Letter Sequence Draft RAI |
|---|
TAC:MD9990, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis, L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008, L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008, L-MT-09-004, Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008, L-MT-09-026, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, Average Power Range Monitor Selected Prnm Licensing Setpoints - EPU Operation (Numac), L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009, L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009, L-MT-09-049, Drawing C.5-2007, Revision 15, Failure to Scram, L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009, L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009, L-MT-09-088, Extended Power Uprate: Revision to Clarify Text in Enclosures 5 and 7 of L-MT-08-052, L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay, L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call, L-MT-10-072, Extended Power Uprate: Updates to Docketed Information, L-MT-11-044, Uprate (Epu): Update on EPU Commitments, L-MT-12-056, WCAP-17549-NP, Rev. 0, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, L-MT-12-090, Westinghouse, LTR-A&SA-12-8, Rev. 1, Attachment B, Recommendations for Inspections of the Monticello Replacement Steam Dryer, L-MT-12-114, Drawing C.5-2007, Rev. 17, Failure to Scram, L-MT-13-020, Enclosure 1 - Responses to the Gap Analysis, L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14, L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan, L-MT-15-074, Enclosure 7, WCAP-18604-NP, Revision 0, Monticello EPU Main Steam Line Strain Data Evaluation Report, L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML083400402, ML083500575, ML083570610, ML083590127, ML090710680, ML090710682, ML090710683, ML091120578, ML091140470, ML091410121, ML091410122, ML091410123, ML091410124, ML091760769, ML092090321, ML092290250, ML092790191, ML092810554, ML093160816, ML093220925, ML093220964, ML093620024, ML100980009, ML101890915, ML102010461... further results
|
MONTHYEARML0920903212003-10-15015 October 2003 Drawing NX-7831-197-1, Rev D, Monticello Nuclear Generating Plant Reactor Vessel & Internals, Monticello, Unit 1 Project stage: Other ML0907106832008-02-17017 February 2008 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Attachment 1-1g Through End of Encl. 1 Project stage: Other ML13064A4352008-03-20020 March 2008 CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4 Project stage: Other 05000263/LER-2008-001, Re Non-Conservative High Energy Line Break Analysis Discovered During Extended Power Uprate Review2008-03-31031 March 2008 Re Non-Conservative High Energy Line Break Analysis Discovered During Extended Power Uprate Review Project stage: Request ML0914101242008-08-11011 August 2008 Calculation CA-08-050, Rev. 0, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased Prnm Setpoints for Cl Tp and EPU Project stage: Other ML0826310122008-09-18018 September 2008 Special Inspection Charter for Loss of Normal Offsite Power to Non-Safety Buses and Resultant Reactor Scram on 9/11/2008 Project stage: Request ML0832301122008-10-31031 October 2008 NEDC-33322-NP, Revision 3, Monticello Nuclear Generating Plant, Safety Analysis Report, Constant Pressure Power Uprate Project stage: Request L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis2008-10-31031 October 2008 Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis Project stage: Other ML0832301112008-11-0505 November 2008 License Amendment Request: Extended Power Uprate Project stage: Request ML0832301142008-11-0505 November 2008 Steam Dryer Dynamic Stress Evaluation Project stage: Request ML0831106732008-11-0707 November 2008 Notice of Meeting with Nuclear Management Company to Discuss the November 05, 2008, License Amendment Application for Extended Power Uprate for Monticello Nuclear Generating Plant Project stage: Meeting ML0832507042008-11-26026 November 2008 Meeting Summary, Meeting with Northern States Power Company to Discuss the November 5, 2008, Application for an Extended Power Uprate Amendment Project stage: Meeting ML0834003662008-12-0202 December 2008 Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues Project stage: Acceptance Review ML0834004022008-12-0505 December 2008 Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area Project stage: Other ML0835000992008-12-11011 December 2008 Extended Power Uprate (USNRC TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis Project stage: Supplement ML0835303022008-12-16016 December 2008 Draft Request for Additional Information, Environmental Issues of EPU Application Project stage: Draft RAI ML0936200242008-12-18018 December 2008 Report 0800760.401, Rev. 1, Flaw Evaluation and Vibration Assessment of Existing Monticello Steam Dryer Flaws for Extended Power Uprate Project stage: Other ML0914101222008-12-18018 December 2008 Calculation CA-95-075, Revision 1, Main Steam Line High Flow Setpoint Project stage: Other