SUBJECT:
POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2022001 AND 05000301/2022001
Dear Mr. Strope:
On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On April 12, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000266 and 05000301
License Numbers:
Report Numbers:
05000266/2022001 and 05000301/2022001
Enterprise Identifier:
I-2022-001-0067
Licensee:
NextEra Energy Point Beach, LLC
Facility:
Point Beach Nuclear Plant
Location:
Two Rivers, WI
Inspection Dates:
January 01, 2022 to March 31, 2022
Inspectors:
K. Barclay, Reactor Inspector
T. Hartman, Senior Resident Inspector
V. Meghani, Reactor Inspector
J. Neurauter, Senior Reactor Inspector
V. Petrella, Resident Inspector
E. Sanchez Santiago, Senior Reactor Inspector
Approved By:
Néstor J. Féliz Adorno, Chief
Branch 4
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status URI 05000266,05000301/2021010-01 Containment Air Recirculation System Design Function Change 71111.17T Discussed
PLANT STATUS
Unit 1 began the inspection period at rated thermal power. On March 4, 2022, the unit began coastdown for the upcoming refueling outage. On March 26, 2022, the unit was shut down for a refueling outage and remained shut down throughout the remainder of the inspection period.
Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe cold weather on January 10, 2022.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) G-01 emergency diesel generator on February 15, 2022
- (2) Unit 1 safety injection train B on March 4, 2022
- (3) Unit 1 containment spray train B on March 7, 2022
- (4) Unit 2 turbine-driven auxiliary feedwater system on March 8, 2022
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
(1)fire zone 138 on February 2, 2022 (2)fire zone 139 on February 3, 2022 (3)fire zone 151 on March 11, 2022 (4)fire zones 152, 153, 154, 156, and 156A on March 11, 2022 (5)fire zones 155 and 159 on March 21, 2022
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) control room heating, ventilation, and air conditioning equipment room
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during the Unit 1 shutdown on March 26, 2022.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a crew during an emergency drill on February 28, 2022, and a requalification scenario on March 1, 2022.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (3 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:
(1)2AF-04026, 2P-29 Auxiliary Feedwater Pump Suction Relief Valve (2)2CC-00763A, 2P-1A Reactor Coolant Pump Component Cooling Water Return Header Relief Valve (3)2CC-00763B, 2P-1B Reactor Coolant Pump Component Cooling Water Return Header Relief Valve
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
(1)emergent work due to a Unit 2 atmospheric dump control valve drifting open on January 26, 2022 (2)emergent work due to multiple instrument modules needing replacement due to incorrect manufacturing on February 8, 2022 (3)type B cask shipment containing class B/C waste on March 11, 2022
- (4) Unit 1 doghouse removal and component cooling water pump heavy lifts on March 16, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
(1)low coolant level in the G-500 gas turbine starting diesel engine
- (2) NUS instrument modules have drifting issue (3)low oil level on 'B' spent fuel pool cooling pump (4)component cooling water heat exchanger 'D' outlet temperature controller was found outside of its limits
- (5) Unit 2 'A' safety injection accumulator level dropped 3 percent
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Engineering Change (EC) 272153, "Service Water Pump Replacement," and EC 273505, "Component Cooling Water Pump Replacement, Pump Anchorage Modification Using Epoxy Grout"
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
(1)testing after replacement of the 1W-1D1 containment accident recirculation fan control switch on January 18, 2022 (2)testing after replacement of the Unit 2B steam generator atmospheric steam dump valve positioner on January 27, 2022 (3)testing after replacement of the 2T-38 spray additive tank vacuum breaker 2SI-00840A, on November 5, 2021 (4)testing after replacement of the 2T-38 spray additive tank vacuum breaker 2SI-00840B, on November 5, 2021
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)
(1)
(Partial) The inspectors evaluated refueling outage U1R40 activities from February 10 to March 31, 2022.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (4 Samples)
(1)2ICP 02.031, 2P-53 Motor Driven Auxiliary Feedwater Suction Header Pressure Trip Channel Operability Test, on February 14, 2022
- (3) IT 06 Train A, Train A Containment Spray Pump and Valves Unit 2, on March 16, 2022
- (4) TS 6, Rod Exercise Test Unit 2, on March 17, 2022
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) IT 01 Train B, High Head Safety Injection Pumps and Valves Train B Unit 1, on March 4, 2022
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample) (1)first quarter full scale emergency preparedness drill on February 28,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)corrective actions for Action Request (AR) 2402577, "NRC Question Requiring Additional Investigation" (2)corrective actions for AR 2408370, "Worker Received Electrical Shock During Bus Inspection"
INSPECTION RESULTS
URI (Discussed)
Containment Air Recirculation System Design Function Change URI 05000266,05000301/2021010-01 71111.17T
Description:
The licensee reassessed 10 CFR 50.59 Screening 2018-0157, Provide Additional Containment Cooling Using 1/2SW-2907 or 1/2SW-2908, HX-15A-D Cont Recirc HX Emergency FCV, dated August 27, 2018, which evaluated a change to an operating procedure for the containment air recirculation system associated with the alignment of the containment air recirculation system to provide additional containment cooling during normal operations.
