Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray 1999-09-03
[Table view] Category:TEST REPORT
MONTHYEARML20216G5151998-02-28028 February 1998 Non-proprietary Version of NEDC-32788, Safety Review for Enrico Fermi Energy Center Unit 2 Safety/Relief Valve Setpoint Tolerance Relaxation Analyses ML20197J1901993-03-31031 March 1993 Power Uprate Startup Test Rept for Nov 1992-Mar 1993 ML20127P1461993-01-0808 January 1993 Third Refueling Outage Final Rept for Reactor Containment Bldg Integrated Leak Rate Test NRC-90-0022, Final Rept for Reactor Containment Bldg Integrated Leak Rate Test1990-01-31031 January 1990 Final Rept for Reactor Containment Bldg Integrated Leak Rate Test NRC-88-0212, Suppl 9 to Interim Startup Test Rept1988-09-10010 September 1988 Suppl 9 to Interim Startup Test Rept ML20151K0271988-07-25025 July 1988 Confirmation Test Rept for IE Bulletin 85-003 NRC-88-0038, Suppl 7 to Interim Startup Test Rept1988-03-10010 March 1988 Suppl 7 to Interim Startup Test Rept ML20147D6841987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6741987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6661987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6981987-12-21021 December 1987 Rev 1 to Chemical & Physical Testing of Fasteners for Fermi 2 NRC-87-0229, Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept1987-12-0707 December 1987 Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept NRC-87-0155, Suppl 5 to Interim Startup Test Rept1987-09-19019 September 1987 Suppl 5 to Interim Startup Test Rept ML20235F5761987-08-31031 August 1987 Max Credible Fault Tests CM249-Q2 Carrier Modulator for Fermi 2 Spds. Fault Applied to Output of CM249-Q2 Does Not Cause Degradation of Isolator Input Signal Beyond Acceptable Level ML20238E9371987-08-31031 August 1987 Rev 0 to Vols 1 & 2 to DET-22-103, Final Test Rept, In-Plant Safety Relief Valve Discharge Test,Enrico Fermi Atomic Plant,Unit 2 ML20237G3991987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Post-Accident Sampling Sys (P3400) ML20237G3821987-08-0606 August 1987 Leakage Reduction Program Summary Rept for RWCU Sys (G33-00) ML20237G3621987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Process Sampling Leakage Monitoring Sys (P33-00) NRC-87-0084, Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept1987-06-10010 June 1987 Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept ML20214J4151987-03-12012 March 1987 Leakage Reduction Program Summary Rept for Standby Gas Filter Sys (T46-00) ML20214J3991987-03-12012 March 1987 Leakage Reduction Program Summary Rept for RCIC Sys (E51-00) ML20214J3811987-03-12012 March 1987 Leakage Reduction Program Summary Rept for HPCI Sys (E41-00) ML20204H0071987-03-10010 March 1987 Suppl 3 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept ML20210A7691987-02-0303 February 1987 Leakage Reduction Program Summary Rept for Control Room Drive Sys-(C1100),Fermi Unit 2 ML20211D3601986-10-16016 October 1986 Main Steam Bypass Sys Testing Program Rept ML20197C2531986-10-10010 October 1986 Leakage Reduction Program Summary Rept for RHR Sys - (E1100) ML20199E8631986-06-13013 June 1986 Submits Suppl 1 to 860312 Startup Rept,Per Tech Spec 6.9.1.3.No Test Results Available Due to 851031 Plant Shutdown.Supplemental Rept Will Be Submitted by 860920 ML20203A0661986-03-20020 March 1986 Leak Reduction Program Summary Rept for Primary Containment Monitoring Sys - (T50-00) ML20203A0281986-03-20020 March 1986 Leakage Reduction Program Summary Rept for Core Spray Sys - (E2100) ML20210D9091986-03-18018 March 1986 Rev to Description of Diesel Generator Bearing Reliability Demonstration Test Program ML20140D4161986-03-12012 March 1986 Interim Startup Test Rept ML20215C2601985-07-17017 July 1985 Radiation Measurements - Complete Survey ML20107E1941984-11-30030 November 1984 Reactor Containment Bldg Integrated Leak Rate Test, Preoperational Test Results,Nov 1984 ML20065F9751982-07-0808 July 1982 Inservice Testing Program ML20009B2421981-06-10010 June 1981 Revised Slope Stability Analysis of Shore Barrier,Enrico Fermi Atomic Power Plant,Unit 2,810610. ML20010E6651979-12-13013 December 1979 Test Rept: Cofrentes H22-P017B-H22-P018-H22-P005 ML20010E6641979-12-11011 December 1979 Test Rept: Cofrentes H13-P618 1998-02-28
[Table view] |
Text
_
LEAKAGE REDUCTION PROGRAM
SUMMARY
REPORT FOR CORE SPRAY SYSTEM - (E2100) i DETROIT EDISON COMPANY FERMI-2 POWER PLANT REPORT NO.
E2100-85-01 l
1
~f I
Prepared By:
~
Date:
3 - //-8d
'Isl ProgEYms Supervfsor Approved By:
'l f//c[jd Plant Manager P
4 LEAKAGE REDUCTION PROGRAM REPORT FOR 1
CORE SPRAY SYSTEM - (E2100)
INTRODUCTION: Both the Fermi-2 Technical Specifications, paragraph 6.8.4.a.2, and the Fermi-2 FSAR, Section H.III.D.l.1, require i
that leakage from systems outside primary containment that could or would contain highly radioactive fluids, be reduced and maintained to as-low-as-practical levels.
