Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401
ML24200A295
Person / Time
Site:  NextEra Energy icon.png
Issue date: 07/23/2024
From: Jasmine Gilliam
NRC/RGN-III/DORS/EB2
To: Durbin M
Point Beach
References
IR 2024401
Download: ML24200A295 (3)


Text

July 23, 2024

SUBJECT:

POINT BEACH NUCLEAR PLANT - CYBER SECURITY INSPECTION REPORT 05000266/2024401 AND 05000301/2024401

Dear Michael Durbin:

On June 13, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

Two findings of very low security significance (Green) are documented in this report. Two of these findings involved violations of NRC requirements. We are treating these violations as non- cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

Licensee- identified violations which were determined to be of very low security significance are documented in this report. We are treating these violations as non-cited violations (NCVs)

consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555- 0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement ; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Point Beach Nuclear Plant.

The following cross-cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.8] - Procedure Adherence.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 -0001; with copies to the Regional Administrator, Region III ; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident I nspector at Point Beach Nuclear Plant. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading- rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information- Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Jasmine A. Gilliam, Chief Engineering Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000266 and 05000301 License Nos. DPR- 24 and DPR-27

Enclosure:

As stated

cc: J. Baugniet, Site Security Manager N. Reckelberg, Engineering Director B. Coffey, President, Nuclear Division

cc w/o encl: Distribution via LISTSERV ML24200A295 (Cover letter)

Entire Report: Non-Sensitive Publicly Available SUNSI Review  Sensitive  Non-Publicly Available Cover Letter Only: Non-Sensitive Publicly Available SUNSI Review  Sensitive  Non-Publicly Available OFFICE RIII RIII NAME ADahbur:gmp JGilliam DATE 07/18/2024 07/23/2024