November 4, 2020

SUBJECT:

POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2020003 AND 05000301/2020003

Dear Mr. Strope:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On October 6, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects

Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2020003 and 05000301/2020003

Enterprise Identifier: I-2020-003-0033

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

July 01, 2020 to September 30, 2020

Inspectors:

K. Barclay, Reactor Inspector

M. Garza, Emergency Preparedness Inspector

T. Hartman, Senior Resident Inspector

V. Myers, Senior Health Physicist

Approved By:

Néstor J. Féliz Adorno, Chief

Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/r eactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On September 25, 2020, the unit began coastdown for the upcoming refueling outage. The unit completed the inspection period at 97 percent rated thermal power.

Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities, and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather for a severe thunderstorm warning with potential high winds on August 10, 2020

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) G-02 emergency diesel generator on August 18, 2020 (2)2P-29, Unit 2 turbine-driven auxiliary feedwater pump on September 14, 2020
(3) Control room emergency ventilation train B on September 28, 2020

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire zone 237 on August 13, 2020
(2) Fire zones 300, 301, and 303 on August 18, 2020
(3) Fire zone 187 on August 18, 2020
(4) Fire zone 320 on August 25, 2020
(5) Fire zone 319 on September 3, 2020

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the on-site fire brigade training and performance during an announced fire drill on August 31, 2020

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (2 Samples)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Unit 1 and Unit 2 turbine-driven auxiliary feedwater pump rooms (2)1A-05 / 2A-05 vital switchgear room and G-01/G-02 emergency diesel generator rooms

Cable Degradation (IP Section 03.02) (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Vaults Z-65A, Z-65B, Z-66A, and Z-67A

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) HX-12C, component cooling water heat exchanger

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated Just-In-Time Training (JITT) for plant shutdown on September 28, 2020

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:

(1)2-275/A06 degraded voltage relay calibration failure on July 8, 2020

(2) Multiple instrument air compressor failures

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 emergency core cooling system venting, and pump runs for Train A and B safety injection pumps on July 24, 2020
(2) Unplanned Unit 1 containment entry for increased reactor coolant system leakage on August 3, 2020
(3) Station elevated risk due to G-03 emergency diesel generator maintenance on August 25, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Fire door, DOOR-343, not secured with latch
(2) Fire door, DOOR-152, has torn rubber sweep
(3) Auxiliary building fire rounds not performed within required time
(4) Non-conservative limit for starting a second reactor coolant pump
(5) Calculation errors for steam flow / feedwater flow setpoints

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) G-01 emergency diesel generator exhaust stack temporary repair

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) IT 21, Charging Pumps and Check Valve Test (Quarterly) Unit 1, after packing replacement on 1P-2A charging pump on July 1, 2020 (2)0-SOP-FLEX-002, FLEX Portable 480 VAC Generator Operation Z-2001A &

Z-2001B, after annual planned maintenance on August 4, 2020

(3) TS 83, Emergency Diesel Generator G-03 Monthly, after governor replacement on August 25, 2020
(4) IT 04 Train B, Low Head Safety Injection Pumps and Valves Train B Unit 2, after maintenance of the Unit 2 train B residual heat removal pump on September 9, 2020
(5) IT 04 Train A, Low Head Safety Injection Pumps and Valves Train B Unit 2, after maintenance of the Unit 2 train A residual heat removal pump on September 15, 2020

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1)

(Partial)

The inspectors evaluated refueling outage 1R39 preparatory activities from September 3-September 30, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1)1ICP 02.005B, Engineered Safety Features System Logic Train B 31 Day Staggered Actuation Logic Test, on August 13, 2020

(2) IT 05 Train B, Train B Containment Spray Pump and Valves Unit 1, on August 26, 2020

Inservice Testing (IP Section 03.01) (1 Sample)

(1) IT 13 Train B, 2P-11B, Component Cooling Water Pump and Valves Unit 2, on September 9, 2020

FLEX Testing (IP Section 03.02) (1 Sample)

