ML083010624

From kanterella
Jump to navigation Jump to search

Letter to Determine Withholding Proprietary Information from Public Disclosure
ML083010624
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/12/2008
From: Tam P
Plant Licensing Branch III
To: O'Connor T
Northern States Power Co
Tam P
References
TAC MD6864
Download: ML083010624 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 12, 2008 Mr. Timothy J. O'Connor Site Vice President Monticello Nuclear Generating Plant Northern State Power Company 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD6864)

Dear Mr. O'Connor:

By letter dated September 8, you submitted a supplement to the September 25,2007, application for an amendment to revise the allowable value and channel calibration surveillance interval for the Recirculation Riser Differential Pressure - High function in the Technical Specifications. Your letter stated that Enclosure 5, "Requests for Additional Information Nos.

2 and 4," and Enclosure 6, "10 CFR 50.46 Notification Letter 2006-01," contain information which is proprietary to GE-Hitachi Nuclear Energy Americas LLC (GEH). GEH requested that this proprietary information be withheld from public disclosure in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 390(a)4, and Part 9, Section 17(a)(4). Your letter provided two affidavits as Enclosure 4, executed by Mr. James F. Harrison, of GEH to support this request. The affidavits requested that Enclosures 5 and 6 be withheld from public disclosure pursuant to Title 10 of the Code of Federal RegUlations (10 CFR), Part 2, Section 2.390.

Mr. Harrison's affidavits stated that the entire Enclosures 5 and 6 should be considered exempt from mandatory public disclosure because Enclosures 5 and 6 contain:

(a) Information that discloses a process, method, or apparatus including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390, and on the basis of the statements in the affidavit, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the entire documents identified as Enclosures 5 and 6, which are marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

T. J. O'Connor -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1451.

Sincerely, ez~~~

Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: Distribution via ListServ

November 12, 2008 T. J. O'Connor -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1451.

Sincerely, lRAI Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: Distribution via ListServ DISTRIBUTION PUBLIC Ridsl\lrrDorlLpl3-1 Resource RidsNrrPMMonticello Resource RidsNrrLATHarris Resource RidsOgcMailCenter Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDirsltsb RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource LPL3-1 R/F RidsNrrLATHarris Resource Accession No'.. ML083010624 OFFICE LPL3-1/PM LPL3-1/LA SRXB/BC '" LPL3-1/BC h NAME PTam \((/f THarrisj~\~ GCranston}fV'" LJames:t ~iJ,,- ~

\

DATE /011 V08 ) () 1~1/08 ftJ 13/108 '1 1/7108 OFFICIAL RECORD COPY