Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:UTILITY
MONTHYEARIR 05000413/19900281990-10-26026 October 1990 Insp Repts 50-413/90-28 & 50-414/90-28 on 901001-04. Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors W/Emphasis on Compensatory Measures & Records & Repts IR 05000413/19900251990-10-11011 October 1990 Insp Rept 50-413/90-25 & 50-414/90-25 on 900924-28.No Violations Noted.Major Areas inspected:post-refueling Startup Tests for Both Units & Core Performance Surveillance Performed on Unit 2 IR 05000413/19900241990-09-27027 September 1990 Insp Repts 50-413/90-24 & 50-414/90-24 on 900803-0905. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation,Review of LERs & Followup of Previously Identified Items IR 05000413/19900231990-09-10010 September 1990 Insp Repts 50-413/90-23 & 50-414/90-23 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program in Areas of Internal & External Exposure & Contamination Control & ALARA IR 05000413/19900191990-08-30030 August 1990 Insp Repts 50-413/90-19 & 50-414/90-19 on 900624-0802. Violations Noted.Major Areas Inspected:Plant Operations, Refueling Activities,Surveillance/Maint Observations,Review of LERs & Followup of Previously Identified Items IR 05000413/19900201990-08-28028 August 1990 Insp Repts 50-413/90-20 & 50-414/90-20 on 900724-26. Unresolved Item Identified.Major Areas Inspected: fitness-for-duty Program IR 05000413/19900221990-07-30030 July 1990 Insp Repts 50-413/90-22 & 50-414/90-22 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Records Review of Maint Activities Following 5-yr Insp of Emergency Diesel Generator 2A & Review of Test Procedures ML20056A5101990-07-19019 July 1990 Insp Repts 50-413/90-15 & 50-414/90-15 on 900527-0623. Violation Noted.One Noncited Violation Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation & Maint Observation IR 05000413/19900211990-07-19019 July 1990 Insp Repts 50-413/90-21 & 50-414/90-21 on 900627-29.No Violations or Deviations Noted.Major Areas Inspected:Main Steam Safety Relief Valve Setpoint Testing & Maint & Repair of Coatings on Steel Containment Vessel IR 05000413/19900181990-07-11011 July 1990 Insp Repts 50-413/90-18 & 50-414/90-18 on 900625-29.No Violations Noted.Major Areas Inspected:Inservice Insp & Maint,Including Plan for Outage,Reviews of NDE Procedures & Independent Exam of Verifications IR 05000413/19900161990-07-0909 July 1990 Insp Repts 50-413/90-16 & 50-414/90-16 on 900611-15. Violations Noted But Not Cited.Major Areas Inspected: Conformance to Reg Guide 1.97 & Instrumentation for Light water-cooled Nuclear Power Plants During Accidents IR 05000413/19900141990-06-13013 June 1990 Partially Withheld Physical Security Insp Repts 50-413/90-14 & 50-414/90-14 on 900521-25 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected: Physical Barriers & Security Sys Power Supply IR 05000413/19890281989-10-10010 October 1989 Partially Withheld Insp Repts 50-413/89-28 & 50-414/89-28 on 890911-15 (Ref 10CFR2.790(d) & 73.21)Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Detection & Assessment Aids & Testing & Maint IR 05000413/19890251989-09-25025 September 1989 Insp Repts 50-413/89-25 & 50-414/89-25 on 890801-28 & 0912-15.Violations Being Considered for Enforcement.Major Areas Inspected:Two Events Re Overspeeding & Tripping of Auxiliary Feedwater Pump IR 05000413/19890261989-09-20020 September 1989 Insp Repts 50-413/89-26 & 50-414/89-26 on 890821-24.No Violations or Deviations Noted.One Unresolved Item Identified.Major Areas Inspected:Organization & Mgt Controls & Maintaining Radiation Exposures ALARA IR 05000413/19890241989-09-0707 September 1989 Insp Repts 50-413/89-24 & 50-414/89-24 on 890807-11.No Violations Noted.Major Areas Inspected:Physical Security Program for Program Power Reactors IR 05000413/19890221989-08-22022 August 1989 Insp Repts 50-413/89-22 & 50-414/89-22 on 890723-28.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Previously Identified Insp Items IR 05000413/19890201989-08-11011 August 1989 Insp Repts 50-413/89-20 & 50-414/89-20 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment,Generic Ltr 83-28 & NRC Bulletins 88-001 & 88-003 IR 05000413/19890181989-08-11011 August 1989 Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items IR 05000413/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-413/89-23 & 50-414/89-23 on 890728 (Ref 10CFR2.790 & 73.21)).Violations Noted.Major Area Inspected:Security Event Logs ML20247R7511989-07-24024 July 1989 Insp Repts 50-413/89-16 & 50-414/89-16 on 890528-0701.Two Violations & One Deviation Noted.Major Areas Inspected:Plant Operations,Surveillance Observation,Maint Observation, Licensee Nonroutine Event Repts & Part 21 Insps IR 05000413/19890171989-07-13013 July 1989 Partially Withheld Insp Repts 50-413/89-17 & 40-414/89-17 on 890605-09.Violations Noted Re Protected Area Access Controls & Visitor Controls.Major Areas Inspected:Mgt Support, Security Program Plans & Audits & Physical Barriers IR 05000413/19890191989-07-13013 July 1989 Insp Repts 50-413/89-19 & 50-414/89-19 on 890616-0628. Violations Noted.Major Areas inspected:890616 Event Re Channels of Reactor Vessel Level Instrumentation Sys Inoperable for Period of Time in Excess of Tech Specs ML20246P7321989-07-10010 July 1989 Insp Repts 50-413/89-09 & 50-414/89-09 on 890410-0505. Violations Noted.Major Areas Inspected:Various Plant Groups Including Operations,Maint,Qa,Engineering & Training in Support of Safe Plant Operations IR 05000413/19890151989-06-27027 June 1989 Insp Repts 50-413/89-15 & 50-414/89-15 on 890430-0527. Violation Noted Re Failure to Meet Overtime Restriction Requirements & Unlocked Valves.Major Areas Inspected:Plant Operations,Surveillance & Maint Observations & Plant Mods IR 05000413/19890131989-06-27027 June 1989 Insp Repts 50-413/89-13 & 50-414/89-13 on 890326-0429. