IR 05000266/2022001

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000266/2022001 and 05000301/2022001
ML22124A138
Person / Time
Site: Point Beach  
Issue date: 05/04/2022
From: Nestor Feliz-Adorno
Reactor Projects Region 3 Branch 4
To: Strope M
Point Beach
References
IR 2022001
Download: ML22124A138 (14)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2022001 AND 05000301/2022001

Dear Mr. Strope:

On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On April 12, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2022001 and 05000301/2022001

Enterprise Identifier:

I-2022-001-0067

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

January 01, 2022 to March 31, 2022

Inspectors:

K. Barclay, Reactor Inspector

T. Hartman, Senior Resident Inspector

V. Meghani, Reactor Inspector

J. Neurauter, Senior Reactor Inspector

V. Petrella, Resident Inspector

E. Sanchez Santiago, Senior Reactor Inspector

Approved By:

Néstor J. Féliz Adorno, Chief

Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status URI 05000266,05000301/2021010-01 Containment Air Recirculation System Design Function Change 71111.17T Discussed

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On March 4, 2022, the unit began coastdown for the upcoming refueling outage. On March 26, 2022, the unit was shut down for a refueling outage and remained shut down throughout the remainder of the inspection period.

Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe cold weather on January 10, 2022.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) G-01 emergency diesel generator on February 15, 2022
(2) Unit 1 safety injection train B on March 4, 2022
(3) Unit 1 containment spray train B on March 7, 2022
(4) Unit 2 turbine-driven auxiliary feedwater system on March 8, 2022

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)fire zone 138 on February 2, 2022 (2)fire zone 139 on February 3, 2022 (3)fire zone 151 on March 11, 2022 (4)fire zones 152, 153, 154, 156, and 156A on March 11, 2022 (5)fire zones 155 and 159 on March 21, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) control room heating, ventilation, and air conditioning equipment room

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during the Unit 1 shutdown on March 26, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a crew during an emergency drill on February 28, 2022, and a requalification scenario on March 1, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (3 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:

(1)2AF-04026, 2P-29 Auxiliary Feedwater Pump Suction Relief Valve (2)2CC-00763A, 2P-1A Reactor Coolant Pump Component Cooling Water Return Header Relief Valve (3)2CC-00763B, 2P-1B Reactor Coolant Pump Component Cooling Water Return Header Relief Valve

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)emergent work due to a Unit 2 atmospheric dump control valve drifting open on January 26, 2022 (2)emergent work due to multiple instrument modules needing replacement due to incorrect manufacturing on February 8, 2022 (3)type B cask shipment containing class B/C waste on March 11, 2022

(4) Unit 1 doghouse removal and component cooling water pump heavy lifts on March 16, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)low coolant level in the G-500 gas turbine starting diesel engine

(2) NUS instrument modules have drifting issue (3)low oil level on 'B' spent fuel pool cooling pump (4)component cooling water heat exchanger 'D' outlet temperature controller was found outside of its limits
(5) Unit 2 'A' safety injection accumulator level dropped 3 percent

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Engineering Change (EC) 272153, "Service Water Pump Replacement," and EC 273505, "Component Cooling Water Pump Replacement, Pump Anchorage Modification Using Epoxy Grout"

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1)testing after replacement of the 1W-1D1 containment accident recirculation fan control switch on January 18, 2022 (2)testing after replacement of the Unit 2B steam generator atmospheric steam dump valve positioner on January 27, 2022 (3)testing after replacement of the 2T-38 spray additive tank vacuum breaker 2SI-00840A, on November 5, 2021 (4)testing after replacement of the 2T-38 spray additive tank vacuum breaker 2SI-00840B, on November 5, 2021

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1)

(Partial) The inspectors evaluated refueling outage U1R40 activities from February 10 to March 31, 2022.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (4 Samples)

(1)2ICP 02.031, 2P-53 Motor Driven Auxiliary Feedwater Suction Header Pressure Trip Channel Operability Test, on February 14, 2022

