Letter Sequence Request |
---|
TAC:ME3145, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis., L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008, L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008, L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538, L-MT-09-026, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, Average Power Range Monitor Selected Prnm Licensing Setpoints - EPU Operation (Numac), L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009, L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009, L-MT-09-049, Drawing C.5-2007, Revision 15, Failure to Scram, L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009, L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009, L-MT-09-088, Extended Power Uprate: Revision to Clarify Text in Enclosures 5 and 7 of L-MT-08-052, L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay, L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call, L-MT-10-072, Extended Power Uprate: Updates to Docketed Information, L-MT-11-044, Uprate (Epu): Update on EPU Commitments, L-MT-12-056, WCAP-17549-NP, Rev. 0, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, L-MT-12-090, Westinghouse, LTR-A&SA-12-8, Rev. 1, Attachment B, Recommendations for Inspections of the Monticello Replacement Steam Dryer., L-MT-12-114, Drawing C.5-2007, Rev. 17, Failure to Scram, L-MT-13-020, Enclosure 1 - Responses to the Gap Analysis, L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project., L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14, L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan, L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages, L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit, L-MT-14-023, Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications, L-MT-15-074, Enclosure 7, WCAP-18604-NP, Revision 0, Monticello EPU Main Steam Line Strain Data Evaluation Report., L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML083230111, ML083400402, ML083500575, ML083570610, ML083590127, ML090710680, ML090710683, ML090710684, ML091120578, ML091140470, ML091410121, ML091410122, ML091410123, ML091410124, ML091760769, ML092290250, ML092810554, ML093160816, ML093220925, ML093220964, ML093620024, ML100280558... further results
|
MONTHYEARML0907106832008-02-17017 February 2008 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Attachment 1-1g Through End of Encl. 1 Project stage: Other ML13064A4352008-03-20020 March 2008 CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4 Project stage: Other ML0914101242008-08-11011 August 2008 Monticello - Calculation CA-08-050, Rev. 0, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased Prnm Setpoints for Cl Tp and EPU Project stage: Other L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis.2008-10-31031 October 2008 Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis. Project stage: Other ML0832301122008-10-31031 October 2008 NEDC-33322-NP, Revision 3, Monticello Nuclear Generating Plant, Safety Analysis Report, Constant Pressure Power Uprate. Project stage: Request ML0832301112008-11-0505 November 2008 Monticello Nuclear Generating Plant, License Amendment Request: Extended Power Uprate Project stage: Other ML0832301142008-11-0505 November 2008 Monticello Nuclear Generating Plant, Steam Dryer Dynamic Stress Evaluation. Project stage: Request ML0834003662008-12-0202 December 2008 Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues Project stage: Acceptance Review ML0834004022008-12-0505 December 2008 Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area Project stage: Other ML0835000992008-12-11011 December 2008 Monticello Extended Power Uprate (Usnrc TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis Project stage: Supplement ML0835303022008-12-16016 December 2008 Draft Request for Additional Information, Environmental Issues of EPU Application Project stage: Draft RAI ML0936200242008-12-18018 December 2008 Report 0800760.401, Rev. 1, Flaw Evaluation and Vibration Assessment of Existing Monticello Steam Dryer Flaws for Extended Power Uprate. Project stage: Other ML0835005752008-12-18018 December 2008 Letter Finding 11/5/08 Application for Amendment Acceptable for Review Project stage: Other ML0835309982008-12-18018 December 2008 EPU Application - Additional RAI Question Regarding an Environmental Issue Project stage: RAI ML0835310022008-12-18018 December 2008 Proposed Eou Amendment - Revised RAI Re. Containment Analysis Project stage: RAI ML0914101222008-12-18018 December 2008 Monticello - Calculation CA-95-075, Revision 1, Main Steam Line High Flow Setpoint Project stage: Other ML0914101212008-12-19019 December 2008 Monticello - Calculation CA-95-073, Revision 4, Reactor Low Water Level SCRAM Setpoint Project stage: Other ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure Project stage: Other ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 20082009-01-29029 January 2009 Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008 Project stage: Other L-MT-09-005, Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate2009-02-0404 February 2009 Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate Project stage: Request L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 20082009-02-0404 February 2009 Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008 Project stage: Other ML0904204852009-02-11011 February 2009 Draft RAI from Materials Engineering Re. Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907106792009-02-17017 February 2009 Monticello, Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008 Project stage: Request ML0907106802009-02-17017 February 2009 Monticello, Enclosure 1 to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 1 Dated December 18, 2008, Cover Through Copy of MNGP Appr T0406 Data Transmittal Page 424 of 424 Project stage: Other L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 5382009-02-17017 February 2009 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538 Project stage: Other ML0907106842009-02-17017 February 2009 Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008 Project stage: Other L-MT-09-018, Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 20092009-02-24024 February 2009 Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 2009 Project stage: Request ML0907100912009-03-11011 March 2009 Conveying Draft RAI Questions from the Instrumentation and Controls Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907200572009-03-12012 March 2009 Conveys Draft RAI Regarding Fire Protection for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800062009-03-18018 March 2009 Draft RAI from Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800042009-03-18018 March 2009 Conveys Draft RAI by the PRA Licensing Branch on the Proposed EPU Amendment Project stage: Draft RAI ML0907809032009-03-19019 March 2009 Conveys Draft RAI Provided by the Containment and Ventilation Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907809092009-03-19019 March 2009 RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment Project stage: RAI L-MT-09-017, Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 20092009-03-19019 March 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 2009 Project stage: Request ML0908200312009-03-20020 March 2009 Draft RAI Re. Health Physics Issues for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908200992009-03-23023 March 2009 Draft RAI from the Balance of Plant Branch Re the Proposed Amendment on Extended Power Uprate Project stage: Draft RAI ML0908800022009-03-28028 March 2009 Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908800032009-03-28028 March 2009 Draft RAI from the Electrical Engineering Branch Re. the Proposed Extended Power Uprate Amendment for Monticello Project stage: Draft RAI ML0908800012009-03-29029 March 2009 Additional Draft RAI Questions from the Containment and Ventilation Branch Proposed EPU Amendment for Monticello Project stage: Draft RAI ML0910300172009-04-0606 April 2009 Conveys an Additional EPU Draft RAI Question from Instrumentation and Controls Branch Project stage: Draft RAI ML0910300212009-04-0606 April 2009 Draft RAI Question from Instrumentation and Controls Branch Re. Proposed EPU Amendment Project stage: Draft RAI ML0911205782009-04-22022 April 2009 Request for Audit of Implementation of Long-Term Stability Solution Project stage: Other L-MT-09-025, Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 20092009-04-22022 April 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 2009 Project stage: Request ML0911902092009-04-29029 April 2009 Transmit Revised Draft RAI from the Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0914101232009-05-0606 May 2009 Monticello - Calculation 96-054, Rev 5, Turbine Stop Valve Closure/Generator Load Reject Scram Bypass Project stage: Other ML0911404702009-05-0707 May 2009 Determination That Submitted Information Can Be Withheld from Public Disclosure Project stage: Other ML0914101202009-05-13013 May 2009 Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009 Project stage: Request L-MT-09-045, Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 20092009-05-26026 May 2009 Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 2009 Project stage: Request L-MT-09-029, Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 20092009-05-29029 May 2009 Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009 Project stage: Request 2009-02-24
[Table View] |
|
---|
Category:Legal-Affidavit