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19890121989-06-0606 June 1989 Corrected Page to Insp Repts 50-413/89-12 & 50-414/89-12. No Violations or Deviations Noted.Major Area Inspected: Annual Radiological Emergency Response Exercise on 890427 ML20245F3421989-05-23023 May 1989 Insp Repts 50-413/89-12 & 50-414/89-12 on 890425-28.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Radiological Emergency Response Exercise IR 05000413/19890111989-05-18018 May 1989 Insp Repts 50-413/89-11 & 50-414/89-11 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities During Extended Outages & Control of Radioactive Matls & Surveys IR 05000413/19890101989-05-0202 May 1989 Insp Repts 50-413/89-10 & 50-414/89-10 on 890403-07 & 13. Violations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste,Plant Chemistry,Environ Monitoring,Confirmatory Measurements & Followup on Previously Identified Items IR 05000413/19890071989-04-20020 April 1989 Insp Repts 50-413/89-07 & 50-414/89-07 on 890226-0325. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Rept IR 05000413/19890081989-04-19019 April 1989 Insp Repts 50-413/89-08 & 50-414/89-08 on 890313-14,16-17 & 27-31.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Program Implementing Procedures, Reviews of NDE Procedures & Personnel Qualifications ML20244A8991989-03-29029 March 1989 Insp Repts 50-413/89-05 & 50-414/89-05 on 890204-25. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Nonroutine Event Repts IR 05000413/19890041989-03-13013 March 1989 Insp Repts 50-413/89-04 & 50-414/89-04 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness Re Emergencies ML20246L6721989-03-0303 March 1989 Insp Repts 50-413/89-02 & 50-414/89-02 on 890130-0203. Violations Noted.Major Areas Inspected:Preoutage Planning, Preparations & Mgt Support for Implementing Licensee Radiation Protection Program ML20236A2241989-02-25025 February 1989 Resident Insp Repts 50-413/88-38 & 50-414/88-38 on 881127-890204.One Strength,One Weakness & One Apparent Violation Identified.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observation & Procedures Review IR 05000413/19890031989-02-23023 February 1989 Insp Repts 50-413/89-03 & 50-414/89-03 on 890130-0203.One Weakness Identified Re Photomultiplier Tube.Major Areas Inspected:Design Changes,Plant Mods & Licensee Action on Previously Identified Insp Findings ML20206J5961988-11-15015 November 1988 Insp Repts 50-413/88-34 & 50-414/88-34 on 880926-1025. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880331988-10-14014 October 1988 Insp Repts 50-413/88-33 & 50-414/88-33 on 880826-0925. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880301988-09-20020 September 1988 Insp Repts 50-413/88-30 & 50-414/88-30 on 880726-0826.No Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation,Review of Licensee Nonroutine Event Repts & Part 21 Repts IR 05000413/19880271988-09-0909 September 1988 Insp Repts 50-413/88-27 & 50-414/88-27 on 880719-22. Violations Noted.Major Areas Inspected:Radiation Protection, Including Organization & Mgt Controls,Solid Waste Program, Transportation & Licensee Action on Previous Insp Findings IR 05000414/19880311988-09-0808 September 1988 Partially Withheld Insp Repts 50-413/888-31& 50-414/88-31 on 880815-19 (Ref 10CFR2.790 & 73.21).No inspector-identified Violations or Deviations Noted.Major Areas Inspected:Testing & Maint & Physical Barriers - Protected Area ML20154E9461988-09-0606 September 1988 Page 11 to Insp Repts 50-413/88-25 & 50-414/88-25 IR 05000413/19880261988-09-0202 September 1988 Insp Repts 50-413/88-26 & 50-414/88-26 on 880801-05.No Violations Noted.Major Areas Inspected:Qa & Confirmatory Measurements for in-plant Radiochemcial Analysis ML20154A6241988-08-31031 August 1988 Insp Repts 50-413/88-29 & 50-414/88-29 on 880801-05. Violation Noted.Major Areas Inspected:Areas of Catawba Safety Review Group Activities & 10CFR21 Reportability Determinations IR 05000413/19880281988-08-23023 August 1988 Insp Repts 50-413/88-28 & 50-414/88-28 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Waste Mgt,Effluent Sampling,Monitoring & Analysis & Radiological Environ Monitoring ML20153C5451988-08-19019 August 1988 Insp Repts 50-413/88-25 & 50-414/88-25 on 880626-0725. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of LERs & Followup of Previously Identified Items & NRC Bulletins ML20151E5681988-07-0808 July 1988 Insp Repts 50-413/88-22 & 50-414/88-22 on 880526-0625. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of Licensee Nonroutine Event Repts & Previously Identified Items IR 05000413/19880231988-06-22022 June 1988 Partially Withheld Insp Repts 50-413/88-23 & 50-414/88-23 on 880607-10.Violation Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Program & Organization,Records & Repts & Alarm Stations IR 05000413/19880191988-06-21021 June 1988 Insp Repts 50-413/88-19 & 50-414/88-19 on 880517-20 & 0603. No Violations or Deviations Noted.Major Areas Inspected: Emergency Plan & Implementing Procedures,Emergency Facilities & Organization & Mgt Control 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000413/19993021999-10-12012 October 1999 NRC Operator Licensing Retake Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23.Two Out of Three RO Candidates & One SRO Passed Retake Exam IR 05000413/19993011999-09-30030 September 1999 NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16.Eight of Fourteen Applicants Passed Exam IR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20210H2211999-07-22022 July 1999 Notice of Violation from Insp on 990314-0424.Violation Noted:Sss Was Not Inoperable for Thirteen Days Because Electrical Breakers Associated with SSS Motor Control Ctr Were Mispositioned ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-II-99-017, on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground1999-05-18018 May 1999 PNO-II-99-017:on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations PNO-II-99-015, on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws1999-05-0505 May 1999 PNO-II-99-015:on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20207A5881999-02-17017 