ML092650228: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML092650228
| number = ML092650228
| issue date = 09/28/2009
| issue date = 09/28/2009
| title = Monticello, Request for Withholding Information from Public Disclosure
| title = Request for Withholding Information from Public Disclosure
| author name = Feintuch K D
| author name = Feintuch K D
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1

Revision as of 22:35, 16 April 2019

Request for Withholding Information from Public Disclosure
ML092650228
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/28/2009
From: Feintuch K D
Plant Licensing Branch III
To: O'Connor T J
Northern States Power Co
tam P S, NRR/DORL, 415-1451
References
TAC MD9990
Download: ML092650228 (4)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 September 28, 2009 Mro Timothy J. O'Connor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company -Minnesota (NSPM) 2807 West County Road 75 Monticello, MN 55362-9637 SUB..MONTICELLO NUCLEAR GENERATING PLANT -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD9990)

Dear Mr. O'Connor:

By letter dated August 26, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092390326), you responded to a Request for Additional Information (RAI) from the Nuclear Regulatory Commission (NRC) staff. Your submittal included Enclosure 1, "Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Monticello, Rev. 3 (Proprietary)" (ADAMS Accession No. ML092390325, and an affidavit executed by Ms. Barbara A. Agans of Continuum Dynamics, Inc. (CoD. I.), dated August 10, 2009, requesting that Enclosure 1 be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. The affidavit stated that the entire Enclosure 1 should be considered exempt from mandatory public disclosure because the information summarizes: a process or method, including supporting data and analysis, where prevention of its use by CD.I.'s competitors without license from CoD. I. constitutes a competitive advantage over other companies; Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.

We have reviewed CoD.I.'s affidavit in accordance with the requirements of 10 CFR 2.390, and on the basis of its statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the entire Enclosure 1, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. We have released to the public the balance (non-proprietary) parts of your August 26, 2009, letter, including Enclosure 3, the non-proprietary version of the C.D.1. document (ADAMS Accession No. ML0092390321).

T. J. O'Connor -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-3079.

Sincerely, Karl D. Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc w/encl: Distribution via ListServ Monticello Nuclear Generating Plant Ms. Barbara A. Agans, Director, Business Administration Continuum Dynamics, Inc. 34 Lexington Avenue Ewing, NJ 08618-2302 Additional Distribution via ListServ T. J. O'Connor -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1451.

Sincerely, IRA! Karl D. Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket 1\10. 50-263 cc w/encl: Distribution via ListServ DISTRIBUTION:

PUBLIC RidsNrrDorlLpl3-1 Resource RidsNrrPMPTamResource RidsNrrLABTully Resource RidsOgcMailCenterResource RidsAcrsAcnw

_MailCTRResource RidsNrrDirsltsb RidsRgn3MailCenterResource RidsNrrDorlDprResource LPL 3-1 R/F Accession No'.. ML092650228 OFFICE LPL3-1/PM LPL3-1/LA EMCB/BC LPL3-1/BC(A)

NAME KFeintuch THarris AT sirigotis for MKhanna PTam DATE 9/25/09 9/24/09 9/28/09 9/28/09 OFFICIAL RECORD COpy