IR 05000382/2018005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 36: Line 36:
Please contact me at 817-200-1 574 with any questions you have regarding this letter.
Please contact me at 817-200-1 574 with any questions you have regarding this letter.


Sincerely,/RA/ Cornelius F. O'Keefe
Sincerely,
/RA/ Cornelius F. O'Keefe
, Chief Project Branch D Division of Reactor Projects Docket Nos.
, Chief Project Branch D Division of Reactor Projects Docket Nos.


50-3 82 License Nos.
50-3 82 License Nos.


NPF-38  
NPF-38 Enclosure:
 
===Enclosure:===
Inspection Plan Waterford 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count TRIENNIAL FIRE PROTECTION INSPECTION 6 3 07/22/2018 08/18/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
Inspection Plan Waterford 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count TRIENNIAL FIRE PROTECTION INSPECTION 6 3 07/22/2018 08/18/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
3 07/22/2018 08/04/2018 IP 92702 000238 Followup On Corrective Actions For Violations And Deviations 3 08/13/2018 08/17/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
3 07/22/2018 08/04/2018 IP 92702 000238 Followup On Corrective Actions For Violations And Deviations 3 08/13/2018 08/17/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
Line 58: Line 57:
WATERFORD INSERVICE INSPECTION
WATERFORD INSERVICE INSPECTION


1 3
3 01/14/2019
01/14/2019


01/25/2019
01/25/2019
Line 69: Line 67:
RP INSPECTION (1,2) - RFO
RP INSPECTION (1,2) - RFO


2 3
3 01/14/2019
01/14/2019


01/18/2019
01/18/2019
Line 78: Line 75:
000725 Radiological Hazard Assessment and Exposure Controls
000725 Radiological Hazard Assessment and Exposure Controls


3 01/14/2019
01/14/2019


01/18/2019
01/18/2019
Line 88: Line 85:
WATERFORD EQ PROGRAMS INSPECTION
WATERFORD EQ PROGRAMS INSPECTION


3 3
3 04/01/2019
04/01/2019


04/19/2019
04/19/2019
Line 99: Line 95:
TARGET SET INSPECTION
TARGET SET INSPECTION


2 3
3 04/29/2019
04/29/2019


05/31/2019
05/31/2019
Line 110: Line 105:
Security Access Control .02
Security Access Control .02


1 3
3 05/13/2019
05/13/2019


05/17/2019
05/17/2019
Line 119: Line 113:
000734 Access Control
000734 Access Control


3 05/13/2019
05/13/2019


05/17/2019
05/17/2019
Line 125: Line 119:
IP 71151 001338 Performance Indicator Verification
IP 71151 001338 Performance Indicator Verification


BRQ 2
BRQ
 
3 07/29/2019
3 07/29/2019


Line 136: Line 131:
RP TEAM INSPECTION
RP TEAM INSPECTION


4 3
3 09/16/2019
09/16/2019


09/20/2019
09/20/2019
Line 145: Line 139:
000729 Radiation Monitoring Instrumentation
000729 Radiation Monitoring Instrumentation


3 09/16/2019
09/16/2019


09/20/2019
09/20/2019
Line 153: Line 147:
000730 Radioactive Gaseous and Liquid Effluent Treatment
000730 Radioactive Gaseous and Liquid Effluent Treatment


3 09/16/2019
09/16/2019


09/20/2019
09/20/2019
Line 161: Line 155:
000731 Radiological Environmental Monitoring Program
000731 Radiological Environmental Monitoring Program


3 09/16/2019
09/16/2019


09/20/2019
09/20/2019
Line 173: Line 167:
Security Protective Strategy .05
Security Protective Strategy .05


2 3
3 10/07/2019
10/07/2019


10/11/2019
10/11/2019
Line 184: Line 177:
EP EXERCISE AND PI INSPECTION
EP EXERCISE AND PI INSPECTION


4 3
3 11/18/2019
11/18/2019


11/22/2019
11/22/2019
Line 193: Line 185:
000716 Exercise Evaluation
000716 Exercise Evaluation


3 11/18/2019
11/18/2019


11/22/2019
11/22/2019
Line 201: Line 193:
000719 Emergency Action Level and Emergency Plan Changes
000719 Emergency Action Level and Emergency Plan Changes


3 11/18/2019
11/18/2019


11/22/2019
11/22/2019
Line 209: Line 201:
8/22/2018 10:13:16 AM
8/22/2018 10:13:16 AM


Page 2
Page  
of 3
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.


Line 223: Line 217:
TI 2515/194
TI 2515/194


2 3
3 12/09/2019
12/09/2019


12/13/2019
12/13/2019
Line 239: Line 232:
RS24 Radiation Safety
RS24 Radiation Safety


2 3
3 02/10/2020
02/10/2020


02/14/2020
02/14/2020
Line 248: Line 240:
000726 Occupational ALARA Planning and Controls
000726 Occupational ALARA Planning and Controls


3 02/10/2020
02/10/2020


02/14/2020
02/14/2020
Line 258: Line 250:
Waterford 3 - Design Bases Assurance Inspection (Teams)
Waterford 3 - Design Bases Assurance Inspection (Teams)


6 3
3 05/04/2020
05/04/2020


05/08/2020
05/08/2020
Line 267: Line 258:
000713 Design Bases Assurance Inspection (Teams)
000713 Design Bases Assurance Inspection (Teams)


3 05/18/2020
05/18/2020


05/22/2020
05/22/2020
Line 277: Line 268:
8/22/2018 10:13:16 AM
8/22/2018 10:13:16 AM


Page 3
Page  
of 3
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.



