Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P7111999-10-26026 October 1999 Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196K6721999-07-0202 July 1999 Discusses 990628 Meeting Conducted in Region IV Office Re Status of San Onofre Nuclear Generating Station Emergency Preparedness Program.List of Attendees & Licensee Presentation Encl 1999-09-03
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062F9441990-11-0909 November 1990 Forwards Insp Repts 50-206/90-35,50-361/90-35 & 50-362/90-35 on 901009-12.No Violations Noted ML20058G5571990-11-0505 November 1990 Provides Corrections to Insp Repts 50-206/90-33,50-361/90-33 & 50-362/90-33,per ML20058B9291990-10-22022 October 1990 Forwards Ref Matl Requirements for Requalification Program Evaluation at Units 2 & 3 During Wk of 910122-0201 ML20059N9351990-10-0303 October 1990 Forwards Insp Repts 50-206/90-33,50-361/90-33 & 50-362/90-33 on 900904-07.No Violations Noted ML20059L1611990-09-18018 September 1990 Provides Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exam to Be Administered on 901010.W/o Encls ML20059G9751990-08-21021 August 1990 Forwards Insp Repts 50-206/90-31,50-361/90-31 & 50-362/90-31 on 900731-0803.No Violations Noted ML20059A4621990-08-16016 August 1990 Advises That 900717 Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount, Served as Basis for Closing Issue on Unit 1.Results of Evaluation of Units 2 & 3 Will Be Subj of Future Ltr ML20058P2911990-08-0101 August 1990 Forwards Initial Licensing Exam Rept 50-361/OL-90-02 on 900618-29 for Units 2 & 3.Fifteen of 19 Candidates Passed Exam IR 05000206/19900101990-07-26026 July 1990 Ack Receipt of Advising of Steps Taken to Correct Violations Noted in Insp Repts 50-206/90-10,50-361/90-10 & 50-362/90-10.Identification of New Info Provided Addl Useful Info on Recent Check Valve Activities at Facility ML20055H7451990-07-24024 July 1990 Requests Util Provide Listed Ref Matls for Reactor & Senior Reactor Operator Licensing Exams on 901023-25 ML20058L8981990-07-23023 July 1990 Forwards Insp Repts 50-206/90-26,50-361/90-26 & 50-362/90-26 on 900625-29.No Violations Noted.Weaknesses Re Implementation of Internal Exposure Control Program Noted ML20055G5771990-07-17017 July 1990 Advises That New Storage Facility Meets Requirements of 10CFR73.21(d)(2) & Acceptable for Storage of Safeguards Info,Per 900403 Request ML20055D5201990-07-0202 July 1990 Requests Util Provide Ref Matls Listed in Encl for Requalification Program Evaluation & Exams During Wk of 901001,by 900801.Failure to Supply Ref Matl as Required May Result in Postponement of Exam ML20055F3871990-06-29029 June 1990 Forwards Insp Repts 50-206/90-22,50-361/90-22 & 50-362/90-22 on 900422-0602 & Notice of Deviation.Several Staff Members May Have Misunderstanding Re Licensee Ability to Make Repeated Entries Into & Exits from Tech Spec Statements ML20055D5361990-06-29029 June 1990 Discusses Electrical Safety Sys Functional Insp Conducted on 891030-1130 & Forwards Notice of Violation ML20055E1641990-06-28028 June 1990 Authorizes Use of Alloy 690 as Alternative to Alloy 600 in Steam Generator Tube Plugs,Per 900627 Request.Nrc Endorsed Use of Alloy 690 for Fabrication of Plugs in NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube.. ML20059M9701990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248E0851989-09-29029 September 1989 Forwards Amend 18 to Indemnity Agreement B-31 Re Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements, Effective 890701 ML20248J0561989-09-22022 September 1989 Forwards Insp Repts 50-206/89-26,50-361/89-26 & 50-362/89-26 on 890828-0901 & Acceptance Criteria.No Violations or Deviations Noted ML20248H9271989-09-20020 September 1989 Forwards Insp Repts 50-206/89-23,50-361/89-23 & 50-362/89-23 on 890814-18.No Violations Noted ML20248B5261989-09-19019 September 1989 Provides Info Re Generic Fundamentals Exam Section of Licensing Written Exam to Be Administered on 891004 ML20248B7841989-09-16016 September 1989 Advises That Portions of 880624 & 0825 Revs 19,19A & 20 to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable.Unacceptable Portion Withheld (Ref 10CFR73.21) ML20247B1181989-08-25025 August 1989 Forwards Insp Repts 50-206/89-18,50-361/89-18 & 50-362/89-18 on 890618-0729 & Notice of Violation ML20248A9121989-07-28028 July 1989 Advises of Reactor Operator Written Exams Scheduled for 891031 & Operating Exams Scheduled for 891101-03.Ref Matl Requirements for Reactor/Senior Reactor Operator Licensing Exams Encl ML20245G7031989-07-26026 July 1989 Forwards Insp Repts 50-206/89-14,50-361/89-14 & 50-362/89-14 on 890430-0617.No Violations Noted.Addl Example of LER Failing to Properly Address All Applicable Root Causes & Corrective Actions for Event Identified in Rept IR 05000206/19890171989-07-0606 July 1989 Forwards Safeguards Insp Repts 50-206/89-17,50-361/89-17 & 50-362/89-17 on 890619-23.No Violations Noted.Repts Withheld (Ref 10CFR73.21) ML20246B5701989-06-22022 June 1989 Forwards Enforcement Conference Repts 50-361/89-19 & 50-362/89-19 on 890602 & Notice of Violation.Importance of Prompt Corrective Actions for Identified Engineering Program Deficiencies Addressed During Conference ML20246L6911989-06-22022 June 1989 Forwards Exam Rept 50-361/OL-89-01 for Units 2 & 3 Administered on 890512.Candidate Failed to Meet Min Qualification Requirements for Licensing ML20245K3571989-06-16016 June 1989 Forwards Insp Repts 50-206/89-15,50-361/89-15 & 50-362/89-15 on 890508-26.No Violations Noted IR 05000361/19880351989-05-31031 May 1989 Confirms 890602 Enforcement Conference in Region V to Discuss Concerns Re Inoperability of Emergency Chillers Noted in Insp Repts 50-361/88-35 & 50-362/88-37,per 890524 & 31 Telcons.Agenda & Notice of Meeting Encl ML20246N6641989-05-15015 May 1989 Responds to Request to Revise Physical Security Plan,Section 5.1.1 Re Granting Unescorted Access to Protected Areas. Advises of Issuance of Rule Requiring All Power Reactor Licensees to Have Access Authorization Program ML20247G1391989-05-12012 May 1989 Advises That Evaluation of Requalification Program & Licensed Personnel Scheduled for Wks of 890814 & 28.Ref Matl Listed on Encl Should Be Furnished by 890616 ML20246P8861989-05-0202 May 1989 Forwards Insp Repts 50-206/89-08,50-361/89-08 & 50-362/89-08 on 890313-23 & Notice of Violation.Rept Describes Too Many Examples Involving Inadequate Control of Radioactive Matl ML20246C2441989-04-19019 April 1989 Forwards Insp Repts 50-206/89-12,50-361/89-12 & 50-362/89-12 on 890320-24.No Violations or Deficiencies Noted ML20236B8601989-03-13013 March 1989 Advises That 880204 & 890216 Revs 17 & 17A to Physical Security Plan,Respectively,Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion in Plan IR 05000206/19890051989-02-28028 February 1989 Forwards Safeguards Insp Repts 50-206/89-05,50-361/89-05 & 50-362/89-05 on 890206-10.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20235T7991989-02-27027 February 1989 Advises That 871229,880204 & 890216 Revs 4A,5 & 5A, Respectively,To Safeguards Contingency Plan Acceptable ML20235Q6011989-02-10010 February 1989 Forwards Notice of Issuance of Amends to Licenses NPF-10 & NPF-15 & Opportunity for Hearing on 881024 Request Re Change to Tech Spec 3/4.8.1.1, AC Sources ML20235L0941989-02-0909 February 1989 Requests Encl Ref Matl Be Submitted by 890227 for Reactor Operator Licensing Exams Scheduled for 890505.Inadequate or Incomplete Ref Matl May Result in Exam Rescheduled ML20245C0771989-02-0808 