(2) IT 13 Train A, 2P-11A Component Cooling Water Pump and Valves Unit 2, on March 15, 2022
(3) IT 06 Train A, Train A Containment Spray Pump and Valves Unit 2, on March 16, 2022
(4) TS 6, Rod Exercise Test Unit 2, on March 17, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1) IT 01 Train B, High Head Safety Injection Pumps and Valves Train B Unit 1, on March 4, 2022

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample) (1)first quarter full scale emergency preparedness drill on February 28,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) Unit 1 (January 1, 2021 through December 31, 2021)
(2) Unit 2 (January 1, 2021 through December 31, 2021)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)

(1) Unit 1 (January 1, 2021 through December 31, 2021)
(2) Unit 2 (January 1, 2021 through December 31, 2021)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)

(1) Unit 1 (January 1, 2021 through December 31, 2021)
(2) Unit 2 (January 1, 2021 through December 31, 2021)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1)corrective actions for Action Request (AR) 2402577, "NRC Question Requiring Additional Investigation" (2)corrective actions for AR 2408370, "Worker Received Electrical Shock During Bus Inspection"

INSPECTION RESULTS

URI (Discussed)

Containment Air Recirculation System Design Function Change URI 05000266,05000301/2021010-01 71111.17T

Description:

The licensee reassessed 10 CFR 50.59 Screening 2018-0157, Provide Additional Containment Cooling Using 1/2SW-2907 or 1/2SW-2908, HX-15A-D Cont Recirc HX Emergency FCV, dated August 27, 2018, which evaluated a change to an operating procedure for the containment air recirculation system associated with the alignment of the containment air recirculation system to provide additional containment cooling during normal operations.

The licensees reassessment concluded that the change was adverse and the licensee performed a 10 CFR 50.59 evaluation, which was documented in Evaluation 2021-001, OI 72, Containment Air Recirculation System.

The inspectors began reviewing the 10 CFR 50.59 evaluation and updated screening; however, the inspection was not complete at the end of the inspection period and will continue into the second quarter. This URI remains open.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 12, 2022, the inspectors presented the integrated inspection results to Mr. M. Strope, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AOP-13C

Severe Weather Conditions

71111.01

Procedures

OI 106

Façade Freeze Protection

Corrective Action

Documents

Resulting from

Inspection

AR 2418903

Sr. NRC Resident G01 Room Pipe Hanger Walkdown

2/16/2022

110E017, Sheet 1

P&ID Safety Injection System Point Beach N.P. Unit 1

110E017, Sheet 2

P&ID Safety Injection System Point Beach N.P. Unit 1

110E017, Sheet 3

P&ID Safety Injection System Point Beach N.P. Unit 1

M-209, Sheet 12

Emergency Diesel Air Starting System

M-217, Sheet 1

P&ID Auxiliary Feedwater System

107

M-217, Sheet 2

P&ID Auxiliary Feedwater System

M-219, Sheet 1

Fuel Oil System

Drawings

M-219, Sheet 2

Fuel Oil System Diesel Generator Building

Miscellaneous

CL 13E, Part 1

Auxiliary Feedwater Valve Lineup Turbine-Driven Unit 2

CL 10D

Fuel Oil Systems

71111.04

Procedures

CL 11A G-01

G-01 Diesel Generator Checklist

AR 2422170

PFP-0-PAB 8 Updates Needed - NRC Question

03/21/2022

AR 2422171

PFP-0-PAB 8 - Pre-Fire Plan Primary Auxiliary Building Elev.

03/21/2022

Corrective Action

Documents

Resulting from

Inspection

AR 2422453

PFP-0-PAB 8 - Pre-Fire Plan Primary Auxiliary Building Elev.