The licensees reassessment concluded that the change was adverse and the licensee performed a 10 CFR 50.59 evaluation, which was documented in Evaluation 2021-001, OI 72, Containment Air Recirculation System.
The inspectors began reviewing the 10 CFR 50.59 evaluation and updated screening; however, the inspection was not complete at the end of the inspection period and will continue into the second quarter. This URI remains open.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On April 12, 2022, the inspectors presented the integrated inspection results to Mr. M. Strope, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Severe Weather Conditions
Procedures
OI 106
Façade Freeze Protection
Corrective Action
Documents
Resulting from
Inspection
Sr. NRC Resident G01 Room Pipe Hanger Walkdown
2/16/2022
110E017, Sheet 1
P&ID Safety Injection System Point Beach N.P. Unit 1
110E017, Sheet 2
P&ID Safety Injection System Point Beach N.P. Unit 1
110E017, Sheet 3
P&ID Safety Injection System Point Beach N.P. Unit 1
M-209, Sheet 12
Emergency Diesel Air Starting System
M-217, Sheet 1
P&ID Auxiliary Feedwater System
107
M-217, Sheet 2
P&ID Auxiliary Feedwater System
M-219, Sheet 1
Fuel Oil System
Drawings
M-219, Sheet 2
Fuel Oil System Diesel Generator Building
Miscellaneous
CL 13E, Part 1
Auxiliary Feedwater Valve Lineup Turbine-Driven Unit 2
CL 10D
Fuel Oil Systems
Procedures
CL 11A G-01
G-01 Diesel Generator Checklist
PFP-0-PAB 8 Updates Needed - NRC Question
03/21/2022
PFP-0-PAB 8 - Pre-Fire Plan Primary Auxiliary Building Elev.
03/21/2022
Corrective Action
Documents
Resulting from
Inspection
PFP-0-PAB 8 - Pre-Fire Plan Primary Auxiliary Building Elev.
03/23/2022
PFP-0-PAB-8
Pre-Fire Plan Primary Auxiliary Building Elevations 8' and
Below
Fire Plans
PFP-0-PAB-8
Pre-Fire Plan Primary Auxiliary Building Elevations 8' and
Below
Procedures
OM 3.27
Control of Fire Protection and NFPA 805 Equipment
Calculations
2015-00222
Internal Flooding Assessment of HVAC Equipment Room
Corrective Action
Documents
CR HVAC Room Cleanliness
2/17/2022
Corrective Action
Documents
Resulting from
Control Room HVAC Room Cleanliness
2/16/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Inspection
Miscellaneous
PBN LOC 22b
001E
SM Read/STA Eval
OP 3A Unit 1
Power Operation to Hot Standby Unit 1
Procedures
Reactor Shutdown
Relief Valve Discharge Path in Question
01/03/2011
Relief Valve 2CC-00763B, 2P-1B RCP CC Return Header
Relief
06/13/2013
2-CC-763B Contingency for Scope Expansion Testing
2/07/2017
2-AF-04026 2R36 Contingency for Scope Expansion Testing
2/07/2017
2AF-4026 Relief Valve Failed Its As-Found Test
2/01/2021
Relief Valve Removed from System Had Broken Seal Wire
2/01/2021
2CC-763B Relief Valve Failed Its As-Found Test
2/27/2021
Corrective Action
Documents
2CC-763A - IST Relief Valve Replacement Scope Expansion
01/06/2022
Corrective Action
Documents
Resulting from
Inspection
Error on Data Sheet for Completed Work Order
2/04/2022
110E029, Sheet 2
P&ID Auxiliary Coolant System
DS-C-78089
Nozzle Type Relief Valve
H-51032
Nozzle Type Relief Valve
05/09/1978
Drawings
M-217, Sheet 2
P&ID Auxiliary Feedwater System Point Beach
N.P. Units 1&2
CC-00763B, Replace Relief Valve - IST Program
03/30/2014
Replace Relief Valve - IST Program
03/18/2014
2CC-00763A/Replace Relief Valve - IST Program
10/23/2015
2CC-00763B/Replace Relief Valve - IST Program
10/23/2015
2CC-00763A/Replace Relief Valve - IST Program
05/02/2019
2AF-04026/Rebuild and Complete as Left Testing (IST)
09/20/2018
2CC-763B Contingency for Scope Expansion Testing
05/04/2019
2CC-00763B/Replace Relief Valve - IST Program
11/05/2021
Work Orders
2AF-04026/Replace Relief Valve - IST Program
11/05/2021
Miscellaneous
T-0 Execution Schedule by Early Start
01/26/2022-
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
01/28/2022
T-0 Execution Schedule by Early Start
2/08/2022-
2/10/2022
PBN Units 1 and 2 Current Risk Summary Report
01/26/2022-
01/28/2022