February 1999 Notice of Violation from Insp on 981213-990123.Violation Noted:Licensee Made Change to Procedures as Described in Updated Final Safety Analysis Rept & Failed to Perform Written Safety Evaluation IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown ML20154C4301998-09-14014 September 1998 Notice of Violation from Insp on 980705-0815.Violation Noted:Licensee Failed to Establish Adequate Surveillance Procedures IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-037A, on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed1998-08-28028 August 1998 PNO-II-98-037A:on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-037, on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified1998-08-10010 August 1998 PNO-II-98-037:on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified ML20236V7351998-07-27027 July 1998 Notice of Violation from Insp on 980524-0704.Violation Noted:Licensee Failed to Identify & Take Prompt C/A Following Unit 1 Upper Surge Tank over-temp Events on 960120,980111 & 0507 IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236J7471998-06-11011 June 1998 Notice of Violation from Insp on 980222-0411.Violation Noted:Adminstrative & Surveillance Procedures Not Implemented as Evidenced by Listed Examples IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 PNO-II-98-025, on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed1998-05-11011 May 1998 PNO-II-98-025:on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support ML20217G5551998-03-23023 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Perform Written Safety Evaluation for Closing Valves 1CA-6 & 2CA-6 IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20203L6251998-02-0909 February 1998 Notice of Violation from Insp on 971123-980110.Violation Noted:Changes to Radiological Conditions in 1B Residual Heat Removal Pump Room Not Logged to Reflect Changes in Dress Requirements ML20199L6301998-02-0202 February 1998 Notice of Violation from Insp & Exam on 971117-21 & 971201-19.Violation Noted:As of 971219,selected Officers from Site Security Force Had Not Been Retrained to Perform non-licensed Operator Emergency Tasks for Starting Ssf PNO-II-97-066, on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc1997-12-31031 December 1997 PNO-II-97-066:on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc PNO-II-97-064, on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation1997-12-29029 December 1997 PNO-II-97-064:on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation ML20197F2481997-12-19019 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Follow Radiation Protection Procedures in That,Current Radiation Dose Rates Were Not on Vacuum Cleaner Label as Required IR 05000414/19970081997-12-19019 December 1997 Notice of Deviation from Insp on 971012-1122.Deviation Noted:On 971020,licensee Had Not Performed Alarm Set Point Adjustment Evaluation Discussed in Violation 50-414/97-08-01 ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199G0351997-11-10010 November 1997 Notice of Violation from Insp on 970831-1011.Violations Noted:Licensee Failed to Follow Procedures for Security Badge Access Control as Evidenced.On 970909,security Failed to Destroy & Unassign Access Badge of Terminated Individual IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector ML20211L3051997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970727,technician Failed to Correctly Review Drawing Number CNEE-2792-01.02,connection Diagram,Main Steam Sys Terminal Cabinet 2SMTC1,rev 12 IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20210N7111997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:On 970424,operations Test Group Technician Failed to Open Valve 2NV-873 as Required by Step 2.2.3 of PT/2/A/4200/01C,resulting in Closed Test Vent Flowpath 1999-09-30
[Table view] |
Inspection Report - Catawba - 1989008 |
---|
|
|
Text
- - . _ . - .
'
.
[ *'s gR Rio UNITED STATES g NUCLEAR REGULATORY COMMISslON
,
,
s- p' .
, REGION 11 g j 101 MARIETTA STREET, * 'e ATLANTA, GEOR GI A 30323
,6
'+9**.*+
Report Nos.: 50-413/89-08 and 50-414/89-08 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-413 and 50-414 License Nos.: NPF-35 and NPF-52 Facility Name: Catawba 1 and 2 Inspection Condu te : arch M -17, and 27-31, 1989 Inspector: ,
/# .
//d ,j
'
'4'r P,.3/ - Date igned Approved by: ~
f Cv Y /5 9 Date Signed J J/B1 e hief aKrial nd Processes Section ngineering Branch Division of Reactor Safety SUMMARY Scope This routine, unannounced inspection was conducted in the areas of Inservice Inspection (ISI) and included a review of the ISI program implementing procedures and the Unit 2 ISI plan for this outage; reviews of nondestructive examination (NDE) procedures; reviews of NDE personnel qualifications; review of NDE equipment calibration and material certification documentation; and, a review of completed NDE examination data. Also, previously opened NRC items were addresse Results In the areas inspected, violations or deviations were not identifie ihe licensee's ISI program appears adequate in all areas inspected, however the implementation of that program shows signs of lack of attention to details. No major problems were identified in any of the areas reviewe Tvs emenived Items were Identified; the first concerning a magnetic particle er.emi nW ', technique used to examine reactor vessel studs and nuts, paragraph !
No. 2.e.(1), and the second concerning the protection of installed equipment, i I
paragraph No. 2e(8).
8904280072 8904 PDR ADOCK 05000413 Q PDC
_ - _ . _ _ _ _ _ - _ _
_ _ - _ _ _ _ _ _ _ - _ - _ _ _ -
'
.
'
.
.
>
.
.. .
During the exit interview, the station manager committed to correct all illegible print in all the Duke Power Company (DPC) Nondestructive Examination (NDE) procedures. These corrections are to be made during the occasion of the next revision of each procedur )
l l
t .. .. i
- - _ _ - _ _ _ - --_
.