February 1989 Identifies Addl Technical Issues Which NRC Must Resolve Before Restart from Current Refueling Outage ML20206M4061988-11-28028 November 1988 Denies 881112 Request for Commission to Extend Public Comment Period on Proposed Fitness for Duty Program ML20195H6681988-11-28028 November 1988 Responds to 881112 Request for Commission to Extend Public Comment Period on Proposed Fitness for Duty Rule.Comments Received After 881121 Will Be Considered If Practical ML20206L7571988-11-22022 November 1988 Informs That Review of Change Notice 29 to Topical Rept SCE-1-A, QA Program, Amend 11 Will Require More than 60 Days to Complete Review & Evaluation ML20206J5201988-11-16016 November 1988 Informs That 881108 Request for Extension of Public Comment Period on Proposed Fitness for Duty Rule Denied.Ample Response Time Provided IR 05000361/19880101988-11-0707 November 1988 Ack Receipt of 880902 & 1003 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/88-10 & 50-362/88-10 ML20206D0331988-10-31031 October 1988 Forwards Exam Rept 50-361/OL-88-02 Administered on 880726-0811.Rept for Both Units ML20205R6931988-10-26026 October 1988 Documents Change in Schedule for Administration of Reactor Operator & Senior Reactor Operator Licensing Exams.Written Exams Scheduled for 881213 & Plant Oral Exams on 881214-16 IR 05000361/19880151988-10-0404 October 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/88-15 & 50-362/88-16 ML20154N9121988-09-0909 September 1988 Forwards Emergency Operating Procedures Insp Repts 50-361/88-13 & 50-362/88-14 on 880601-14.No Violations or Deviations Identified.Emphasizes Staff Commitment to Eliminate Deficiencies in Procedures & Training Program ML20154N9301988-09-0909 September 1988 Forwards Insp Rept 50-362/88-22 on 880718-0805 & Notice of Violation 1990-09-18
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217P7111999-10-26026 October 1999 Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20196K6721999-07-0202 July 1999 Discusses 990628 Meeting Conducted in Region IV Office Re Status of San Onofre Nuclear Generating Station Emergency Preparedness Program.List of Attendees & Licensee Presentation Encl ML20196K3351999-06-30030 June 1999 Informs That Effective 990703,NRC Project Management Responsibility for San Onofre Unit 1 Will Be Transferred to Wc Huffman ML20212J3581999-06-24024 June 1999 Final Respons to FOIA Request for Records.App a Records Withheld in Part (Ref Exemptions 1 & 3) ML20209D7851999-06-16016 June 1999 Requests That San Onofre Nuclear Generating Station Be Included as One of Several Reference Plants in GSI-191 Study ML20195J6441999-06-15015 June 1999 Forwards Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 30 Days of Receipt of Ltr ML20196A7351999-06-15015 June 1999 Requests That Cover Page to NRC Insp Repts 50-361/98-14 & 50-362/98-14 Be Replaced with Encl Page.Originally Issued Page,Signed by T Steka,Was Dated Incorrectly ML20207H4021999-06-14014 June 1999 Requests Addl Info Re Completion of Time for Containment Isolation Valves,Same as for Engineered Safeguards Features ML20196A8001999-06-0909 June 1999 Requests That Pages 14-17 of NRC Insp Repts 50-361/99-04 & 50-362/99-04 Be Replaced with Encl Pages.Initial Issued Rept Contained Some Duplicated Info ML20195E8001999-06-0808 June 1999 Forwards Insp Repts 50-361/99-06 & 50-362/99-06 on 990404- 0515.Violations Identified & Being Treated as Noncited Violations ML20195E8091999-06-0707 June 1999 Ack Receipt of Transmitting Licensee Emergency Plan,Rev 7 Under Provisions of 10CFR50.54(q) ML20195E8281999-06-0707 June 1999 Ack Receipt of Transmitting Licensee Emergency Plan Implementing Proceedure SO123-VIII-1,rev 11 Under Provisions of 10CFR50.54(q) ML20207E6521999-06-0202 June 