UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 14, 2009 Mr. Timothy J. O'Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MI\J 55362-9637 SUB..IECT: MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD9990)

Dear Mr. O'Connor:

By letter dated November 5, 2008, you submitted an application for amendment (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083230113),

including Enclosure 5, "Safety analysis Report for Monticello Constant Pressure Power Uprate (Proprietary)," and Enclosure 6, an affidavit executed by Mr. Tim E. Abney of GE-Hitachi Nuclear Energy Americas LLC (GEH), on October 24,2008, requesting that Enclosure 5 be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390.

The affidavit stated that the entire Enclosure 5 should be considered exempt from mandatory public disclosure for the following reasons:

(1) Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; (2) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed GEH's affidavit in accordance with the requirements of 10 CFR 2.390, and on the basis of its statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the entire Enclosure 5, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

We have released to the public the non-proprietary version of the GEH document that was submitted as Enclosure 7 (ADAMS Accession No. ML083230112) of your November 5, 2008, application.

T. J. O'Connor -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, 1may be reached at 301-415-1451.

~~v~

~ri. Tam~?Z~~eCI Plant Licensing Branch 111-1 Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: Mr. Tim E. Abney Vice President, Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via ListServ

January 14, 2009 T. J. O'Connor -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1451.

Sincerely, IRAJ Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: Mr. Tim E. Abney Vice President, Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via ListServ DISTRIBUTION PUBLIC RidsNrrDorlLpl3-1 Resource RidsNrrPMPTamResource RidsNrrLATHarrisResource RidsOgcMailCenterResource RidsAcrsAcnw_MailCTRResource RidsNrrDirsltsb RidsRgn3MailCenterResource RidsN rrDorl DprResource LPL 3-1 R/F Accession No'.. ML083590127 OFFICE LPL3-1/PM LPL3-1/LA SRXB/BC LPL3-1/BC NAME PTam THarris GCranston LJames DATE 1/13/08 12/29/08 117/09 1/14/09 OFFICIAL RECORD COPY