Letter Sequence Response to RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis., L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008, L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008, L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538, L-MT-09-026, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, Average Power Range Monitor Selected Prnm Licensing Setpoints - EPU Operation (Numac), L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009, L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009, L-MT-09-049, Drawing C.5-2007, Revision 15, Failure to Scram, L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009, L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009, L-MT-09-088, Extended Power Uprate: Revision to Clarify Text in Enclosures 5 and 7 of L-MT-08-052, L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay, L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call, L-MT-10-072, Extended Power Uprate: Updates to Docketed Information, L-MT-11-044, Uprate (Epu): Update on EPU Commitments, L-MT-12-056, WCAP-17549-NP, Rev. 0, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, L-MT-12-090, Westinghouse, LTR-A&SA-12-8, Rev. 1, Attachment B, Recommendations for Inspections of the Monticello Replacement Steam Dryer., L-MT-12-114, Drawing C.5-2007, Rev. 17, Failure to Scram, L-MT-13-020, Enclosure 1 - Responses to the Gap Analysis, L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project., L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14, L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan, L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages, L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit, L-MT-14-023, Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications, L-MT-15-074, Enclosure 7, WCAP-18604-NP, Revision 0, Monticello EPU Main Steam Line Strain Data Evaluation Report., L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML083230111, ML083400402, ML083500575, ML083570610, ML083590127, ML090710680, ML090710683, ML090710684, ML091120578, ML091140470, ML091410121, ML091410122, ML091410123, ML091410124, ML091760769, ML092290250, ML092810554, ML093160816, ML093220925, ML093220964, ML093620024, ML100280558... further results
|
MONTHYEARML0907106832008-02-17017 February 2008 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Attachment 1-1g Through End of Encl. 1 Project stage: Other ML13064A4352008-03-20020 March 2008 CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4 Project stage: Other ML0914101242008-08-11011 August 2008 Monticello - Calculation CA-08-050, Rev. 0, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased Prnm Setpoints for Cl Tp and EPU Project stage: Other L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis.2008-10-31031 October 2008 Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis. Project stage: Other ML0832301122008-10-31031 October 2008 NEDC-33322-NP, Revision 3, Monticello Nuclear Generating Plant, Safety Analysis Report, Constant Pressure Power Uprate. Project stage: Request ML0832301112008-11-0505 November 2008 Monticello Nuclear Generating Plant, License Amendment Request: Extended Power Uprate Project stage: Other ML0832301142008-11-0505 November 2008 Monticello Nuclear Generating Plant, Steam Dryer Dynamic Stress Evaluation. Project stage: Request ML0834003662008-12-0202 December 2008 Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues Project stage: Acceptance Review ML0834004022008-12-0505 December 2008 Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area Project stage: Other ML0835000992008-12-11011 December 2008 Monticello Extended Power Uprate (Usnrc TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis Project stage: Supplement ML0835303022008-12-16016 December 2008 Draft Request for Additional Information, Environmental Issues of EPU Application Project stage: Draft RAI ML0936200242008-12-18018 December 2008 Report 0800760.401, Rev. 1, Flaw Evaluation and Vibration Assessment of Existing Monticello Steam Dryer Flaws for Extended Power Uprate. Project stage: Other ML0835005752008-12-18018 December 2008 Letter Finding 11/5/08 Application for Amendment Acceptable for Review Project stage: Other ML0835309982008-12-18018 December 2008 EPU Application - Additional RAI Question Regarding an Environmental Issue Project stage: RAI ML0835310022008-12-18018 December 2008 Proposed Eou Amendment - Revised RAI Re. Containment Analysis Project stage: RAI ML0914101222008-12-18018 December 2008 Monticello - Calculation CA-95-075, Revision 1, Main Steam Line High Flow Setpoint Project stage: Other ML0914101212008-12-19019 December 2008 Monticello - Calculation CA-95-073, Revision 4, Reactor Low Water Level SCRAM Setpoint Project stage: Other ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure Project stage: Other ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 20082009-01-29029 January 2009 Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008 Project stage: Other L-MT-09-005, Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate2009-02-0404 February 2009 Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate Project stage: Request L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 20082009-02-0404 February 2009 Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008 Project stage: Other ML0904204852009-02-11011 February 2009 Draft RAI from Materials Engineering Re. Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907106792009-02-17017 February 2009 Monticello, Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008 Project stage: Request ML0907106802009-02-17017 February 2009 Monticello, Enclosure 1 to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 1 Dated December 18, 2008, Cover Through Copy of MNGP Appr T0406 Data Transmittal Page 424 of 424 Project stage: Other L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 5382009-02-17017 February 2009 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538 Project stage: Other ML0907106842009-02-17017 February 2009 Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008 Project stage: Other L-MT-09-018, Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 20092009-02-24024 February 2009 Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 2009 Project stage: Request ML0907100912009-03-11011 March 2009 Conveying Draft RAI Questions from the Instrumentation and Controls Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907200572009-03-12012 March 2009 Conveys Draft RAI Regarding Fire Protection for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800062009-03-18018 March 2009 Draft RAI from Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800042009-03-18018 March 2009 Conveys Draft RAI by the PRA Licensing Branch on the Proposed EPU Amendment Project stage: Draft RAI ML0907809032009-03-19019 March 2009 Conveys Draft RAI Provided by the Containment and Ventilation Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907809092009-03-19019 March 2009 RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment Project stage: RAI L-MT-09-017, Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 20092009-03-19019 March 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 2009 Project stage: Request ML0908200312009-03-20020 March 2009 Draft RAI Re. Health Physics Issues for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908200992009-03-23023 March 2009 Draft RAI from the Balance of Plant Branch Re the Proposed Amendment on Extended Power Uprate Project stage: Draft RAI ML0908800022009-03-28028 March 2009 Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908800032009-03-28028 March 2009 Draft RAI from the Electrical Engineering Branch Re. the Proposed Extended Power Uprate Amendment for Monticello Project stage: Draft RAI ML0908800012009-03-29029 March 2009 Additional Draft RAI Questions from the Containment and Ventilation Branch Proposed EPU Amendment for Monticello Project stage: Draft RAI ML0910300212009-04-0606 April 2009 Draft RAI Question from Instrumentation and Controls Branch Re. Proposed EPU Amendment Project stage: Draft RAI ML0910300172009-04-0606 April 2009 Conveys an Additional EPU Draft RAI Question from Instrumentation and Controls Branch Project stage: Draft RAI L-MT-09-025, Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 20092009-04-22022 April 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 2009 Project stage: Request ML0911205782009-04-22022 April 2009 Request for Audit of Implementation of Long-Term Stability Solution Project stage: Other ML0911902092009-04-29029 April 2009 Transmit Revised Draft RAI from the Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0914101232009-05-0606 May 2009 Monticello - Calculation 96-054, Rev 5, Turbine Stop Valve Closure/Generator Load Reject Scram Bypass Project stage: Other ML0911404702009-05-0707 May 2009 Determination That Submitted Information Can Be Withheld from Public Disclosure Project stage: Other ML0914101202009-05-13013 May 2009 Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009 Project stage: Request L-MT-09-045, Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 20092009-05-26026 May 2009 Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 2009 Project stage: Request L-MT-09-029, Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 20092009-05-29029 May 2009 Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009 Project stage: Request 2009-02-24
[Table View] |
|
---|
Category:Legal-Affidavit
