ML20207T170

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request.App B Documents Available in Pdr.App a Documents Re plant-specific Backfitting & SPDS Encl & Being Placed in PDR
ML20207T170
Person / Time
Site: Mcguire, Catawba, McGuire, 05000000
Issue date: 03/19/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Stenger D
BISHOP, COOK, PURCELL & REYNOLDS
Shared Package
ML20205H658 List:
References
FOIA-87-68, RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8703230275
Download: ML20207T170 (4)


Text

U.S. NUCLEAR REIULATORY COMMISSION NRc FotA REcutsi Nuustnist f.

e, b

w_ gg-g atsrONst (vre f 't,,

i i RESPON!E TO FREED M CF V' 's '

M*h^' l I'^*'

ene. / INFORMATION ACT (FOlA) REQUEST MAR 19137 DOCKET NUMBER (Sp l# app 6canet REQUESTER 1 IT M ' AUb i PART1.

D@

pORDS RELEASED OR NOT LOCATED (See checked bones)

No agency records subject to the request have been located.

No additional agency records subject to the request have been located.

Agency records subject to the request that are ident#ied in Appendia E are already available for public inspection and copying in the NRC Public Document R orn, 1717 H Street, N.W., Washington, DC.

Agency records subject to the request that are identified in Appendia A a,e being made avawe fm puu.c insp.ction end copying in the NRC Puwie Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA nurnber and requester name.

The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a mornber of my staff is now being made avalable for public inspection and coying at the NRC Public Document Room,1717 H Street, N W., Washington, DC, in a folder under thia FOIA number and requester name.

Enclosed is information on how you rnay obtain access to and the charges for copying records placed in the NF:C Public Document Room,1717 H Street, N.W., Washington, DC.

Agency records subject to the request are enclosed. Any applicable charge for copies of the records provides1 and payment procedures are noted in the commerus section.

Records subject to the request have been referred to another Federal egency(ies) for rwiew and direct response to you.

In view of NRC's response to this request, no further action is being taken on appeal lettei .4ated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the FOIA exemptions described in and for the reasons stated in Part li, sec-tions B, C, and D. Any released portions of the documents for which only part of the record is being wi thheld are being made available for public inspecta and copying in the NRC Public Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA number and requester t'ame.

Comments l

I l

l 8703230275 870319

-68 PDR NGE A E, DIRECTOR. OMS OF RULES A RECORDS M . w

. J

  • . ' . " .::c
. ..::s::::.

NRC FORM 464 (Pyt U ,

is 86.

Re: F01A-87-68 APPENDIX A DATE DESCRIPTION

1. 12/30/85 Memorandum from J. Knight to K. Jabbour regarding the Safety Evaluation Report Concerning the Catawba Safety

.ParameterDisplaySystem.(19pages)

' 2. 4/18/86 Draft memorandum from H. Denton to V. Stello concerning the Backfit Determination Regarding the Safety Parameter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2. (7 pages)

3. Undated Draft letter from H. Denton to E. Utley regarding Shearon Harris Backfit Considerations. (3 pages)
4. 8/18/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant - S Activities - July 1986. (27 pages)pecificBackfitting
5. 9/19/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting Activities - August 1986. (29 pages)
6. 10/24/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting -

Activities - September 1986. (29 pages)

7. 11/21/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting Activities - October 1986. (30 pages)
8. 8/13/85 Letter to H. Denton from H. Tucker regarding the Response to NRC Request for Additional Information concernin E-MAX Isolation Devices for McGuire SPDS. (5 pages)g the l

l

9. 3/29/84 Letter from H. Tucker to H. Denton transmitting Revision 3 to Response to Supplement I to NUREG-0737; SPDS data, McGuire docket. (25 pages)
10. 11/84 Page 18.2-A11 of SRP Section 18.2 w/ note regarding CRGR Approval.(1page) l ~ -
11. 6/13/86 Memorandum from H. Denton to V. Stello concerning the Backfit Detennination Regarding the Safety Parameter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2. (1 page) .
12. 8/28/84 Letter from E. Adensam to H. Tucker transmitting NRC request for Additional Information concerning the Safety i ParameterDisplaySystem.(4pages) l l

I l

i

l Re: F01A-87-68 APPENDIX B DATE DOCUMENT DESCRIPTION

1. 3/25/86 Letter from H. Tucker to H. Denton requesting plant -

specific backfit for McGuire and Catawba SPDS, PDR 8603270319

2. 11/7/85 Letter from E. Adensam (signed by L. Kintner) to H.

