MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999
[Table view]Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene ML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests 1999-09-30 Category:NRC TO LEGAL/LAW FIRM MONTHYEARML20245B4271989-06-21021 June 1989
[Table view]Final Response to FOIA Request.App U Records Encl & Available in Pdr.App V Record Withheld (Ref FOIA Exemption 5) ML20236B4611989-03-13013 March 1989 Ack Receipt of Notifying of Change in Ownership Interest in Facility from Burlington Electric Light Dept to Connecticut Municipal Electric Energy Cooperative.No Further Review of Transfer Required IA-88-419, Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR1988-09-0707 September 1988 Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR ML20155F7911988-09-0707 September 1988 Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR ML20207H9391988-08-25025 August 1988 Forwards Fr Notice Granting Request to Extend Time Until 880913 to Comment on Suspension of License Antitrust Conditions ML20153H1451988-08-17017 August 1988 Partial Response to FOIA Request for Memos Re Selection of Severity Levels for Various Violations at Nuclear Plants. Forwards Documents Listed in App C.Documents Also Available in PDR ML20153G9211988-08-11011 August 1988 Final Response to FOIA Request for Records Re Shoreham Offsite Emergency Plan.App G Documents Available in Pdr.App H Documents Withheld (Ref FOIA Exemption 5).No Further Action Being Taken on Appeal Ltr ML20151W7771988-07-21021 July 1988 Third Partial Response to FOIA Request for Documents.App C Documents Encl & Available in Pdr.Addl Records Referred to Dept of Commerce & Doi for Review & Direct Response ML20196B3111988-06-22022 June 1988 Forwards Notice Published in Fr on 880616 Per Proceeding Re Util Request to Delete Antitrust License Conditions ML20150D5251988-03-21021 March 1988 Final Response to FOIA Request.App a & B Documents Encl & Available in PDR ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236X3121987-12-0404 December 1987 Partial Response to FOIA Request for Documents Re Generic or site-specific Backfits & Associated Cost/Benefit or value-impact Analyses.Forwards Documents Listed in App B. App a & B Documents Available in PDR ML20237H8581987-08-21021 August 1987 Final Response to FOIA Request for Documents.Forwards App E Documents.Documents Also Available in PDR ML20237G4181987-08-11011 August 1987 Further Response to FOIA Request for Documents Re Petition for Issuance of 860702 Show Cause Order & Investigation Into Wrongdoing at Plants.Encl App F Documents Also in Pdr.App G Documents Completely Withheld (Ref FOIA Exemption 5) ML20235T5281987-07-17017 July 1987 Final Response to FOIA Request for Documents Re Const & Operation of Facility & NRC Review of Facility Regulatory Exemptions & Safety Evaluations.Forwards App D Documents. App C & D Documents Available in PDR ML20235N0311987-07-15015 July 1987 Partial Response to FOIA Request.Forwards App C Documents Re SECY-86-383, Engineering Expertise on Shift. Documents Also Available in Pdr.App D Documents Completely Withheld (Ref FOIA Exemption 5) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20234E4571987-06-23023 June 1987 Partial Response to FOIA Request for 771026 Minutes of ACRS Subcommittee on Fluid/Hydraulic Dynamic Effects Meeting in Portland,Or & Addl ACRS Documentation.Documents Identified on App H & Addl ACRS Documents Encl ML20215G6021987-06-18018 June 1987 Partial Response to FOIA Request for Documents.Forwards App B Documents,Including Sign in Sheet for 860925 Meeting on Engineering Expertise on Shift.App a & B Documents Available in PDR ML20209J0281987-04-28028 April 1987 Partial Response to FOIA Request for Documents.Category 1 Documents Subj to Request Encl ML20207T1701987-03-19019 March 1987 Final Response to FOIA Request.App B Documents Available in Pdr.App a Documents Re plant-specific Backfitting & SPDS Encl & Being Placed in PDR ML20212N5381987-03-0606 March 1987 Advises That Commission Will Either Withdraw 861020 Show Cause Order & Dismiss Proceeding or Rule on Request for Hearing,Per Telcon Re Recipient