MONTHYEARL-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 ML21211A5962021-06-30030 June 2021 Attachments 9a, B, 10a, B, 11a, 12a and 13a and 13b, Including ANP-3933NP, Revision 0, Monticello ATWS-I Evaluation for Atrium 11 Fuel, Affidavit L-MT-21-034, Affidavit for Cycle 31 Core Operating Limits Report - NAD-MN-047P2021-05-13013 May 2021 Affidavit for Cycle 31 Core Operating Limits Report - NAD-MN-047P L-MT-16-028, Transmittal of Extended Power Uprate, Extended Steam Dryer - Response to Requests for Additional Information2016-05-18018 May 2016 Transmittal of Extended Power Uprate, Extended Steam Dryer - Response to Requests for Additional Information ML15289A0732015-10-12012 October 2015 Submittal of Power Ascension Testing Results for Replacement Steam Dryer L-MT-15-065, Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits2015-09-29029 September 2015 Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits ML15348A2202015-08-26026 August 2015 Enclosure 9, Areva Affidavits ML14204A7092014-07-23023 July 2014 Enclosure 3, Affidavit of Peter M. Yandow L-MT-14-060, Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information2014-07-22022 July 2014 Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information L-MT-14-016, Calculation 11042-0204, Revision 2, Structural and Allowable Flaw Size Evaluation of the Spent Fuel Storage Canisters with Nonconforming Closure Welds at Monticello Nuclear Generating Plant2014-07-0707 July 2014 Calculation 11042-0204, Revision 2, Structural and Allowable Flaw Size Evaluation of the Spent Fuel Storage Canisters with Nonconforming Closure Welds at Monticello Nuclear Generating Plant ML15348A2152014-07-0707 July 2014 Enclosure 4, General Electric Hitachi (GEH)- Affidavit L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit2013-12-20020 December 2013 Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit ML13282A1412013-10-0404 October 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-070, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-07-31031 July 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-059, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Informati2013-06-26026 June 2013 Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Information L-MT-13-033, Extended Power Uprate: Secy 11-0014 Use of Containment Accident Pressure - Responses to Requests for Additional Information2013-03-21021 March 2013 Extended Power Uprate: Secy 11-0014 Use of Containment Accident Pressure - Responses to Requests for Additional Information ML1127000682011-09-26026 September 2011 Enclosure 3, Mfn 10-245 R4, Affidavit ML0923903232009-08-10010 August 2009 Enclosure 2 - Continuum Dynamics Affidavit ML0520003282005-07-14014 July 2005 Surveillance Program for Channel-Control Blade Interference ML0413101222004-04-30030 April 2004 Request for Closed Meeting with USNRC to Discuss NMC Refueling Plans 2023-07-04
[Table view] Category:Letter type:L
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-11-10010 November 2022 Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan2022-09-0606 September 2022 Sixth Interval Inservice Testing (1ST) Plan L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-08-29029 August 2022 Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) L-MT-22-026, Changes to the Emergency Plan2022-07-19019 July 2022 Changes to the Emergency Plan L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-05-25025 May 2022 Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-017, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report L-MT-22-018, 2021 Annual Radioactive Effluent Release Report2022-05-11011 May 2022 2021 Annual Radioactive Effluent Release Report L-MT-22-016, 2021 Annual Report of Individual Monitoring2022-04-28028 April 2022 2021 Annual Report of Individual Monitoring L-MT-22-019, Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-04-18018 April 2022 Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-22-012, Special Report for the Bypass of the Offgas Treatment Storage System2022-03-15015 March 2022 Special Report for the Bypass of the Offgas Treatment Storage System L-MT-22-008, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008)2022-03-0707 March 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006)2022-02-18018 February 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) 2024-01-11
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) ML22220A2722022-08-0808 August 2022 Response to a Request for Additional Informational Regarding the Monticello Fuel Oil Storage Tank Inspection L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) ML22161A9152022-06-10010 June 2022 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-05-25025 May 2022 Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-21-017, Response to Request for Additional Information (RAI) Related to License Amendment Request to Implement Technical Specifications Task Force Traveler TSTF-505, Revision 22021-04-20020 April 2021 Response to Request for Additional Information (RAI) Related to License Amendment Request to Implement Technical Specifications Task Force Traveler TSTF-505, Revision 2 L-MT-20-036, Response to Request