'
.
.
'
..
REPORT DETAILS Persons Contacted Licensee Employees
- J. Barbour, Quality Assurance (QA) Director Operations
"J. Cherry, QA Specialist Inservice Inspection (ISI)
R. Giles, QA ISI Coordinator
- R. Glover, Technical Support (TS), Complinnce
- T. Owens, Catawba Station Manager Other licensee employees contacted during this inspection included craftsmen, engineers, technicians, and administrative personne NRC Resident Inspectors
- Orders, Senior Resident Inspector M. Lesser, Resident Inspector
- Attended exit interview Acronyms and initialisms used throughout this report are listed in the last paragrap . Inservice Inspection The inspector reviewed documents and records and observed activities, as indicated below, to determine whether ISI was being conducted in accordance with applicable procedures, regulatory requirements, and licensee commitments. The applicable code for ISI is the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME B&PV) Code,Section XI, 1980 edition with addenda through Winter 1981 (80W81). The Preservice Inspection (PSI) was perfonned to the requirements of 74S75 for both Unit I and Unit 2. The Construction Permits for both Unit I and Unit 2 were issued on August 7, 1975. The full nower Operating Licenses were issued on June 24, 1985 and August 14, 1986, respectively. Commercial l operation commenced June 29, 1985, for Unit I and August 19, 1986, for Unit Unit 1 just completed the third outage of the first 40 month period of the first ten year interval. Unit 2 is in the second outage of the first 40 month period of the first ten year interva DPC nondestructive examination personnel are performing the liquid penetrant (PT), magnetic particle (MT), radiography (RT), and visual (VT)
examinations under the umbrella of the DPC QA Program. Babcock and Wilcox L_ ____ _ __ _ -
. . _ _ _ - _ _ _ _ _ _ _ _ _ - - _ _ _ _
'
'
l ,
l'
-
., ,
l (B&W) personnel and DPC personnel are conducting the ultrasonic (UT)
examinations for DPC under the umbrella of the B&W QA Progra Steam generator tubing eddy cutrent (EC) examination data collection and i
the primary data analysis was performed by B&W personnel under the umbrella of the B&W QA Program, with DPC personnel performing a secondary data evaluatio ISI Program Review, Units 1 and 2 (73051)
(1) Program The inspector reviewed the following documents relating to the ISI program to determine whether the plan had been approved by the licensee and to assure that procedures and plans had been established (written, reviewed, approved and issued) to control and accomplish the following applicable activities:
organizational structure including qualifications, training, responsibilities, and duties of personnel responsible for ISI; audits including procedures, frequency, and qualification of personnel; general Quality Assurance requirements including examination reports, deviations from previously established program, material certifications, and identification of l
components to be covered; work and inspection procedures; control l of processer including suitably controlled work conditions, special methods, and use of qualified personnel; corrective i action; document control; control of examination equipment; quality records including documentation of indications and NDE findings, review of documentation, provisions to assure legibility and retrievability, and corrective action; scope of the inspection including description of areas to be examined, examination category, method of inspection, extent of examinations, and justification for any exception; definition of inspectior; interval and extent of examination; qualification of NDE personnel; and, controls of generation, approval, custody, storage and maintenance of NDE record Duke Power Company ASME,Section XI Manual (RO)
(Implemented November 30,1988)
Section A (RO) Purpose, Organization, and Responsibility Section B RO) Control of Manual Section D RO) Inservice Inspection and Testing Section F RO) Records Section G (RO) Control of Measuring and Test Equipment Section I (RO) Audit and Surveillance Activities
- Inservice Inspection Plan Catawba Nuclear Station Appendix A, Revision 4, 2nd Outage
_ _ - - _ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _ - - _ _ _ _ _ _ - _ . _- _ __
-__ _ _ _ - _ _ - _ _ ._ . -- _ _ _ _ - _ _ . - _ _ . _ _ _ _ . . - _ _ - - _ _
'
.
1 .
.
' ~
..
l l
[ 3
,
DPC- QCL-5 (R9) Control of Preservice and Inservice Inspection Activities DPC- QA-116 (R12) Quality Assurance Records Collectio Storage and Retention DPC- QA-513 (R6) Control of Inservice Inspection Plans and Reports DPC- QA-516 (RO) Evaluation of ISI Indications (2) Relief Requests The inspector reviewed the below listed Relief Requests. This review included record review and walkdown inspection to verify the bases for relie Relief Requests Reviewed Units 1 and 2 Relief Request Serial No. CNS-001 and CNS-002 (3) Replacement Program The inspector reviewed the completed portion of the licensee's Repair and Replacement Program for compliance with the requirements of ASME B&PV Code,Section XI, Subsections IWA 4000 and IWA 7000, Review of NDE Procedures Units 1 and 2 (73052)
(1) The inspector reviewed the procedures listed below to determine whether these procedures were consistent with regulatory requirements and licensee commitments. The procedures were also reviewed in the areas of procedure approval, requirements for qualification of NDE personnel, and compilation of required records; and, if applicable, division of responsibility between the licensee and contractor personnel if contractor personnel were involved in the ISI effor DPC-QCL-14 (R8) ISI Visual Examination, VT-3 and VT-4 DPC-NDE-35 (RIO) Liquid Penetrant Examination DPC-NDE-98 (R4) (Special) Liquid Penetrant Examination Technique (Color Contrast Solvent Removal Method) for Preservice and Inservice Inspectio _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___
__-_ - _ - ---_ _ - .
, .
,.
'.