MONTHYEARL-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-21-044, Attachments 9a, B, 10a, B, 11a, 12a and 13a and 13b, Including ANP-3933NP, Revision 0, Monticello ATWS-I Evaluation for Atrium 11 Fuel, Affidavit2021-06-30030 June 2021 Attachments 9a, B, 10a, B, 11a, 12a and 13a and 13b, Including ANP-3933NP, Revision 0, Monticello ATWS-I Evaluation for Atrium 11 Fuel, Affidavit L-MT-21-034, Affidavit for Cycle 31 Core Operating Limits Report - NAD-MN-047P2021-05-13013 May 2021 Affidavit for Cycle 31 Core Operating Limits Report - NAD-MN-047P L-MT-16-028, Transmittal of Extended Power Uprate, Extended Steam Dryer - Response to Requests for Additional Information2016-05-18018 May 2016 Transmittal of Extended Power Uprate, Extended Steam Dryer - Response to Requests for Additional Information ML15289A0732015-10-12012 October 2015 Submittal of Power Ascension Testing Results for Replacement Steam Dryer L-MT-15-065, Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits2015-09-29029 September 2015 Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits ML15348A2202015-08-26026 August 2015 Enclosure 9, Areva Affidavits ML14204A7092014-07-23023 July 2014 Enclosure 3, Affidavit of Peter M. Yandow L-MT-14-060, Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information2014-07-22022 July 2014 Extended Power Uprate: Replacement Steam Dryer - Response to NRC Requests for Additional Information, Revised Limit Curves and Supporting Information L-MT-14-016, Calculation 11042-0204, Revision 2, Structural and Allowable Flaw Size Evaluation of the Spent Fuel Storage Canisters with Nonconforming Closure Welds at Monticello Nuclear Generating Plant2014-07-0707 July 2014 Calculation 11042-0204, Revision 2, Structural and Allowable Flaw Size Evaluation of the Spent Fuel Storage Canisters with Nonconforming Closure Welds at Monticello Nuclear Generating Plant ML15348A2152014-07-0707 July 2014 Enclosure 4, General Electric Hitachi (GEH)- Affidavit L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit2013-12-20020 December 2013 Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit ML13282A1412013-10-0404 October 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-070, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-07-31031 July 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-059, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Informati2013-06-26026 June 2013 Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Information L-MT-13-033, Extended Power Uprate: Secy 11-0014 Use of Containment Accident Pressure - Responses to Requests for Additional Information2013-03-21021 March 2013 Extended Power Uprate: Secy 11-0014 Use of Containment Accident Pressure - Responses to Requests for Additional Information ML1127000682011-09-26026 September 2011 Enclosure 3, Mfn 10-245 R4, Affidavit ML0923903232009-08-10010 August 2009 Enclosure 2 - Continuum Dynamics Affidavit ML0520003282005-07-14014 July 2005 Surveillance Program for Channel-Control Blade Interference ML0413101222004-04-30030 April 2004 Request for Closed Meeting with USNRC to Discuss NMC Refueling Plans 2023-07-04
[Table view] Category:Letter
MONTHYEARML24318C5002024-11-19019 November 2024 Letter to Robert Blanchard Tribal Chairman Bad River Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3512024-11-18018 November 2024 Letter to Amy Spong, Deputy State Historic Preservation Officer, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5252024-11-18018 November 2024 Letter to J Garrett Renville Tribal Chairman Sisseton Wahpeton Oyate of the Lake Traversee Re NOA Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5272024-11-18018 November 2024 Letter to Thomas Fowler Chairman St. Croix Chippewa of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5162024-11-18018 November 2024 Letter to James Williams Jr Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5092024-11-18018 November 2024 Letter to Doreen Blaker President Keweenaw Bay Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5072024-11-18018 November 2024 Letter Timothy Rhodd Chairman Iowa Tribe of Kansas and Nebraska Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5102024-11-18018 November 2024 Letter to Louis Taylor Chairman Lac Courte Oreilles Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A1732024-11-18018 November 2024 Ltr. to Shawn Hafen, Site Vice President, Monticello Nuclear Generating Plant, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A3202024-11-18018 November 2024 Letter to Durell Cooper Tribal Chairman Apache Tribe of Oklahoma Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5062024-11-18018 November 2024 Letter to Robert Deschampe Tribal Chair Grand Portage Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3462024-11-18018 November 2024 Letter to Jaime Loichinger Director Office of Federal Agency Programs, Achp NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5262024-11-18018 November 2024 Letter to Lonna Johnson Street Chairperson Spirit Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5112024-11-18018 November 2024 Letter to John Johnson President Lac Du Flambeau Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5312024-11-18018 November 2024 Letter to Virgil Wind Chief Executive Mille Lacs Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5222024-11-18018 November 2024 Letter to Darrell Seki Chairman Red Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5012024-11-18018 November 2024 Letter to Catherine Chavers Tribal Chairwoman