Final Response to FOIA Request for Documents Re Const & Operation of Facility & NRC Review of Facility Regulatory Exemptions & Safety Evaluations.Forwards App D Documents. App C & D Documents Available in PDR
ML20235T528
Person / Time
Site: Hatch, Seabrook, 05000000
Issue date: 07/17/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Goren J
HARMON & WEISS
Shared Package
ML20235T530 List: ... further results
References
FOIA-87-51, RTR-NUREG-0452, RTR-NUREG-0484, RTR-NUREG-0588, RTR-NUREG-0612, RTR-NUREG-0737, RTR-NUREG-0800, RTR-NUREG-0896, RTR-NUREG-452, RTR-NUREG-484, RTR-NUREG-588, RTR-NUREG-612, RTR-NUREG-737, RTR-NUREG-800, RTR-NUREG-896, RTR-NUREG-CR-2136, RTR-REGGD-01.008, RTR-REGGD-01.061, RTR-REGGD-01.075, RTR-REGGD-01.083, RTR-REGGD-01.089, RTR-REGGD-01.092, RTR-REGGD-01.097, RTR-REGGD-01.100, RTR-REGGD-08.008, RTR-REGGD-1.008, RTR-REGGD-1.061, RTR-REGGD-1.075, RTR-REGGD-1.083, RTR-REGGD-1.089, RTR-REGGD-1.092, RTR-REGGD-1.097, RTR-REGGD-1.100, RTR-REGGD-8.008 NUDOCS 8707220168
Download: ML20235T528 (7)


Text

r TSDR - olb 8 ( p ato g je UNITED STATES g

NUCLEAR REGULATORY COMMISSION n

7, E

WASHINGTON, D. C. 20555

,o

}

Ms. Jennifer Goren Harmon & Weiss 2001 S Street, NW Suite 430 IN RESPONSE REFER Washington, DC 20009-1125 TO F01A-87-51

Dear Ms. Goren:

This is in final response to your letter dated January 21, 1987, in which you requested, pursuant to the Freedom of Information Act (F0IA), copies of all records reflecting the application for or issuing of regulatory exemptions, waivers, or deviations with respect to the construction or operation of the Seabrook nuclear power plant and records concerning any staff review of Seabrook regulatory exemptions or j

the safety of the Seabrook plant as described in an enclosed newspaper article. This is also in regard to your letter dated June 2,1987, concerning your F0IA request.

In a telephone conversation between you and Nina Toms on April 20, 1987, you were informed that the search for records had been completed by the staff of the Office of Nuclear Reactor Regulation (NRR). According to the staff, the remaining information you were requesting could be found in the Safety Evaluation Reports for Seabrook, the facility operating license, and certain letters sent to the Public Service Company of New j

Hampshire, which are identified on enclosed Appendix C.

These records are available for public inspection and copying in the NRC Public Document Room (PDR),1717 H Street, N.W., Washington DC 20555.

In a subsequent conference telephone call on May 18, 1987, with you, j

Diane Curran, Vic Nerses, and hina Toms, Diane Curran indicated that she was seeking all records (staff or otherwise) reflecting the application for or issuing of regulatory exemptions, waivers or deviations with respect to the construction or operation of the Seabrook plant that are in the files of the Seabrook reviewers since the construction permit application wa:: filed. Mr. Nerses informed Ms. Curran that the task to locate all the staff personnel who were reviewers on the Seabrook project since the construction permit application in 1973 would require significant effort and that this would necessitate NRR management attention.

NRR management has determined that there is no listing of persons who worked on or reviewed exemptions, waivers or deviations for the Seabrook facility.

There is, however, a rough listing of persons who at some time worked on matters regarding the Seabrook plant. Since this listing is not accurate for your purposes, NRR has searched and reviewed the agency's internal memoranda file maintained between July 1973 and January 1987 to identify records relating to exemptions, waivers and deviations for the Seabrook plant.

The records located during this search and review are listed on the enclosed Appendix D and are being made available for public inspection and copying in PDR folder F01A-87-51 under your name.

8707220168 870717 PDR FOIA GOREN87-51 pan

q Ms. Jennifer Goren The staff believes these records may satisfy your request.

If you decide i

after your review of these records that you wish additional related records, you may submit another F0IA request. Any questions which you may have regarding this request may be directed to Ms. Nina Toms at (301)

I 492-8133.

Sincerely, k.s u Y u w.: l Donnie H. Grimsley, Dire or Division of Rules and Records Office of Administration and Resources Management

)

i

Enclosures:

As stated l

I i

l

Re:

F0TA-87-51 APPENDIX C

RECORDS MAINTAINED AMONG PDR FILES NUMBER DATE DESCRIPTION 1.

