ML090710679

From kanterella
Jump to navigation Jump to search

Monticello, Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008
ML090710679
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/17/2009
From: O'Connor T J
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-09-004, TAC MD9990
Download: ML090710679 (2)


Text

ýg XcelEnergy-February 17, 2009 L-MT-09-004 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License License No. DPR-22 Response to NRC Containment

& Ventilation Branch Request for Additional Information (RAls) dated December 18, 2008 (TAC No. MD9990)

References:

1. NSPM letter to NRC, "License Amendment Request: Extended Power Uprate" (L-MT-08-052) dated November 5, 2008 (TAC No. MD9990)2. Email P. Tam (NRC) to G. Salamon, T. Blake, and K. Pointer (NSPM) dated December 18, 2008, "Monticello

-proposed EPU amendment, revised RAI on containment analysis" (TAC No. MD9990)Pursuant to 10 CFR 50.90, the Northern States Power Company, a Minnesota corporation (NSPM), requested in Reference 1 an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS) to increase the maximum authorized power level from 1775 megawatts thermal (MWt) to 2004 MWt.The U. S. Nuclear Regulatory Commission (NRC) Containment

& Ventilation Branch provided four RAls as described in Reference

2. Enclosures 1 through 4 provide the NSPM response to Containment

& Ventilation Branch RAIs dated December 18, 2008.In accordance with 10 CFR 50.91, a copy is being provided to the designated Minnesota Official.Summary of Commitments This letter makes no new commitments and does not revise any existing commitments.

41oo Document Control Desk Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.Executed on Februa 17, 2009.Tr oth .onn r Site Vic resident, Monticello Nuclear Generating Plant Norther States Power Company -Minnesota Enclosures (4)1. Enclosure 1, NSPM Response to Containment

& Ventilation Branch RAI Number 1 2. Enclosure 2, NSPM Response to Containment

& Ventilation Branch RAI Number 2 3. Enclosure 3, NSPM Response to Containment

& Ventilation Branch RAI Number 3 4. Enclosure 4, NSPM Response to Containment

& Ventilation Branch RAI Number 4 cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC Minnesota Department of Commerce