(1)0-SOP-FLEX-002, FLEX Portable 480 VAC Generator Operation Z-2001A & Z-2001B, on August 4, 2020

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the following maintenance and testing of the alert and notification system:
  • 2018 Annual Siren Maintenance
  • 2019 Annual Siren Maintenance

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) A mini-scenario EP drill conducted on September 16, 2020

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) An emergency coordinator classification evaluation on August 20,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Calibration and Testing Program (IP Section 03.02) (12 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) MGP TelePole, Serial Number 482544
(2) Ludlum 9-3, Serial Number 330636
(3) MGP AMP-100, Serial Number 474102
(4) Thermo RO-20, Serial Number 472965
(5) Ludlum 12, Serial Number 264673
(6) Low Volume Air Sampler, Serial Number LVS-43
(7) ORTEC #2 Gamma Spectroscopy Unit
(8) Canberra Cronos, Serial Number 1511-197
(9) Canberra Argos 5AB, Serial Number 712-048/0480461
(10) Canberra GEM, Serial Number 480459(0712-118)
(11) Canberra iSolo, Serial Number 472922
(12) Containment High Range Monitor, 2RE-126

Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1) Waste Distillate Overboard Liquid Monitor, RE-223
(2) Unit 1 Containment Noble Gas Monitor, 1RE-212

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1)2nd quarter 2019 through 2nd quarter 2020

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) 2nd quarter 2019 through 2nd quarter 2020

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) 2nd quarter 2019 through 2nd quarter 2020

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 July 1, 2019-June 30, 2020
(2) Unit 2 July 1, 2019-June 30, 2020

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 July 1, 2019-June 30, 2020
(2) Unit 2 July 1, 2019-June 30, 2020

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 July 1, 2019-June 30, 2020
(2) Unit 2 July 1, 2019-June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 4, 2020, the inspectors presented the radiation protection baseline inspection results to Mr. M. Strope, Site Director, and other members of the licensee staff.
  • On October 5, 2020, the inspectors presented the Emergency Preparedness Program Inspection Exit Meeting inspection results to Mr. M. Strope, Site Director, and other members of the licensee staff.
  • On October 6, 2020, the inspectors presented the integrated inspection results to Mr. M. Strope, Site Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

AOP-13C

Severe Weather Conditions

71111.04

Drawings

M-144, Sheet 2

Heating & Ventilation Temperature Control

M-209, Sheet 12

P&ID Em. Diesel Air Starting Sys

M-217, Sheet 1

P&ID Auxiliary Feedwater System

104

M-217, Sheet 2

P&ID Auxiliary Feedwater System

M-219, Sheet 1

P&ID Fuel Oil System

M-219, Sheet 2

P&ID Fuel Oil System Diesel Generator Building

Miscellaneous

CL 11A G-02

G-02 Diesel Generator Checklist

CL 13E Part 1

Auxiliary Feedwater Valve Lineup Turbine-Driven Unit 2

Procedures

0-SOP-VNCR-

2

Control and Computer Room Ventilation System Normal

Operation

71111.05

Fire Plans

PFP-0-PAB 26

Pre-Fire Plan Unit 1 & Unit 2 Auxiliary Building 26 FT

PFP-0-PAB 46

Pre-Fire Plan Unit 1 & Unit 2 Auxiliary Building 46 FT

PFP-0-PAS

Pre-Fire Plan Protected Area South (Inside the Fence)

