Letter Sequence Withholding Request Acceptance |
---|
TAC:MD9990, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis., L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008, L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008, L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538, L-MT-09-026, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, Average Power Range Monitor Selected Prnm Licensing Setpoints - EPU Operation (Numac), L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009, L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009, L-MT-09-049, Drawing C.5-2007, Revision 15, Failure to Scram, L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009, L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009, L-MT-09-088, Extended Power Uprate: Revision to Clarify Text in Enclosures 5 and 7 of L-MT-08-052, L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay, L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call, L-MT-10-072, Extended Power Uprate: Updates to Docketed Information, L-MT-11-044, Uprate (Epu): Update on EPU Commitments, L-MT-12-056, WCAP-17549-NP, Rev. 0, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, L-MT-12-090, Westinghouse, LTR-A&SA-12-8, Rev. 1, Attachment B, Recommendations for Inspections of the Monticello Replacement Steam Dryer., L-MT-12-114, Drawing C.5-2007, Rev. 17, Failure to Scram, L-MT-13-020, Enclosure 1 - Responses to the Gap Analysis, L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project., L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14, L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan, L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages, L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit, L-MT-14-023, Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications, L-MT-15-074, Enclosure 7, WCAP-18604-NP, Revision 0, Monticello EPU Main Steam Line Strain Data Evaluation Report., L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML083230111, ML083400402, ML083500575, ML083570610, ML083590127, ML090710680, ML090710683, ML090710684, ML091120578, ML091140470, ML091410121, ML091410122, ML091410123, ML091410124, ML091760769, ML092290250, ML092810554, ML093160816, ML093220925, ML093220964, ML093620024, ML100280558... further results
|
MONTHYEARML0907106832008-02-17017 February 2008 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Attachment 1-1g Through End of Encl. 1 Project stage: Other ML13064A4352008-03-20020 March 2008 CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4 Project stage: Other ML0914101242008-08-11011 August 2008 Monticello - Calculation CA-08-050, Rev. 0, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased Prnm Setpoints for Cl Tp and EPU Project stage: Other L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis.2008-10-31031 October 2008 Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis. Project stage: Other ML0832301122008-10-31031 October 2008 NEDC-33322-NP, Revision 3, Monticello Nuclear Generating Plant, Safety Analysis Report, Constant Pressure Power Uprate. Project stage: Request ML0832301112008-11-0505 November 2008 Monticello Nuclear Generating Plant, License Amendment Request: Extended Power Uprate Project stage: Other ML0832301142008-11-0505 November 2008 Monticello Nuclear Generating Plant, Steam Dryer Dynamic Stress Evaluation. Project stage: Request ML0834003662008-12-0202 December 2008 Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues Project stage: Acceptance Review ML0834004022008-12-0505 December 2008 Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area Project stage: Other ML0835000992008-12-11011 December 2008 Monticello Extended Power Uprate (Usnrc TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis Project stage: Supplement ML0835303022008-12-16016 December 2008 Draft Request for Additional Information, Environmental Issues of EPU Application Project stage: Draft RAI ML0936200242008-12-18018 December 2008 Report 0800760.401, Rev. 1, Flaw Evaluation and Vibration Assessment of Existing Monticello Steam Dryer Flaws for Extended Power Uprate. Project stage: Other ML0835005752008-12-18018 December 2008 Letter Finding 11/5/08 Application for Amendment Acceptable for Review Project stage: Other ML0835309982008-12-18018 December 2008 EPU Application - Additional RAI Question Regarding an Environmental Issue Project stage: RAI ML0835310022008-12-18018 December 2008 Proposed Eou Amendment - Revised RAI Re. Containment Analysis Project stage: RAI ML0914101222008-12-18018 December 2008 Monticello - Calculation CA-95-075, Revision 1, Main Steam Line High Flow Setpoint Project stage: Other ML0914101212008-12-19019 December 2008 Monticello - Calculation CA-95-073, Revision 4, Reactor Low Water Level SCRAM Setpoint Project stage: Other ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure Project stage: Other ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 20082009-01-29029 January 2009 Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008 Project stage: Other L-MT-09-005, Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate2009-02-0404 February 2009 Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate Project stage: Request L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 20082009-02-0404 February 2009 Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008 Project stage: Other ML0904204852009-02-11011 February 2009 Draft RAI from Materials Engineering Re. Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907106792009-02-17017 February 2009 Monticello, Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008 Project stage: Request ML0907106802009-02-17017 February 2009 Monticello, Enclosure 1 to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 1 Dated December 18, 2008, Cover Through Copy of MNGP Appr T0406 Data Transmittal Page 424 of 424 Project stage: Other L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 5382009-02-17017 February 2009 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538 Project stage: Other ML0907106842009-02-17017 February 2009 Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008 Project stage: Other L-MT-09-018, Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 20092009-02-24024 February 2009 Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 2009 Project stage: Request ML0907100912009-03-11011 March 2009 Conveying Draft RAI Questions from the Instrumentation and Controls Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907200572009-03-12012 March 2009 Conveys Draft RAI Regarding Fire Protection for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800062009-03-18018 March 2009 Draft RAI from Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800042009-03-18018 March 2009 Conveys Draft RAI by the PRA Licensing Branch on the Proposed EPU Amendment Project stage: Draft RAI ML0907809032009-03-19019 March 2009 Conveys Draft RAI Provided by the Containment and Ventilation Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907809092009-03-19019 March 2009 RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment Project stage: RAI L-MT-09-017, Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 20092009-03-19019 March 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 2009 Project stage: Request ML0908200312009-03-20020 March 2009 Draft RAI Re. Health Physics Issues for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908200992009-03-23023 March 2009 Draft RAI from the Balance of Plant Branch Re the Proposed Amendment on Extended Power Uprate Project stage: Draft RAI ML0908800022009-03-28028 March 2009 Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908800032009-03-28028 March 2009 Draft RAI from the Electrical Engineering Branch Re. the Proposed Extended Power Uprate Amendment for Monticello Project stage: Draft RAI ML0908800012009-03-29029 March 2009 Additional Draft RAI Questions from the Containment and Ventilation Branch Proposed EPU Amendment for Monticello Project stage: Draft RAI ML0910300172009-04-0606 April 2009 Conveys an Additional EPU Draft RAI Question from Instrumentation and Controls Branch Project stage: Draft RAI ML0910300212009-04-0606 April 2009 Draft RAI Question from Instrumentation and Controls Branch Re. Proposed EPU Amendment Project stage: Draft RAI ML0911205782009-04-22022 April 2009 Request for Audit of Implementation of Long-Term Stability Solution Project stage: Other L-MT-09-025, Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 20092009-04-22022 April 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 2009 Project stage: Request ML0911902092009-04-29029 April 2009 Transmit Revised Draft RAI from the Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0914101232009-05-0606 May 2009 Monticello - Calculation 96-054, Rev 5, Turbine Stop Valve Closure/Generator Load Reject Scram Bypass Project stage: Other ML0911404702009-05-0707 May 2009 Determination That Submitted Information Can Be Withheld from Public Disclosure Project stage: Other ML0914101202009-05-13013 May 2009 Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009 Project stage: Request L-MT-09-045, Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 20092009-05-26026 May 2009 Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 2009 Project stage: Request L-MT-09-029, Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 20092009-05-29029 May 2009 Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009 Project stage: Request 2009-02-24
[Table View] |
|
---|
Category:Letter
MONTHYEARL-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20244012024-05-30030 May 2024 Public - Monticello Nuclear Generating Plant - Cyber Security Inspection Report 05000263/2024401 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community L-MT-24-012, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A2882024-04-25025 April 2024 Sec106 Tribal, Fairbanks, Michael-White Earth Nation.Docx ML24115A3012024-04-25025 April 2024 Sec106 Tribal, Seki, Darrell-Red Lake Nation ML24115A2922024-04-25025 April 2024 Sec106 Tribal, Jensvold, Kevin-Upper Sioux Community ML24115A2942024-04-25025 April 2024 Sec106 Tribal, Johnson, John-Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa 2024-09-26
[Table view] Category:Proprietary Information Review
