Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call
ML101020021
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/06/2010
From: O'Connor T
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-10-025, TAC MD9990
Download: ML101020021 (3)


Text

XceI Energy@ Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 April 6, 2010 L-MT-10-025 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22

Subject:

Monticello Extended Power Uprate (EPU): Response to NRC-NSPM February 25, 2010 Conference Call (TAC MD9990)

References:

1) Letter from Northern States Power Company Minnesota (NSPM) to Document Control Desk, "License Amendment Request: Extended Power Uprate," L-MT-08-052, dated November 5, 2008, Accession No. ML083230111.
2) Email from Peter Tam (NRC), to Lynne, Gunderson, Kurt Schaefer and Gabor Salamon (NSPM), "Monticello - Withdrawal of draft RAI re: high energy line break (TAC MD9990),"

February 26, 2010, Accession No. ML100600329.

Pursuant to 10 CFR 50.90, the Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested in Reference 1 an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications to increase the maximum authorized power level from 1775 megawatts thermal (MWt) to 2004 MWt.

In a conference call on February 25, 2010 and re-iterated by the NRC in Reference 2, NSPM personnel stated that NSPM is not seeking NRC approval with the EPU License Amendment Request (LAR) for changes in the High Energy Line Break (HELB) analysis methods which resulted from corrective actions at Monticello Nuclear Generating Plant (MNGP). NSPM stated that changes in HELB analysis methods discussed in the EPU LAR and any required modifications (if necessary) are, or will be, reviewed using the 10 CFR 50.59 process. If a 10 CFR 50.59 review indicates that the NRC must approve the change, then NSPM will submit an LAR. NSPM personnel also committed to send the NRC a letter to state the same.

Document Control Desk Page 2 This letter confirms the above discussion, and that a LAR would be submitted if required by 10 CFR 50.59.

This response does not affect the "No Significant Hazards Consideration" and the "Environmental Consideration" evaluations in the Reference 1 license amendment request.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on: April 6, 2010 inott *' Cnnor" Site i e-"resident Monre;;o Nuclear Generating Plant Northern States Power Company-Minnesota cc: Administrator, Region III, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC Minnesota Department of Commerce

QF-0212, Revision 4 (FP-SC-RSI-04) Page 1 of 1 XcelEnergy@

SHIPPING DOCUMENT NORTHERN STATES POWER -MN Xcel Energy 2807 County Rd 75 Monticello MN 55362 Date: 4/7/20 10 Shipping Document Tracking Number:

Ship To:

USNRC One White Flint North 11555 Rockville Pike Rockville, MD 20852 Attention Of: Document Control Desk Monticello EPU: Response to NRC-NSPM 2.25.2010 1 1 Letter Conference Call 4 1 + 4 Shipment Requester SWIP Making Shipment Tori Blomgren Use of this form as a procedural aid does not require retention as a quality record.