PFP-1-TB 26

Pre-Fire Plan Unit 1 Turbine Hall Building 26 FT

PFP-1-TB 8

Pre-Fire Plan Unit 1 Turbine Hall Building Elev 8 FT

Miscellaneous

Fire Drill Outline 3rd Quarter 2020

08/31/2020

Procedures

AOP-40

Response to Fire

PFP-SOG-001

Pre-Fire Plan Standard Operating Guidelines

71111.06

Calculations

2014-0007

Allowable Flood Levels

Corrective Action

Documents

AR 2315832

Standing Water and Corrosion Found Under Floor Plug

05/28/2019

AR 2315833

Standing Water and Corrosion Found Under Floor Plug

05/28/2019

Drawings

PBC-7019

Subsoil Drainage System Manhole Covers & Cleanout Plugs

Procedures

ARP 1C20 B 3-6

Alarm Response Procedure: Condenser Pit Level High

Unit 1

OM 4.3.8

Control of Time Critical and Time Sensitive Operator Actions

Work Orders

WO 40573538

1ICP 5.47 - Secondary Lvl Contr/Sw Operational Ck

07/28/2019

WO 40614880

Inspect Pipe Plugs in TB Floor Subsoil Drains

05/28/2019

WO 40635412

2ICP 5.47 - Secondary Lvl Contr/Sw Operational Ck

04/02/2020

WO 40680689

P-290A; Annual Service / Maintenance

09/22/2020

WO 40681140

P-290B; Annual Service / Maintenance

09/22/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

WO 40693994

Manholes: Electrical Inspection (Yearly - Fall)