for Additional Information Related to License Amendment Request to Implement Technical Specification Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times2020-12-21021 December 2020 Response to Request for Additional Information Related to License Amendment Request to Implement Technical Specification Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times L-MT-20-024, Response to Request for Additional Information (RAI) Monticello 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval2020-07-20020 July 2020 Response to Request for Additional Information (RAI) Monticello 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval L-MT-20-015, Response to Request for Additional Information (RAI) Long-Term Replacement Steam Dryer Inspection Plan2020-06-0808 June 2020 Response to Request for Additional Information (RAI) Long-Term Replacement Steam Dryer Inspection Plan ML20045E8942020-02-14014 February 2020 Response to a Request for Additional Information for Proposed 10 CFR 50.55a(z)(2) Alternatives to Utilize ASME Code Case N-786-3, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, and AS L-MT-19-030, Supplement to a Response for a Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors.2019-05-15015 May 2019 Supplement to a Response for a Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. L-MT-19-024, Response to a Request for Additional Information for Removal of a Note Associated with Technical Specification 3.5.12019-04-18018 April 2019 Response to a Request for Additional Information for Removal of a Note Associated with Technical Specification 3.5.1 L-MT-19-018, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk- Informed Categorization & Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-03-13013 March 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk- Informed Categorization & Treatment of Structures, Systems and Components for Nuclear Power Reactors L-MT-18-058, Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to ...2018-10-23023 October 2018 Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to ... L-MT-18-041, Response to Request for Additional Information Re Request for Permanent Exemption from 10CFR50, App R, III.G.2.a Requirements for Exposed Structural Steel2018-07-20020 July 2018 Response to Request for Additional Information Re Request for Permanent Exemption from 10CFR50, App R, III.G.2.a Requirements for Exposed Structural Steel L-MT-18-032, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, and Supplement (EPID: L-2017-LLA-03602018-06-0101 June 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, and Supplement (EPID: L-2017-LLA-0360 ML18131A2232018-05-11011 May 2018 Prairie and Monticello - Response to Request for Additional Information Regarding Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Di L-MT-18-013, Response to Request for Additional Information Regarding Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 152018-04-0505 April 2018 Response to Request for Additional Information Regarding Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 15 L-MT-17-071, Response to Request for Additional Information Regarding Risk-Informed Request for Exemption from 10CFR50, Appendix R, III.G.2 Requirements for Multiple Spurious Operations of Drywell Spray Motor-Operated Valves2017-11-20020 November 2017 Response to Request for Additional Information Regarding Risk-Informed Request for Exemption from 10CFR50, Appendix R, III.G.2 Requirements for Multiple Spurious Operations of Drywell Spray Motor-Operated Valves L-MT-17-066, Supplemental Information for the Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events2017-09-28028 September 2017 Supplemental Information for the Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events L-MT-17-065, License Amendment Request to Revise the Emergency Action Level Scheme - Supplement and Response to Requests for Additional Information2017-09-25025 September 2017 License Amendment Request to Revise the Emergency Action Level Scheme - Supplement and Response to Requests for Additional Information L-MT-17-063, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times2017-09-20020 September 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times L-MT-17-025, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accid2017-04-11011 April 2017 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident L-MT-17-022, Response to Second Round PRA Related RAIs for the License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2017-03-29029 March 2017 Response to Second Round PRA Related RAIs for the License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval L-MT-17-007, Part 3 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2017-02-0707 February 2017 Part 3 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval L-MT-17-002, Part 2 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50Appendix J