Advises That Reactor Operator & Senior Reactor Operator Written Licensing Exams Scheduled for 870623.Simulator Operating Exams Scheduled for 870624-26
ML20207S751
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/11/1987
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 8703200240
Download: ML20207S751 (8)


Text

.

~

X := '

1.

March 11, 1987-t Mr.~ Harold . Ray, Vice President and Site Manager Southern California Edison Company' P. 0. Box 128 San Clemente, California 92672 -

Dear Mr. Ray:

Subject:

Reactor Operator and Senior Reactor Operator Licensing ~ <

Examinations In a telephone conversation between Mr.' Mike Kirby' of your staff and .

Mr. Michael J..Royack, License Examiner, arrangements were'made for the administration of the examinations at the' San Onofre Unit'l Nuclear. '

Generating Station. ~

The written exarinations. are scheduled for' June 23,1987. The simulator /

operating examinations are scheduled for June 24-26, 1987.

In order for us to meet the above schedule, it will be'necessary for the facility to furnish the approved reference material listed in Attachment 1,

" Reference Material Requirements for' Reactor / Senior Reactor Operator Licensing Examinations," by April 17, 1987.- Any delay in receiving properly bound.and indexed reference material will result in a delay in administering the examinations. The examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the

. examination dates' requested by the various facilities. Therefore, missing l~ the April 17, 1987. deadline, even by a few days, likely will result in a long i delay.because it may not be possible to reschedule examinations at other ~

facilities. Mr. Kirby has been advised of the reference material sets that are required, and the examiner's names-and addresses where each set is to be i mailed.

l- .The facility management is responsible for providing adequate space and

( facilities in order to properly conduct the written examinations.

Attachment 2, " Requirements for Administration of Written Examinations,"

describes our requirements for conducting these examinations. Mr. Kirby has also been informed of.these requirements.

[ Attachment 2, also contains the Rules and Guidance that will be in effect i during the administration of the written examination. The facility management L 8 is responsible for ensuring that all candidates are aware of these rules.

i T..

A -

~

8703200240 870311 g

, PDR ADOCK 05000206 V PDR l

l

. _ _ _ - _ . . _ _ . _ __ _ -~__ . - _ - - _ _ _ _ _ _ - . _ . _ . - . . ~ .

4 p .

4

.. , , a

o. -

- , = -

~

Mr. Harold Ray 2 ,

March 11, 1987.

~

( ~

All. reactor operator and senior reactor operatoi l'icense' applications should normally be submitted at'least 60 days before the first' examination dates so that we.will be able.to. review'the training and experience of the candidates,

- . process the medical certifications, and prepare 1 final examiner assignments

after candidate eligibility has been determined. If'the applications are not received.at least 30 days before the examination. dates, it is likely that a postponement will.be necessary. ,

- This request for information was approved by the Office of Management and' -

s Budget under Clearance Number 3150-0101,~which expires May 31, 1989. ,

Comments on burden and duplication may be directed to the Office of Management and Budget Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503. ,

.Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact Mr. Michael J. Royack or_ Mr. J. Elin, in Region V.

Sincerely,

/S/

Robert J. Pate, Chief Reactor Safety Branch Attachments:

1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
2. Requirements for Administration of Written Examinations cc w/ attachments (1)'and (2):

R. Cross,RV(2~ copies)

' ccw/oattachments-(1)and(2):

H. Rood, NRR, Project Manager R. Huey, SRI, SONGS

. P. Johns, RV M. Royack, Chief Examiner J. O'Brien, RV B. Boger,-OLB-HQ R. Pate; Branch Chief, RV W. M. Dean, RII RV/jk EST COPY ] REQUEST /CDPY BEQUEST COPY ]

YES / ' NO ' ] YES / ( N0) /YES) / N0  :

v U 5JI(D TO PDR '

/YES)/ N0 ROYACK ' ELIN E i

' 3/o/87 3/ /b7 3/f/87'

  • p r.tg
  1. jof UNITED STATES y g NUCLEAR REGULATORY COMMISSION
y
O j REGION V s 1450 MARIA LANE, SUITE 210 d,et : WALNUT CREEK, CALIFORNIA 94596 4

March 11, 1987

. Mr. Harold Ray, Vice President and Site Manager Southern Califernia Edison Company P. 0. Bax 128

~

San Clemente, California 92672

Dear Mr. Ray:

Subject:

Reactor Operator and Senior Reactor Operator Licensing Examinations In a telephont. conversation between Mr. Mike Kirby of your staff and Mr. Michael J. Royack, License Examiner, arrangements were made for the administration of the examinations at the San Onofre Unit 1 Nuclear Generating Station.

