ML092161007

From kanterella
Jump to navigation Jump to search

Request for Withholding Information from Public Disclosure
ML092161007
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/14/2009
From: Tam P
Plant Licensing Branch III
To: O'Connor T
Northern States Power Co
Tam P
References
TAC MD9990
Download: ML092161007 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 August 14, 2009 Mr. Timothy J. O'Connor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company - Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD9990)

Dear Mr. O'Connor:

By letter dated July 23, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092090317), you responded to two Requests for Additional Information from the Nuclear Regulatory Commission (NRC) staff. Your submittal included , "NSPM Response to SRXB [Reactor System Branch] RAls Dated March 23, 2009 (Proprietary)" (ADAMS Accession No. ML092090220), and an affidavit executed by Mr. James F. Harrison of GE-Hitachi Nuclear Energy Americas LLC (GEH), dated June 19, 2009, requesting that Enclosure 5 be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390.

The affidavit stated that the entire Enclosure 5 should be considered exempt from mandatory public disclosure for the following reasons:

(a) Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed GEH's affidavit in accordance with the requirements of 10 CFR 2.390, and on the basis of its statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the entire Enclosure 5, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

We have released to the public as one package your July 23,2009, letter, Mr. Harrison's affidavit, and Enclosure 1, the non-proprietary version of the GEH document.

T. J. O'Connor - 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1451.

C?;st: v Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: Mr. James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via ListServ

T. J. O'Connor -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1451.

Sincerely, IRAJ Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: Mr. James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via ListServ DISTRIBUTION:

PUBLIC RidsNrrDorlLpl3-1 Resource RidsNrrPMPTamResource RidsNrrLABTully Resource RidsOgcMailCenterResource RidsAcrsAcnw_MailCTRResource RidsNrrDirsltsb RidsRgn3MailCenterResource RidsNrrDorlDprResource LPL 3-1 R/F Accession No'.. Ml092161007 OFFICE LPL3-1/PM LPL3-1/LA SRXB/BC LPL3-1/BC NAME PTam BTully rrHarris for GCranston LJames DATE 8/11/09 8/10109 8/11/09 8/14/09 OFFICIAL RECORD COpy