ML0835309982008-12-18018 December 2008 EPU Application - Additional RAI Question Regarding an Environmental Issue Project stage: RAI ML0835005752008-12-18018 December 2008 Letter Finding 11/5/08 Application for Amendment Acceptable for Review Project stage: Other ML0835310022008-12-18018 December 2008 Proposed Eou Amendment - Revised RAI Re. Containment Analysis Project stage: RAI ML0914101212008-12-19019 December 2008 Calculation CA-95-073, Revision 4, Reactor Low Water Level Scram Setpoint Project stage: Other ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure Project stage: Other ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 20082009-01-29029 January 2009 Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008 Project stage: Other L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 20082009-02-0404 February 2009 Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008 Project stage: Other L-MT-09-005, Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate2009-02-0404 February 2009 Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate Project stage: Request ML0904204852009-02-11011 February 2009 Draft RAI from Materials Engineering Re. Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907106792009-02-17017 February 2009 Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008 Project stage: Request ML0907106802009-02-17017 February 2009 Enclosure 1 to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 1 Dated December 18, 2008, Cover Through Copy of MNGP Appr T0406 Data Transmittal Page 424 of 424 Project stage: Other ML0907106822009-02-17017 February 2009 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538 Project stage: Other L-MT-09-004, Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 20082009-02-17017 February 2009 Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008 Project stage: Other L-MT-09-018, Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 20092009-02-24024 February 2009 Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 2009 Project stage: Request ML0907100912009-03-11011 March 2009 Conveying Draft RAI Questions from the Instrumentation and Controls Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907200572009-03-12012 March 2009 Conveys Draft RAI Regarding Fire Protection for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800062009-03-18018 March 2009 Draft RAI from Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800042009-03-18018 March 2009 Conveys Draft RAI by the PRA Licensing Branch on the Proposed EPU Amendment Project stage: Draft RAI ML0907809032009-03-19019 March 2009 Conveys Draft RAI Provided by the Containment and Ventilation Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907809092009-03-19019 March 2009 RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment Project stage: RAI L-MT-09-017, Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 20092009-03-19019 March 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 2009 Project stage: Request ML0908200312009-03-20020 March 2009 Draft RAI Re. Health Physics Issues for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908200992009-03-23023 March 2009 Draft RAI from the Balance of Plant Branch Re the Proposed Amendment on Extended Power Uprate Project stage: Draft RAI ML0908800022009-03-28028 March 2009 Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908800032009-03-28028 March 2009 Draft RAI from the Electrical Engineering Branch Re. the Proposed Extended Power Uprate Amendment for Monticello Project stage: Draft RAI ML0908800012009-03-29029 March 2009 Additional Draft RAI Questions from the Containment and Ventilation Branch Proposed EPU Amendment for Monticello Project stage: Draft RAI ML0910300172009-04-0606 April 2009 Conveys an Additional EPU Draft RAI Question from Instrumentation and Controls Branch Project stage: Draft RAI ML0910300212009-04-0606 April 2009 Draft RAI Question from Instrumentation and Controls Branch Re. Proposed EPU Amendment Project stage: Draft RAI ML0911205782009-04-22022 April 2009 Request for Audit of Implementation of Long-Term Stability Solution Project stage: Other L-MT-09-025, Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 20092009-04-22022 April 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 2009 Project stage: Request ML0911902092009-04-29029 April 2009 Transmit Revised Draft RAI from the Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI 2009-01-14
[Table View] |
Text
Accession No. ML090820031 From:
Peter Tam Sent:
Friday, March 20, 2009 4:21 PM To:
'Pointer, Kenneth'; 'Salamon, Gabor' Cc:
Roger Pedersen; Karl Feintuch
Subject:
Monticello - Draft RAI from re. Reactor Inspection Branch re. Proposed EPU Amendment (TAC MD9990)
Ken:
Our review of your 11/5/09 application for an extended power uprate (EPU) amendment is ongoing. Our Reactor Inspection Branch has provided the following draft RAI questions in the health physics area. Please contact me to set up a conference call to discuss these questions.