ML20212C2721987-02-27027 February 1987 Final Response to FOIA Request.Forwards Documents Listed in App A.Documents Also Available in Pdr.No Records Found for Pantex Plant,Test Reactor Ava & Two Foreign Nuclear Facilities ML20212R4811987-01-29029 January 1987 Partial Response to FOIA Request for Documents Re Alcohol & Drug Use by Const Workers at Nuclear Reactor Plant Sites. App E & F Documents Partially & Completely Withheld (Ref FOIA Exemptions 5 & 6) ML20212H6601987-01-20020 January 1987 Final Response to FOIA Request.App F Documents Re Marviken II Project Encl & Available in PDR ML20207Q0741987-01-16016 January 1987 Partial Response to FOIA Request for Documents Re Drug & Alcohol Use at Nuclear Facilities.Document Listed on App C Available in Pdr.Documents Listed on App D Partially Withheld (Ref FOIA Exemption 6) ML20207N3111987-01-0909 January 1987 Partial Response to FOIA Request.Forwards Documents Listed on App J Re Draft Final Proposed Rule 10CFR50.72.Documents Also Available in PDR ML20215E5751986-12-19019 December 1986 Partial Response to FOIA Request for Documents Re 10CFR50.72 & 50.73.App G Documents in PDR ML20215A1581986-12-0909 December 1986 Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR ML20214R5581986-12-0202 December 1986 Partial Response to FOIA Request Re Apr 1983 Allegations Against S&W.Forwards App B,C & D Documents.App C & D Documents Partially & App E Document Completely Withheld (Ref FOIA Exemption 7).Documents Also Available in PDR ML20214R6681986-12-0101 December 1986 Partial Response to FOIA Request.App C Records Re Requirements of 10CFR50.72 & 50.73 Encl & Placed in PDR ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20215C5661986-10-0606 October 1986 Further Response to FOIA Request for All Records Concerning Allegations That Pullman Power Products Employees Intimidated QC Inspectors.Forwards App F Documents.App G & H Documents Withheld (Ref FOIA Exemptions 7 & 5) ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20215L0711986-09-0202 September 1986 Responds to to Board.Submittal Is Highly Inappropriate & Unacceptable & Cannot Be Condoned.Issue Already Remedied by Intervenor 860829 Submittal IA-86-630, Final Response to FOIA Request for Low Level Radiation Health Effects:Study for Haddam Neck & Millstone..., Dtd Jul 1981.App Document Available in Pdr.W/O Notice Re Procedures for Obtaining PDR Records1986-08-25025 August 1986 Final Response to FOIA Request for Low Level Radiation Health Effects:Study for Haddam Neck & Millstone..., Dtd Jul 1981.App Document Available in Pdr.W/O Notice Re Procedures for Obtaining PDR Records ML20212M8111986-08-25025 August 1986 Final Response to FOIA Request for Low Level Radiation Health Effects:Study for Haddam Neck & Millstone..., Dtd Jul 1981.App Document Available in Pdr.W/O Notice Re Procedures for Obtaining PDR Records ML20205E6001986-08-0707 August 1986 Final Response to FOIA Request.Forwards Documents Listed in App E.Documents Also Available in PDR ML20206F3261986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in Pdr.W/O App B & C Documents ML20198B5041986-04-21021 April 1986 Partial Response to FOIA Request for Secys 85-306A & B & Related Documents.App a Documents Available in Pdr.App B Documents Partially Withheld & App C Documents Entirely Withheld (Ref FOIA Exemption 5) ML20197E9711986-04-0404 April 1986 Further Response to FOIA Request for Three Categories of Documents Re Backfit Rule Published in 850920 Fr.Apps E & F Documents Available in Pdr.App G Documents Withheld in Entirety (Ref FOIA Exemption 5) IA-85-759, Further Response to FOIA Request for Three Categories of Documents Re Backfit Rule Published in 850920 Fr.Apps E & F Documents Available in Pdr.App G Documents Withheld in Entirety (Ref FOIA Exemption 5)1986-04-0404 April 1986 Further Response to FOIA Request for Three Categories of Documents Re Backfit Rule Published in 850920 Fr.Apps E & F Documents Available in Pdr.App G Documents Withheld in Entirety (Ref FOIA Exemption 5) IA-85-763, Grants,In Part & Denies,In part,860131 Ltr Appealing 851224 Denial of FOIA Request for Documents Re Client Exposure to Radiation at Plant