Bois Forte Band Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5202024-11-18018 November 2024 Letter to Grant Johnson President Prairie Island Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5052024-11-18018 November 2024 Letter to Bruce Savage Tribal Chairperson Found Du Lac Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5292024-11-18018 November 2024 Letter to Kevin Jensvold Tribal Chairman Upper Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5242024-11-18018 November 2024 Letter to Cole Miller Chairman Shakopee Mdewakaton Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5032024-11-18018 November 2024 Letter to Anthony Reider President Flandreau Santee Sioux Tribe NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5172024-11-18018 November 2024 Letter to Robert Larsen President Lower Sioux Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5152024-11-18018 November 2024 Letter to Faron Jackson Sr Chairman Leech Lake Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5182024-11-18018 November 2024 Letter to Gena Kakkak Chairwoman Menominee Indian Tribe of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5212024-11-18018 November 2024 Letter to Nicole Boyd Chairwoman Red Cliff Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5232024-11-18018 November 2024 Letter to Alonzo Denney Chairman Santee Sioux Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5302024-11-18018 November 2024 Letter to Michael Fairbanks Chairman White Earth Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5192024-11-18018 November 2024 Letter to Michael Laroque President Minnesota Chippewa Tribe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5022024-11-18018 November 2024 Letter to Reggie Wassana Governor Cheyenne and Arapaho Tribes NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5282024-11-18018 November 2024 Letter to Jamie Azure Chairman Turtle Mountain Band of Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5322024-11-18018 November 2024 Letter to Robert Vanzile Jr Chairman Sokaogon Chippewa Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5042024-11-18018 November 2024 Letter to Jeffrey Stiffarm President Fort Belknap Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR IR 05000263/20240032024-11-13013 November 2024 Integrated Inspection Report 05000263/2024003 ML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS 2024-09-26
[Table view] |
Text
ENCLOSURES 1 AND 3 CONTAIN PROPRIETARY INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390 XcelEnergy Monticello Nuclear Generating Plant 2807 W County Rd 75 Monticello, MN 55362 October 4, 2013 L-MT-1 3-096 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22
Subject:
Maximum Extended Load Line Limit Analysis Plus License Amendment Request -Request for Additional Information Responses (TAC ME3145)
References:
- 1) Letter from T J O'Connor (NSPM), to Document Control Desk (NRC),"License Amendment Request: Maximum Extended Load Line Limit Analysis Plus," L-MT-10-003, dated January 21, 2010. (ADAMS Accession No. ML100280558)
- 2) Email from K. Feintuch for T. Beltz (NRC) to J. Fields (NSPM),"Monticello Nuclear Generating Plant -Revised Draft Request for Additional Information Associated with NRC Staff Review of the MELLLA+ License Amendment Request (TAC No. ME3145)," dated September 11,2013.In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested approval of an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS). The proposed change would allow operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
domain.In Reference 2 the NRC provided Requests for Additional Information (RAIs) pertaining to information needed to support MELLLA+ and analysis revisions.
The purpose of this letter is to provide NSPM's responses to the Reference 2 RAIs.Enclosure 1 provides a report from General Electric -Hitachi (GEH) letter, GE-MNGP-AEP-3304R1, "GEH Response to MELLLA+ RAI 2." Enclosure 1 contains proprietary information.
Document Control Desk Page 2 Enclosure 2 provides a non-proprietary copy of the Enclosure 1 RAI responses.
The non-proprietary copy of the RAI responses is being provided based on the NRC's expectation that the submitter of the proprietary information should provide, if possible, a non-proprietary version of the document with brackets showing where the proprietary information has been deleted.Enclosure 3 provides page changes to the MELLLA+ Safety Analysis Report (NEDC-33435P). These page changes are based on corrections and changes in the analysis presented in Enclosure
- 1. Enclosure 3 contains proprietary information.
Enclosure 4 provides a non-proprietary version of Enclosure 3.Enclosure 5 provides an affidavit executed to support withholding Enclosures 1 and 3 from public disclosure.
Information in Enclosures 1 and 3 contain proprietary information as defined by 10 CFR 2.390. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the NRC and addresses with specificity the considerations listed in 10 CFR 2.390(b)(4).