Containment Type a Test Interval2017-01-31031 January 2017 Part 2 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50Appendix J Containment Type a Test Interval L-MT-16-062, Part 1 Response to Probabilistic Risk Assessment Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2016-12-16016 December 2016 Part 1 Response to Probabilistic Risk Assessment Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval L-MT-16-058, Supplement to License Amendment Request to Revise Battery Charger Surveillance Requirement 3.8.4.22016-11-22022 November 2016 Supplement to License Amendment Request to Revise Battery Charger Surveillance Requirement 3.8.4.2 ML16288A0972016-10-14014 October 2016 and Monticello - Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools L-MT-16-044, Response to Request for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2016-10-10010 October 2016 Response to Request for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval L-MT-16-045, Response to Request for Additional Information: License Amendment Request to Revise Battery Charger Surveillance Requirement 3.8.4.22016-10-0303 October 2016 Response to Request for Additional Information: License Amendment Request to Revise Battery Charger Surveillance Requirement 3.8.4.2 L-MT-16-041, License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties2016-09-14014 September 2016 License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties L-MT-16-038, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2016-08-19019 August 2016 Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) L-MT-16-039, Response to Nuclear Security and Incident Response Requests for Additional Information Regarding Changes to the Monticello Nuclear Generation Plant Physical Security Plan (Revision 16) Pursuant to 10 CFR 50.54(p)(2)2016-08-15015 August 2016 Response to Nuclear Security and Incident Response Requests for Additional Information Regarding Changes to the Monticello Nuclear Generation Plant Physical Security Plan (Revision 16) Pursuant to 10 CFR 50.54(p)(2) ML16221A2742016-07-31031 July 2016 ANP-3435NP, Revision 2, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. L-MT-16-026, Response to Request for Additional Information for Approval of Alternative to Apply the BWRVIP Guidelines in Lieu of Specific ASME Section XI Code Requirements for Reactor Pressure Vessel Internals and Components Inspection2016-06-0202 June 2016 Response to Request for Additional Information for Approval of Alternative to Apply the BWRVIP Guidelines in Lieu of Specific ASME Section XI Code Requirements for Reactor Pressure Vessel Internals and Components Inspection L-MT-16-028, Transmittal of Extended Power Uprate, Extended Steam Dryer - Response to Requests for Additional Information2016-05-18018 May 2016 Transmittal of Extended Power Uprate, Extended Steam Dryer - Response to Requests for Additional Information L-MT-16-024, Flood Hazard Reevaluation Report2016-04-21021 April 2016 Flood Hazard Reevaluation Report ML16091A2282016-03-29029 March 2016 Monticello Nuclear Generating Plant Exemption Request for Nonconforming Dry Shielded Canister Dye Penetrant Examinations, Supplemental Information to Respond to the Second Request for Additional Information (TAC No. L25058) L-MT-15-081, ANP-3435NP, Revision 1, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar.2015-12-0808 December 2015 ANP-3435NP, Revision 1, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. ML15274A4732015-09-29029 September 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions ML15348A2172015-08-31031 August 2015 Enclosure 6, Areva Report ANP-3424NP, Non-Proprietary, Areva Responses to RAI from Scvb on MNGP EFW LAR, Revision 0, August 2015 2023-09-05
[Table view] |
Text
ENCLOSURE 1 CONTAINS PROPRIETARY INFORMATION -
WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390 Monticello Nuclear Generating Plant 2807 W County Rd 75 Monticello, MN 55362 May 18, 2016 L-MT-16-028 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 Monticello Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information (CAC No. MF6730)
References:
- 1) Letter from T. Beltz (NRC) to K. Fili (NSPM), Monticello Nuclear Generating Plant - Issuance of Amendment No. 176 to Renewed Facility Operating License Regarding Extended Power Uprate (TAC No. MD9990), dated December 9, 2013. (ADAMS Accession No. ML13343A006)
- 2) Letter from M. Schimmel (NSPM) to Document Control Desk (NRC),
Monticello Extended Power Uprate: Replacement Steam Dryer -
Responses to Clarification Questions and Revised Analysis Documentation (TAC MD9990), L-MT-13-091, dated August 29, 2013. (ADAMS Accession No. ML13248A343)
- 3) Email from T. Beltz (NRC) to J. Fields (NSPM), Monticello Nuclear Generating Plant - EPU Power Ascension - Clarification Questions Regarding Data Review for 2004 MWt (112.9% of 1775 MWt) (TAC No. MF5153), dated July 14, 2015.