1999 Responds to Ltr Which Identified Several Inaccuracies within NRC Insp Repts 50-361/98-18 & 50-362/98-18.Forwards Revised Pages for page-by-page Replacement in Insp Repts ML20195D2771999-06-0202 June 1999 Forwards Se,Concluding That Util Has Capability to Perform Reload Design & non-LOCA Analyses for Songs,Units 2 & 3, Based on Review of TR SCE-9801-P & Onsite Audit of Implementation of Reload Technology Transfer Program ML20207A8981999-05-25025 May 1999 Advises That Versions of SCE-9801-P,Rev 0 & CEN-635(S)-P, Rev 00,submitted in 981130 & s & Affidavits & 990225,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206U3681999-05-18018 May 1999 Forwards Partially Withheld Insp Repts 50-361/99-07 & 50-362/99-07 on 990426-29.Matl Encl Contains Safeguards Info & Will Not Be Placed in PDR (Ref 10CFR2.790) ML20207A2131999-05-14014 May 1999 Submits Summary of 990422 Meeting in San Clemente,Ca Re PPR Results Completed 990211.Informal Discussions Held with Public Following Meeting Re Recent Changes Used to Assess Licensee Performance ML20206P1521999-05-13013 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206P4051999-05-12012 May 1999 Responds to Re Request of TS Interpretation. Instrumentation with Battery Backup,But Lacking DG Backup Cannot Be Excluded from Provisions of Action B.2 ML20206Q2481999-05-10010 May 1999 Forwards Insp Repts 50-361/99-05 & 50-362/99-05 on 990426-30.No Violations Noted ML20206H4881999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Aswer Key,Encl for Info.Without Encl ML20206H7651999-05-0606 May 1999 Forwards Exam Repts 50-361/99-301 & 50-362/99-301 on 990416. Two Operators & Two Senior Operators Were Evaluated.Four Applicants Satisfied Requirements of 10CFR55 & Appropriate Licenses Issued IR 05000361/19983021999-05-0303 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/98-302 & 50-362/98-302 Issued on 990104.Review Found Reply Responsive to Concerns Raised ML20206K5061999-04-30030 April 1999 Discusses Closure of OI Investigation 4-1998-04 Re Southern California Edison Led Joint Util Audit of Inst of Nuclear Power Operations Fitness for Duty & Access Authorization Programs.Synopsis from Subj Rept Encl ML20206B4921999-04-20020 April 1999 Forwards Insp Repts 50-361/99-04 & 50-362/99-04 on 990221-0403.Three Violations Occurred & Being Treated as non-cited Violations ML20205S2941999-04-20020 April 1999 Forwards RAI Re Licensee 981230 Request to Implement risk-informed IST Program During Remainder of Second 10-year Interval for SONGS & to 970313 Response to GL 96-05 ML20206B4241999-04-20020 April 1999 Forwards Insp Repts 50-361/99-03 & 50-362/99-03 on 990205-0312.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of NRC Enforcement Policy ML20205Q6171999-04-19019 April 1999 Forwards SE Authorizing Licensee 980826 Request for Relief from ASME B&PV Code,Section XI Requirements for Certain ISIs at Plant,Units 2 & 3 ML20205R0101999-04-16016 April 1999 Discusses Request for Approval of Deviation from Approved Fire Protection Program.Forwards SE Related to Request for Approval Incorporating Certain Requirements of App R to 10CFR50 ML20205M9421999-04-13013 April 1999 Forwards Emergency Response Data System Implementation Documents.Data Point Library Updates for Kewaunee (271), San Onofre (272) & Clinton (273) Encl.Also Encl Plant Attribute Library Update for Grand Gulf (274).Without Encls ML20205M9891999-04-0707 April 1999 Informs That L Raghavan Assumed Project Manager Responsibilities Effective 990329 & Dembek Assumed Responsibilities as Section Chief for SONGS ML20205E5441999-03-30030 March 1999 Forwards Insp Repts 50-361/99-01 & 50-362/99-01 on 990103- 0220.Three non-cited Violations Were Identified 1999-09-03
[Table view] |
Text
.
~
X := '
1.
