Issue date | Title | Topic | |
---|---|---|---|
ML20216G515 | 28 February 1998 | Non-proprietary Version of NEDC-32788, Safety Review for Enrico Fermi Energy Center Unit 2 Safety/Relief Valve Setpoint Tolerance Relaxation Analyses | |
ML20197J190 | 31 March 1993 | Power Uprate Startup Test Rept for Nov 1992-Mar 1993 | Power Uprate Overspeed trip Loss of condenser vacuum |
ML20127P146 | 8 January 1993 | Third Refueling Outage Final Rept for Reactor Containment Bldg Integrated Leak Rate Test | Packing leak Scram Discharge Volume Integrated leak rate test |
NRC-90-0022, Final Rept for Reactor Containment Bldg Integrated Leak Rate Test. W/900221 Ltr | 31 January 1990 | Final Rept for Reactor Containment Bldg Integrated Leak Rate Test. W/900221 Ltr | Anchor Darling Scram Discharge Volume Integrated leak rate test |
NRC-88-0212, Suppl 9 to Interim Startup Test Rept | 10 September 1988 | Suppl 9 to Interim Startup Test Rept | Shutdown Margin Grab sample Coatings Local Leak Rate Testing Feedwater Heater |
ML20151K027 | 25 July 1988 | Confirmation Test Rept for IE Bulletin 85-003 | Stroke time Hardened grease |
NRC-88-0038, Suppl 7 to Interim Startup Test Rept | 10 March 1988 | Suppl 7 to Interim Startup Test Rept | Shutdown Margin Reactor Vessel Water Level Grab sample Stroke time Coatings Feedwater Heater Scram Discharge Volume Power change Overspeed trip Overspeed Water hammer |
ML20147D684 | 23 December 1987 | Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 | |
ML20147D674 | 23 December 1987 | Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 | |
ML20147D666 | 23 December 1987 | Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 | |
ML20147D698 | 21 December 1987 | Rev 1 to Chemical & Physical Testing of Fasteners for Fermi 2 | |
NRC-87-0229, Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept | 7 December 1987 | Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept | |
NRC-87-0155, Suppl 5 to Interim Startup Test Rept | 19 September 1987 | Suppl 5 to Interim Startup Test Rept | |
ML20238E937 | 31 August 1987 | Rev 0 to Vols 1 & 2 to DET-22-103, Final Test Rept, In-Plant Safety Relief Valve Discharge Test,Enrico Fermi Atomic Plant,Unit 2 | |
ML20235F576 | 31 August 1987 | Max Credible Fault Tests CM249-Q2 Carrier Modulator for Fermi 2 Spds. Fault Applied to Output of CM249-Q2 Does Not Cause Degradation of Isolator Input Signal Beyond Acceptable Level | |
ML20237G362 | 6 August 1987 | Leakage Reduction Program Summary Rept for Process Sampling Leakage Monitoring Sys (P33-00) | |
ML20237G382 | 6 August 1987 | Leakage Reduction Program Summary Rept for RWCU Sys (G33-00) | |
ML20237G399 | 6 August 1987 | Leakage Reduction Program Summary Rept for Post-Accident Sampling Sys (P3400) | |
NRC-87-0084, Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept | 10 June 1987 | Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept | |
ML20214J381 | 12 March 1987 | Leakage Reduction Program Summary Rept for HPCI Sys (E41-00) | |
ML20214J415 | 12 March 1987 | Leakage Reduction Program Summary Rept for Standby Gas Filter Sys (T46-00) | |
ML20214J399 | 12 March 1987 | Leakage Reduction Program Summary Rept for RCIC Sys (E51-00) | Packing leak |
ML20204H007 | 10 March 1987 | Suppl 3 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept | Shutdown Margin Grab sample |
ML20210A769 | 3 February 1987 | Leakage Reduction Program Summary Rept for Control Room Drive Sys-(C1100),Fermi Unit 2 | |
ML20211D360 | 16 October 1986 | Main Steam Bypass Sys Testing Program Rept | |
ML20197C253 | 10 October 1986 | Leakage Reduction Program Summary Rept for RHR Sys - (E1100) | |
ML20199E863 | 13 June 1986 | Submits Suppl 1 to 860312 Startup Rept,Per Tech Spec 6.9.1.3.No Test Results Available Due to 851031 Plant Shutdown.Supplemental Rept Will Be Submitted by 860920 | |
ML20203A028 | 20 March 1986 | Leakage Reduction Program Summary Rept for Core Spray Sys - (E2100) | Packing leak |
ML20203A066 | 20 March 1986 | Leak Reduction Program Summary Rept for Primary Containment Monitoring Sys - (T50-00) | |
ML20210D909 | 18 March 1986 | Rev to Description of Diesel Generator Bearing Reliability Demonstration Test Program | Safe Shutdown |
ML20140D416 | 12 March 1986 | Interim Startup Test Rept | |
ML20215C260 | 17 July 1985 | Radiation Measurements - Complete Survey | |
ML20107E194 | 30 November 1984 | Reactor Containment Bldg Integrated Leak Rate Test, Preoperational Test Results,Nov 1984 | Hydrostatic Local Leak Rate Testing Integrated leak rate test |
ML20065F975 | 8 July 1982 | Inservice Testing Program | Stroke time Squib Excess Flow Check Valve Power Operated Valves |
ML20009B242 | 10 June 1981 | Revised Slope Stability Analysis of Shore Barrier,Enrico Fermi Atomic Power Plant,Unit 2,810610. | |
ML20010E665 | 13 December 1979 | Test Rept: Cofrentes H22-P017B-H22-P018-H22-P005. | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Earthquake |
ML20010E664 | 11 December 1979 | Test Rept: Cofrentes H13-P618. |