IR 05000266/2022001
ML22124A138 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 05/04/2022 |
From: | Nestor Feliz-Adorno Reactor Projects Region 3 Branch 4 |
To: | Strope M Point Beach |
References | |
IR 2022001 | |
Download: ML22124A138 (14) | |
Text
May 4, 2022
SUBJECT:
POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2022001 AND 05000301/2022001
Dear Mr. Strope:
On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On April 12, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Feliz-Adorno, Nestor on 05/04/22 Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000266 and 05000301 License Numbers: DPR-24 and DPR-27 Report Numbers: 05000266/2022001 and 05000301/2022001 Enterprise Identifier: I-2022-001-0067 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant Location: Two Rivers, WI Inspection Dates: January 01, 2022 to March 31, 2022 Inspectors: K. Barclay, Reactor Inspector T. Hartman, Senior Resident Inspector V. Meghani, Reactor Inspector J. Neurauter, Senior Reactor Inspector V. Petrella, Resident Inspector E. Sanchez Santiago, Senior Reactor Inspector Approved By: Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Status Section URI 05000266, Containment Air 71111.17T Discussed 05000301/2021010-01 Recirculation System Design Function Change
PLANT STATUS
Unit 1 began the inspection period at rated thermal power. On March 4, 2022, the unit began coastdown for the upcoming refueling outage. On March 26, 2022, the unit was shut down for a refueling outage and remained shut down throughout the remainder of the inspection period.
Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe cold weather on January 10, 2022.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) G-01 emergency diesel generator on February 15, 2022
- (2) Unit 1 safety injection train B on March 4, 2022
- (3) Unit 1 containment spray train B on March 7, 2022
- (4) Unit 2 turbine-driven auxiliary feedwater system on March 8, 2022
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) fire zone 138 on February 2, 2022
- (2) fire zone 139 on February 3, 2022
- (3) fire zone 151 on March 11, 2022
- (4) fire zones 152, 153, 154, 156, and 156A on March 11, 2022
- (5) fire zones 155 and 159 on March 21, 2022
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) control room heating, ventilation, and air conditioning equipment room
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during the Unit 1 shutdown on March 26, 2022.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a crew during an emergency drill on February 28, 2022, and a requalification scenario on March 1, 2022.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (3 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:
- (1) 2AF-04026, 2P-29 Auxiliary Feedwater Pump Suction Relief Valve
- (2) 2CC-00763A, 2P-1A Reactor Coolant Pump Component Cooling Water Return Header Relief Valve
- (3) 2CC-00763B, 2P-1B Reactor Coolant Pump Component Cooling Water Return Header Relief Valve
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) emergent work due to a Unit 2 atmospheric dump control valve drifting open on January 26, 2022
- (2) emergent work due to multiple instrument modules needing replacement due to incorrect manufacturing on February 8, 2022
- (3) type B cask shipment containing class B/C waste on March 11, 2022
- (4) Unit 1 doghouse removal and component cooling water pump heavy lifts on March 16, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) low coolant level in the G-500 gas turbine starting diesel engine
- (2) NUS instrument modules have drifting issue
- (3) low oil level on 'B' spent fuel pool cooling pump
- (4) component cooling water heat exchanger 'D' outlet temperature controller was found outside of its limits