- 4) Letter from P. Gardner (NSPM) to Document Control Desk (NRC),
Monticello Extended Power Uprate: Submittal of Power Ascension Testing Results for Replacement Steam Dryer (TAC No.MF6730),
L-MT-15-074, dated October 12, 2015. (ADAMS Accession No. ML15289A073)
Document Control Desk Page 2
- 5) Email from R. Kuntz (NRC) to J. Fields (NSPM), Monticello Nuclear Generating Plant - Requests for Additional Information re: Power Ascension Testing Results for the RSD (CAC No. MF6730), dated February 11, 2016. (ADAMS Accession No. ML16048A508)
Pursuant to 10 CFR 50.92, the NRC issued Reference 1, License Amendment No. 176 to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS) to increase the maximum authorized power level from 1775 megawatts thermal (MWt) to 2004 MWt. This change of power level is considered an extended power uprate (EPU). As part of the approval, MNGP was required to complete a power ascension test program (PATP) outlined in a series of license conditions to monitor and evaluate plant conditions while transitioning from 1775 MWt up to 2004 MWt.
In Reference 2, Northern States Power Company, a Minnesota corporation (NSPM),
doing business as Xcel Energy, provided the final analysis documentation for the replacement steam dryer (RSD) under EPU conditions. This documentation was used in support of the NRCs decision to grant license amendment 176 (Reference 1).
On July 14, 2015, after review of MNGP PATP data at full EPU conditions, the NRC determined that NSPM had successfully completed the PATP for MNGP, and indicated that operation at 2004 MWt was authorized in accordance with the license conditions (Reference 3).
In Reference 4, NSPM provided power ascension testing analysis results to the NRC in accordance with MNGP license conditions 2.C.15(b)2 and 2.C.15(e) as required by Reference 1. The results of the power ascension testing were derived from data taken from MNGP main steam line strain gauges at full EPU power and flow conditions. The analysis results demonstrated that the high-cycle fatigue calculations for the MNGP replacement steam dryer meet the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel (B&PV) Code Section III, Subsection NG criteria. The analysis results provided in Reference 4 resulted in revisions to a subset of the reports provided in Reference 2.
In Reference 5, the NRC provided NSPM requests for additional information (RAIs).
The purpose of this letter is to provide the NRC with the RAI responses. contains Westinghouse Electric Company, LLC (WEC) letter attachment, LTR-BWR-ENG-16-020-P, Responses to the U.S. NRC Requests for Additional Information Relative to the Monticello Perforated Plate Analysis, dated May 5, 2016. provides responses to the RAIs from Reference 5. Enclosure 1 contains proprietary information. contains a WEC affidavit executed to support withholding Enclosure 1 from public disclosure. The affidavit sets forth the basis on which the information may be
Document Control Desk Page 3 withheld from public disclosure by the NRC and addresses with specificity the considerations listed in 10 CFR 2.390(b)(4). NSPM requests that the proprietary information in Enclosure 1 be withheld from public disclosure in accordance with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4. Accordingly, it is respectfully requested that the information which is proprietary to WEC be withheld from public disclosure in accordance with 10 CFR 2.390.
Correspondence with respect to the copyright or proprietary aspects of WEC information or the supporting WEC affidavit in Enclosure 2 should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Building 3 Suite 310, Cranberry Township, Pennsylvania 16066. contains a nonproprietary version of Enclosure 1. The nonproprietary report is being provided based on the NRC's expectation that the submitter of the proprietary information should provide, if possible, a nonproprietary version of the document with brackets showing where the proprietary information has been deleted.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Peter A. Gardner Site Vice-President Monticello Nuclear Generating Plant Northern States Power Company-Minnesota Enclosures (3) cc: Administrator, Region Ill, USNRC (w/o enclosures)
Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC (w/o enclosures)
L-MT-16-028 ENCLOSURE 2 AFFIDAVIT FOR WITHHOLDING PROPRIETARY DOCUMENTS 6 pages follow
CAW-16-4408 May 9, 2016 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
ss COUNTY OF BUTLER:
I, James A. Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Mfidavit are true and correct to the best of my knowledge, information, and belief.
