| Issue date | Title | Topic | |
|---|---|---|---|
| ML20216G515 | 28 February 1998 | Non-proprietary Version of NEDC-32788, Safety Review for Enrico Fermi Energy Center Unit 2 Safety/Relief Valve Setpoint Tolerance Relaxation Analyses | |
| ML20197J190 | 31 March 1993 | Power Uprate Startup Test Rept for Nov 1992-Mar 1993 | Main Steam Line Radiation Monitor Power Uprate Overspeed trip Loss of condenser vacuum |
| ML20127P146 | 8 January 1993 | Third Refueling Outage Final Rept for Reactor Containment Bldg Integrated Leak Rate Test | Integrated leak rate test |
| NRC-90-0022, Final Rept for Reactor Containment Bldg Integrated Leak Rate Test | 31 January 1990 | Final Rept for Reactor Containment Bldg Integrated Leak Rate Test | Anchor Darling Scram Discharge Volume Integrated leak rate test Seal weld Restart |
| NRC-88-0212, Suppl 9 to Interim Startup Test Rept | 10 September 1988 | Suppl 9 to Interim Startup Test Rept | |
| ML20151K027 | 25 July 1988 | Confirmation Test Rept for IE Bulletin 85-003 | Stroke time Hardened grease Overthrust |
| NRC-88-0038, Suppl 7 to Interim Startup Test Rept | 10 March 1988 | Suppl 7 to Interim Startup Test Rept | Shutdown Margin Reactor Vessel Water Level Grab sample Stroke time Coatings Feedwater Heater Scram Discharge Volume Loss of Offsite Power Main Steam Line Radiation Monitor Power change Overspeed trip Overspeed Water hammer Restart |
| ML20147D684 | 23 December 1987 | Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 | |
| ML20147D674 | 23 December 1987 | Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 | |
| ML20147D666 | 23 December 1987 | Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 | |
| ML20147D698 | 21 December 1987 | Rev 1 to Chemical & Physical Testing of Fasteners for Fermi 2 | |
| NRC-87-0229, Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept | 7 December 1987 | Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept | |
| NRC-87-0155, Suppl 5 to Interim Startup Test Rept | 19 September 1987 | Suppl 5 to Interim Startup Test Rept | Shutdown Margin Reactor Vessel Water Level Grab sample Stroke time Scram Discharge Volume Main Steam Line Radiation Monitor Flow Induced Vibration Overspeed trip Overspeed Water hammer Restart |
| ML20235F576 | 31 August 1987 | Max Credible Fault Tests CM249-Q2 Carrier Modulator for Fermi 2 Spds. Fault Applied to Output of CM249-Q2 Does Not Cause Degradation of Isolator Input Signal Beyond Acceptable Level | |
| ML20238E937 | 31 August 1987 | Rev 0 to Vols 1 & 2 to DET-22-103, Final Test Rept, In-Plant Safety Relief Valve Discharge Test,Enrico Fermi Atomic Plant,Unit 2 | |
| ML20237G399 | 6 August 1987 | Leakage Reduction Program Summary Rept for Post-Accident Sampling Sys (P3400) | |
| ML20237G382 | 6 August 1987 | Leakage Reduction Program Summary Rept for RWCU Sys (G33-00) | |
| ML20237G362 | 6 August 1987 | Leakage Reduction Program Summary Rept for Process Sampling Leakage Monitoring Sys (P33-00) | |
| NRC-87-0084, Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept | 10 June 1987 | Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept | Shutdown Margin Reactor Vessel Water Level Grab sample Stroke time B.5.b Scram Discharge Volume Loss of Offsite Power Main Steam Line Radiation Monitor Overspeed trip Restart |
| ML20214J415 | 12 March 1987 | Leakage Reduction Program Summary Rept for Standby Gas Filter Sys (T46-00) | |
| ML20214J399 | 12 March 1987 | Leakage Reduction Program Summary Rept for RCIC Sys (E51-00) | Packing leak |
| ML20214J381 | 12 March 1987 | Leakage Reduction Program Summary Rept for HPCI Sys (E41-00) | |
| ML20204H007 | 10 March 1987 | Suppl 3 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept | Shutdown Margin Grab sample |
| ML20210A769 | 3 February 1987 | Leakage Reduction Program Summary Rept for Control Room Drive Sys-(C1100),Fermi Unit 2 | |
| ML20211D360 | 16 October 1986 | Main Steam Bypass Sys Testing Program Rept | |
| ML20197C253 | 10 October 1986 | Leakage Reduction Program Summary Rept for RHR Sys - (E1100) | |
| ML20199E863 | 13 June 1986 | Submits Suppl 1 to 860312 Startup Rept,Per Tech Spec 6.9.1.3.No Test Results Available Due to 851031 Plant Shutdown.Supplemental Rept Will Be Submitted by 860920 | |
| ML20203A066 | 20 March 1986 | Leak Reduction Program Summary Rept for Primary Containment Monitoring Sys - (T50-00) | |
| ML20203A028 | 20 March 1986 | Leakage Reduction Program Summary Rept for Core Spray Sys - (E2100) | Packing leak |
| ML20210D909 | 18 March 1986 | Rev to Description of Diesel Generator Bearing Reliability Demonstration Test Program | Safe Shutdown Loss of Offsite Power Restart |
| ML20140D416 | 12 March 1986 | Interim Startup Test Rept | |
| ML20215C260 | 17 July 1985 | Radiation Measurements - Complete Survey | |
| ML20107E194 | 30 November 1984 | Reactor Containment Bldg Integrated Leak Rate Test, Preoperational Test Results,Nov 1984 | Hydrostatic Local Leak Rate Testing Integrated leak rate test |
| ML20065F975 | 8 July 1982 | Inservice Testing Program | Stroke time Squib Excess Flow Check Valve Power Operated Valves |
| ML20009B242 | 10 June 1981 | Revised Slope Stability Analysis of Shore Barrier,Enrico Fermi Atomic Power Plant,Unit 2,810610 | |
| ML20010E665 | 13 December 1979 | Test Rept: Cofrentes H22-P017B-H22-P018-H22-P005 | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Earthquake |
| ML20010E664 | 11 December 1979 | Test Rept: Cofrentes H13-P618 |