ML13239A061

From kanterella
Jump to navigation Jump to search

Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 14, 2013, by Bradley F. Maurer of Westinghouse
ML13239A061
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/30/2013
From: Beltz T
Plant Licensing Branch III
To: Fili K
Northern States Power Co
Beltz T
References
TAC MD9990
Download: ML13239A061 (3)


Text

. UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

  • September 30, 2013 Mrs. Karen D. Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company - Minnesota 2807 West County Road 75
  • Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT (MNGP)- REQUEST FOR WITHHOLDING OF PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD9990)

Dear Mrs. Fili:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated November 5, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083230111 ), Northern States Power Company- Minnesota (NSPM, the licensee), doing business as Xcel Energy, submitted an extended power uprate license amendment request to revise the MNGP Renewed Operating License and technical specifications to increase the maximum authorized licenses thermal power level from 1775 megawatts thermal (MWt) to 2004 MWt. In a letter dated June 30, 2010 (ADAMS Accession No. ML102010462), NSPM provided a supplement to the November 5, 2008, application. The supplement provided detailed design and analysis results for a replacement steam dryer (RSD) for the MNGP.

In a letter dated March 18, 2013 (ADAMS Accession No. ML13078A390), NSPM submitted responses to NRC staff requests for additional information associated with the RSD review.

The submittal included, as Enclosure 3, an affidavit (CAW-13-3643) executed on March 14, 2013, by Bradley F. Maurer of Westinghouse Electric Company, LLC (Westinghouse). The affidavit was executed to support withholding Enclosure 1 from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 2, Section 2.390. The. affidavit stated that Enclosure 1 should be considered exempt because it contains:

a. Information that reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by Westinghouse competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
b. Supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
c. Information that, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

K. D. Fili We have reviewed the GEH affidavit in accordance with the requirements of 10 CFR 2.390 and, on the basis of its statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, Enclosure 1, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. of the March 18, 2013, submittal was provided as a non-proprietary version of , and was released to the public.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-3049.

Sincerely,

~ Terry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: J. A. Gresham, Manager Regulatory Compliance Westinghouse Electric Company, LLC Suite 428

  • 1000 Westinghouse Drive Cranberry Township, PA 16066 Additional Distribution via ListServ

..* ML13239A061 OFFICE LPL3-1/PM LPL3-1/LAiT LPL3-1/LA EMCB/BC LPL3-1/BC LPL3-1/PM NAME TBeitz MHenderson SRohrer AMcMurtray RCarlson TBeltz DATE 09/16/13 09/05/13 09/05/13 09/19/13 09/30/13 09/30/13