DPC..NDE-25(R12) Magnetic Particle Examination Procedure and Technique DPC-NDE-44 (R7) Ultrasonic Examination of Bolts, Studs, Bushings and Threads in Flanges for Preservice and Inservice Inspection DPC-NDE-12 (R6) General Radiography Procedure for Preservice and Inservice Inspection DPC-NDE-90 (RO) Reference System for Ident'ffcation Layout of Welds and Components B&W-ISI-21(R9) Administrative Procedure for the Written Practice of Personnel Qualification in Ultrasonic Examinations B&W-ISI-50 (R11) Technical Procedure Describing Surface Requirements of Welds Adjacent Base Metal and Components for Nondestructive Examination B&W-ISI-55 (R3) Technical Procedure for Sulfur Content-Analysis B&W-ISI-56 (R2) Technical Procedure for Halogen Content Analysis B&W-ISI-69 (R16) Administrative Procedure for Processing Nondestructive Examination Data B&W-ISI-76 (R15) Administrative Procedure for the Design, Fabrication, and Certification of Calibration Standards B&W-ISI-78 (R11) Administrative Procedure for Tagging and Correction of Nonconforming Items B&W-ISI-119 (R8) Ultrasonic Examination of Stainless Steel and Nickel Base Alloy Weld Seams B&W-ISI-120(R25) Ultrasonic Examination of Pipe and With CA-88-006 Vessel Welds Joining Similar and Dissimilar Materials B&W-ISI-130(R24) Ultrasonic Examination of Vessel Welds and Nozzle Inside Radius Sections
.
_
'
.
.
,
'.
B&W-ISI-424 (R14) Multi-frequency Eddy Current Examination Of Tubing .750" OD X .044" Wall RSG For ASME Exam. And Wear at Tube Support Plates All procedures listed above have been reviewed during previous NRC inspections. Only current revisions were reviewed during this inspectio (2). Ultrasonic Examination (UT)
The inspector reviewad the procedure Nos. B&W-ISI-119 and B&W-ISI-120 to ascerv.ain whether they had been reviewed and approved in accordance with the licensee's established QA procedures. The procedures were also reviewed for technical adequacy and conformance with ASME,Section V Article 5 and other licensee commitments / requirements in the following areas:
type of apparatus used; extent of ccverage of weldment; calibration requirements; search units; beam angles; DAC curves; reference level for monitoring discontinuities; method for demonstrating penetration; limits for evaluating and recording indications; recording significant indications; and, acceptance limit (3) Eddy Current Examination (EC)
The inspector reviewed procedure No. S&W-ISI-424 to ascertain whether it had been reviewed and approved in accordance with the licensee's established QA procedures. The procedure was reviewed for technical content relative to: multichannel examination unit, multichannel examination indication equipment was specified, examination sensitivity, material permeability, method of examination, method of calibration and calibration sequence, and acceptance criteri (4) Magnetic Particle Examination (MT)
The inspector reviewed procedure No. DPC-NDE-25 to ascertain whether it had been reviewed and approved in accordance with the ;
licensee's established QA procedures. The procedure was reviewed i for technical adequacy and for conformance with the ASME Code Section V, Article 7, and other licensee commitments and/or requirements in the following areas: examination methods; j contrast of dry powder particle color with background; surface temperature; suspension medium and surface temperature j
'
requirement for wet particles; viewing conditions; examination overlap and directions; pole or prod spacing; current or lifting ;
power (yoke); and, acceptance criteri '
)
_ - - -
_ .__ -_ -____ _ __ - _ -
'
,
>
'.
.
6-(5) Visual Examination (VT)
The inspector reviewed procedure No. DPC-QCL-14 to determine whether it contained sufficient instructions to assure that: the following parameters were specified and controlled within the
. limits permitted by the applicable code, standard, or.any other specification requirement: method - direct visual, remete' visral or translucent visual; application - hydrostatic. testing, fabrication procedure, visual examination of welds, leak testing, etc.; hcw visual examination was to be performed; type of surface condition available; method or implement used for surface preparation, if any; whether direct or remote viewing was used; sequence of performing examination, when apoliceble; data to be tabulated, if any; acceptance criteria was specified and couistent with the applicable code section or controlling i
specification; and, report form completio (6) Radiographic Examination (RT)
The inspe~ tor' reviewed procedure No. DPC-12 to determine whether it contained sufficient information to assure that the following parameters were specified and controlled within the limits permitted by the applicable code, or any other specification requirement: type of material to be radiographer; material and weld surface condition requirements; type of radiation source, effective focal spot or effective source size; film brand or type; number of films in cassette;. minimum source to film distance; type and thickness of intensifying screens and filters; quality of radiographs; film density and contrast for single an composite viewing; use of densitometers for assuring compliance with film density requirements; system of radiograph identification; use of location markers; methods of reducing and testing for back-scatter; selection of penetrameters including penetrometer placement; number of penetrameters; shims under penetrameters; radiographic technique for double wall viewing; surface conditioning; method used for pre-examination surface cleaning; surface drying time prior to penetrant application; method of penetrant application; penetrant dwell time; method used for excess penetrant removal; surface drying prior to developer ap,>11 cation, if applicable; type of developer; examination technique; evaluation techniques; ind, procedure requalificatio Observation of Work and Work Activities, Unit 2(73753)
The inspector observed examination activities, reviewed NDE equipment and materials certification records, and reviewed NDE personnel qualifications for personnel that had been utilized during the required ISI examinations during this outage. The observations and reviews conducted by the inspector are documented belo _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ - _ _ - _ _ _ _ _ - _ _ _ - - _ - _ _ - _ _ _ _ _ _ _ _ _ _ - _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ -
__ __________ _______ ___-_- _____ - ___ - - _ __ - _
.
f -
L .