- (5) Unit 2 'A' safety injection accumulator level dropped 3 percent
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Engineering Change (EC) 272153, "Service Water Pump Replacement," and EC 273505, "Component Cooling Water Pump Replacement, Pump Anchorage Modification Using Epoxy Grout"
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
- (1) testing after replacement of the 1W-1D1 containment accident recirculation fan control switch on January 18, 2022
- (2) testing after replacement of the Unit 2B steam generator atmospheric steam dump valve positioner on January 27, 2022
- (3) testing after replacement of the 2T-38 spray additive tank vacuum breaker 2SI-00840A, on November 5, 2021
- (4) testing after replacement of the 2T-38 spray additive tank vacuum breaker 2SI-00840B, on November 5, 2021
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)
(1) (Partial)
The inspectors evaluated refueling outage U1R40 activities from February 10 to March 31, 2022.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (4 Samples)
- (1) 2ICP 02.031, 2P-53 Motor Driven Auxiliary Feedwater Suction Header Pressure Trip Channel Operability Test, on February 14, 2022
- (3) IT 06 Train A, Train A Containment Spray Pump and Valves Unit 2, on March 16, 2022
- (4) TS 6, Rod Exercise Test Unit 2, on March 17, 2022
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) IT 01 Train B, High Head Safety Injection Pumps and Valves Train B Unit 1, on March 4, 2022
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
- (1) first quarter full scale emergency preparedness drill on February 28,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) ===
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)
(2 Samples)
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) corrective actions for Action Request (AR) 2402577, "NRC Question Requiring Additional Investigation"
- (2) corrective actions for AR 2408370, "Worker Received Electrical Shock During Bus Inspection"
INSPECTION RESULTS
URI Containment Air Recirculation System Design Function 71111.17T (Discussed) Change URI 05000266,05000301/2021010-01
Description:
The licensee reassessed 10 CFR 50.59 Screening 2018-0157, Provide Additional Containment Cooling Using 1/2SW-2907 or 1/2SW-2908, HX-15A-D Cont Recirc HX Emergency FCV, dated August 27, 2018, which evaluated a change to an operating procedure for the containment air recirculation system associated with the alignment of the containment air recirculation system to provide additional containment cooling during normal operations.
The licensees reassessment concluded that the change was adverse and the licensee performed a 10 CFR 50.59 evaluation, which was documented in Evaluation 2021-001, OI 72, Containment Air Recirculation System.
The inspectors began reviewing the 10 CFR 50.59 evaluation and updated screening; however, the inspection was not complete at the end of the inspection period and will continue into the second quarter. This URI remains open.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On April 12, 2022, the inspectors presented the integrated inspection results to Mr. M. Strope, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.01 Procedures AOP-13C Severe Weather Conditions 51
OI 106 Façade Freeze Protection 41
71111.04 Corrective Action AR 2418903 Sr. NRC Resident G01 Room Pipe Hanger Walkdown 02/16/2022
Documents
Resulting from
Inspection
Drawings 110E017, Sheet 1 P&ID Safety Injection System Point Beach N.P. Unit 1 60
110E017, Sheet 2 P&ID Safety Injection System Point Beach N.P. Unit 1 67
110E017, Sheet 3 P&ID Safety Injection System Point Beach N.P. Unit 1 48
M-209, Sheet 12 Emergency Diesel Air Starting System 28
M-217, Sheet 1 P&ID Auxiliary Feedwater System 107
M-217, Sheet 2 P&ID Auxiliary Feedwater System 38
