ML20237D631

From kanterella
Jump to navigation Jump to search
Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1
ML20237D631
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/18/1998
From:
DETROIT EDISON CO.
To:
References
PROC-980818, NUDOCS 9808270089
Download: ML20237D631 (6)


Text

...

.w' m

DETROIT EDISON - FERMI:2 AUTOMATED RECORD MANAGEMENT-DISTRIBUTION CONTROL LIST 08/19/98 To: 00935

,US NRC' PAGE 1

DOCUMENT CNTRL DESK'

WASHINGTON, DC 20555

' Media:.8 1/2 X 11-Number Cnt Issue TDTC

. Doc. Serial Number.

Page Rev Copies Lvl Date Sec Status

====================================================================

TMTRM TRM VOL I 22-

-11 IR 08/18/98 AFC

.t

.t i

Please destroy-or mark'all revised, superseded, or cancelled documents as such. ' CONTROLLED stamps must be voided by lining through and initialing.

=============================================================a===========a

f.-

Detroit Edison EF2,.C/O Info Mgmt 140 NOC, 6400 North Dixie Highway,

Newport MI 48166. (734) 586-4338 OR (734)1586-4061 for questions of. concerns, f

Ref:[E5'2186I r

I-9808270089 9eos1e g

DR 2

.p g,

I LICENSING DOCUMENT TRANSMITTAL TECHNICAL REQUIREMENTS MANUAL, VOLUME 1 Instructions for Revision 22 dated 08/18/98 Immediately upon receipt of the item (s) below, please insert and/or remove the documents indicated. Destroy the removed documents. Be sure Revision 21 has been placed in TRM Vol I prior to inserting these pages.

Location Reniove Insert Title Page Title Page Title Page Rev 21 06/16/98 Rev 22 08/18/98 List of Effective Pages LEP-1, Rev. 21 06/98 LEP-1, Rev. 22 08/98 LEP-2, Rev. 21 06/98 LEP-2, Rev. 22 08/98 Section 3.3 Page 3/4 3-5 Rev 19 05/98 Pages 3/4 3-5 Rev 22 08/98 END

~f O

l Fermi 2 l

l Technical Requirements Manual l

Volume I i

Detroit Edison AI&fS-INFOl&fA 710N DTC: TMTRM l File: 1754 DSN: TRM VOL1 l Rev: T; Y

Date: 08/lC/98 Recipient

a.

I i

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL LIST OF EFFECTIVE PAGES

{)

Page Revision Page Revision 1

19 3/4 6-1 19 2

19 3/4 6-2 19 i

20 3/4 6-3 19 ii-20 3/4 6-4 19 iii 20 3/4 6-5 19 iv 20 3/4 6-6 19 v

20 3/4 6-7 19 3/4 6-8 19 TECHNICAL REQUIREMENTS 3/4 6-9 19 3/4 6-10 19 1-1 19 3/4 6-11 19 1-2 19 3/4 6-12 19 1-3 19 3/4 6-13 19 1-4 19 3/4 6-14 19 2-1 Blank 3/4 6-15 19 3/4 0-1 19 3/4 6-16 19 3/4 0-2 19 3/4 6-17 19 3/4 0-3 19 3/4 6-18 19 3/4 0-4 19 3/4 6-19

-19 3/4 0-5

.19 3/4 6-20 19 3/4 0-6 19 3/4 6-21 19 3/4 0-7 19 3/4 6-22 19 3/4 1-1 Blank 3/4 6-23 19 3/4 2-1 Blank 3/4 6-24 19 3/4 3-1 19 3/4 6-25 19 3/4 3-2 19 3/4 6-26 19 3/4 3-3 19 3/4 6-27 19 3/4 3-4 19 3/4 6-28 19 3/4 3-5 22 3/4 6-29 19 3/4 3-6 19 3/4 7-1 Blank 3/4 3-7 19 3/4 8-1 19 3/4 3-8 19 3/4 8-2 19 3/4 3-9 19 3/4 8-3 19 3/4 3-10 19 3/4 8-4 19 3/4 3-11 20 3/4 8-5 19 3/4 3-12 21 3/4 8-6 19 3/4 3-13 20 3/4 9-1 Blank 3/4 3-14 20 3/4 10-1 Blank 3/4 3-15 20

