MONTHYEARML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20304A1612020-10-14014 October 2020 Lake Engineering Co., Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 Final Report Per 10 CFR Part 21 ML20097B6912020-03-20020 March 2020 Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML18241A0292018-08-23023 August 2018 Hex Inverter Chip on Westinghouse 7300 Process Analog Control System Circuit Cards W3F1-2018-0040, Interim Report of a Deviation or Failure to Comply2018-07-0505 July 2018 Interim Report of a Deviation or Failure to Comply ML18081A1192018-03-15015 March 2018 Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1154 and Model 1154 Serles H Pressure Transmitters and 01154-0153-0002 Amplifier Circuit Card Assemblies ML17325B0222017-11-17017 November 2017 Fisher Controls International LLC Information Notice (FIN) 2017-05 ML17324A9792017-11-17017 November 2017 Part 21 Report Re Fisher Type 461 Valve Plug Machining ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16188A3762016-06-21021 June 2016 Part 21 Interim Evaluation of Deviation - Contractor Failure ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML15303A0042015-10-23023 October 2015 Part 21 Report Regarding Westinghouse Type KIR-60 Current Transformer, Per Waterford, Unit 3 ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15089A4362015-03-21021 March 2015 Part-21 Report - Valve Seat Leakage Defect W3F1-2014-0069, Part 21 Report of Time-Delay Relay Failure2014-11-12012 November 2014 Part 21 Report of Time-Delay Relay Failure ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14265A0492014-09-12012 September 2014 Amendment to Part 21 Report from Abb, Inc Re Deviation of K-Line Circuit Secondary Close Latch (Event #50371) ML14237A1212014-08-15015 August 2014 Notification of Potential Part 21 Re Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch W3F1-2014-0042, Part 21 Report of Pneumatic Valve Actuator Reverse Action2014-07-0909 July 2014 Part 21 Report of Pneumatic Valve Actuator Reverse Action ML14171A3562014-06-12012 June 2014 Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open Configuration ML14170A0132014-06-0909 June 2014 Part 21 (Event 50025) - Barton Model 288A and 289A Differential Pressure Switch Defect W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14101A4672014-04-11011 April 2014 (Waterford 3)- Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14079A0282014-03-13013 March 2014 Part 21 - Allen Bradley Type 700RTC Relay Spuriously De-Energizing ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13099A2382013-03-27027 March 2013 Notification of Potential Part 21 Report Re Series 24 Csr Relays with Oversized Cam Drive Components ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12283A2452012-09-28028 September 2012 Part 21 - Defective Masoneilan Transducer Model 8005N ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML11363A1882011-12-0202 December 2011 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0098, Rev. 3, Amot Thermostatic Valve Element P/N: 9760X ML11336A3692011-12-0101 December 2011 Notification of Potential Part 21 Interim Report on Thermostatic Valve Failure on Palo Verde EDG ML11251A1982011-09-0606 September 2011 Notification Under 10 CFR Part 21 on Certain Rosemount Model 1153 Series B, 1164 and 1154 Series H Pressure Transmitters, May Not Perform Their Intended Safety Function ML1109701512011-04-0101 April 2011 Interim Report on Thermostatic Valve Failure on Palo Verde EDG ML0934301402009-12-0202 December 2009 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X ML0930304542009-10-23023 October 2009 Hilti, Inc., Potential Delivery of Nonconforming Washers, and Affected Utilities or Plants Are Pilgrim, Brunswick, Arizona Public Service, and Waterford 3 ML0930205602009-10-23023 October 2009 Potential Delivery of Nonconforming Washers Supplied with Expansion Anchors Type Hilti Kwik Bolt KB3 SS316, 1/4 and 3/8 Diameters, All Lengths, Which May Meet the Definition of a Defect within 10 CFR Part 21 2023-03-03
[Table view] Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] |
Text
4345229832 LP39 01:22:29p.m. 12-01-2022 1 /1 FLOWSERVE Limitorque December 2, 2022 Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555-0001
Subject:
Interim Report Potential Part 21 on Peerless 56 frame DC Motors
Dear Sirs,
Pursuant to the requirements of 10 CFR Part 21, Flowserve - Limitorque is submitting this interim report as notification to the NRC of a potential Part 21 condition under evaluation.
Flowserve - Limitorque received information from Entergy Waterford 3 on 10-5-2022 that during routine maintenance involving partial disassembly of a Peerless 125 volt, 25 ft-lb, 56 frame DC motor, the motor was found to have two fasteners securing the brush holder ring assembly to the motor frame while the motor frame machining has provision to accommodate four fasteners.
Investigation into Limitorque actuator environmental and seismic qualification records indicate that the DC motor assembly used in the qualification test program was assembled with four fasteners.
Therefore, the use of two fasteners in the assembly in lieu of four fasteners constitute a deviation to the qualified design. Flowserve is evaluating this deviation to determine whether the condition could potentially affect the safety related function of DC powered Limitorque SMB/SB/SBD actuators.
This brush holder assembly mounting configuration is unique to Peerless -Winsmith DC electric motors built in a 56 frame size. Peerless - Winsmith DC motors with start torque ratings of 2, 5, 7.5, 10, 15 and 25 ft-lb. are built in a 56 frame size. Flowserve continues to work with the motor OEM to refine the scope of potentially affected motors through research of historic assembly records.
Limitorque actuators equipped with Peerless - Winsmith DC electric motors with start torque ratings of 40 ft-lb and larger are not affected by this issue. Limitorque actuators equipped with AC powered electric motors are not affected by this issue.
The evaluation is expected to be completed by 01/27/2023. If there are questions, or addition information is required, please contact Chris Shaffer (434) 522-4136.
Chris Sha er Quality Assurance Manager, Flowserve Corporation Flowserve - Lynchburg VA Operations 5114 Woodall Road Lynchburg VA, 24502 Flowserve, Lynchburg VA Operations Page 1 ofl Limitorque Engineering Department