3/31/83 NUREG-0896 - Safety Evaluation Report Related to the Operation of Seabrook Station, Units 1 and 2, Acc. No. 8303220444 2.

Facility Coperating License NPF-56 (Filed in Docket flos. 50-443 and 50-444) 3.

Letters sent to the Public Service Company of New Hampshire (Filed in Docket Nos. 50-443 i"9 50-444)

I i

Re:

F01A-87-51 APPENDIX D RECORDS MAINTAIhED IN THE PDR UNDER THE AB0VE REQUEST NUMBER 1.

10/20/75 Docket Nos. 50-443/444, SEABROOK 1 and 2 EFFLUENT RELEASE l

POINT DATA (2 pages).

i 2.

1/12/79 Memorandum for Harold R. Denton from Emanuel licitra..

SUBJECT:

l

SUMMARY

OF MEETING HELD WITH POST-CP APPLICANTS TO DISCUSS OL 1

REVIEWMATTERS(8pages).

3.

1/25/82 Memo to Tesesco from Johnston, Subj: NUCLEAR STATION UNITS 1 AND 2, PUBLIC SERVICE CO. OF NEW HAMPSHIRE (9 pages).

4 5/18/82 Memo to Tedesco from Johnston, Subj: PRESERVICE AND INSERVICE INSPECTION PROGRAM: SEABROOK STATION, UNITS 1 AND 2, PUBLIC SERVICE CO. OF NEW HAMPSHIRE (17 pages).

5.

6/7/83 Memo to Novak from Muller, Subj: METB INPUT FOR SUPPLEMENT TO SEABROOK SER (4 pages).

6.

6/13/83 Memo to Novak from Muller, Subj: METB INPUT FOR SUPPLEMENT TO SEABROOK SER (9 pages) 7 12/6/84 Memo to Denton, et al from Nerses, Subj: DAILY HIGHLIGHT (19 pages).

E.

1/18/85 Memo for hovak from Johnston, Subj:

SEABROOK, Units 1 anti 2-Elimination of Large Primary Loop Pipe Ruptures. (23 pages).

9.

2/22/85 Memo for Novak from Muller, Subj: Seabrook Station-Units 1 and 2 Alternative Pipe Break Design Considerations-Request for an Exemption to GDC-4 (4 pages).

10. 3/18/85 Memo for Novak from Bosnak, Subj: Seabrook Nuclear Station Unit 1-Arbitrary Intermediate Pipe Breaks (14 pages).
11. 5/2/85 Memo for Novak from Bosnak, Subj: Seabrook Nuclear Station Unit 1-Arbitrary Intennediate Pipe Breaks-Revised SER (5 pages).
12. 5/20/85 Docket Nos. 50-443 and 50-444, Subj: Meeting Summary (7 pages).
13. 7/11/85 Memo for Novak from Bosnak, Subj:

Input for SER Supplement-Seabrook Station Docket No. 50-443 (3 pages).

14. 9/11/85 Memo for Novak to Rubenstein, Subj:

Resolution of Seabrook Integrated Design Inspection (IDI) Issues (Findings 6-17 and 6-30) TAC No. 57134 (4 pages).

15 2/14/85 Memo for Noonan from Nerses. Subj:

Seabrook Environmental Qualification of Electrical Equipment Site Audit (4 pages).

16. 3/13/85 Memo for Noonan, et al, from Rossi, Subj: Proof and Review of the Seabrook Station Unit 1 Technical Specifications. (4 pages).

17.

3/26/86 Memo for Nerses from Rossi, Subj:

Public Service Company og New Hampshire, Seabrook Nuclear Power Station Unit 1, Safety Evaluation Report Supplement (9 pages).

18. 4/11/86 Memo for Rossi from Russell, Subj:

Seabrook Technical Specifications (16 pages).

19. 4/15/86 Trip Report-Seabrook Cast Stainless Steel Examination, April 15, 1986 (5 pages).
20. 4/23/86 Memo for Nerses from Rossi, Subj:

Supplemental Safety Evaluation Report-Seabrook Unit 1 and 2 (36 pages).

21. 4/24/86 Memo for Nerses from Rossi, Subj:

Seabrook-Requests for Additional Information Related to the Instrumentation and Control Design (4 pages).

22. 4/26/86 Memo for Nerses from Rossi, Subj:

Input for Supplement to the Safety-Evaluation Report Seabrook Station, Units 1 and 2 (36 pages).