To demonstrate the leak tight integrity of the Core Spray System, a system leakage, test is conducted once per reactor refueling 1
(apprc'.timately once every 18 months).
This report is for the initial leakage test.
j i
REFERENCES:
1
- 1) Dwg. No. EM721-5707, " Core Spray System -Functional l
Operating Sketch".
- 2) Procedure No. 43.203.01, " Division I - Core Spray System Leakage Monitoring Test" (A copy of this procedure is on file at the plant).
- 3) Procedure No. 43.203.05, " Division II - Core Spray System Leakage Monitoring Test" (A copy of this procedure is on i
file at the plant).
j TEST DESCRIPTION: Each Core Spray Division was tested by two separate procedures.
The major portion of Core Spray. piping.
i was inspected by procedure 43.203.01, for Division'I, and procedure 43.203.05, for Division II.
With the Core Spray System in the test flow mode, and at rated pressure and flow, the system was inspected and all leakage measured and recorded.
The remainder of the system ( from the E21-F005A&B i
valves to containment ) was inspected using. procedure 43.000.09, Reactor Pressure Vessel System Leakage Test, with all leakage being measured and recorded.
This procedure was 1
performed twice, initially on 5-15-85 and again on~6-7-85.
Each test was conducted at normal operating pressure.
Subsequent to the initial test corrective maintenance was performed to reduce leakage further.
TEST RESULTS:
I i
DIVISION - I l
-Instrument E21-N004A leaked at the threaded fitting and E21-F005A leaked at packing giving a total system leakage rate of 38.25. drops per minute.
Maintenance performed corrective repairs to the valves to reduce system leakage to 30.25 drops
/ minute total.
Page 1 i
,,,,w.,,-v,n,
--n r-
4 1
LEAKAGE REDUCTION PROGRAM REPORT FOR CORE SPRAY SYSTEM - (E2100)
J l
-DIVISION - II i
No corrective maintenance was required for this system, the total system leakage rate of 13.5 drops / minute is well within the acceptable criteria.
TEST RESULTS
SUMMARY
DIVISION - I Corrective maintenance yielded a net reduction in total system' leakage of: 8 drops / minute.
As Found Leakage Leakage Reduced By As Left Leakage Maintenance Activity 38.25 drops / min.
8 drops / min.
30.25 drops / min.
DIVISION - II No corrective maintenLnce was requireci for this system, the total system leakage rate of 13.5 drops / min. is within the acceptance criteria.
i f
ACCEPTANCE CRITERIA:
The general leakage criteria to be applied I
during the first fuel cycle as the basis for instituting i
corrective action in the form of corrective maintenance.shall be 80 drops / minute for each division. Per the EF-2 FSAR, this leakage criteria will be further evaluated at the end of the first refueling cycle to determine the long range leakage reduction program criteria.
This will allow experience gained during the intial fuel cycle to be factored into the long range criteria.
4
-t l
Page 2
LEAKAGE REDUCTION PROGRAM REPORT-
^
-FOR CORE SPRAY SYSTEM - (E2100)
~
TEST RESULTS CORE SPRAY DIVISION I:
Final leakage results from procedures; 43.203.01 and 43.00.09.
Procedure 43.203.01 (Completed 3-19-85)
Examination Item Leakage Amount E21-F036A Packing Leak 3 drops / Min.
4 E21-F020A 2 drops ~/ Min.
E21-F020C 2 drops / Min.
E21-F031A 2 drops / Min.
E21-N003A Valve Block 2 drops / Min.
i E21-N001A Packing Leak 1 drop / Min.
E21-N006A Threaded Fitting 2 drops / Min, i
E21-F005A Packing Leak 1.25 drops / Min.
l i
Sub Total:~15.25 drops / Min.
Procedure 43.000.09 (Completed 05-15-85)
Examination Item Leakage Amount i
E21-N004A Threaded Fitting.
3 drops / Min.
E21-F005A Packing Leak 20' drops / Min.
Sub Total: 23.00 drops / Min.
(Subsequently Reduced) i Procedure 43.000.09 J(Completed-06-07-85) - Subsequent to i.
Corrective Maintenance j
Examination Item Leakage Amount E21-N004A Threaded Fitting 15 drops / Min.
Sub Total:
15 drops / Min.
Total combined leakage for this system 30.25 drops / Min.
Total
~
i a
Page 3 i
LEAKAGE REDUCTION PROGRAM REPORT FOR CORE SPRAY SYSTEM - (E2100)
TEST RESULTS CORE SPRAY DIVISIOM II:
Final leakage results'from procedures: 43.203.05 and 43.000.09.
. Procedure 43.203.05 (Completed 6-20-85)
Examination Item Leakage Amount E21-F036B Packing Leak 2 drops / Min.
E21-F037B Packing ~ Leak 3.5 drops / Min.
E21-F037D Packing Leak 2 drops / Min.
E21-F031B Packing Leak 5 drops / Min.
E21-N003B Seat Leak 1 drop / Min.
i Sub Total:
13.5 drops / Min.
J l
Procedure 43.000.09 (Completed 05-15-85 & 06-07-85)
No leakage noted from 43.000.09 on test completed on 5-15-85
~
i and 6-07-85.
The total combined leakage for this system from all components within the test boundary was 13.5 drops / minute.
f i
4 e
i Page 4
..