!
i (1) Ultrasonic Examination (UT)
The inspector observed calibration activities and the in-process )
ultrasonic examination described below. The observations were compared with the applicable procedures and the ASME B&PV Code in the following areas: availability of and compliance with approved NDE procedures; use of knowledgeable NDE personnel; use of NDE l personnel qualified to the proper level; type of apparatus used; j calibration requirements; search units; beam angles; DAC curves; i reference level for monitoring discontinuities; method of demonstrating penetration; extent of weld / component examination coverage; limits of evaluating cnd recording indications; recording significant indications; and, acceptance limit Item N Weld N Description C01.030.001 2 S G-02-03 Tubesheet to Stub Barrel The following listed ultrasonic equipment certification records were reviewed:
Ultrasonic Instruments Serial N The inspector reviewed spectrum analysis data for the ultrasonic transducers listed below:
Serial N Size Frequency DB32349 0.5"x0.5" 2.25 MHz M18423 1.0" 2.25 MHz M18416 1.0" 2.25 MHz 184282 1.0" 2.25 MHz 32725 0.25" 2.25 MHz 32723 0.25" 2.25 MHz K86082 0.5" 2.25 MHz K86094 0.5" 2.25 MHz 32381 .5" 2.25 MHz 80784 1.0" 2.25 MHz
_ _ _ _ _ _ _ _ _ _ _ _ __ l
__ ____
\
-
.
.
.
.
!
The certification documentation for the below listed Ultrasonic Couplant Batch was reviewed:
BATCH N The certification documentation for the below listed Ultrasonic Calibration Blocks was examined:
SERIAL NO , 50374, 50376, 1078-83 The certification documentation for the below listed Thermometers was examined:
SERIAL NO CNIAC-18608, CNIAC-18601, CNTAC-18606 (2) Liquid Penetrant Examination (PT)
The inspector observed the PT examinations indicated below. The observations were compared with the applicable procedure and the ASME B&PV Code in the following areas: specified method; penetrant materials identified; penetrant materials analyzed for halogens and sulfur; acceptable pre-examination surface; surface temperature; surface drying time prior to penetrant application; method of penetrant application; penetrant dwell time; method used for excess penetrant removal; surface drying prior to developing, if applicable; type of developer; examination technique; evaluation technique; and, reporting of examination result Item N Weld ID Description Class B09.011.310A 2NI59-04 Pipe Weld 1 B09.011.311A 2NI61-03 Pipe Weld 1 B09.011.312A 2NI61-05 Pipe Weld 1 The inspector reviewed the below listed liquid penetrant materials certification records to ascertain if the sulfur and halogen content of the material was within acceptable content limits:
-_ - - - - - - -- -- - - - - - - - - - - - _ - _ - - _ _ - - - _ - -_ _ _ _ _ _ -
L .
.
!.
1 ,
'
' . .
l Materials Batch Number Liquid Penetrant 78E084 l Cleaner / Remover 86J005, 88F051 Developer 83G033, 86B076 (3) Magnetic Particle Examination (MT)
The inspector observed the magnetic particle examinations indicated below. The observations were compared with the applicable procedures and the Code in the following areas: 3 examination methods; . contrast of dry powder particle color with :
background; surface temperature; suspension medium for wet particles, if applicable; viewing conditions; examination overlap and directions; pole or prod spacing; current or lifting power (yoke); and acceptance criteri Item N Weld ID Description Class C05.011.453 2SV3-05 Pipe Weld 2 C05.011.452 2SV3-04 Pipe Weld 2 The inspector reviewed the certification documentation for the below listed MT equipment:
Yoke ID: CN030 Test Weight ID: MTC-1 MT Unit Serial No.: 851001 Calibration documentation records were reviewed for the below listed Light Meter to confirm that it was in a properly calibrated state at the time of their use:
Light Meter ID: 803145 A review of the material certification records for below listed magnetic particles indicated the sulfur and halogen content of the material was within acceptable content limits:
Batch Nos: 87F008, 86D062 (4) Visual Examination (VT)
The inspector observed / independently reexamined the visual examinations indicated below. The observations were compared with the applicable procedures and the Code in the following areas: method - direct visual, remote visual or translucent visual; application - hydrostatic testing, fabrication procedure, visual examination of welds, leak testing, etc.; how visual examination was to be performed; type of surface condition available; method or implement used for surface preparation, if any; i
_ _ _ _ _ _ _ _ _
,
.
-'
., ,
l whether direct or remote viewing was used; sequence of performi,r examina-tion, when applicable; data to be tabulated, if any; acceptance criteria was specified and consistent with the applicable code section or controlling specification; and, report form completio Item N Identification Description Method F1.02.335 2-R-ND-0350 Rigid Support VT-3 F1.03.624 2-RKD-0048 Class 3 Support VT-3 F1.03.626 2-RKD-0050 Class 3 Support VT-3 FI.03.618 2-RKD-0057 Class 3 Support VT-3 F1.03.621 2-RKD-0060 Class 3 Support VT-3
'
(5) Personnel Qualification The inspector reviewed the qualification documentation for the below listed examiners in the following areas: employer's name; person certified; activity qualified to perform; effective period of certification; signature of employer's designated representative; basis used for certification; and, annual visual acuity, color vision examination, and periodic decertificatio Company Examiner Method-Level DPC WCL UT II DPC GEH UT I DPC LEM UT I DPC RBC PT II MT II DPC WMc PT II MT II DPC DKZ PT II MT II DPC WF MT II DPC TMB PT II DPC JKT PT II DPC DJG PT II DPC KLW PT II DPC MW VT-2 II DPC MM VT-1 II VT-3 II DPC KBG VT-1 II DPC LW VT-3 II DPC WKD EC IIA DPC AG EC I DPC LGC EC II B&W RJP UT II B&W JW UT II B&W WSJ UT II B&W MJK EC IIA B&W JBW EC IIA B&W ACG EC IIA B&W CBW EC IIA B&W JMB EC IIA B&W JB EC III
. _ _ _ _ _ _ _ _ _ _ _ _ . _ - _ -
. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ - _ _ _ _ _ _
.