09/22/2020

71111.07A

Corrective Action

Documents

AR 2364613

HX-12C As Found Coating Inspection

08/05/2020

Work Orders

WO 40678247

HX-012C GL 89-13 Open/Inspect/Clean/Close HX

08/03/2020

71111.11Q Corrective Action

Documents

AR 2369675

Simulator Went to Freeze During LOC Just in Time Training

09/29/2020

Miscellaneous

PBN LOC

Mode1-5 JITT

Mode 1 thru 5 JITT

71111.12

Corrective Action

Documents

AR 2322895

K-2A Instrument Air Compressor Trip

07/31/2019

AR 2335105

PS-3003C Not Functioning Properly

11/11/2019

AR 2336857

PS-3075: Switch is Sticking and Needs to be Replaced

11/27/2019

AR 2362193

Degraded Voltage Relay 2-275/A06 OOT for Dropout and

Pickup

07/08/2020

Miscellaneous

STPT 21.1 Sheet

2

Setpoint Document: Protective Relay Setpoints: Bus 2A06,

Cubicle 91

04/26/2011

71111.13

Miscellaneous

Units 1 and 2 Current Risk Summary Report

07/24/2020

Operations Work List

07/24/2020

Units 1 and 2 Current Risk Summary Report

08/03/2020

Units 1 and 2 Current Risk Summary Report

08/25/2020

Operations Work List

08/25/2020

Operations Work List

08/03/2020

71111.15

Calculations

CN-CPS-07-13

Steam Flow/Feedwater Flow Instrumentation Setpoint,

Uncertainty, and Scaling Calculation

Corrective Action

Documents

AR 02361730

Door-343 Finger Catch Plate

07/04/2020

AR 2362619

CN-CPS-07-13: SF/FF Uncertainty, Setpoint, & Scaling

07/13/2020

AR 2364034

Door-152 Rubber Sweep Torn

07/29/2020

AR 2364189

Non-Conservative Limit in TRM for 2nd RCP Start on LTOP

07/30/2020

AR 2365689

PAB 4-Hour Fire Rounds Not Performed Within Time

Expectations

08/17/2020

71111.18

Engineering

Changes

EC 295188

G-01 Exhaust Pipe Temporary Patch

08/21/2020

Work Orders

WO 40737442

G01/Exhaust Piping Degraded

08/21/2020

71111.19

Corrective Action

AR 2362825

2P-2A Did Not Start and Experienced an IOC Fault on VFD

07/15/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Engineering

Evaluations

FPTE 2013-002

Inventory and Pressure Control Calculations for the Point

Beach NFPA 805 Safe Shutdown Analysis

Procedures

TS 83

Emergency Diesel Generator G-03 Monthly

Work Orders

WO 40654693

G-03 Gov Replace Engine Speed Governor Actuator

08/26/2020

WO 40682659

Z-2001A Annual PM Requirements

08/04/2020

WO 40683128

Z-2001A 2 Year PM Requirements

08/04/2020

WO 40689819

1P-014BM, MCE Analyze Motor (1B52-19A/1B-04) w/ RIC

08/26/2020

WO 40707318

1P-002A, Replace Pump Seals

07/02/2020

WO 40709827

2P-10B-M/ Perform MCE w/ RIC for Additional Trend Data

09/08/2020

71111.20

Miscellaneous

U1R39 Outage Safety Review Supporting Documentation

09/28/2020

U1R39 Critical Path Schedule

09/29/2020

Procedures

RP 2A

Receipt of New Fuel Assemblies

RP 2C

New Fuel and Fuel Insert Inspection

71111.22

Corrective Action

Documents

Resulting from

Inspection

AR 2364619

Procedure Place Keeping & Proc. Clarification

08/05/2020

PCR 2364611

0-SOP-FLEX-002 - FLEX Portable 480 VAC Generator

Operation

08/05/2020

Procedures

0-SOP-FLEX-002

FLEX Portable 480 VAC Generator Operation Z-2001A &

Z-2001B

1ICP 02.005B

Engineered Safety Features System Logic Train B 31 Day

Staggered Actuation Logic Test

AOP-22 Unit 1

Abnormal Operating Procedure: EDG Load Management

FSG-5.3

FLEX Electrical Operations

IT 05 Train B

Train B Containment Spray Pump and Valves, Unit 1

IT 13 Train B

2P-11B, Component Cooling Water Pump and Valves, Unit 2 14

NP 7.7.36

Diverse and Flexible Coping Strategies (FLEX) Program

71114.02

Corrective Action

Documents

AR 2301146

EP Siren 012 Passed Test with Warning Signal

2/08/2019

AR 2314982

EP Siren 006 Failed Poll Test

05/20/2019

AR 2315721

EP Siren 003 Failed Poll Test

06/28/2019

AR 2334493

Kewaunee County EPZ Sirens Actuated Early by County

Emergency Management Office

11/06/2019

AR 2339924

Missed Siren Test Opportunity

01/03/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 2354545

Early Warning Communication Battery Indicates Nearing

End

04/27/2020

AR 2357272

Incorrect Siren Test Performed

05/20/2020

Miscellaneous

2018 Point Beach Nuclear Plant Annual Siren Maintenance

11/13/2018

2019 Point Beach Nuclear Plant Annual Siren Maintenance

10/08/2019

71114.03

Corrective Action

Documents

AR 2318454

2Q19 ERO Augmentation Drill Non-Responders

06/19/2019

AR 2337878

