SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000266/2024420 AND 05000301/2024420
Dear Michael Durbin:
On April 25, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000266 and 05000301
License Numbers:
Report Numbers:
05000266/2024420 and 05000301/2024420
Enterprise Identifier: I-2024-420-0004
Licensee:
NextEra Energy Point Beach, LLC
Facility:
Point Beach Nuclear Plant, Units 1 and 2
Location:
Two Rivers, WI
Inspection Dates:
April 01, 2024, to April 26, 2024
Inspectors:
C. Roundtree, Team Leader, NSIR
T. Barry, Senior Physical Security Inspector, NSIR
C. Bustamante, Physical Security Inspector, NSIR
N. Egan, Senior Physical Security Inspector, RIII
Approved By:
Jefferson K. Clark, Chief
Security Performance Evaluation Branch
Division of Security Operations
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.03 - Contingency Response - Force-On-Force Testing
Contingency Response - Force-On-Force Testing (1 Sample)
- (1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
REPORT ATTACHMENTS
Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126128.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 25, 2024, the inspectors presented the security baseline inspection results to Michael Durbin and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
01-02480325 22
24 Security Force On Force Action Items
03/04/2024
Procedure Terminology Enhancement
04/02/2024
Security Training Needs Analysis NFS LP-Room Clearing
04/02/2024
Controller/Player Actions Not In Accordance With
Expectations
04/23/2024
Gai-Tronics Needs To Have Adjustment
04/23/2024
Gai-Tronics Needs Maintenance
04/24/2024
Roof Hatch On the Training Building Not Securing
04/24/2024
Standardize Hotwash Participants
04/24/2024
Corrective Action
Documents
Security Drills and Exercise Procedure Violation
04/24/2024
24 FOF Preparations - 2024 PBNP Triennial Rehearsal
Exercises
Target Set Index Book 1
Rev 18, Aug
28, 2023
Target Set Index Book 2
Rev 15, Aug
28, 2018
Point Beach Nuclear Plant Protective Strategy Briefing
01/05/24
Point Beach Nuclear Plant, Units 1 and 2 Physical Security
Plan
Revision 19,
09/25/2023
C8-89K
External BREs
Rev 17 Aug
04, 2023
CS-89g
Delay Barriers
Revision 6,
Feb 15, 2018
PBSRP 1.4.1
Point Beach Nuclear Plant Security Response Procedure
Rev 65;
01/23/2024
Power Point 17-
014
Site Responder TimeLine Development Standardization
March 21,
2017
Security Position
Paper: 04-003
Evaluation of Safe Standoff Distances for CAS, SAS, and
External Security Positions
10/06/2004
Procedures
Security Position
Paper: 21-008
Kontek BBRE Blast Analysis
01/23/2024
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Security Drills and Exercise Procedure
Revision 15;
11/09/20
VAM Book 1
Target Set Documents
Updated
09/03/19
VAM Book 2
Target Set Basis Documents
01/25/17
OFFICE
NSIR/DSO/SPEB
R-III/DRS/PSB
NSIR/DSO/SPEB/ETA NSIR/DSO/SPEB
/ETA
NAME
CBustamante
NEgan
CRoundtree
JClark
DATE
Jun 4, 2024
Jun 4, 2024
Jun 4, 2024
Jun 5, 2024