23. 5/1/86 Docket No. 50-443 (7 pages).

24, 5/5/86 Nemo for Noonan to Nerses, Subj:

Forthcoming Seabrook Pump and Valve Inservice Testing Program Meeting (20 pages).

25.

5/7/86 Memo for Ballard from Sullivan, Subj: Trip Report on Site Visit to Seabrook Station Unit 1 for Cast Stainless Steel Ultrasonic Examination Demonstration (11 pages).

26.

5/19/86 Memo for Herses from Rossi, Subj:

Seabrook Unresolved Licensing 1ssues and Supplemental Safety Evaluation Report (5 pages).

27, 6/9/86 Memo for Nerses from Rossi, Subj:

Input for Seabrook Station Supplemental Safety Evaluation Report, Section 3.11, Environmental Qualification of Electrical Equipment Important to Safety and Safety-Related Mechanical Equipment (19 pages).

28. UNDATED Memo for Nerses from Rossi, Subj:

Supplemental Safety Evaluation Report, Seabrook Station, Unit 1 (12 Pages).

29. 6/14/86 Memo for Nerses from Rossi, Subj:

Input for Supplement to the Safety Evaluation Report for the Seabrook Plant, Units 1 and 2 (15pages).

1

l l

I Re:

F01A-87-51 APPENDIXD(Cont'd) 30.

6/16/86 Memo for herses from Rossi, Subj:

Fire Protection Input for Supplement 5 to the Seabrook Station, Units 1 and 2 Safety Evaluation Report (21 pages).

31, 6/17/86 Memo for Nerses from Rossi, Subj:

Public Service Company of New Hampshire, Seabrook Nuclear Power Station Unit 1, Safety Evalutation Report Supplement No. 5 on Preservice Inspection l

Program (18 pages).

i l

32. 6/19/86 Memo for Nerses from Rossi, Subjl Seabrook Station Ser Input on Equipment Qualification (26 pages).
33. 6/21/86 Docket hos:

50-443 and 50-444, Subj: Meeting Summary. (24 pages).

34 6/24/86 Memo for Rossi from Ballard, Subj:

Final Draft SSER for Seabrook, Unit 1 (15 pages).

l

35. 6/25/86 Memo for Nerses from Rossi, Subj:

Final Draft SSER for l

l Seabrook, Units 1 ano 2 (14 pages).

I I

36, 6/27/86 Memo for Nerses from Benaroya, Subj: Supplement Safety Evaluation Report, Technical Specification Improvement Program (3pages).

37. 7/11/86 Memo for Cunningham from Novak, Subj: Seabrook Station Unit 1 Operating License Status (9 pages).

38.

7/30/86 Memo for herses from Rossi, Subj: Revised Final Draft SSER 5 For Seabrook, Units 1 and 2 (34 pages).

39. 8/7/86 Memo for Rossi from Russell, Subj: DHFT Review of Seabrook l

Final Draft Technical Specifications (2 pages).

40. 8/11/86 Note to Novak from Speis, Subj:

Review of the Sebrook EPZ Submittal (2 pages).

41. 8/12/86 Memo for Denton from Novak, Subj: Review of EPZ Sensitivity Study for Seabrook (9 pages).

s 1

Re:

F01A-87-51 APPENDIX D (Cont'd)

42. 8/23/86 Memo for herses from Rossi, Subj: Seabrook Station SSER Input on Inservice Testing of Pumps and Valves (4 pages).
43. 8/26/86 Memo for Nerses from Rossi, Subj:

Fire Hazards Analyses for Charcoal Filter Unites-Seabrook Station, Units 1 and 2 (5 pages).

44, 8/29/86 Memo for hovak from Speis, Subj: Seabrook Unit 1 Low Power I

l License (24 pages).

45.

10/2/86 Memo for Nerses from Milhoan, Subj:

Input for Supplement to the Safety Evaluation Report Seabrook Station, Units 1 and 2 (5 pages).

46, 10/9/86 Memo for Nerses from Rossi, Subj:

Input for Seabrook Station-Supplemental Safety Evaluation Report, Section 3.11 (1 page).

1 47.

1/16/87 Memo for Nerses from McCracken, Subj:

Input for Supplement to the Safety Evaluation Report for Seabrook Station, Units 1 and 2, Fire Protection SRP Section 9.5.1, (TAC 63398) (5 pages).

48.

5/12/86 Memo for V. Nerses from C. Rossi, Subj:

Seabrook Station, Units 1 and 2, Input for Supplement to the Safety Evaluation Report (5pgs.)

49. undated Extracted page from Seabrook Specifications (1 pg.)