~
,
'e ,
11 Inservice Inspection, Data Review and Evaluation, Unit 2 (73755)
(1) Records of completed nondestructive examinations were selected and reviewed to ascertain whether: the methods, technique, and extent of the examination complied with the ISI plan and applicable NDE procedures; findings were properly recorded and evaluated by qualified personnel; programmatic deviations were recorded as required; personnel, instruments, calibration blocks; and NDE materials (penetrants, couplants) were designate Records selected for this review are listed below:
Item N Weld / Component ID NDE Method B01.021.002 2RPV-102-101 UT B05.010.010 2RPV-W81-101SE UT B05.010.010A 2RPV-W81-101SE PT B06.010.002 2RPV-NUT-02A MT B06.030.002A 2RPV-STUD-02A MT B06.050.003 2RPV-WASHER-03 VT-1 B07.030.003 2SGB-MW-W-X VT-1 B09.011.040 2NC24-07 UT B09.011.040A 2NC24-07 PT B09.040.229 2NV323-22 PT B15.020.001 2PRZ VT-2 B15.030.001 2SG-2A VT-2 B16.020.001 2SG-TUBES EC B05.070.004A ISGB-0UTLET-SE PT B09.011.310A 2NI59-04 PT B09.011.311 A 2NI61-03 PT B09.011.312A 2NI61-05 PT B09.011.055A 2NC45-02 PT B09.011.056A 2NC45-03 PT B09.011.057A 2NC46-02 PT B09.011.058A 2NC46-04 PT Eddy Current Unit 2 SG-A SG-8 SG-C SG-D Tubes plugged during baseline 0 7 0 0 Tubes plugged 9/87 outage 0 0 0 0 Tubes plugged 2/88 outage 4 1 0 2 Total tubes plugged 4 8 0 0 Observations (1) The documentation for examination Nos. B06.010.002 (RPV Nut) and B06.030.002A (RPV Stud) do not support a code acceptable examination, in that the Circular Direct Current Amps and the Longitudinal Amp. Turns indicated are not consistent with DPC NDE 25 or ASME B&PV Code,Section V, Article 7. The licensee i
- - _ _ _ _ _ _ - _ _ - - _ _ _ _ _ i
-_ _ - . _ - _ - _ _ _ _
'
.
B B
B
,
indicated that they would preform a demonstration to support all the MT examinations performed on RPV Studs and Nuts at this site which are not consistent wi+,h the cod Pending the NRC review of this demonstration, this matter will be identified as unresolved item 50-413,414/89-08-01: "MT Demonstration".
(2) ASME,Section XI, Paragraph IWA-4500, requires that repairs be examined by the method that detected the flaw that required repair. This requirement is implemented in Procedure NDE-25, Revision 12, Paragraph 12.2.4.1 (c) and NDE-35, Revision 10, i Paragraph 17.4. This requirement is not implemented in NDE-12 or NDE-98. The licensee indicated that this requirement is covered in other documents ia their program. The licensee indicated that they would amend the above procedures to uniformly address this requirement. This matter will be identified as inspector followup item 50-414/89-08-02: "ISI Baseline Inspection Method".
(3)' The licensee was unable to provide objective quality evidence of calibration for temperature instrument A0668 for January 1988. In addition, the licensee could not provide the spectrum analysis for transducer Nos. M18416 and M18423. The licensee indicated that they would make the above documents available at a future inspection. This matter will be identified as inspector followup item 50-414/89-08-03: " Unavailable ISI Records".
l (4) Relative to the observation of MT Examination the inspector nated the following:
(a) The examiners used a puffer ball to remove excess particles during the examination with excessive air flow forc (b) Light gray particles were used on bright steel which did not provide good contrast between the steel surface and the particles. When the inr %ctor asked the examiners why they chose gray parc1cles, they stated that the red particles were too mess l l
(c) The examination record for the two welds the l inspector observed being examined indicated only one certified examiner performed the examination, when in point of fact, there were two examiners !
who each only performed portions of each {
examination on each weld. The licensee corrected l the records for the two welds discussed above and ;
identified and corrected two additional example !
l
'
.
w _ _ _ -_- - _. - _ -
_ -
.
.
g 6 l
(d) The certification of calibration for the yoke used to perform the MT examination, observed by the inspector, did not specify how the calibration was accomplished (Was ten pound lift test performed? Was the weight traceable to the National Bureau Of Standards?). The licensee corrected the report reflecting the calibration '
method and the test weight employe (e) Items (a)-(d) above were the subject of licensee training given to all the DPC MT examiner (f) A valve, immediately upstream, of the two welds, the inspector observed being MT examined was tagged "2SV27A". The isometric drawing (CN-25V-3 R10) the examiners had to locate and identify the welds to be examined, identified the the valve as "2SV027". When asked, the examiners could not explain why the discrepancy. Further investigation revealed that the valve tag number corresponded to the sy3 tem flow drawing (CN-2593-1.0 R9) identification. The licensee indicated that they would provide training in this area and correct the isometric drawings to reflect the correct valve numbers. This matter will be identified as inspector followup item 50-413,414/89-08-04: " Valve Identification."
(5) Notes on sketches in DPC NDE Manual copy 31, Procedure NDE-12 due to the reproduction process and the size of the print was not legible. The licensee committed to correct all the illegible figures in each NDE procedure at the NEXT REVISION of each NDE procedur (6) DPC ASME,Section XI Manual, Section E, " Repairs And Replacements And Maintenance Activities" is the Licensees' program procedure for the implementation of the ASME B&PV Code,Section XI, Article <
IWA-4000 and IWA-700 Section E, Paragraph 2.0 b) ** note ** is a l
'
list of " Items which are not considered a replacement." This list includes all the items contained in ASME B&PV Code, Paragraph IWA-7400, " Items Exempt From Requirements Of this Article" (IWA-7400). In addition, this list (2.0 b) ** note **),
contains all the items included in ASME B&PV Code,Section III, Subsection NB, Paragraph NB-2121(b). Items that are included in NB-2121(b) and section "E" of the DPC ASME,Section XI Manual, which are, therefore, not included in the DPC Repair and
~ Replacement Program include: Shaf ts, Stems, Springs, Bearings, Bushings, and Spring _ _ - - - - - -
.