ERO Training Program/Qualification Discrepancies

2/10/2019

AR 2347504

Non-Responders for 1Q20 August Drill

05/06/2020

Miscellaneous

EPG 1.0

11

Point Beach Nuclear Plant Shift Augmentation Drill

06/26/2020

Q04-01

ERO Pager Staff Augmentation Drill

03/10/2020

Q04-02

ERO Pager Staff Augmentation Drill

08/05/2019

Q04-03

ERO Pager Staff Augmentation Drill

09/24/2019

Q04-04

ERO Pager Staff Augmentation Drill

2/16/2019

71114.05

Corrective Action

Documents

AR 2273644

Adverse Trend EP Call-Up Tasks

7/26/2018

AR 2304052

EAL Rev 6 Training Identified Several Questions and

Concerns

03/01/2019

AR 2306545

Notification Timeliness

05/34/2019

AR 2306545

1Q19 Classification Timeliness

03/20/2019

AR 2317748

Routine RP Staff Augmentation During EP Drills

06/12/2019

AR 2317809

PAR Determination DEP Not Met

06/11/2019

AR 2317809

2019 NRC Ex - PAR Determination DEP Not Met

06/11/2019

AR 2318631

ERO Performance - Declining Trend

06/20/2019

AR 2364422

NA Escalation-1 for Continued Documentation Gaps

09/03/2020

Miscellaneous

4Q19 EP Drill Report

11/04/2019

2Q19 EP Pre-Exercise Report

06/03/2019

4Q18 EP Drill Report

01/07/2019

1Q19 EP Drill Report

03/21/2019

Self-Assessments PBN 19-008

Nuclear Assurance Report - Emergency Preparedness

08/11/2019

PBN 20-005

Nuclear Assurance Report - Emergency Preparedness

08/10/2020

71114.06

Miscellaneous

Point Beach Nuclear Plant Emergency Preparedness 3Q20

EP Drill

09/16/2020

PBN EPR 203

EC DEP Opportunity - July 2020

07/30/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

001D

71124.05

Calculations

N-90-033

Liquid Monitor Sensitivity

Calibration

Records

PBF-4085y; Calibration Data Sheet for Ludlum 9-3 Serial

Number 330636

01/22/2020

PBF-4085z; Calibration Data Sheet for MGP AMP-100 Serial

Number 474102

03/09/2020

PBF-4085y; Calibration Data Sheet for Thermo RO-20 Serial

Number 472965

10/16/2019

PBF-4020; Low Volume Air Sampler Maintenance and

Calibration Record

01/05/2020

Calibration Data Files for ORTEC #2 Gamma Spectroscopy

Unit

04/13/2020

RP-AA-110-1000-F01; Cronos Calibration Data Sheet for

Serial Number 1511-197

09/17/2019

PBF-4055a; Canberra Argos 5AB Calibration Worksheet for

Serial Number 712-048/0480461

06/30/2020

PBF-4055b; Canberra GEM Calibration Data Sheet for Serial

Number 480459(0712-118)

05/07/2020

PBF-4085ff; iSolo Calibration Data Sheet

06/22/2020

Certificate of Calibration for Ludlum 12 Serial Number

264673

04/27/2020

PBF -4085x; Calibration Data Sheet for MGP TelePole Serial

Number 482544

03/27/2020

Corrective Action

Documents

AR 01226110

Evaluate the Use of Disc Sources for Calibration of RMS

Liquid Monitors

2/20/2002

Work Orders

WO 40579105

RE-223 Calibration

06/18/2019

WO 40623061

Containment High Range RMS Channel Calibration

03/13/2020

WO 40624976

1RE-211/1RE-212 Calibration

06/03/2020

WO 40635297

2RE-126/2RE-127/2RE-128 Calibration

03/14/2020

71151

Corrective Action

Documents

AR 2293043

Change to Performance Indicator

2/03/2018

AR 2363936

Change to the NRC Participation Performance Indicator

07/28/2020

Miscellaneous

NRC Performance Indicator Data; Emergency Preparedness

- Alert and Notification System

2nd Quarter

2019

through 2nd

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Quarter

20

71151

Miscellaneous

NRC Performance Indicator Data; Emergency Preparedness

- Drill and Exercise Performance

2nd Quarter

2019

through 2nd

Quarter

20

NRC Performance Indicator Data; Emergency Preparedness

- ERO Drill Participation

2nd Quarter

2019

through 2nd

Quarter

20

MSPI Derivation Reports; High Pressure Injection,

Emergency AC, Cooling Water; Unavailability Index; Units 1

and 2

07/01/2019 -

06/30/2020

MSPI Derivation Reports; High Pressure Injection,

Emergency AC, Cooling Water; Unreliability Index; Units 1

and 2

07/01/2019 -

06/30/2020

MSPI Margin Reports; Units 1 and 2

07/01/2019 -

06/30/2020

Procedures

PBN-BFJR-18-

054

MSPI Basis Document for PBNP

71152

Corrective Action

Documents

AR 2363096

Z-2000F Failed to Start (WR For AR 2363095)

07/19/2020

Miscellaneous

Vendor Manual; Baldor DG Series Generator

03/14/2003

Procedures

FSG-5.6

Flex Miscellaneous Equipment and Monitoring

NP 7.7.36

Diverse and Flexible Coping Strategies (FLEX) Program

7