The-written examinations are scheduled for June 23, 1987. The simulator /

operating examinations are scheduled for June 24-26, 1987.

In order for us_ to meet the above schedule, it will be necessary for the

- facility to furnish the approved reference material listed in Attachment 1,

" Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations," by April 17, 1987. Any delay in receiving properly bound and indexed reference material will result in a delay in. administering the examinations. The examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the examination dates requested by the various facilities. Therefore, missing the April 17, 1987 deadline, even by a few days, likely will result in a long delay because it may not be possible to reschedule examinations at other facilities. Mr. Kirby has been advised of-the reference material sets that are required, and the examiner's names and addresses where each set is to be i

mailed.

The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations.

Attachment 2, " Requirements for Administration of Written Examinations,"

describes our requirements for conducting these examinations. Mr. Kirby has also been informed of these requirements.

Attachment 2, also contains the Rules and Guidance that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all candidates are aware of these rules.

i

---,--4 ~-

-r-~ y -- ..-r,m<+

, r . _ . , , , ,...,,iv.-n-,, - , - - . - . - - , , , - - - _ , - . , ,n , .,,---.-,_....---#-, ,, .w_,,__.

, . . . . . _ , , , . , - - - - . , . . - . - + , m--, --

Mr. liarold Ray 2 March 11, 1987 All reactor operator and senior reactor operator license applications should normally be submitted at least 60 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligibility has been determined. If the applications are not received at least 30 days before the examination dates, it is likely that a postponement will be necessary.

This request for information was approved by the Office.of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989..

Comments on burden and ~ duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503.

Thank you for your consideration in this matter. If you have any questions

< regarding the examination procedures and requirements, please contact Mr. Michael J. Royack or Mr. J. Elin, in Region V.

Sincerely, Robert J. ate, Chief Reactor Safety Branch Attachments:

1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
2. Requirements for Administration of Written Examinations ccw/ attachments (1)and(2):

R. Cross, RV (2 copies) ccw/oattachments(1)and(2):

H.-Rood, NRR, Project Manager R. Huey, SRI, SONGS P. Johns, kV M. Royack, Chief Examiner J. O'Brien, RV B. Boger, OLB-HQ R. Pate, Branch Chief, RV W. M. Dean, RII

~.

. \

+ f  !

ATTACHMENT 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS

1. Existing learning objectives and lesson plans'(including training manuals, plant orientation manual, system descriptions, reactor

~ theory, thermodynamics, etc.)

Training materials should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing.

The written material should be inclusive of _ learning objectives and the details presented during lecture, rather than outlines. Training

. materials should be identified by plant and unit, bound, and indexed.

Failure to provide complete properly bound and indexed plant _ reference material will result in cancelling and rescheduling of the examinations.

Training materials which include the following should be provided:

. System descriptions including descriptions of all operationally i relevant flow paths,' components, centrols and instrumentation.

System training material should draw parallels to the actual '

procedures used for operating the applicable system.

. Complete and operationally useful descriptions of all safety-system interactions and, where available, 80P system interactions o

under energency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.

Training material used to clarify and strengthen understanding of emergency operating procedures.

. Comprehensive theory material that includes fundamentals in

the area of theory of reactor operation, thermodynamics, heat l transfer and fluid flow, as well as specific application to

!- actual in-plant components. For example, mechanical theory material on pumps should include pump theory as well as

, descripticns of how these principles actually apply to major plant pumps and the systems in which they are installed (i.e.,

Reactor Coolant Pumps, all ECCS pumps, Recirculation pumps,

, Feedwater pumps and Emergency Feedwater pumps). Reactor Theory material should include descriptions that draw explicit ties between the fundamentals and the actual operating limits

. followed in the plant (i.e., reactor theory material should l' contain explanations how principles relate to the actual curves used by. operators to verify shutdown margin or calculate an ECP).

