March 16, 2021
SUBJECT:
POINT BEACH NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000266/2021401; 05000301/2021401; INDEPENDENT SPENT FUEL STORAGE SECURITY INSPECTION REPORT 07200005/2021401
Dear Mr. Strope:
On March 3, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000266; 05000301; 07200005 License Nos. DPR-24;DPR-27; General License (ISFSI)
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000266; 05000301; 07200005
License Numbers:
DPR-24; DPR-27; General License (ISFSI)
Report Numbers:
05000266/2021401; 05000301/2021401; 07200005/2021401
Enterprise Identifiers: I-2021-401-0110; I-2021-401-0136
Licensee:
NextEra Energy Point Beach, LLC
Facility:
Point Beach Nuclear Plant
Location:
Two Rivers, WI
Inspection Dates:
February 22, 2021 to March 03, 2021
Inspector:
M. Ziolkowski, Senior Physical Security Inspector
Approved By:
Steven K. Orth, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. and Inspection Manual Chapter 2690, Inspection Program for Storage of Spent Reactor Fuel and Reactor-Related Greater-Than-Class C Waste at Independent Spent Fuel Storage Installations and for Title 10 of the Code of Federal Regulations, Part 71, Transportation Packagings. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.02 - Access Control
The inspector evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 02.06a, b; 02.08d
- Tier III: 02.09 Events and Logs
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspector verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17)
=
- (1) Unit 1 (January 01, 2020 through December 31, 2020)
Unit 2 (January 01, 2020 through December 31, 2020)
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
===81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations
The inspector evaluated the Physical Protection Program for the Independent Spent Fuel Storage Installation. The following elements were evaluated:
Physical Security Requirements for Independent Spent Fuel Storage Installations===
(1)02.01 a - f
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspector verified no proprietary information was retained or documented in this report.
- On March 3, 2021, the inspector presented the security baseline inspection results to you and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Point Beach Nuclear Plant Units 1 and 2 Physical Security
Plan
Procedures
CS-959
Key and Lock Change Out Directions
PBSAP 1.3.2
Vehicle Processing
PBSAP 1.3.4
Personnel Searches
PBSAP 1.8
Security Emergency Response
PBSRP 1.3.4
Picture Badge Alarm Response
PBSRP 3.1
Emergency and Delivery Search Exceptions
Safeguards Information Program
Tampering
Security Badge Control and Use
Vehicle and Material Searches
Visitor Access Control
Escorting Vehicles and Material
81311
Miscellaneous
Point Beach Nuclear Plant Units 1 and 2 Physical Security
Plan, Appendix D, Independent Spent Fuel Storage
Installation Security Program
Point Beach Nuclear Plant Response to Interim
Compensatory Measures for ISFSI located within Owner
Controlled Area
10/16/2002
Local Law Enforcement Agencies Agreement
01/28/2021