James A. Gresham, Manager Regulatory Compliance
2 CAW-16-4408 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse),
and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commissions regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commissions regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouses competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
3 CAW-16-4408 (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
(iii) There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component
4 CAW-16-4408 may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission.
(v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(vi) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-BWR-ENG-16-020 P-Attachment, Responses to the U.S. NRC Requests for Additional Information Relative to the Monticello Perforated Plate Analysis (Proprietary), for submittal to the Commission, being transmitted by Xcel Energy letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the NRCs further review of replacement steam dryer (RSD) methodology for Monticello Nuclear Generating Plant (MNGP), and may be used only for that purpose.
(a) This information is part of that which will enable Westinghouse to assist Xcel Energy in responding to NRC Requests for Additional Information relative to the MNGP RSD 90-day report.
5 CAW-16-4408 (b) Further, this information has substantial commercial value as follows:
(i) Westinghouse plans to sell the use of similar information to its customers for purposes of plant specific replacement steam dryer analysis for licensing basis applications..
(ii) Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications.
(iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation justifications and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
Proprietary Information notice Transmitted herewith are proprietary and non-proprietary versions of a document, furnished to the NRC associated with the NRCs further review of replacement steam dryer (RSD) methodology for Monticello Nuclear Generating Plant (MNGP), and may be used only for that purpose.
In order to conform to the requirements of 10 CFR 2.390 of the Commissions regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).
Copyright Notice The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
L-MT-16-028 ENCLOSURE 3 WESTINGHOUSE LETTER, LTR-BWR-ENG-16-020 NP-ATTACHMENT (NON-PROPRIETARY)
RESPONSES TO THE U.S. NRC REQUESTS FOR ADDITIONAL INFORMATION RELATIVE TO THE MONTICELLO PERFORATED PLATE ANALYSIS 8 pages follow
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-16-020 NP-Attachment Responses to the U.S. NRC Requests for Additional Information Relative to the Monticello Perforated Plate Analysis May 5, 2016 Westinghouse Electric Company LLC 1000 Westinghouse Drive Cranberry Township, PA 16066 USA
© 2016 Westinghouse Electric Company LLC All Rights Reserved
LTR-BWR-ENG-16-020 NP-Attachment Page 2 of 8 MNGP EPU-EMCB-RSD-90 Day Report-RAI-1:
To provide the USNRC Staff with a better understanding of the additional damping introduced at the perforated plates and to compare the damping with the 1-percent structural damping ratio, the licensee is requested to convert the perforated plate damping coefficients corresponding to EPU flow conditions to equivalent frequency dependent structural damping ratios for various frequencies including 10, 25, and 50 Hz.
One approach to computing the damping ratio is the following relationship: damping ratio =
b / (2*m*omega), where b is the integrated damping coefficient (units force/velocity) over a given plate; m is the mass of the perforated plate considering its porosity; and omega is radial frequency (2*pi*cyclic frequency).
Response
Reference:
- 1. Westinghouse Calculation Note, CN-A&SA-09-08, Rev. 4, Monticello Steam Dryer Finite Element Model, August 22, 2013.
[
]a,b,c Any damping can be expressed in terms of critical damping with a non-dimensional number , called the damping ratio:
Where
- effective modal mass
- integrated damping coefficient (units force/velocity) over a given plate
- natural radial frequency The NRC equation identified in the RAI was used to formulate the information provided below.