2. Procedure Index (alphabetical by subject)

. . . , , . , ,_.,_U.. ,,.-,-,,.m...,.

. , _ _ , -.,_.,.,.y,,, ,_ w ,,,,,..,ry,_ . - - . , , , - m,,,_.,,_- . . , . , , , -._,,...m,..

4 2

3. All administrative procedures (as applicable to reactor operation orsafety)
4. All integrated plant procedures (normal or general operating procedures)
5. ' Emergency procedures (emergency instructions, abnormal or special procedures)
6. Standing orders (important orders that are safety related and may supersede the regular procedures)
7. Fuel-handling and core-loadin procedure, when appropriate) g procedures, (initial core loading
8. Annunciator procedures (alarm procedures, including set points)-
9. Radiation protection manual (radiation control manual or procedures)
10. Emergency plan implementing procedures
11. Technical Specifications
12. System operating procedures
13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
14. Technical Data Book, and/or plant curve information as usea by operators and facility precautions, limitations, and set points (PLS) for the facility, ,
15. Questions and answers that licensee has prepared (voluntary by licensee)
  1. 16. The following on the plant reference simulator
a. List of all readily available initialization points
b. List of all preset malfunctions with a clear identification number. The list should include cause and effect information.

Specifically, for each malfunction a concise description of the expected results, or range of results, that will occur upon implementation should be provided. Additionally, an indication of which annunciators are to be initially expected should be given.

l c. A description of simulator failure capabilities for valves, j breakers, indicators and alarms.

A

e, 3

d. Where.the capability exists, an explanation of the ability to ,

. vary the severity of a particular malfunction should be provided, i.e., ability to vary the size of a given LOCA or steam leak,

, or the ability to cause a slow failure of a component such as a feed pump, turbine generator or. major valve (e.g.- drifting shut.of a main feedwater control valve.

e. An indication of modeling conditions / prob'lems that may impact the examination.
f. -Identification of significant differences between the simulator and the control rocm.
g. Copies of facility generated scenarios that expose the candidates to situations of degraded pressure control (PWR), degraded heat
' removal capability (PWR and BWR) and containment challenges 1 (BWR) may be provided (voluntary by licensee).
h. Simulator instructors manual (voluntary by licensee)

Description of the scenarios used for the training class i.

(voluntary by licensee) i

17. Additional material required by the examiners to develop examinations
that meet the requirements of these' standards and the regulations.

l All above reference material should be approved, final issues and should be so marked. If a plant has not finalized some of the material, the chief examiner shall verify with the facility that the most complete,-

up-to-date material is available and that agreement has been reached with

' . the licensee for limiting changes before the administration of the examination.

All procedures-and reference material should be bound with appropriate indexes

-or tables of contents so that they can be used efficiently.

i i

,3- - ,--e--~ ~,,--,,,-,,,-,,,,,--w,- -,n- - , -, -, -- -----r-- m,,ne,- , --_..-r..a -- ,e-w -+,.a ~...- - - -,n, - -- , - , ..n-,-,----- --

e ATTACHMENT 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.

2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3-ft space between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
3. Suitable arrangements shall be made by the facility if the candidates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the examiner and/or proctor.
4. The facility shall arrange to have knowledgeable personnel available to review examination questions and answer key. The facility will be given a copy of the exams and answer keys after the last candidate has turned in his completed examination. The facility staff will have until the end of the first exam week to provide comments and supporting documentation. They should provide these comments and supporting documentation in writing to the Chief Examiner before he leaves the site, and also forward them to the Operator Licensing Section Chief in Region V. The current two-hour post-exam review by the facility staff may also be conducted at the option of the Chief Examiner.
5. The licensee shall provide pads of 8-1/2 x 11-in. lined paper in unopened packages for each candidate's use in completing the examination. The examiner shall distribute these pads to the candidates. All reference material needed to complete the examination shall be furnished by the i examiner. Candidates can bring pens, pencils, calculators or slide rules l into the examination room, and no other equipment or reference material shall be allowed.
6. Only black ink or dark pencils should be used for writing answers to questions.

l

.