M-219, Sheet 1 Fuel Oil System 51
M-219, Sheet 2 Fuel Oil System Diesel Generator Building 16
Miscellaneous CL 13E, Part 1 Auxiliary Feedwater Valve Lineup Turbine-Driven Unit 2 32
Procedures CL 10D Fuel Oil Systems 26
CL 11A G-01 G-01 Diesel Generator Checklist 30
71111.05 Corrective Action AR 2422170 PFP-0-PAB 8 Updates Needed - NRC Question 03/21/2022
Documents AR 2422171 PFP-0-PAB 8 - Pre-Fire Plan Primary Auxiliary Building Elev. 03/21/2022
Resulting from AR 2422453 PFP-0-PAB 8 - Pre-Fire Plan Primary Auxiliary Building Elev. 03/23/2022
Inspection
Fire Plans PFP-0-PAB-8 Pre-Fire Plan Primary Auxiliary Building Elevations 8' and 4
Below
PFP-0-PAB-8 Pre-Fire Plan Primary Auxiliary Building Elevations 8' and 4
Below
Procedures OM 3.27 Control of Fire Protection and NFPA 805 Equipment 80
71111.06 Calculations 2015-00222 Internal Flooding Assessment of HVAC Equipment Room 0
Corrective Action AR 2419029 CR HVAC Room Cleanliness 02/17/2022
Documents
Corrective Action AR 2419003 Control Room HVAC Room Cleanliness 02/16/2022
Documents
Resulting from
Inspection Type Designation Description or Title Revision or
Procedure Date
Inspection
71111.11Q Miscellaneous PBN LOC 22b SM Read/STA Eval 0
001E
Procedures OP 3A Unit 1 Power Operation to Hot Standby Unit 1 22
OP 3B Reactor Shutdown 48
71111.12 Corrective Action AR 1605105 Relief Valve Discharge Path in Question 01/03/2011
Documents AR 1882231 Relief Valve 2CC-00763B, 2P-1B RCP CC Return Header 06/13/2013
Relief
AR 2239499 2-CC-763B Contingency for Scope Expansion Testing 12/07/2017
AR 2239531 2-AF-04026 2R36 Contingency for Scope Expansion Testing 12/07/2017
AR 2412678 2AF-4026 Relief Valve Failed Its As-Found Test 12/01/2021
AR 2412681 Relief Valve Removed from System Had Broken Seal Wire 12/01/2021
AR 2414672 2CC-763B Relief Valve Failed Its As-Found Test 12/27/2021
AR 2415343 2CC-763A - IST Relief Valve Replacement Scope Expansion 01/06/2022
Corrective Action AR 2418016 Error on Data Sheet for Completed Work Order 02/04/2022
Documents
Resulting from
Inspection
Drawings 110E029, Sheet 2 P&ID Auxiliary Coolant System 17
DS-C-78089 Nozzle Type Relief Valve 1
H-51032 Nozzle Type Relief Valve 05/09/1978
M-217, Sheet 2 P&ID Auxiliary Feedwater System Point Beach 38
N.P. Units 1&2
Work Orders WO 364297 CC-00763B, Replace Relief Valve - IST Program 03/30/2014
WO 40208052 Replace Relief Valve - IST Program 03/18/2014
WO 40367507 2CC-00763A/Replace Relief Valve - IST Program 10/23/2015
WO 40385904 2CC-00763B/Replace Relief Valve - IST Program 10/23/2015
WO 40557445 2CC-00763A/Replace Relief Valve - IST Program 05/02/2019
WO 40577124-03 2AF-04026/Rebuild and Complete as Left Testing (IST) 09/20/2018
WO 40577128 2CC-763B Contingency for Scope Expansion Testing 05/04/2019
WO 40623976 2CC-00763B/Replace Relief Valve - IST Program 11/05/2021
WO 40726255 2AF-04026/Replace Relief Valve - IST Program 11/05/2021
71111.13 Miscellaneous T-0 Execution Schedule by Early Start 01/26/2022-
Inspection Type Designation Description or Title Revision or
Procedure Date
01/28/2022
T-0 Execution Schedule by Early Start 02/08/2022-
2/10/2022
PBN Units 1 and 2 Current Risk Summary Report 01/26/2022-
01/28/2022
PBN Units 1 and 2 Current Risk Summary Report 02/08/2022-
2/10/2022
Work Activity Risk Management Plan for the Type B Cask 03/09/2022
Shipment Containing Class B/C Waste on 03/09/2022
Procedures MA-AA-212-1000 Rigging and Material Handling 24
NP 8.4.7 Control of Safe Load Path and Rigging Material 15
71111.15 Corrective Action AR 2414946 G-500 Coolant Level Found Low During PC 21, Part 4 01/02/2022
Documents AR 2415897 2TIC-621D, 2HX-12D Component Cooling HX Outlet Temp 01/12/2022
AR 2416664 2LI-939A, T-34A SI Accumulator Level Indicator 01/20/2022
Dropped 3%
AR 2418040 Issue on SAM503-03 Curtiss-Wright Modules 02/04/2022
