Hatch On the Training Building Not Securing

04/24/2024

A/R 02484867

Standardize Hotwash Participants

04/24/2024

Corrective Action

Documents

A/R 02484868

Security Drills and Exercise Procedure Violation

04/24/2024

24 FOF Preparations - 2024 PBNP Triennial Rehearsal

Exercises

Target Set Index Book 1

Rev 18, Aug

28, 2023

Target Set Index Book 2

Rev 15, Aug

28, 2018

Point Beach Nuclear Plant Protective Strategy Briefing

01/05/24

Point Beach Nuclear Plant, Units 1 and 2 Physical Security

Plan

Revision 19,

09/25/2023

C8-89K

External BREs

Rev 17 Aug

04, 2023

CS-89g

Delay Barriers

Revision 6,

Feb 15, 2018

PBSRP 1.4.1

Point Beach Nuclear Plant Security Response Procedure

Rev 65;

01/23/2024

Power Point 17-

014

Site Responder TimeLine Development Standardization

March 21,

2017

Security Position

Paper: 04-003

Evaluation of Safe Standoff Distances for CAS, SAS, and

External Security Positions

10/06/2004

71130.03

Procedures

Security Position

Paper: 21-008

Kontek BBRE Blast Analysis

01/23/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-102-1008

Security Drills and Exercise Procedure

Revision 15;

11/09/20

VAM Book 1

Target Set Documents

Updated

09/03/19

VAM Book 2

Target Set Basis Documents

01/25/17

ML24156A113

OFFICE

NSIR/DSO/SPEB

R-III/DRS/PSB

NSIR/DSO/SPEB/ETA NSIR/DSO/SPEB

/ETA

NAME

CBustamante

NEgan

CRoundtree

JClark

DATE

Jun 4, 2024

Jun 4, 2024

Jun 4, 2024

Jun 5, 2024