Revision as of 05:28, 9 May 2019

Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2018005)
ML18234A105
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/2018
From: O'Keefe C F
NRC/RGN-IV/DRP/RPB-D
To: Dinelli J
Entergy Operations
O'Keefe C F
References
IR 2018005
Download: ML18234A105 (6)


Text

August 31, 2018

Mr. John Dinelli, Site Vice President Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

SUBJECT: UPDATED INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2018005)

Dear Mr. Dinelli:

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Waterford Steam Electric Station, Unit 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes

. Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/194, "Inspection of the Licensee's Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012

-01)." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1 574 with any questions you have regarding this letter.

Sincerely,

/RA/ Cornelius F. O'Keefe

, Chief Project Branch D Division of Reactor Projects Docket Nos.

50-3 82 License Nos.

NPF-38 Enclosure:

Inspection Plan Waterford 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count TRIENNIAL FIRE PROTECTION INSPECTION 6 3 07/22/2018 08/18/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

3 07/22/2018 08/04/2018 IP 92702 000238 Followup On Corrective Actions For Violations And Deviations 3 08/13/2018 08/17/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

EP PROGRAM INSPECTION 1 3 07/30/2018 08/10/2018 IP 71114.02 000717 Alert and Notification System Testing 3 07/30/2018 08/10/2018 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 3 07/30/2018 08/10/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3 07/30/2018 08/10/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 3 07/30/2018 08/10/2018 IP 71151 001397 Performance Indicator Verification RAD SAFETY 2,4 2 3 09/10/2018 09/14/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 3 09/10/2018 09/14/2018 IP 71124.04 000728 Occupational Dose Assessment BIENNIAL PI&R 4 3 09/17/2018 09/21/2018 IP 71152B 000747 Problem Identification and Resolution 3 10/01/2018 10/05/2018 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7 3 09/24/2018 09/28/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 3 10/15/2018 10/19/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing INITIAL EXAM 4 3 09/30/2018 10/06/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

3 11/04/2018 11/10/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

CYBER SECURITY INSPECTION 5 3 11/05/2018 11/09/2018 IP 71130.10P 000741 Cyber Security 3 11/26/2018 11/30/2018 IP 71130.10P 000741 Cyber Security Security Access Control .02 1 3 12/03/2018 12/07/2018 IP 71130.02 000734 Access Control 3 12/03/2018 12/07/2018 IP 71151 001338 Performance Indicator Verification 8/22/2018 10:13:16 AMPage 1 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Waterford 08/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

WATERFORD INSERVICE INSPECTION

3 01/14/2019

01/25/2019

IP 71111.08P

000702 Inservice Inspection Activities - PWR

RP INSPECTION (1,2) - RFO

3 01/14/2019

01/18/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

01/14/2019

01/18/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

WATERFORD EQ PROGRAMS INSPECTION

3 04/01/2019

04/19/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

TARGET SET INSPECTION

3 04/29/2019

05/31/2019

IP 71130.14

000743 Review of Power Reactor Target Sets

Security Access Control .02

3 05/13/2019

05/17/2019

IP 71130.02

000734 Access Control

05/13/2019

05/17/2019

IP 71151 001338 Performance Indicator Verification

BRQ

3 07/29/2019

08/03/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

RP TEAM INSPECTION

3 09/16/2019

09/20/2019

IP 71124.05

000729 Radiation Monitoring Instrumentation

09/16/2019

09/20/2019

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

09/16/2019

09/20/2019

IP 71124.07

000731 Radiological Environmental Monitoring Program

09/16/2019

09/20/2019

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

Security Protective Strategy .05

3 10/07/2019

10/11/2019

IP 71130.05

000737 Protective Strategy Evaluation

EP EXERCISE AND PI INSPECTION

3 11/18/2019

11/22/2019

IP 71114.01

000716 Exercise Evaluation

11/18/2019

11/22/2019

IP 71114.04

000719 Emergency Action Level and Emergency Plan Changes

11/18/2019

11/22/2019

IP 71151 001397 Performance Indicator Verification

8/22/2018 10:13:16 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Waterford 08/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

TI 2515/194

3 12/09/2019

12/13/2019

TI 2515/194

000512 Inspection of the Licensee

s Implementation of Industry Initiative Associated With the

Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin

2012-01)

RS24 Radiation Safety

3 02/10/2020

02/14/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

02/10/2020

02/14/2020

IP 71124.04

000729 Occupational Dose Assessment

Waterford 3 - Design Bases Assurance Inspection (Teams)

3 05/04/2020

05/08/2020

IP 71111.21M

000713 Design Bases Assurance Inspection (Teams)

05/18/2020

05/22/2020

IP 71111.21M

000713 Design Bases Assurance Inspection (Teams)

8/22/2018 10:13:16 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

ML18234A 105 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: CFO/RDR Yes No Publicly Available Sensitive NRC-002 OFFICE C:DRP/D NAME NO'Keefe SIGNATURE /RA/ DATE 8/22/18