PBN Units 1 and 2 Current Risk Summary Report
2/08/2022-
2/10/2022
Work Activity Risk Management Plan for the Type B Cask
Shipment Containing Class B/C Waste on 03/09/2022
03/09/2022
Rigging and Material Handling
Procedures
NP 8.4.7
Control of Safe Load Path and Rigging Material
G-500 Coolant Level Found Low During PC 21, Part 4
01/02/2022
2TIC-621D, 2HX-12D Component Cooling HX Outlet Temp
01/12/2022
2LI-939A, T-34A SI Accumulator Level Indicator
Dropped 3%
01/20/2022
Issue on SAM503-03 Curtiss-Wright Modules
Installed (Unit 2)
2/04/2022
Corrective Action
Documents
Oil Bulb Approx Half Full
03/19/2022
Miscellaneous
SCR 2018-0157
OI 72, Containment Air Recirculation System
11-144
Structural Evaluation of Service Water Pump Sole Plate
Anchorage
Calculations
2017-0003
Structural Anchorage for Component Cooling Water Pump
Replacement
Corrective Action
Documents
Document Updates to Component Cooling Water and
Service Water Pump Replacements
03/22/2022
Corrective Action
Documents
Resulting from
Inspection
NRC - Evaluation of Epoxy-Resin Grout and Anchor Design
2/18/2022
Service Water Pump Replacement to Enhance Reliability
Engineering
Changes
Component Cooling Pump Replacement; Upgrades for
Reliability
Miscellaneous
SCR 2012-0086
CFR 50.59 Screening: EC 272153 - Service Water
System Vertical Pump Replacement
07/12/2012
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SCR 2017-0055
CFR 50.59 Screening: Component Cooling Pump
Replacement; Upgrades for Reliability
Corrective Action
Documents
1B52-18B 1W-1D1 Cont Acc Fan Breaker Not Fully Seated
01/18/2022
Corrective Action
Documents
Resulting from
Inspection
Spray Additive Tanks Do Not Have Nitrogen Blanket
11/23/2021
Licensee Document of What Occurred to Allow the Station to
Not be in Compliance with the Licensing Basis (FSAR)
Miscellaneous
SCR 2013-0089
T-38 Spray Additive Tank Alternate Vent Configuration
05/30/2013
1W-001D1-CS, Cycle and Test Control Switch
01/18/2022
2SI-00840A/Replace Relief Valve - IST Program
11/05/2021
2SI-00840B/Replace Relief Valve - IST Program
11/05/2021
Work Orders
2MS-2015 Atmospheric Steam Dump Opened on Its Own
01/27/2022
OP 3C Unit 1
Hot Standby to Cold Shutdown Unit 1
Procedures
Ort 4 Unit 1
Main Turbine Mechanical Overspeed Trip Device Unit 1
H-12 Verification (G-11 Trace)
03/17/2022
Miscellaneous
H-12 Verification (G-13 Trace)
03/17/2022
IT 06, Train A
Train A Containment Spray Pump and Valves Unit 2
IT 13, Train A
2P-11A, Component Cooling Water Pump and Valves Unit 2
OI 182
Flux Mapping
Procedures
TS 6
Rod Exercise Test Unit 2
2ICP-2.31 - 2P-53 AF Suction Header Pressure Trip
03/10/2022
Work Orders
IT 01 Train B
03/04/2022
22 1st Qtr Exercise
2/28/2022
Miscellaneous
Nuclear Accident Reporting Forms (NARS) - Drill
2/28/2022
Performance Indicators; Units 1 and 2; Unplanned Power
Changes Per 7000 Critical Hours
01/01/2021-
2/31/2021
Performance Indicators; Units 1 and 2; Unplanned Scrams
with Complications
01/01/2021-
2/31/2021
71151
Miscellaneous
Performance Indicators; Units 1 and 2; Unplanned Scrams
Per 7000 Critical Hours
01/01/2021-
2/31/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Point Beach PI Reporting Data; Units 1 and 2; Unplanned
Power Changes Per 7,000 Critical Hours
01/01/2021-
2/31/2021
Point Beach PI Reporting Data; Units 1 and 2; Unplanned
Scrams with Complications
01/01/2021-
2/31/2021
Point Beach PI Reporting Data; Units 1 and 2; Unplanned
Scrams Per 7000 Critical Hours
01/01/2021-
2/31/2021
PBN-BFJR-18-
054
MSPI Bases Document for PBNP
NRC Question Requiring Additional Investigation
2/23/2022
Corrective Action
Documents
Worker Received Electrical Shock During Bus Inspection
10/20/2021
ECA-0.0, Unit 1
Loss of All AC Power
ECA-0.0, Unit 2
Loss of All AC Power
Temporary Ventilation for Vital Areas
RMP 9370-1A-03
Bus Inspection, Cleaning, and Maintenance
(Westinghouse 4.16KV Switchgear 1A-03)
Procedures
RMP 9370-1A-05
Bus Inspection, Cleaning, and Maintenance
(Westinghouse 4.16KV Switchgear 1A-05)
1