ML20205E600

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request.Forwards Documents Listed in App E.Documents Also Available in PDR
ML20205E600
Person / Time
Site: Oyster Creek, 05000000, Crane
Issue date: 08/07/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Weiss E
HARMON & WEISS
Shared Package
ML20205E603 List:
References
FOIA-86-293 NUDOCS 8608180436
Download: ML20205E600 (4)


Text

-

PM-6'4 9

UNITED STATES

  1. p c e -

NUCLEAR REGULATORY COMMISSION

[

W ASHIN GTON, D.

C.

20555 ri g

O 0 7 Ms. Ellyn R. Weiss, Esquire Harmon and Weiss 2001 S Street, NW, Suite 430 IN RESPONSE REFER Washington, DC 20009-1125 TO FOIA-86-293

Dear Ms. Weiss:

This is in regard to your request, pursuant to the Freedom of Information Act, to which the NRC assigned the above number.

This is a partial response to your request.

We will notify you upon completion of search for and review of any additional records subject to your request.

_Z__

The staff has completed the search for and review of records subject to your request, and this is the final response to your request.

The NRC has no records subject to your request.

Records subject to your request are available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, as noted on the enclosure (s).

The PDR accession number is 4

identified beside each record description.

_X__

Records subject to your request are being made available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, in the PDR file folder under the above number and your name.

These records are listed on the enclosure (s).

We are enclosing a notice that provides information about

~

charges and procedures for obtaining records from the PDR.

Sincerely,

,s //

t< '"3h Donnie H. Grimsley, Director Division of Pules and Records Office of Administration Enclosure (s):

As stated P608180436 860807 PDR FOIA WEIS586-293 PDR

APPENDIX E

~

F01A-86-293 1

l-Procedure GPU Technical Functions Division, No. 5000-ADM-7317.01, Rev. 0-01, 6/14/85, Equipment Environmental Qual i fica tion. (52 pages) 2.

Procedure, GPU Technical Functions Division, No. 5000-ADM-7311.03, Rev. 1-01, 2/21/86, Project Reviews. (15 pages) 3.

Procedutg, GPU Technical Functions Division, No. 5000-ADM-7313.01, Rev.1-01, 9/13/85, Modification and System Design Descriptions. (28 pages) 4.

Procedure, GPU Oyster Creek Nuclear Generating Station, No.105.3, Rev. 2, 3/9/86, Maintenance of Oyster Creek Environmental Qualified (EO) Equipment. (25 pages) 5.

Procedure, GPU Nuclear Corporate Policy and Procedure Manual, No. 1000-POL-7317.01, Rev. 0-00, 5/31/85, Environmental Qualification of Equipment. (8 pages) 6, Oyster Creek Master List, Electricci Equipment Environmental Qualification, Rev. 2, 2/5/86, GPU Nuclear. (85 pages)

7. GPUNC Corporate Policy and Procedure Manual, 1/24/86. (7 pages)

-m..

8. GPullC Generation Corrective Maintenance System Job Tickets, 1/14/85. (29 pages).
9. GPUNC Generation Corrective Maintenance System Job Tickets, 1/9/84. (22 pages)
10. GPUNC Generation Corrective liaintenance System Job Tickets, 6/29/85.

(23 pages)

11. GPUNC Generation Corrective llaintenance System Job Tickets, 7/6/79.

(2 pages)

12. GPUllC Generation Corrective liaintenance System Job Ticket, 6/9/85 (over-sized drawing (K. Imhof) not copies and returned). (20 pages)
13. GPUNC Generation Corrective Maintenance System Job Ticket, 12/6/85 (10 pages)

I

F01A-86-293

14. GPUNC Generation Corrective Maintenance System Job Ticket, 7/9/85 (10 pages)
15. Unit I Maintenance Dept. Organization Chart,1/28/86 attaching Manpower Budget 1986 Chart (2 pgs.)
16. Undated - Handwritten Note (1 pg.)
17. Undated - Maintenance Organization Chart (1 pg.)
18. TMI Unit 1 - Organizations Department Shift Assignment (6 pgs.)

2/19/86

19. Organization Chart 1/15/86 (2 pgs.)

~

20. Corrective Maintenance Component History Report (8 pgs.)

3/10/86

21. Instrument Automatic flode of Progression 2/8/83 (10 pgs.)
22. PAT I Information Request 2/19-20-85 (2 pgs.)
23. Undated - 1986 Maintenance Training Projections (4 pgs.)
24. Till Nuclear Station Unit 1 Operating Procedure 1104-25' Instrument and Control Air System 2/26/85 (78 pgs.)
25. GPUNC Vendor Deficiency Trend Analysis Report 3/4/86 (9 pgs.)
26. Undated - GPUNC Fourth Quarter 1985. Treed Report'(30 pgs.)
27. Completed QASE Evaluations Handwritten Note 3/20 (1 pg.)
28. GPUNC Quality Assurance Systems Engineering Evaluation Report 3,

3/6/86 (29 pgs.)