on 850529.Forwards App Docs.W/O Encls1986-03-31031 March 1986 Grants,In Part & Denies,In part,860131 Ltr Appealing 851224 Denial of FOIA Request for Documents Re Client Exposure to Radiation at Plant on 850529.Forwards App Docs.W/O Encls ML20202E6511986-03-31031 March 1986 Grants,In Part & Denies,In part, Appealing 851224 Denial of FOIA Request for Documents Re Client Exposure to Radiation at Plant on 850529.Forwards App Docs.W/O Encls IA-86-137, Final Response to FOIA Request for Weekly/Monthly Repts of Power Consumption by Toledo Edison & Cpc.Records Subj to Request Available in PDR1986-03-19019 March 1986 Final Response to FOIA Request for Weekly/Monthly Repts of Power Consumption by Toledo Edison & Cpc.Records Subj to Request Available in PDR ML20203E3961986-03-19019 March 1986 Final Response to FOIA Request for Weekly/Monthly Repts of Power Consumption by Toledo Edison & Cpc.Records Subj to Request Available in PDR DD-85-20, Informs That Time Provided by NRC Regulations to Review Director'S Decision DD-85-20 Expired.Commission Declined Review.Decision Became Final Agency Action on 860207.Served on 8602071986-02-10010 February 1986 Informs That Time Provided by NRC Regulations to Review Director'S Decision DD-85-20 Expired.Commission Declined Review.Decision Became Final Agency Action on 860207.Served on 860207 ML20199E4721986-02-0606 February 1986 Responds to FOIA Request for SECY-85-367A & SECY-85-371. Forwards Portions of Documents Listed in App.Info Also Available in Pdr.App Documents Partially Withheld (Ref FOIA Exemption 5) ML20141N2771986-01-14014 January 1986 Partial Response to FOIA Request for Seven Classes of Documents.Forwards App a Documents.App B Documents Available in Pdr.App C Documents Outside Scope of Request,Per 860114 Telcon W/Ca Reed 1989-06-21 Category:OUTGOING CORRESPONDENCE MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999
[Table view]Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review ML20211H9971999-08-27027 August 1999 Forwards Insp Rept 50-423/99-07 on 990614-0715.Violations of NRC Requirements Occurred Re Adequacy of C/As for Organizational Changes & Being Treated as NCVs DD-99-09, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-09) Expired.Commission Declined Any Review & Decision Became Final on 990823.With Certificate of Svc.Served on 9908261999-08-26026 August 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-09) Expired.Commission Declined Any Review & Decision Became Final on 990823.With Certificate of Svc.Served on 990826 ML20211F5841999-08-23023 August 1999 Discusses Proposed Rev 21 to Northeast Utils Quality Assurance Program TR for NRC Review & Approval,Iaw 10CFR50.54 ML20211D5701999-08-20020 August 1999 Informs That in May 1999,Northeast Nuclear Energy Co, Restarted Millstone Nuclear Power Station,Unit 2.Licensee Has Been Tasked Charter with Listed Specific Responsibilities ML20211E8051999-08-20020 August 1999 Forwards Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted.Completion of Corrective Actions for Spent Fuel Bldg Ventilation Issues Adequate ML20211C4621999-08-18018 August 1999 Discusses Rev to TS Bases Sections 3/4.5.2 & 3/4.5.3, Emergency Core Cooling Sys Subsystems ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210N4921999-08-0909 August 1999 Ack Receipt of 990331 Electronic Transfer of $88,000 for Civil Penalty,Proposed on 990309.Corrective Actions Will Be Examined During Future Insp ML20210J6021999-08-0202 August 1999 Informs That Info Re Orise Technical Survey Assistance to NRC at CT Yankee Is to Include Copies of Listed Documents ML20210C0751999-07-21021 July 1999 Forwards 990721 Notice of Public Meeting Re post-shutdown Decommissioning Activities Rept ML20210A9681999-07-14014 July 1999 Responds to Re Changes to Millstone Physical Security Plan Identified as Rev 32,submitted Per Provisions of 10CFR50.54(p).No NRC Approval Is Required,Based on Util Determination That Revs Do Not Decrease Plan Effectiveness ML20209E7341999-07-12012 July 1999 Discusses Util Responses to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Responses Acceptable.Info Revised in Reactor Vessel Integrity