03/23/2022

PFP-0-PAB-8

Pre-Fire Plan Primary Auxiliary Building Elevations 8' and

Below

Fire Plans

PFP-0-PAB-8

Pre-Fire Plan Primary Auxiliary Building Elevations 8' and

Below

71111.05

Procedures

OM 3.27

Control of Fire Protection and NFPA 805 Equipment

Calculations

2015-00222

Internal Flooding Assessment of HVAC Equipment Room

Corrective Action

Documents

AR 2419029

CR HVAC Room Cleanliness

2/17/2022

71111.06

Corrective Action

Documents

Resulting from

AR 2419003

Control Room HVAC Room Cleanliness

2/16/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Inspection

Miscellaneous

PBN LOC 22b

001E

SM Read/STA Eval

OP 3A Unit 1

Power Operation to Hot Standby Unit 1

71111.11Q

Procedures

OP 3B

Reactor Shutdown

AR 1605105

Relief Valve Discharge Path in Question

01/03/2011

AR 1882231

Relief Valve 2CC-00763B, 2P-1B RCP CC Return Header

Relief

06/13/2013

AR 2239499

2-CC-763B Contingency for Scope Expansion Testing

2/07/2017

AR 2239531

2-AF-04026 2R36 Contingency for Scope Expansion Testing

2/07/2017

AR 2412678

2AF-4026 Relief Valve Failed Its As-Found Test

2/01/2021

AR 2412681

Relief Valve Removed from System Had Broken Seal Wire

2/01/2021

AR 2414672

2CC-763B Relief Valve Failed Its As-Found Test

2/27/2021

Corrective Action

Documents

AR 2415343

2CC-763A - IST Relief Valve Replacement Scope Expansion

01/06/2022

Corrective Action

Documents

Resulting from

Inspection

AR 2418016

Error on Data Sheet for Completed Work Order

2/04/2022

110E029, Sheet 2

P&ID Auxiliary Coolant System

DS-C-78089

Nozzle Type Relief Valve

H-51032

Nozzle Type Relief Valve

05/09/1978

Drawings

M-217, Sheet 2

P&ID Auxiliary Feedwater System Point Beach

N.P. Units 1&2

WO 364297

CC-00763B, Replace Relief Valve - IST Program

03/30/2014

WO 40208052

Replace Relief Valve - IST Program

03/18/2014

WO 40367507

2CC-00763A/Replace Relief Valve - IST Program

10/23/2015

WO 40385904

2CC-00763B/Replace Relief Valve - IST Program

10/23/2015

WO 40557445

2CC-00763A/Replace Relief Valve - IST Program

05/02/2019

WO 40577124-03

2AF-04026/Rebuild and Complete as Left Testing (IST)

09/20/2018

WO 40577128

2CC-763B Contingency for Scope Expansion Testing

05/04/2019

WO 40623976

2CC-00763B/Replace Relief Valve - IST Program

11/05/2021

71111.12

Work Orders

WO 40726255

2AF-04026/Replace Relief Valve - IST Program

11/05/2021

71111.13

Miscellaneous

T-0 Execution Schedule by Early Start

01/26/2022-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

01/28/2022

T-0 Execution Schedule by Early Start

2/08/2022-

2/10/2022

PBN Units 1 and 2 Current Risk Summary Report

01/26/2022-

01/28/2022

PBN Units 1 and 2 Current Risk Summary Report

2/08/2022-

2/10/2022

Work Activity Risk Management Plan for the Type B Cask

Shipment Containing Class B/C Waste on 03/09/2022

03/09/2022

MA-AA-212-1000

Rigging and Material Handling

Procedures

NP 8.4.7

Control of Safe Load Path and Rigging Material

AR 2414946

G-500 Coolant Level Found Low During PC 21, Part 4

01/02/2022

AR 2415897

2TIC-621D, 2HX-12D Component Cooling HX Outlet Temp

01/12/2022

AR 2416664

2LI-939A, T-34A SI Accumulator Level Indicator

Dropped 3%

01/20/2022

AR 2418040

Issue on SAM503-03 Curtiss-Wright Modules

Installed (Unit 2)

