ML20237D631
ML20237D631 | |
Person / Time | |
---|---|
Site: | Fermi ![]() |
Issue date: | 08/18/1998 |
From: | DETROIT EDISON CO. |
To: | |
References | |
PROC-980818, NUDOCS 9808270089 | |
Download: ML20237D631 (6) | |
Text
...
.w' m
DETROIT EDISON - FERMI:2 AUTOMATED RECORD MANAGEMENT-DISTRIBUTION CONTROL LIST 08/19/98 To: 00935
,US NRC' PAGE 1
DOCUMENT CNTRL DESK'
- WASHINGTON, DC 20555
' Media:.8 1/2 X 11-Number Cnt Issue TDTC
. Doc. Serial Number.
Page Rev Copies Lvl Date Sec Status
====================================================================
TMTRM TRM VOL I 22-
-11 IR 08/18/98 AFC
.t
.t i
Please destroy-or mark'all revised, superseded, or cancelled documents as such. ' CONTROLLED stamps must be voided by lining through and initialing.
=============================================================a===========a
f.-
Detroit Edison EF2,.C/O Info Mgmt 140 NOC, 6400 North Dixie Highway,
- Newport MI 48166. (734) 586-4338 OR (734)1586-4061 for questions of. concerns, f
Ref:[E5'2186I r
I-9808270089 9eos1e g
DR 2
.p g,
I LICENSING DOCUMENT TRANSMITTAL TECHNICAL REQUIREMENTS MANUAL, VOLUME 1 Instructions for Revision 22 dated 08/18/98 Immediately upon receipt of the item (s) below, please insert and/or remove the documents indicated. Destroy the removed documents. Be sure Revision 21 has been placed in TRM Vol I prior to inserting these pages.
Location Reniove Insert Title Page Title Page Title Page Rev 21 06/16/98 Rev 22 08/18/98 List of Effective Pages LEP-1, Rev. 21 06/98 LEP-1, Rev. 22 08/98 LEP-2, Rev. 21 06/98 LEP-2, Rev. 22 08/98 Section 3.3 Page 3/4 3-5 Rev 19 05/98 Pages 3/4 3-5 Rev 22 08/98 END
~f O
l Fermi 2 l
l Technical Requirements Manual l
Volume I i
Detroit Edison AI&fS-INFOl&fA 710N DTC: TMTRM l File: 1754 DSN: TRM VOL1 l Rev: T; Y
Date: 08/lC/98 Recipient
a.
I i
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL LIST OF EFFECTIVE PAGES
{)
Page Revision Page Revision 1
19 3/4 6-1 19 2
19 3/4 6-2 19 i
20 3/4 6-3 19 ii-20 3/4 6-4 19 iii 20 3/4 6-5 19 iv 20 3/4 6-6 19 v
20 3/4 6-7 19 3/4 6-8 19 TECHNICAL REQUIREMENTS 3/4 6-9 19 3/4 6-10 19 1-1 19 3/4 6-11 19 1-2 19 3/4 6-12 19 1-3 19 3/4 6-13 19 1-4 19 3/4 6-14 19 2-1 Blank 3/4 6-15 19 3/4 0-1 19 3/4 6-16 19 3/4 0-2 19 3/4 6-17 19 3/4 0-3 19 3/4 6-18 19 3/4 0-4 19 3/4 6-19
-19 3/4 0-5
.19 3/4 6-20 19 3/4 0-6 19 3/4 6-21 19 3/4 0-7 19 3/4 6-22 19 3/4 1-1 Blank 3/4 6-23 19 3/4 2-1 Blank 3/4 6-24 19 3/4 3-1 19 3/4 6-25 19 3/4 3-2 19 3/4 6-26 19 3/4 3-3 19 3/4 6-27 19 3/4 3-4 19 3/4 6-28 19 3/4 3-5 22 3/4 6-29 19 3/4 3-6 19 3/4 7-1 Blank 3/4 3-7 19 3/4 8-1 19 3/4 3-8 19 3/4 8-2 19 3/4 3-9 19 3/4 8-3 19 3/4 3-10 19 3/4 8-4 19 3/4 3-11 20 3/4 8-5 19 3/4 3-12 21 3/4 8-6 19 3/4 3-13 20 3/4 9-1 Blank 3/4 3-14 20 3/4 10-1 Blank 3/4 3-15 20
'3/4 11-1 Blank 3/4 3-16 20 3/4 12-1 Blank 3/4 3-17 20 5-1 Blank 3/4 3-18 20 6-1 Blank 3/4 3-19 20 3/4 3-20 20 CORE OPERATING LIMITS REPORT 3/4 3-21 20 COLR 6, Revision 1 3/4 3-22 20 3/4 3-23 20 Notation Page 3/4 3-24 20 1
1 r'~T 3/4 4-1 Blank 2
1 l
Q 3/4 5-1 Blank 3
1 TRM Vol. I LEP-1 REV 22 08/98 t____________
i-L' FERMI 2 - TECHNICAL REQUIREMENTS MANUAL
. g.