Accordingly, NSPM respectfully requests that the proprietary information in Enclosures 1 and 3 be withheld from public disclosure in accordance with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4.Correspondence with respect to the copyright or proprietary aspects of GEH information or the supporting GEH affidavit in Enclosure 5 should be addressed to Peter M.Yandow, Vice President, Nuclear Plant Projects/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas LLC, 3901 Castle Hayne Road, Wilmington, NC 28401.Enclosure 6 contains a response to RAI 1 from Reference 2 and a commitment associated with the MELLLA+ analysis implementation.
The supplemental information provided herein does not change the conclusions of the No Significant Hazards Consideration and the Environmental Consideration evaluations provided in Reference 1 for the MELLLA+ license amendment request.In accordance with 10 CFR 50.91(b), a copy of this application supplement, without enclosures is being provided to the designated Minnesota Official.Summary of Commitments This letter makes the following new commitment:
NSPM commits to train and test licensed reactor operators to initiate Monticello Nuclear Generating Plant feedwater flow reduction in less than or equal to 90 seconds to support the MELLLA+ Anticipated Transient without Scram Instability analysis.
Document Control Desk Page 3 I declare under penalty of perjury that the foregoing is true and correct.Executed on: October 2013 KarenbD Fili Site Vice-President Monticello Nuclear Generating Plant Northern States Power Company-Minnesota Enclosures (6)cc: Regional Administrator, Region III, USNRC (w/o enclosures)
Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC (w/o enclosures)
Minnesota Department of Commerce (w/o enclosures)
L-MT-1 3-096 ENCLOSURE 5 GENERAL ELECTRIC -HITACHI AFFIDAVIT FOR WITHHOLDING PROPRIETARY INFORMATION 3 pages follow GE-Hitachi Nuclear Energy Americas LLC AFFIDAVIT I, Peter M. Yandow, state as follows: (1) I am the Vice President, Nuclear Plant Projects/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas LLC (GEH), and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld is contained in Enclosures I and 3 of GEH letter, GE-MNGP-AEP-3304R1, "GEH Response to MELLLA Plus Requests for Additional Information," dated October 3, 2013. The GEH proprietary information in Enclosure 1, which is entitled "GEH Response to MELLLA+ RAI 2," and Enclosure 3 which is entitled"NEDC-33435P Corrected Pages," is identified by a dark red dotted underline inside double square brackets.
[[This ..sentence -.i*s...an.
examp l'e...131]]
.Figures containing GEH proprietary information are identified with double square brackets before and after the object. In each case, the superscript notation 131 refers to Paragraph (3) of this affidavit that provides the basis for the proprietary determination.
(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GEH relies upon the exemption from disclosure set forth in the Freedom of Information Act (FOIA), 5 U.S.C. Sec. 552(b)(4), and the Trade Secrets Act, 18 U.S.C.See. 1905, and NRC regulations 10 CFR 9.17(a)(4), and 2.390(a)(4) for trade secrets (Exemption 4). The material for which exemption from disclosure is here sought also qualifies under the narrower definition of trade secret, within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Proiect v. Nuclear Regulatory Commission, 975 F.2.d 871 (D.C. Cir. 1992), and Public Citizen Health Research Group v. FDA, 704 F.2.d 1280 (D.C. Cir. 1983).(4) The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b. Some examples of categories of information that fit into the definition of proprietary information are: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH or other companies.
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.c. Information that reveals aspects of past, present, or future GEH customer-funded development plans and programs, that may include potential products of GEH.Affidavit for GE-MNGP-AEP-3304R1 Page I of 3 GE-Hitachi Nuclear Energy Americas LLC d. Information that discloses trade secret or potentially patentable subject matter for which it may be desirable to obtain patent protection.
(5) To address 10 CFR 2.390(b)(4), the information sought to be withheld is being submitted to the NRC in confidence.
The information is of a sort customarily held in confidence by GEH, and is in fact so held. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GEH, not been disclosed publicly, and not been made available in public sources. All disclosures to third parties, including any required transmittals to the NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary or confidentiality agreements that provide for maintaining the information in confidence.
The initial designation of this information as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure are as set forth in the following paragraphs (6) and (7).(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, who is the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge, or who is the person most likely to be subject to the terms under which it was licensed to GEH. Access to such documents within GEH is limited to a "need to know" basis.(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist, or other equivalent authority for technical content, competitive effect, and determination of the accuracy of the proprietary designation.
Disclosures outside GEH are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary or confidentiality agreements.
(8) The information identified in paragraph (2) above is classified as proprietary because it contains results of an analysis performed by GEH to support the Monticello Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
license application.
This analysis is part of the GEH MELLLA+ methodology.
Development of the MELLLA+ methodology and the supporting analysis techniques and information, and their application to the design, modification, and processes were achieved at a significant cost to GEH.The development of the evaluation methodology along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GEH asset.(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GEH's competitive position and foreclose or reduce the availability of profit-making opportunities.
The information is part of GEH's comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost.The value of the technology base goes beyond the extensive physical database and Affidavit for GE-MNGP-AEP-3304R1 Page 2 of 3 GE-Hitachi Nuclear Energy Americas LLC analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.The research, development, engineering, analytical and NRC review costs comprise a substantial investment of time and money by GEH. The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial.
GEH's competitive advantage will be lost if its competitors are able to use the results of the GEH experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.
The value of this information to GEH would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GEH of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing and obtaining these very valuable analytical tools.I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information, and belief.Executed on this 3 rd day of October, 2013.Peter M. Yandow Vice President, Nuclear Plant Projects/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd Wilmington, NC 28401 Peter.Yandow@ge.com Affidavit for GE-MNGP-AEP-3304R1 Page 3 of 3 L-MT-1 3-096 ENCLOSURE 6 MAXIMUM EXTENDED LOAD LINE LIMIT PLUS (MELLLA+)REQUEST FOR ADDITIONAL INFORMATION This enclosure provides a response from the Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, to a request for additional information (RAI) provided by the Nuclear Regulatory Commission (NRC) in Reference 1.NRC Request The failure of the reactor to shut down during certain transient can lead to unacceptable reactor coolant system pressure, fuel conditions, and/or containment conditions.
Provide a training schedule and tracking method to train operators on the importance of taking action within 90 seconds to mitigate an A TWS event.NSPM Response The current MELLLA+ Anticipated Transient Without Scram (ATWS) Instability (ATWSI)analysis demonstrates acceptable performance and resulting fuel protection when operators initiate actions to reduce feedwater flow to the reactor vessel in less than or equal to 90 seconds of the onset of an ATWS event initiation.
The Monticello Nuclear Generating Plant (MNGP) Time Critical Operator Actions (TCOA) procedures identify tasks contained in the plant's operating procedures that are credited by the design and licensing basis to be accomplished in a specified time. For the ATWS event at MNGP, operators are currently required to reduce feedwater flow in 78 seconds. Training for operators, validation of satisfactory performance of the TCOA by operators and periodic validation of the equipment necessary to perform TCOAs are all required and controlled by the TCOA procedures.
Currently, operator training on MELLLA+ revisions to the design and licensing basis are scheduled to be completed by October 4, 2013. The Simulator Exercise Guide (SEG), used for training and verification of operator compliance with the TCOA, requires that the feedwater reduction step be completed in less than or equal to 90 seconds of the onset of an ATWS event.To ensure continued future compliance of the performance of the ATWS feedwater flow reduction TCOA, NSPM is providing the following commitment:
Page 1 of 2 L-MT-1 3-096 NSPM commits to train and test licensed reactor operators to initiate Monticello Nuclear Generating Plant feedwater flow reduction in less than or equal to 90 seconds to support the MELLLA+ Anticipated Transient without Scram Instability analysis.References 1 -Email from K. Feintuch for T. Beltz (NRC) to J. Fields (NSPM), "Monticello Nuclear Generating Plant -Revised Draft Request for Additional Information Associated with NRC Staff Review of the MELLLA+ License Amendment Request (TAC No.ME3145)," dated September 11, 2013.Page 2 of 2