March 11, 1987-t Mr.~ Harold . Ray, Vice President and Site Manager Southern California Edison Company' P. 0. Box 128 San Clemente, California 92672 -
Dear Mr. Ray:
Subject:
Reactor Operator and Senior Reactor Operator Licensing ~ <
Examinations In a telephone conversation between Mr.' Mike Kirby' of your staff and .
Mr. Michael J..Royack, License Examiner, arrangements were'made for the administration of the examinations at the' San Onofre Unit'l Nuclear. '
Generating Station. ~
The written exarinations. are scheduled for' June 23,1987. The simulator /
operating examinations are scheduled for June 24-26, 1987.
In order for us to meet the above schedule, it will be'necessary for the facility to furnish the approved reference material listed in Attachment 1,
" Reference Material Requirements for' Reactor / Senior Reactor Operator Licensing Examinations," by April 17, 1987.- Any delay in receiving properly bound.and indexed reference material will result in a delay in administering the examinations. The examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the
. examination dates' requested by the various facilities. Therefore, missing l~ the April 17, 1987. deadline, even by a few days, likely will result in a long i delay.because it may not be possible to reschedule examinations at other ~
facilities. Mr. Kirby has been advised of the reference material sets that are required, and the examiner's names-and addresses where each set is to be i mailed.
l- .The facility management is responsible for providing adequate space and
( facilities in order to properly conduct the written examinations.
Attachment 2, " Requirements for Administration of Written Examinations,"
describes our requirements for conducting these examinations. Mr. Kirby has also been informed of.these requirements.
[ Attachment 2, also contains the Rules and Guidance that will be in effect i during the administration of the written examination. The facility management L 8 is responsible for ensuring that all candidates are aware of these rules.
i T..
A -
~
8703200240 870311 g
, PDR ADOCK 05000206 V PDR l
l
. _ _ _ - _ . . _ _ . _ __ _ -~__ . - _ - - _ _ _ _ _ _ - . _ . _ . - . . ~ .
4 p .
4
.. , , a
- o. -
- , = -
~
Mr. Harold Ray 2 ,
March 11, 1987.
~
( ~
All. reactor operator and senior reactor operatoi l'icense' applications should normally be submitted at'least 60 days before the first' examination dates so that we.will be able.to. review'the training and experience of the candidates,
- . process the medical certifications, and prepare 1 final examiner assignments
- after candidate eligibility has been determined. If'the applications are not received.at least 30 days before the examination. dates, it is likely that a postponement will.be necessary. ,
- This request for information was approved by the Office of Management and' -
s Budget under Clearance Number 3150-0101,~which expires May 31, 1989. ,
Comments on burden and duplication may be directed to the Office of Management and Budget Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503. ,
.Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact Mr. Michael J. Royack or_ Mr. J. Elin, in Region V.
Sincerely,
/S/
Robert J. Pate, Chief Reactor Safety Branch Attachments:
- 1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
- 2. Requirements for Administration of Written Examinations cc w/ attachments (1)'and (2):
R. Cross,RV(2~ copies)
' ccw/oattachments-(1)and(2):
H. Rood, NRR, Project Manager R. Huey, SRI, SONGS
. P. Johns, RV M. Royack, Chief Examiner J. O'Brien, RV B. Boger,-OLB-HQ R. Pate; Branch Chief, RV W. M. Dean, RII RV/jk EST COPY ] REQUEST /CDPY BEQUEST COPY ]
YES / ' NO ' ] YES / ( N0) /YES) / N0 :
v U 5JI(D TO PDR '
- /YES)/ N0 ROYACK ' ELIN E i
' 3/o/87 3/ /b7 3/f/87'
- jof UNITED STATES y g NUCLEAR REGULATORY COMMISSION
- y
- O j REGION V s 1450 MARIA LANE, SUITE 210 d,et : WALNUT CREEK, CALIFORNIA 94596 4
March 11, 1987
. Mr. Harold Ray, Vice President and Site Manager Southern Califernia Edison Company P. 0. Bax 128
~
San Clemente, California 92672
Dear Mr. Ray:
Subject:
Reactor Operator and Senior Reactor Operator Licensing Examinations In a telephont. conversation between Mr. Mike Kirby of your staff and Mr. Michael J. Royack, License Examiner, arrangements were made for the administration of the examinations at the San Onofre Unit 1 Nuclear Generating Station.