Database (Rvid) & Is Releasing as Rvid Version 2 ML20209G2921999-07-0909 July 1999 Forwards Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy DD-96-23, Informs That on 961226,NRC Issued Partial Director'S Decision DD-96-23,in Response to Petition Submitted,Per 10CFR2.206,on 9508211999-07-0101 July 1999 Informs That on 961226,NRC Issued Partial Director'S Decision DD-96-23,in Response to Petition Submitted,Per 10CFR2.206,on 950821 ML20210C1491999-07-0101 July 1999 Responds to ,Which Responded to NRC Ltr & NOV & Informs That Engagement in Any Similar Wrongdoing in Future May Result in More Significant Enforcement Action. No Further Action Will Be Taken at This Time ML20196J2111999-06-30030 June 1999 Forwards SE Concluding Licensee USI A-46 Implementation Program Meets Purpose & Intent of Criteria in Generic Implementation Procedure for Seismic Verification of NPP Equipment, Rev 2 ML20196J5031999-06-30030 June 1999 Responds to 990414 Petition,Submitted Per 10CFR2.206 to Nrc. NRC Solicited Support from FEMA to Ensure That Appropriate Response to Enhancements Identified to Offsite EP in Event of Radiological Emergency at Millstone,Developed ML20196J1131999-06-29029 June 1999 Forwards Notice of Receipt & Availability for Comment of Post-Shutdown Decommissioning Activities Rept, Re .Notice Provided for Public Comments to Be Submitted within 30 Days of Notice Date ML20196G9531999-06-24024 June 1999 Discusses Changes Provided by NNECO on 990504 to TS Bases Sections 3/4.7.7 & 3/4.7.8.Returns TS Bases to NNECO to Be Inserted in TS to Ensure That NRC Staff & NNECO Have Identical TS Bases Pages ML20212H9661999-06-21021 June 1999 Confirms 990611 & 14 Telcons with M Selden,In Which Beckman & Assocs,Inc Was Advised to Stop Work Under Mod 4 to Task Order 005,under Contract NRC-03-98-021 ML20195J3121999-06-15015 June 1999 Expresses Concern Re M Casey 990523 Column, Gaffes Turn Into Cash at NRC, & Disagrees with New London Day Earlier Editorial Criticism of NRC Investigations of Harassment & Intimidation of Employees at Millstone NPPs ML20212J0751999-06-15015 June 1999 Forwards Notice of Withdrawal of Amend Request for Allowed Outage Time Extensions for Emergency Diesel Generators & Low Pressure Safety Injection Trains of Emergency Core Cooling Sys 1999-09-30 |
Text
- -
PD97CA UNITED STATES Sn nacq#'
/
ee o
NUCLEAR REGULATORY COMMISSION W ASHING TON, D. C. 20555
~
.J o gg O a .. <
s AUG 2 51986
%,**.*p,/
Dani-1 Eten.t.ein, E.tquire Wil1im:n, h Asen .tn d S p e r; ,
50 St.w,.c..,a J,t.ree.-t IN RE;'rge .g gyggg Evaten. *4A A3114 TO FOIA-86-63
Dear M:
E n tn s '. e i n T h i , i r. u. r-gard to your revieet, pursuant to the Freedom of Information Act, to which the NRC assigned the above number. ,
Tbj s is a partial respoilse to your request. We will.
notify you upon completion of search for and review sf any a biit ion .s1 rea rds subject t.o your requeat
_X_ The etaff has complet-d the search for and review of reverds subject to yer request, and this is the final r<sponse to your request.
The 1;RC has no records subject to your request
_ Z _ _. Records. subject tv your request are available fer public
~
inspection and cupying at the NRC Public Document Room (PDR), 1717 H Street. NW, Washington, DC 20555, as noted on the enclosure (s). .The PDR accession number is identified beside each record description.
Records subject to your request. are being made available fur public inspection and copyind at the NRC Public Dveument Room (PDR), 1717 li S t reet, NW, Washindton, DC 20555, in the PDR file folder under the above number and your name. These records are listed on the enclosure (s).
_Z ___ We a re enclosing a notice that provides information about chargec and procedures for obtaining recorde from the PDR.
Sincerely. -
6)<tu?
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration Enclosu r-( .s - -As stat ui l
l 4
8608270184 860825 l PDR FOIA !
BURNSTE86-630 PDR ,
l
F01A-86-630 Appendix 08/06/81 Letter from W. G. Counsil to H. R. Denton forwarding " Low Level Radiation Health Effects Study for Haddam ileck & iiillstone fluclear Power Facilities" (151 pgs.) Accession # 8108140189 S