IR 05000261/2014001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 43: Line 43:
Please contact me at 404-997-4645 with any questions you may have regarding this letter.
Please contact me at 404-997-4645 with any questions you may have regarding this letter.


Sincerely,/RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects
Sincerely,
/RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects


Docket No.: 50-261 License No
Docket No.: 50-261 License No
.: DPR-23  
.: DPR-23 Enclosure: Robinson Inspection/Activity Plan (0 3/01/201 5 - 06/3 0/201 6) cc Distribution via ListServ  
 
===Enclosure:===
Robinson Inspection/Activity Plan (0 3/01/201 5 - 06/3 0/201 6) cc Distribution via ListServ  


_________________________
_________________________

Revision as of 05:32, 11 May 2019

Annual Assessment Letter for H.B. Robinson Steam Electric Plant NRC Inspection Report 05000261/2014001
ML15063A323
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/04/2015
From: Hopper G T
NRC/RGN-II/DRP/RPB4
To: Glover R M
Duke Energy Carolinas
References
IR 2014001
Download: ML15063A323 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 March 4, 2015 Mr. Richard Michael Glover Site Vice President H.B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/201 4 00 1

Dear Mr. Glover:

On February 11, 2015, the NRC completed its end

-of-cycle performance review of the H.B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 , through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, the H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid

-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

We also plan on conducting the following infrequently performed inspection s and temporary instructions

Operator Licensing Exams, and TI 2515/19 1 , Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans

. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4645 with any questions you may have regarding this letter.

Sincerely,

/RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket No.: 50-261 License No

.: DPR-23 Enclosure: Robinson Inspection/Activity Plan (0 3/01/201 5 - 06/3 0/201 6) cc Distribution via ListServ

_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE DRP:RII DRP:RII DRP:RII SIGNATURE DXW4 JSD GTH NAME D. Jackson J. Dodson G. Hopper DATE 02/13/2015 03/04/2015 02/20/2015 E-MAIL COPY?

YES NO YES NO YES NO Letter to Richard Michael Glover from George T. Hopper dated March 4, 2015.

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2014001 DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrRobinson Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 03/04/2015 12:10:24 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site RobinsonInspection / Activity Plan 03/01/2015

-06/30/2016ASM EP-2015 EP ASM & RES BASELINE 3 2 IP Drill Evaluation7111406 01/01/2015 12/31/2015OL RQ-REQUAL INSP 2 2 IP Licensed Operator Requalification Program7111111B 03/02/2015 03/06/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 3 2 IP Radiological Hazard Assessment and Exposure Controls71124.0105/11/2015 05/15/2015 2 IP Occupational ALARA Planning and Controls71124.0205/11/2015 05/15/2015 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0305/11/2015 05/15/2015 2 IP Occupational Dose Assessment71124.0405/11/2015 05/15/2015 2 IP Radiation Monitoring Instrumentation71124.0505/11/2015 05/15/2015 2 IP Performance Indicator Verification7115105/11/2015 05/15/2015 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 IP Inservice Inspection Activities - PWR7111108P 05/18/2015 05/22/2015 RP-RP OCCUPATIONAL BASELINE WEEK 2 3 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/18/2015 05/22/2015 2 IP Occupational ALARA Planning and Controls71124.02 05/18/2015 05/22/2015 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/18/2015 05/22/2015 2 IP Occupational Dose Assessment71124.04 05/18/2015 05/22/2015 2 IP Radiation Monitoring Instrumentation71124.05 05/18/2015 05/22/2015 2 IP Performance Indicator Verification71151 05/18/2015 05/22/2015 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 2 IP Heat Sink Performance7111107T 07/06/2015 07/10/2015 EP-EP EXERCISE 7 2 IP Exercise Evaluation7111401 07/20/2015 07/24/2015 2 IP Emergency Action Level and Emergency Plan Changes7111404 07/20/2015 07/24/2015 2 IP Performance Indicator Verification71151 07/20/2015 07/24/2015 MODS-PLANT MODIFICATIONS INSPECTION 3 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 10/26/2015 10/30/2015 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T11/16/201511/20/2015ASM EP-2016 EP ASM & RES BASELINE 3 2 IP Drill Evaluation7111406 01/01/2016 12/31/2016OL EXAM-INITIAL LICENSE EXAM PREP 3 2 ROBINSON/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23459 01/04/2016 01/08/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 03/04/2015 12:10:24 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site RobinsonInspection / Activity Plan 03/01/2015

-06/30/2016 RP-RP PUBLIC RAD SAFETY BASELINE 2 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 01/25/2016 01/29/2016 2 IP Radiological Environmental Monitoring Program71124.07 01/25/2016 01/29/2016 2 IP Performance Indicator Verification71151 01/25/2016 01/29/2016OL EXAM-INITIAL LICENSE EXAM 3 2 ROBINSON/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23459 02/01/2016 02/12/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 2 IP Problem Identification and Resolution71152B 03/07/201603/11/2016 2 IP Problem Identification and Resolution71152B 03/21/2016 03/25/2016 EP-EP PROGRAM INSPECTION 2 2 IP A lert and Notification System Testing7111402 06/20/2016 06/24/2016 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/20/2016 06/24/2016 2 IP Emergency Action Level and Emergency Plan Changes7111404 06/20/2016 06/24/2016 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/20/2016 06/24/2016 2 IP Performance Indicator Verification71151 06/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.