Tucker, " Supplemental Request for Additional Information on Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2", (1 enclosure) PDR 8511180606

3. 2/28/86 Letter from B.Youngblood (signed by D. Hood) to H. Tucker,

" Corrected Report Regarding Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2",

(1 enclosure) PDR 8603120180

4. 2/6/86 Letter from B.Youngblood (signed by D. Hood) to H. Tucker,

" Staff Interim Acceptance of Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2",

(1 enclosure)PDR 8602180556

5. 2/27/86 Memorandum from C.Rossi to D. Hood, " Corrections to the McGuire Safety Parameter Display System SER",

(1 enclosure) PDR 8603050519

6. 11/27/85 Letter to H. Denton from H. Tucker - Catawba 2, McGuire 1&2, (2 attachments) PDR 8512040080
7. 11/2/84 Letter to H.Denton from H. Tucker responding to 8/28/84 request for information on McGuire SPDS, (1 enclosure with one attachment) PDR 8411080243
8. 12/19/84 Letter to H. Tucker from E.Adensam, " Supplemental Request for Additional Information Regarding Safety Parameter Display System". McGuire docket, (1 enclosure) PDR 8501030229
9. 11/28/84 Memorandum to E.Adensam from V. Moore, " Request for Additional Information Concerning the SPDS Parameter Selection for McGuire", (1 enclosure) PDR 8412060628
10. 2/13/86 IE Information Notice No. 86-10: SPDS Malfunctions.

PDR 8602100408

Re: FOIA-87-68 APPENDIX B (Continued)

DATE DOCUMENT DESCRIPTION

11. 12/17/82 NRC Generic Letter No. 82-33, " Supplement il to NUREG-0737 - Requirements for Emergency Response Capability,"(1 enclosure)PDR 8212060349 12, 5/15/85 Letter to H. Tucker from E.Adensam, " Supplemental Request for Additional Information Regarding E-Max Isolation Devices for the McGuire SPDS," (1 enclosure) PDR 8505310383
13. 4/26/85 Memorandum from F. Rosa to W.Regaa "McGuire 1 & 2 - Review of Isolation Devices That Interface with the SPDS",

PDR 8505020185

14. 4/14/83 Letter from H. Tucker to H.Denton transmitting Response to Supplement 1 to NUREG - 0737 (2 volumes),

Catawba, McGuire and Oconee dockets, PDR 8304190003

15. 6/15/84 Letter from E.Adensam to H. Tucker, " Issuance of Order Confirming Licensee Comitments on Emergency Response Capability", McGuire 1 & 2 dockets, (one enclosure and oneattachment)PDR 8406280276
16. 9/8/83 Letter from H. Tucker to H.Denton transmitting Revision 1 to Response to Supplement I to NUREG-0737, McGuire docket, PDR 8309150125
17. 2/16/84 Letter from H. Tucker to H.Denton transmitting Revision 2 to Response to Supplement I to NUREG-0737, McGuire docket, PDR 8402220325
18. 6/13/86 Letter from H.Denton to H. Tucker, "Backfit Determination Regarding Safety Paran.eter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2". PDR 8606230486

! 19. 10/29/85 Memorandum from W.Regan to E.Adensam " Request for Additional Information Concerning the Safety Parameter Display System for McGuire", PDR 8511010146

20. 2/8/85 Letter to H. Denton from H. Tucker responding to 12/19/84 request for information on McGuire SPDS (one enclosure)

PDR 8502150184 l

-