29. GPUNC Quality Assurance Systems Engineering Evalua+ ion Report, 10/24/85 (9 pgs.)
30. GPUNC Safety Review Training, 6/10/86 (3 pgs.)
31. Undated - Two-page listing of Individuals (2 pgs.)
32. Computer Printout - Status of Completion and Scheduling of 1986 Corporate Audits 2/25/86 (14 pgs.)
33. GPU Memo from L. W. Harding 5/6/85 (1 pg.)

i l

4 FOIA-86-293

34. GPU Memo from M. A. Nelson re: Designation of PRG 2/20/86 (4 pgs.)
35. Evaluation and Change sheet - Undated - (2 pgs.)
36. GPU Policy and Procedures Manual No.1000-ADM-1291-018/17 (8 pgs.)
37. Handwritten note to H. D. Hukill attaching Safety Review Training Program Description 7/23/85 (7 pgs.)
38. Quality Assurance Audit Schedule 7/19/85 (4 pgs.)
39. Ltr. to Charles Stouffer with attachment 3/24/85 (2 pgs.)
40. GPU Purcha.;e Order 2/27/86 (4 pgs.)
41. System Description by I. R. Reed - Instrument and Control Air System 10/28/69 (4 pgs.)
42. Quality Deficiency Report 3/21/86 (3 pgs.)
43. Four-page drawing - 8/9/68 (4 pgs.)
44. Integrated Control System Report - Undated (20 pgs.)
45. New Engineer Training Program Overview, Including Specific Reference to Emergency Feedwater and. Integrated Control System.- Undated (81 pgs.)
46. GPU Organizational Plan 2/14/86 (148 pgs.)

47.

Various Vu-Graphs (13 Pages)

48. 12/04/85 Meino for the Commission from William J. Dircks re: Plan for Conducting PAT and SALP Inspections for TMI-1 (7 pages)
49. 04/25/86 - Note to Harold Denton from John Stolz, subject: PAT l

Inspection Results at TMI-l (2pages)

I s

w:

.m O

4 HARMON & WEISS 2001 S S T R E ET, N.W.

SUITE 430 WAS HINGTON, D.C. cocoo-nes G All McG REEVY H AR MON TELEPHONE ELLYN R. WEISS (202)328 3500 OlANE CURRAN DEAN R. TOUSLEY ANDREA C. FERSTER April 21, 1986 fRfenw OF INFCftMATION Joseph Felton, Director Division of Rules and Records M REQUESI United States Nuclear yj,,,gg p j Regulatory Commission h pgdd Washington, D. C.

20555 RE:

FREEDOM OF INFORMATION ACT REQUEST

Dear Mr. Felton:

Pursuant to the Federal Freedom of Information Act, I hereby request copies of the following material related to equipment qualification at TMI-l and the subjects discussed in a meeting of April 18, 1986 described in the attached meeting notice:

h, 1.

Any reports, memoranda or other documents related f'

to the recent Performance Appraisal Team evaluation of TMI-l mentioned in the attached meeting notice, including but not limited to the " unqualified cable finding" desceibed therein.

2.

Any and all material submitted by GPU relating to the five subjects described in the meeting notice.

This should include material submitted both at the meeting and otherwise.

3.

Any documents containing or reflecting evaluations i

or assessments of the current status of environmental qualification of electrical cables at TMI-l and Oyster Creek.

Your prompt attention to this request will be appreciated.

Very Truly Yours, L

=

l' Ellyn'R. We iss ali c

,4

./

- uw,

r*

  • I***/E,w:.ea APR 11, RECT

'o, UNITED STATES

/E'

.,.,[ j '

NUCLEAR REGULATORY COMMISSION

'"#,, ' j REGION I O,

..... /g 631 PARK AVENUE xsNo or Pauss:4. PENNSYLVANIA 19406 -

.j\\g 19 .. '

Docket No. 50-289 GPU Nuclear Corporation ATTN: _ Mr. H. D. Hukill Director, TMI-l P. O. Box 480 Middletown, Pennsylvania 17057 Gentlemen:

Subject:

TMI-1 Equipment Qualification Meeting inis letter is to confirr, tSe c.lantied meeting to be held at 10:00 a.m. or. /s;:ril 18, 19S6, at Three Mlle Island, Middletown, Pennsylvania.

The purpose of the meeting is to discuss the overall equipment qualification program approaches at the Three Mile Island, Unit No.1 (TMI-1) and Oyster Creek facilitics, and, specifically, the recent Performa.nce Appraisal Team unqualified cable finding at TMI-1.

You should be preparec to discuss the following items:

Discuss the r'ethods used t, estaolish tr.e.rcster lists for Three M'ie Island I and Oyster Cred, list the strallarities and dif fers ices.

Identify f rom records, to it:clude central and site procurement files, all cable types re uirin; c;alification.

Verify and dis:oss wnat methods were used to est6blish qualif t:ation (test / analysis).

Discuss what as-built inspe:tions have been perfortned at TMI-1 to verify f

the sampling process.

Discuss what other cer.nodities or equipment the nonrepresentative samplir.g techniques were used for in determining the master list.

Discuss the scope of the current inspection and document review perfortred by your contractor and the results, if you have any further questions concerning this matter, contact R. Blough (215-337-5051) or J. Durr (215-337-5282).

Your cooperation with us in this matter is appreciated.

Sircerely, G ' g li, p. (! Q,.Lu..N="

Stewart D. Ebrie/ter, Director Division of Reactor Safety h (; ) lo n

74 M +.Lur d h))

- - - - - - - - -