The-written examinations are scheduled for June 23, 1987. The simulator /
operating examinations are scheduled for June 24-26, 1987.
In order for us_ to meet the above schedule, it will be necessary for the
- facility to furnish the approved reference material listed in Attachment 1,
" Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations," by April 17, 1987. Any delay in receiving properly bound and indexed reference material will result in a delay in. administering the examinations. The examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the examination dates requested by the various facilities. Therefore, missing the April 17, 1987 deadline, even by a few days, likely will result in a long delay because it may not be possible to reschedule examinations at other facilities. Mr. Kirby has been advised of-the reference material sets that are required, and the examiner's names and addresses where each set is to be i
mailed.
The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations.
Attachment 2, " Requirements for Administration of Written Examinations,"
describes our requirements for conducting these examinations. Mr. Kirby has also been informed of these requirements.
Attachment 2, also contains the Rules and Guidance that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all candidates are aware of these rules.
i
---,--4 ~-
-r-~ y -- ..-r,m<+
, r . _ . , , , ,...,,iv.-n-,, - , - - . - . - - , , , - - - _ , - . , ,n , .,,---.-,_....---#-, ,, .w_,,__.
, . . . . . _ , , , . , - - - - . , . . - . - + , m--, --
Mr. liarold Ray 2 March 11, 1987 All reactor operator and senior reactor operator license applications should normally be submitted at least 60 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligibility has been determined. If the applications are not received at least 30 days before the examination dates, it is likely that a postponement will be necessary.
This request for information was approved by the Office.of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989..
Comments on burden and ~ duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503.
Thank you for your consideration in this matter. If you have any questions
< regarding the examination procedures and requirements, please contact Mr. Michael J. Royack or Mr. J. Elin, in Region V.
Sincerely, Robert J. ate, Chief Reactor Safety Branch Attachments:
- 1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
- 2. Requirements for Administration of Written Examinations ccw/ attachments (1)and(2):
R. Cross, RV (2 copies) ccw/oattachments(1)and(2):
H.-Rood, NRR, Project Manager R. Huey, SRI, SONGS P. Johns, kV M. Royack, Chief Examiner J. O'Brien, RV B. Boger, OLB-HQ R. Pate, Branch Chief, RV W. M. Dean, RII
~.
. \
+ f !
ATTACHMENT 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1. Existing learning objectives and lesson plans'(including training manuals, plant orientation manual, system descriptions, reactor
~ theory, thermodynamics, etc.)
- Training materials should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing.
The written material should be inclusive of _ learning objectives and the details presented during lecture, rather than outlines. Training
. materials should be identified by plant and unit, bound, and indexed.
Failure to provide complete properly bound and indexed plant _ reference material will result in cancelling and rescheduling of the examinations.
Training materials which include the following should be provided:
. System descriptions including descriptions of all operationally i relevant flow paths,' components, centrols and instrumentation.
System training material should draw parallels to the actual '
procedures used for operating the applicable system.
. Complete and operationally useful descriptions of all safety-system interactions and, where available, 80P system interactions o
under energency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
Training material used to clarify and strengthen understanding of emergency operating procedures.
. Comprehensive theory material that includes fundamentals in
- the area of theory of reactor operation, thermodynamics, heat l transfer and fluid flow, as well as specific application to
!- actual in-plant components. For example, mechanical theory material on pumps should include pump theory as well as
, descripticns of how these principles actually apply to major plant pumps and the systems in which they are installed (i.e.,
Reactor Coolant Pumps, all ECCS pumps, Recirculation pumps,
, Feedwater pumps and Emergency Feedwater pumps). Reactor Theory material should include descriptions that draw explicit ties between the fundamentals and the actual operating limits
. followed in the plant (i.e., reactor theory material should l' contain explanations how principles relate to the actual curves used by. operators to verify shutdown margin or calculate an ECP).
- 2. Procedure Index (alphabetical by subject)
. . . , , . , ,_.,_U.. ,,.-,-,,.m...,.