MONTHYEARML23115A4172023-04-28028 April 2023 Requesting for Withholding Information from Public Disclosure for Monticello Nuclear Generating Plant Core Operating Limits Report (COLR) for Cycle31, Revision 2 ML22187A2912022-08-0303 August 2022 Request for Withholding Information from Public Disclosure Monticello Nuclear Generating Plant ML21277A2952021-11-0808 November 2021 Request for Withholding Information from Public Disclosure ML21013A4542021-01-21021 January 2021 Request for Withholding Information from Public Disclosure ML16243A4602016-09-15015 September 2016 Request for Withholding Information from Public Disclosure ML16160A0862016-06-13013 June 2016 Request for Withholding Information from Public Disclosure ML15301A0942015-12-0707 December 2015 Request for Withholding Information from Public Disclosure from Areva Inc. Associated with the Areva Extended Flow Window License Amendment Request ML15301A5502015-11-30030 November 2015 Request for Withholding Information from Public Disclosure from Westinghouse Associated with Submittal of Power Ascension Testing Results for Replacement Steam Dryer ML15140A1472015-09-28028 September 2015 Request for Withholding Information from Public Disclosure (GE-Hitachi LLC) Associated with the Areva Extended Flow Window License Amendment Request ML15140A1242015-09-28028 September 2015 Request for Withholding Information from Public Disclosure from Areva Inc. Associated with the Areva Extended Flow Window License Amendment Request ML14155A1692014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on April 22, 2014, by Mr. Alan B. Meginnis of Areva Inc. ML14155A1772014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on April 28, 2014, by Mr. Philip A. Opsal of Areva Inc. ML14155A1672014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on January 23, 2014, by Mr. Alan B. Meginnis of Areva Np, Inc. ML13239A0842013-10-0808 October 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on March 14, 2013, by Linda Dolan and June 12, 2013, by Kurt Edsinger of ML13239A0762013-10-0808 October 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 14, 2013, by Linda C. Dolan of GE-Hitachi ML13239A0022013-10-0808 October 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on January 14, 2013, by James F. Harrison of GE-Hitachi ML13239A0822013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on March 19, 20, 21, 25 & 27, 2013, by Bradley F. Maurer of Westinghouse ML13239A1092013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on July 16, by James A. Gresham of Westinghouse ML13239A0892013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on July 31 and August 1, 2013, by Hank A. Sepp and James A. Gresham of Westinghouse ML13239A0612013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 14, 2013, by Bradley F. Maurer of Westinghouse ML13239A0482013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 7, 2013, by James A. Gresham of Westinghouse ML13239A0152013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on February 20, 2013, by Bradley F. Maurer of Westinghouse ML13009A0122013-01-25025 January 2013 Request for Withholding of Proprietary Information from Public Disclosure Enclosure 1 of Letter Dated November 30, 2012 ML12240A1232012-09-13013 September 2012 Letter Approving Withholding from Public Disclosure of Submitted Proprietary Information ML12214A5862012-08-0707 August 2012 Letter Approving Withholding from Public Disclosure of Certain Submitted Information Regarding the Nordic Replacement Steam Dryer ML11325A4262011-11-30030 November 2011 Letter Approving Withholding from Public Disclosure Two Documents Containing Proprietary Information Submitted in the Licensee'S 11/11/2011 Letter ML11125A0222011-05-26026 May 2011 Withholding of Submitted Proprietary Information from Public Disclosure ML1104809152011-03-0909 March 2011 Letter Regarding Request for Withholding Proprietary Information from Public ML1101902042011-02-0808 February 2011 Request for Withholding for Proprietary Information from Public Disclosure ML1027706892010-11-0101 November 2010 Withholding Information from Public Disclosure ML1020400512010-07-30030 July 2010 Withholding of Submitted Proprietary Information from Public Disclosure ML1018909152010-07-30030 July 2010 Determination That Appendix 4 of Enclosure 1 of 6/30/10 Submittal Contains Proprietary Information ML1003202292010-02-16016 February 2010 Determination That Attachment 3 Contains Proprietary Information and Is Withheld from Public Disclosure ML0928105542009-10-20020 October 2009 Determination That Submitted Information Is Proprietary and Is Withheld from Public Disclosure ML0926502282009-09-28028 September 2009 Request for Withholding Information from Public Disclosure ML0926109182009-09-28028 September 2009 Request for Withholding Information from Public Disclosure ML0926101052009-09-28028 September 2009 Request for Withholding Information from Public Disclosure ML0922902502009-08-26026 August 2009 Approves Withholding of Proprietary Information in 08/12/2009 Letter from Public Disclosure ML0921608892009-08-14014 August 2009 Request for Withholding Information from Public Disclosure ML0911404702009-05-0707 May 2009 Determination That Submitted Information Can Be Withheld from