'3/4 11-1 Blank 3/4 3-16 20 3/4 12-1 Blank 3/4 3-17 20 5-1 Blank 3/4 3-18 20 6-1 Blank 3/4 3-19 20 3/4 3-20 20 CORE OPERATING LIMITS REPORT 3/4 3-21 20 COLR 6, Revision 1 3/4 3-22 20 3/4 3-23 20 Notation Page 3/4 3-24 20 1

1 r'~T 3/4 4-1 Blank 2

1 l

Q 3/4 5-1 Blank 3

1 TRM Vol. I LEP-1 REV 22 08/98 t____________

i-L' FERMI 2 - TECHNICAL REQUIREMENTS MANUAL

. g.

. LIST OF EFFECTIVE PAGES i

Pace Revision Page Revision 4

1 5

1 l

6 1

7-1 8

1 9-1 l

10 1

l 11-1 12 1

13' 1

l 14 1

15 1

16 1

l

. FIRE PROTECTION LIMITING i

l CONDITIONS FOR OPERATION AND SURVEILLANCE REOUREMENTS 9A.6-1 3

9A.6-2 6

9A.6-3 5

9A.6-4 5

[

9A.6-5 TRM REV 17 i

9A.6-6 TRM REV 17 9A.6-7 TRM REV 17 9A.6-8 6

9A.6-9 TRM REV 17 9A.6-10 6a l

i 9A.6-11 6a 9A.6-12 6

9A.6-13 6

9A.6-14 3

9A.6-15 3

9A.6-16 3

9A.6-17 3

l 9A'.6-18 3

9A.6-19 6

9A.6-20 3

9A.6-21

.TRM REV 7 9A.6-22 3

9A.6-23 TRM REV 8 9A.6-24 TRM REV 8 9A.6-25 TRM REV 15 9A.6-26 TRM REV 15 9A.6-27:

3 9A.6-28.

3 fN.)

TRM Vol. I LEP-2 REV 22 08/98

)

l l 0 TRM - TABLE 3.3.2-3

?

(,)

(UFSAR TABLE 7.3-12)

ISOLATION ACTUATION SYSTEM INSTRUMENTATION RESPONSE TIME TRIP FUNCTION RESPONSE TIME (Seconds) 1.

PRIMARY CONTAINMENT ISOLATION a.

Reactor Vessel Low Water Level 1)

Level 3 NA 2)

Level 2 Nk 3)

Level 1 s1.0*"

b.

Drywell Pressure - High NA c.

Main Steam Line 1)

Radiation - High NA 2)

Pressure - Low NA 3)

Flow - High s0.5*"

d.

Main Steam Line Tunnel Temperature - High NA e.

Condenser Pressure - High NA f.

Turbine Bldg. Area Temperature - High NA g.

Deleted h.

Manual Initiation NA b

2.

REACTOR WATER CLEANUP SYSTEM ISOLATION V

f a.

A Flow - High NA b.

Heat Exchanger / Pump /High Energy Piping Area Temperature - High NA.

c.

Heat Exchanger / Pump / Phase Separator Area Ventilation Temperature AT - High NA l

d.

SLCS Initiation NA e.

Reactor Vessel Low Water Level - Level 2 NA f.

Deleted g.

Manual Initiation NA 3.

REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION a.

RCIC Steam Line Flow - High NA b.

RCIC Steam Supply Pressure - Low NA c.

RCIC Turbine Exhaust Diaphragm Pressure - High NA d.

RCIC Equipment Room Temperature - High NA e.

Manual Initiation NA TRM Vol. I 3/4 3-5 REV 22 08/98 i

_ ____-___