. , _ _ , -.,_.,.,.y,,, ,_ w ,,,,,..,ry,_ . - - . , , , - m,,,_.,,_- . . , . , , , -._,,...m,..
4 2
- 3. All administrative procedures (as applicable to reactor operation orsafety)
- 4. All integrated plant procedures (normal or general operating procedures)
- 5. ' Emergency procedures (emergency instructions, abnormal or special procedures)
- 6. Standing orders (important orders that are safety related and may supersede the regular procedures)
- 7. Fuel-handling and core-loadin procedure, when appropriate) g procedures, (initial core loading
- 8. Annunciator procedures (alarm procedures, including set points)-
- 9. Radiation protection manual (radiation control manual or procedures)
- 10. Emergency plan implementing procedures
- 11. Technical Specifications
- 12. System operating procedures
- 13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 14. Technical Data Book, and/or plant curve information as usea by operators and facility precautions, limitations, and set points (PLS) for the facility, ,
- 15. Questions and answers that licensee has prepared (voluntary by licensee)
- 16. The following on the plant reference simulator
- a. List of all readily available initialization points
- b. List of all preset malfunctions with a clear identification number. The list should include cause and effect information.
Specifically, for each malfunction a concise description of the expected results, or range of results, that will occur upon implementation should be provided. Additionally, an indication of which annunciators are to be initially expected should be given.
l c. A description of simulator failure capabilities for valves, j breakers, indicators and alarms.
A
e, 3
- d. Where.the capability exists, an explanation of the ability to ,
. vary the severity of a particular malfunction should be provided, i.e., ability to vary the size of a given LOCA or steam leak,
, or the ability to cause a slow failure of a component such as a feed pump, turbine generator or. major valve (e.g.- drifting shut.of a main feedwater control valve.
- e. An indication of modeling conditions / prob'lems that may impact the examination.
- f. -Identification of significant differences between the simulator and the control rocm.
- g. Copies of facility generated scenarios that expose the candidates to situations of degraded pressure control (PWR), degraded heat
- ' removal capability (PWR and BWR) and containment challenges 1 (BWR) may be provided (voluntary by licensee).
- h. Simulator instructors manual (voluntary by licensee)
Description of the scenarios used for the training class i.
(voluntary by licensee) i
- 17. Additional material required by the examiners to develop examinations
- that meet the requirements of these' standards and the regulations.
l All above reference material should be approved, final issues and should be so marked. If a plant has not finalized some of the material, the chief examiner shall verify with the facility that the most complete,-
up-to-date material is available and that agreement has been reached with
- ' . the licensee for limiting changes before the administration of the examination.
All procedures-and reference material should be bound with appropriate indexes
-or tables of contents so that they can be used efficiently.
i i
,3- - ,--e--~ ~,,--,,,-,,,-,,,,,--w,- -,n- - , -, -, -- -----r-- m,,ne,- , --_..-r..a -- ,e-w -+,.a ~...- - - -,n, - -- , - , ..n-,-,----- --
e ATTACHMENT 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS Operator Licensing Branch requirements are:
- 1. A single room shall be provided for completing the written examination.
The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.
- 2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3-ft space between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
- 3. Suitable arrangements shall be made by the facility if the candidates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the examiner and/or proctor.
- 4. The facility shall arrange to have knowledgeable personnel available to review examination questions and answer key. The facility will be given a copy of the exams and answer keys after the last candidate has turned in his completed examination. The facility staff will have until the end of the first exam week to provide comments and supporting documentation. They should provide these comments and supporting documentation in writing to the Chief Examiner before he leaves the site, and also forward them to the Operator Licensing Section Chief in Region V. The current two-hour post-exam review by the facility staff may also be conducted at the option of the Chief Examiner.
- 5. The licensee shall provide pads of 8-1/2 x 11-in. lined paper in unopened packages for each candidate's use in completing the examination. The examiner shall distribute these pads to the candidates. All reference material needed to complete the examination shall be furnished by the i examiner. Candidates can bring pens, pencils, calculators or slide rules l into the examination room, and no other equipment or reference material shall be allowed.
- 6. Only black ink or dark pencils should be used for writing answers to questions.
l
.