Public Disclosure ML0905002592009-03-0303 March 2009 Letter to Approve Request to Withhold Document Containing Proprietary Information from Public Disclosure ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure ML0830106242008-11-12012 November 2008 Letter to Determine Withholding Proprietary Information from Public Disclosure ML0814802652008-07-11011 July 2008 Request for Withholding Information from Public Disclosure ML0815600232008-06-16016 June 2008 Withholding from Public Disclosure, 03/31/2008 Application for Extended Power Uprate Amendment Enclosure 1 Mechanical and Civil Engineering Branch Questions and Responses (Proprietary). ML0809805822008-04-30030 April 2008 Request for Withholding Information from Public Disclosure ML0809804572008-04-14014 April 2008 Determining of Proprietary Information in Enclosure 5 of 3/31/08 Application for Extended Power Uprate Amendment ML0805706482008-03-21021 March 2008 Request for Withholding Information from Public Disclosure ML0727506332007-10-31031 October 2007 (MNGP) - Request for Withholding Information from Public Disclosure 2023-04-28
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 30, 2013 Mrs. Karen D. Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company- Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT (MNGP)- REQUEST FOR WITHHOLDING OF PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD9990)
Dear Mrs. Fili:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated November 5, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083230111), Northern States Power Company- Minnesota (NSPM, the licensee), doing business as Xcel Energy, submitted an extended power uprate (EPU) license amendment request to revise the MNGP Renewed Operating License and technical specifications to increase the maximum authorized licenses thermal power level from 1775 megawatts thermal (MWt) to 2004 MWt. In a letter dated June 30, 2010 (ADAMS Accession No. ML102010462),
NSPM provided a supplement to the November 5, 2008, application. The supplement provided detailed design and analysis results for a replacement steam dryer (RSD) for the MNGP.
In a letter dated March 29, 2013 (ADAMS Accession No. ML13092A348), the licensee submitted detailed analysis documentation in its response to NRC staff requests for additional information associated with the RSD review. The submittal included, as Enclosure 8, seven affidavits (CAW-13-3646, CAW-13-3665, CAW-13-3666, CAW-13-3667, CAW-13-3668, CAW-13-3671, and CAW-13-3679) executed on March 19, 20 (2 affidavits), 21 (2 affidavits), 25, 27, 2013, by Bradley F. Maurer of Westinghouse Electric Company, LLC (Westinghouse). The affidavits were executed to support withholding Enclosures 1 through 7 from public disclosure pursuant to Titie 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. The affidavits stated th~t Enclosures 1 through 7 should be considered exempt because they contain:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by Westinghouse competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
- b. Supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures competitive economic advantage, e.g., by optimization or improved marketability.
- c. Information that, if used by a competitor, would reduce their expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
K. D. Fili We have reviewed the Westinghouse affidavits in accordance with the requirements of 10 CFR 2.390 and, on the basis of its statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefor~. Enclosures 1 through 7, which are marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Enclosures 9 through 15 of the March 29, 2013, submittal were provided as a non-proprietary versions of Enclosures 1 through 7, and were released to the public (ADAMS Accession Nos.
ML13092A348, ML13092A349, ML13092A350, ML13092A351, ML13092A352, ML13092A353).
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3049.
Sincerely,
~ Terry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: J. A. Gresham, Manager Regulatory Compliance Westinghouse Electric Company, LLC Suite 428 1000 Westinghouse Drive Cranberry Township, PA 16066 Additional Distribution via ListServ
ML13092A348, ML13092A349, ML13092A350, ML13092A351, ML13092A352, ML13092A353).
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the.information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
\
If you have any questions regarding this matter, I may be reached at 301-415-3049.
Sincerely,
/RAJ Terry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: J. A. Gresham, Manager Regulatory Compliance Westinghouse Electric Company, LLC Suite 428 1000 Westinghouse Drive Cranberry Township, PA 16066 Additional Distribution via ListServ DISTRIBUTION PUBLIC RidsNrrDorllpl3-1 Resource RidsNrrPMMonticello Resource RidsNrrLAMHenderson Resource RidsAcrsAcnw_MaiiCTR Resource RidsNrrDeEmcb Resource RidsRgn3MaiiCenter Resource RidsNrrDoriDpr Resource C. Basavaraju, NRR LPL3-1 RIF ADAMS Accession No ..* ML13239A082 OFFICE LPL3-1/PM LPL3-1/LAiT LPL3-1/LA EMCB/BC LPL3-1/BC LPL3-1/PM NAME TBeltz MHenderson SRohrer AMcMurtray RCarlson TBeltz DATE 09/16/13 09/09/13 09/11/13 09/19/13 09/30/13 09/30/13