Installed (Unit 2)
AR 2421998 Oil Bulb Approx Half Full 03/19/2022
71111.17T Miscellaneous SCR 2018-0157 OI 72, Containment Air Recirculation System 1
71111.18 Calculations11-144 Structural Evaluation of Service Water Pump Sole Plate 1
Anchorage
2017-0003 Structural Anchorage for Component Cooling Water Pump 1
Replacement
Corrective Action AR 2422300 Document Updates to Component Cooling Water and 03/22/2022
Documents Service Water Pump Replacements
Corrective Action AR 2419219 NRC - Evaluation of Epoxy-Resin Grout and Anchor Design 02/18/2022
Documents
Resulting from
Inspection
Engineering EC 272153 Service Water Pump Replacement to Enhance Reliability 21
Changes EC 273505 Component Cooling Pump Replacement; Upgrades for 17
Reliability
Miscellaneous SCR 2012-0086 10 CFR 50.59 Screening: EC 272153 - Service Water 07/12/2012
System Vertical Pump Replacement
Inspection Type Designation Description or Title Revision or
Procedure Date
SCR 2017-0055 10 CFR 50.59 Screening: Component Cooling Pump 21
Replacement; Upgrades for Reliability
71111.19 Corrective Action AR 2416373 1B52-18B 1W-1D1 Cont Acc Fan Breaker Not Fully Seated 01/18/2022
Documents
Corrective Action AR 2412078 Spray Additive Tanks Do Not Have Nitrogen Blanket 11/23/2021
Documents
Resulting from
Inspection
Miscellaneous Licensee Document of What Occurred to Allow the Station to
Not be in Compliance with the Licensing Basis (FSAR)
SCR 2013-0089 T-38 Spray Additive Tank Alternate Vent Configuration 05/30/2013
Work Orders WO 40619622 1W-001D1-CS, Cycle and Test Control Switch 01/18/2022
WO 40726838 2SI-00840A/Replace Relief Valve - IST Program 11/05/2021
WO 40726839 2SI-00840B/Replace Relief Valve - IST Program 11/05/2021
WO 40813871 2MS-2015 Atmospheric Steam Dump Opened on Its Own 01/27/2022
71111.20 Procedures OP 3C Unit 1 Hot Standby to Cold Shutdown Unit 1 21
Ort 4 Unit 1 Main Turbine Mechanical Overspeed Trip Device Unit 1 37
71111.22 Miscellaneous H-12 Verification (G-11 Trace) 03/17/2022
H-12 Verification (G-13 Trace) 03/17/2022
Procedures IT 06, Train A Train A Containment Spray Pump and Valves Unit 2 6
IT 13, Train A 2P-11A, Component Cooling Water Pump and Valves Unit 2 15
OI 182 Flux Mapping 5
TS 6 Rod Exercise Test Unit 2 37
Work Orders WO 40774474 2ICP-2.31 - 2P-53 AF Suction Header Pressure Trip 03/10/2022
WO 40780897 IT 01 Train B 03/04/2022
71114.06 Miscellaneous 2022 1st Qtr Exercise 02/28/2022
Nuclear Accident Reporting Forms (NARS) - Drill 02/28/2022
71151 Miscellaneous Performance Indicators; Units 1 and 2; Unplanned Power 01/01/2021-
Changes Per 7000 Critical Hours 12/31/2021
Performance Indicators; Units 1 and 2; Unplanned Scrams 01/01/2021-
with Complications 12/31/2021
Performance Indicators; Units 1 and 2; Unplanned Scrams 01/01/2021-
Per 7000 Critical Hours 12/31/2021
Inspection Type Designation Description or Title Revision or
Procedure Date
Point Beach PI Reporting Data; Units 1 and 2; Unplanned 01/01/2021-
Power Changes Per 7,000 Critical Hours 12/31/2021
Point Beach PI Reporting Data; Units 1 and 2; Unplanned 01/01/2021-
Scrams with Complications 12/31/2021
Point Beach PI Reporting Data; Units 1 and 2; Unplanned 01/01/2021-
Scrams Per 7000 Critical Hours 12/31/2021
PBN-BFJR-18- MSPI Bases Document for PBNP 26
054
71152A Corrective Action AR 2402577 NRC Question Requiring Additional Investigation 02/23/2022
Documents AR 2408370 Worker Received Electrical Shock During Bus Inspection 10/20/2021
Procedures ECA-0.0, Unit 1 Loss of All AC Power 76
ECA-0.0, Unit 2 Loss of All AC Power 77
EOP-30 Temporary Ventilation for Vital Areas 16
RMP 9370-1A-03 Bus Inspection, Cleaning, and Maintenance 1
(Westinghouse 4.16KV Switchgear 1A-03)
RMP 9370-1A-05 Bus Inspection, Cleaning, and Maintenance 1
(Westinghouse 4.16KV Switchgear 1A-05)
2