[
]a,b,c
LTR-BWR-ENG-16-020 NP-Attachment Page 3 of 8
[
] a,b,c
[ ]a,b,c Table RAI-1-1 Dynamic Characteristics of Monticello RSD Inner Perforated Plate Ratio 1st Natural Effective Effective Frequency Direction Mass Mass to (Hz)
(lb-sec2/in) Total Mass a,b,c
LTR-BWR-ENG-16-020 NP-Attachment Page 4 of 8 Table RAI-1-2 Dynamic Characteristics of Monticello RSD Middle Perforated Plate Ratio 1st Natural Effective Frequency Effective Mass Direction Mass to (Hz) (lb-sec2/in)
Total Mass a,b,c Table RAI-1-3 Dynamic Characteristics of Monticello RSD Outer Perforated Plate Ratio 1st Natural Effective Effective Frequency Direction Mass Mass to (Hz)
(lb-sec2/in) Total Mass a,b,c
[
]a,b,c
LTR-BWR-ENG-16-020 NP-Attachment Page 5 of 8 a,b,c Figure RAI-1-1 Monticello Steam Dryer (Top View) Perforated Plate Schematic Table RAI-1-4 through Table RAI-1-7 below summarize the results of the hydrodynamic damping calculations.
Table RAI-1-4 Inlet 1 Sub-Region Inlet-1 Natural Radial Effective Critical Plate Hydrodynamic b = Plate Areax Damping 14.5% Frequency Frequency Mass Damping Area Damping Hydrodynamic Ratio =
Opening (Hz) X-dir 2 ft2 Coefficient Damping b ÷ Critical rad/s Lbf-sec rad/ft lbf/(ft/sec)/ft2 Coefficient Damping Lbf-sec2/ft lbf/(ft/sec)
[Ref 1] [Ref 1] [Ref 1]
a,b,c Inner Bank Middle Bank Outer Bank
LTR-BWR-ENG-16-020 NP-Attachment Page 6 of 8 Table RAI-1-5 Inlet 2 Sub-Region Inlet-2 Natural Radial Effective Critical Plate Hydrodynamic b = Plate Damping 22.7% Frequency Frequency Mass Damping Area Damping Areax Ratio =
Opening (Hz) X-dir 2 ft2 Coefficient Hydrodynamic b ÷ Critical rad/s Lbf-sec rad/ft lbf/(ft/sec)/ft2 Damping Damping Lbf- Coefficient sec2/ft
[Ref 1] [Ref 1] [Ref 1] lbf/(ft/sec) a,b,c Inner Bank Middle Bank Outer Bank Table RAI-1-6 Inlet 3 Sub-Region Inlet-3 Natural Radial Effective Critical Plate Hydrodynamic b = Plate Damping 32.6% Frequency Frequency Mass Damping Area Damping Areax Ratio =
Opening (Hz) X- 2 ft2 Coefficient Hydrodynamic b ÷ Critical rad/s dir Lbf-sec rad/ft lbf/(ft/sec)/ft2 Damping Damping Lbf- Coefficient sec2/ft
[Ref 1] [Ref 1] [Ref 1] lbf/(ft/sec) a,b,c Middle Bank Outer Bank Table RAI-1-7 Inlet 4 Sub-Region Inlet-4 Natural Radial Effective Critical Plate Hydrodynamic b = Plate Damping 22.7% Frequency Frequency Mass Damping Area Damping Areax Ratio =
Opening (Hz) X- 2 ft2 Coefficient Hydrodynamic b ÷ Critical rad/s direction Lbf-sec rad/ft lbf/(ft/sec)/ft2 Damping Damping Coefficient Lbf-
[Ref 1] sec2/ft [Ref 1] [Ref 1] lbf/(ft/sec) a,b,c Middle Bank Outer Bank
[
]a,b,c
LTR-BWR-ENG-16-020 NP-Attachment Page 7 of 8 MNGP EPU-EMCB-RSD-90 Day Report-RAI-2:
Please provide current Minimum Alternating Stress Ratios (MASRs) for the perforated plates, along with cumulative stress plots for the two highest stressed perforated plate regions.
Response
[
]a,b,c
[
]a,b,c a,b,c Figure RAI-2-1 Cumulative Stress PSD Plot for the Outer Bank Perforated Plate
LTR-BWR-ENG-16-020 NP-Attachment Page 8 of 8 a,b,c Figure RAI-2-1 Cumulative Stress PSD Plot for the Middle Bank Perforated Plate