2/04/2022

71111.15

Corrective Action

Documents

AR 2421998

Oil Bulb Approx Half Full

03/19/2022

71111.17T

Miscellaneous

SCR 2018-0157

OI 72, Containment Air Recirculation System

11-144

Structural Evaluation of Service Water Pump Sole Plate

Anchorage

Calculations

2017-0003

Structural Anchorage for Component Cooling Water Pump

Replacement

Corrective Action

Documents

AR 2422300

Document Updates to Component Cooling Water and

Service Water Pump Replacements

03/22/2022

Corrective Action

Documents

Resulting from

Inspection

AR 2419219

NRC - Evaluation of Epoxy-Resin Grout and Anchor Design

2/18/2022

EC 272153

Service Water Pump Replacement to Enhance Reliability

Engineering

Changes

EC 273505

Component Cooling Pump Replacement; Upgrades for

Reliability

71111.18

Miscellaneous

SCR 2012-0086

CFR 50.59 Screening: EC 272153 - Service Water

System Vertical Pump Replacement

07/12/2012

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SCR 2017-0055

CFR 50.59 Screening: Component Cooling Pump

Replacement; Upgrades for Reliability

Corrective Action

Documents

AR 2416373

1B52-18B 1W-1D1 Cont Acc Fan Breaker Not Fully Seated

01/18/2022

Corrective Action

Documents

Resulting from

Inspection

AR 2412078

Spray Additive Tanks Do Not Have Nitrogen Blanket

11/23/2021

Licensee Document of What Occurred to Allow the Station to

Not be in Compliance with the Licensing Basis (FSAR)

Miscellaneous

SCR 2013-0089

T-38 Spray Additive Tank Alternate Vent Configuration

05/30/2013

WO 40619622

1W-001D1-CS, Cycle and Test Control Switch

01/18/2022

WO 40726838

2SI-00840A/Replace Relief Valve - IST Program

11/05/2021

WO 40726839

2SI-00840B/Replace Relief Valve - IST Program

11/05/2021

71111.19

Work Orders

WO 40813871

2MS-2015 Atmospheric Steam Dump Opened on Its Own

01/27/2022

OP 3C Unit 1

Hot Standby to Cold Shutdown Unit 1

71111.20

Procedures

Ort 4 Unit 1

Main Turbine Mechanical Overspeed Trip Device Unit 1

H-12 Verification (G-11 Trace)

03/17/2022

Miscellaneous

H-12 Verification (G-13 Trace)

03/17/2022

IT 06, Train A

Train A Containment Spray Pump and Valves Unit 2

IT 13, Train A

2P-11A, Component Cooling Water Pump and Valves Unit 2

OI 182

Flux Mapping

Procedures

TS 6

Rod Exercise Test Unit 2

WO 40774474

2ICP-2.31 - 2P-53 AF Suction Header Pressure Trip

03/10/2022

71111.22

Work Orders

WO 40780897

IT 01 Train B

03/04/2022

22 1st Qtr Exercise

2/28/2022

71114.06

Miscellaneous

Nuclear Accident Reporting Forms (NARS) - Drill

2/28/2022

Performance Indicators; Units 1 and 2; Unplanned Power

Changes Per 7000 Critical Hours

01/01/2021-

2/31/2021

Performance Indicators; Units 1 and 2; Unplanned Scrams

with Complications

01/01/2021-

2/31/2021

71151

Miscellaneous

Performance Indicators; Units 1 and 2; Unplanned Scrams

Per 7000 Critical Hours

01/01/2021-

2/31/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Point Beach PI Reporting Data; Units 1 and 2; Unplanned

Power Changes Per 7,000 Critical Hours

01/01/2021-

2/31/2021

Point Beach PI Reporting Data; Units 1 and 2; Unplanned

Scrams with Complications

01/01/2021-

2/31/2021

Point Beach PI Reporting Data; Units 1 and 2; Unplanned

Scrams Per 7000 Critical Hours

01/01/2021-

2/31/2021

PBN-BFJR-18-

054

MSPI Bases Document for PBNP

AR 2402577

NRC Question Requiring Additional Investigation

2/23/2022

Corrective Action

Documents

AR 2408370

Worker Received Electrical Shock During Bus Inspection

10/20/2021

ECA-0.0, Unit 1

Loss of All AC Power

ECA-0.0, Unit 2

Loss of All AC Power

EOP-30

Temporary Ventilation for Vital Areas

RMP 9370-1A-03

Bus Inspection, Cleaning, and Maintenance

(Westinghouse 4.16KV Switchgear 1A-03)

71152A

Procedures

RMP 9370-1A-05

Bus Inspection, Cleaning, and Maintenance

(Westinghouse 4.16KV Switchgear 1A-05)

1