,
., .
ASME B&PV Code,Section III, provides rules covering the requirements for strength and pressure integrity, the failure of which would violate the pressure retaining boundary. ASME B&PV Code,Section XI, provide rules for Inservice inspection an Inservice testing of systems for light water cooled nuclear power plant integrity and operational readiness, the loss of which would adversely impact the shutting down of the reactor or mitigation of an acciden The scope of ASME B&PV, Sections III and XI, are different. The items excluded by Section III are items that do not form the pressure boundary. By the same logic, items excluded by Section XI should not form part of the pressure boundary and should not affect the operational readiness of components necessary for reactor shutdown and mitigation of an acciden Clearly shafts, bearings, bushings, and springs necessary for operational readiness of important plant components, should not be excluded from the Section XI Replacement Program. The absenting the above items from the program would exclude them from the suitability evaluation required for Section XI re?lacement items delineated in IWA-7220. This matter will be the subject of a future inspectio (7) There was insufficient information in the relief requests examined to support the relief requested. After drawing review, review of photographs and a walkdown inspection, the inspector was able to verify that the relief requests, though sketchy, were accurate. The inspector discussed the above with the licensee indicating that in the future they should include enough information to support the request for relief. The licensee indicated that they would supplement their existing relief requests with sufficient information to support those request (8) The inspector noted, during his inspections in the lower level of the Unit Two containment building, that both the licensee's personnel and contractor personnel climbed on anything convenient in i order to reach their work location. Items employed for personnel support included instrument lines, lines to gage glasses, small bore pipe supports and struts, small valves, and cable trays containing cables thus providing a hazard to the equipment important to safety and to personnel . In addition, contrary to the licensee's documented safety program, none of the licensee or contractor personnel, observed by the inspector, had or were using safety belts when working more than six feet above the floor. This matter will be examined in more
~ detail in a future inspection to determine whether the Licensees'
program for the protection installed equipment is consistant with the Licensees' commitments and regulatory requirements. Thi t. matter will ,
be identified as Unresolved Item 50-413, 414/89-08-05: " Protection of installed equipment."
i
_.n_ - ._ - - _ __ . - - _ _ _ - - _ - _ _ _ _ _ _ _ - - _ _ _ . _ - _ _ _ _ - _ _ - _Q
_ _ _ _
i
, ..
,
The licensee's ISI program appears adequate in all areas however the implementation, of that program, shows signs of lack of attention to detail In the areas inspected, violations or deviations were not identifie . Inspector Followup Items (IFI) (Closed) IFI 50-413/89-01-01: " Revision Of UT Instrument Vertical Linearity Calibration" This issue concerns the procedural discrepancy between ASME B&PV Code,Section XI, and DPC Procedure NDE 44 for vertical linearity recalibration intervals (three months vs.12 months). Procedure NDE 44, Revision 8, issued March 6, 1989, corrected the discrepancy. This matter is considered close . Exit Interview The inspection scope and results were summarized on March 31,1,89, with those persons indicated in paragraph 1. The inspector described the areas inspected and discussed in detail the inspection results list.ad belo Althougn reviewed during this inspection, proprietary information is not contained in this repor Dissenting comments were not received from the licensee. The licensee committed to correct all the illegible figures in
.each NDE procedure at the NEXT REVISION of each NDE procedure, Paragraph 2e(5). The Licensee was informed of Unresolved Item 50-413, 414/89-08-05 by telephone on April 17, 198 Unresolved Item 50-413,414/89-08-01: "MT Demonstration"-Paragraph No. 2.e.(1)
Inspector Followup Item 50-414/89-08-02: "ISI Baseline Inspection Method"-Paragraph No. 2.e. (2)
Inspector Followup Item 50-414/89-08-03: " Unavailable ISI Records"
-Paragraph No. 2.e.(3)
Inspector Followup Item 50-413,414/89-08-04: " Valve Identification"
-Paragraph No. 2. e.(4)(f)
Unresolved Item 50-413, 414/89-08-05: " Protection of Installed Equipment"-Paragraph 2.e(8)
_ _ - _ _ _ _ _ . . _ _ _ - _ _ _ - _ _ . _ _ _ - - _ _ _ _ - _ _ ._ ._ _ - _ _ _ _ _ _ ._ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ -
_ .- _ _ _ -
.
.
,. '
. ,
16 Acronyms and Initialisms AC - Alternating Current ASME - American Society of Mechanical Engineers l B&PV -
Boiler and Pressure Vessel i B&W -
Babcock and Wilcox
! Col -
Column DAC - Distance Amplitude Curve DC -
Direct Current DPC - Duke Power Company EC -
Eddy Current ID -
Identification IFI - Inspector Followup Item ISI - Inservice Inspection KB -
Krautkramer/Branson
.MT - Magnetic particle MHz - Megahertz NDE -
Nondestructive Examination N Number NPF - Nuclear Power Facility NRC -
Nuclear Regulatory Commission OD -
Cutside Diameter , Professional Engineer -1 PT -
Liquid penetrant QA - Quality Assurance R -
Revision RPV -
Reactor Pressure Vessel RSG - Recirculating Steam Generator RT -
Radiographic Test SG -
Steam Generator l TK - Tokyo Keiki TS - Technical Support UT -
Ultrasonic VT -
Visual i
I
)