If you desire to have the proposed conference call during 3/24/09 - 4/10/09 when I am on leave, please contact my back up Karl Feintuch (301-415-3079).
- 1.
The Safety Analysis Report for the Monticello Constant Power Uprate, dated October 2008, page 2-343, indicates that an analysis predicts only a 3 percent increase in dose rates at the high pressure (HP) turbine due to increased N-16 in the steam entering the turbine. This is somewhat lower than analysis provided for similar uprates at other BWRs in the U.S.
- a. Provide a detailed description of this analysis and input parameters. Include the main steam transient time, from the reactor head to the HP-LP turbine crossover line under full power CLTP conditions; and the corresponding transient time under full power EPU conditions.
- b. It is the staffs understanding that the steam crossover line from the HP to LP turbines is the major source of N-16 gamma radiation shine from BWR turbine buildings. Verify that this is the case for Monticello or provide the transient time information in 1.a. above from the reactor head to the turbine building component determined to be the major gamma source.
- 2.
The Safety Analysis Report for the Monticello Constant Power Uprate, dated October 2008, page 2-344, indicates that EPU may result in a maximum sky shine source dose rate increase of up to 34.4 percent and that this results in a maximum increase in offsite dose due to sky shine at EPU conditions of less than 6 mrem/yr.
- a. Resolve the apparent discrepancy between the 3 percent increase stated on page 2-343 and the 34.4 percent increase stated on page 2-344.
- b. Describe how Monticello currently demonstrates that the annual dose to the maximum exposed member of the public meets the 25 mrem/yr requirement of 40 CFR 190.
- c. What is the nominal annual dose (allowing for variations from year to year) to the maximum exposed member of the public from Monticello operations under CLTP conditions? What are the contributions to this dose from N-16 shine, Nobel Gas, and other plant effluents?
- 3.
The Safety Analysis Report for the Monticello Constant Power Uprate, dated October 2008, page 2-343, Table 2.10-2, indicates a possible increase in localized dose rates in the balance-of plant (BOP) of up to 1130% under EPU conditions.
Verify that these increases do not change the radiation zoning of the BOP spaces.
- 4.
The Safety Analysis Report for the Monticello Constant Power Uprate, dated October 2008, page 2-340, Table 2.9-1, indicates the dose consequences in the Control Room and Technical Support Center, from a design-basis loss-of-coolant accident under EPU conditions, as 3.80 rem and 0.83 rem, respectively. Verify that these results include direct radiation exposure from plant systems containing the accident source term, consistent with the assumptions in NUREG-0737, item II.B.2.
If not, demonstrate that the direct radiation dose rates for these two vital areas meet the GDC-19 dose criteria, as specified in NUREG-0737, item II.B.2.
This e-mail aims solely to prepare you and others for the requested conference call. This e-mail does not convey a formal NRC staff position, and does not formally request for additional information.
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (3D6B1F4F51D25E4E9B6C93FF92DAE5171443BF3C27)
Subject:
Monticello - Draft RAI from re. Reactor Inspection Branch re. Proposed EPU Amendment (TAC MD9990)
Sent Date: 3/20/2009 4:21:23 PM Received Date: 3/20/2009 4:21:00 PM From: Peter Tam Created By: Peter.Tam@nrc.gov Recipients:
Kenneth.Pointer@xenuclear.com ('Pointer, Kenneth')
Tracking Status: None Gabor.Salamon@xenuclear.com ('Salamon, Gabor')
Tracking Status: None Roger.Pedersen@nrc.gov (Roger Pedersen)
Tracking Status: None Karl.Feintuch@nrc.gov (Karl Feintuch)
Tracking Status: None
Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 17372 3/20/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: