Monticello Extended Power Uprate (Usnrc TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis
ML083500099
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/11/2008
From: O'Connor T J
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-08-091, TAC MD9990
Download: ML083500099 (3)


Text

~S~p XcelEnergya December 11, 2008 L-MT-08-091 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License License No. DPR-22 Monticello Extended Power Uprate (USNRC TAC MD9990): Acceptance Review Supplement Regqardingq Steam Dryer Outer Hood Submodel Analysis

Reference:

NSPM Letter to USNRC, "License Amendment Request: Extended Power Uprate," dated November 5, 2008 Pursuant to 10 CFR 50.90, Northern States Power Company, a Minnesota corporation (NSPM), requested in Reference 1 approval of an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS) to increase the maximum authorized power level from 1775 megawatts thermal (MWt) to 2004 MWt.In a teleconference held December 9, 2008, the NRC staff indicated that calculation 0801040.301 Rev. 0, "Steam Outer Hood Submodel Analysis", which is referenced in the Monticello EPU license amendment request, must be submitted for the NRC to complete its acceptance review. Enclosure 1 provides the requested calculation.

NSPM has reviewed the No Significant Hazards Consideration and the Environmental Consideration submitted with the referenced letter relative to this supplemental information and determined that there are no changes required to either of these sections of Reference 1.,-AO2807 West County Road 75

763.295.5151 e Fax: 763.295.1454 Document Control Desk Page 2 Commitment Summary This letter makes no new commitments and does not change any existing commitments.

I declare under penalty of perjury that the foregoing is true and correct.Executed on Dece' ber 11, 2008.Ti othy O'Connor Site Vic resident, Monticello Nuclear Generating Plant Northern States Power Company

-Minnesota cc: Administrator, Region III, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC Minnesota Department of Commerce Enclosure Enclosure 1 to L-MT-08-091 Steam Outer Hood Submodel Analysis Calculation