. LIST OF EFFECTIVE PAGES i
Pace Revision Page Revision 4
1 5
1 l
6 1
7-1 8
1 9-1 l
10 1
l 11-1 12 1
13' 1
l 14 1
15 1
16 1
l
. FIRE PROTECTION LIMITING i
l CONDITIONS FOR OPERATION AND SURVEILLANCE REOUREMENTS 9A.6-1 3
9A.6-2 6
9A.6-3 5
9A.6-4 5
[
9A.6-5 TRM REV 17 i
9A.6-6 TRM REV 17 9A.6-7 TRM REV 17 9A.6-8 6
9A.6-9 TRM REV 17 9A.6-10 6a l
i 9A.6-11 6a 9A.6-12 6
9A.6-13 6
9A.6-14 3
9A.6-15 3
9A.6-16 3
9A.6-17 3
l 9A'.6-18 3
9A.6-19 6
9A.6-20 3
9A.6-21
.TRM REV 7 9A.6-22 3
9A.6-23 TRM REV 8 9A.6-24 TRM REV 8 9A.6-25 TRM REV 15 9A.6-26 TRM REV 15 9A.6-27:
3 9A.6-28.
3 fN.)
TRM Vol. I LEP-2 REV 22 08/98
)
l l 0 TRM - TABLE 3.3.2-3
?
(,)
(UFSAR TABLE 7.3-12)
ISOLATION ACTUATION SYSTEM INSTRUMENTATION RESPONSE TIME TRIP FUNCTION RESPONSE TIME (Seconds) 1.
PRIMARY CONTAINMENT ISOLATION a.
Reactor Vessel Low Water Level 1)
Level 3 NA 2)
Level 2 Nk 3)
Level 1 s1.0*"
b.
Drywell Pressure - High NA c.
Radiation - High NA 2)
Pressure - Low NA 3)
Flow - High s0.5*"
d.
Main Steam Line Tunnel Temperature - High NA e.
Condenser Pressure - High NA f.
Turbine Bldg. Area Temperature - High NA g.
Deleted h.
Manual Initiation NA b
2.
REACTOR WATER CLEANUP SYSTEM ISOLATION V
f a.
A Flow - High NA b.
Heat Exchanger / Pump /High Energy Piping Area Temperature - High NA.
c.
Heat Exchanger / Pump / Phase Separator Area Ventilation Temperature AT - High NA l
d.
SLCS Initiation NA e.
Reactor Vessel Low Water Level - Level 2 NA f.
Deleted g.
Manual Initiation NA 3.
REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION a.
RCIC Steam Line Flow - High NA b.
RCIC Steam Supply Pressure - Low NA c.
RCIC Turbine Exhaust Diaphragm Pressure - High NA d.
RCIC Equipment Room Temperature - High NA e.
Manual Initiation NA TRM Vol. I 3/4 3-5 REV 22 08/98 i
_ ____-___