ML20206M865

From kanterella
Jump to navigation Jump to search
Rev 30,Vol I to Technical Requirements Manual
ML20206M865
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/06/1999
From:
DETROIT EDISON CO.
To:
References
PROC-990506, NUDOCS 9905170070
Download: ML20206M865 (8)


Text

4 p

e.

DETROIT EDISON - FERMI 3 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 05/06/99 To 00935 l,

'US NRC PAGE 1

DOCUMENT CNTRL DESK l

l WASHINGTON, DC 20555 1

Media 8 1/2 X 11-Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status o...............................................................................

TMTRM TRM VOL I 30 11 IR 05/06/99 AFC i

j l

I l

l 1

990517CHy70 990$06 PDR ADOCK 05000341 e(h' P

PENT UU Please destroy or mark all revised, superseded, or cancelled documents as such.

CONTROLLED stamps must be voided by lining through and initialing, o...............................................................................

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport'MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: E49968

'u s

0 LICENSING DOCUMENT TRANSMITTAL TECHNICAL REQUIREMENTS MANUAL, VOLUME I Instructions for Revision 30 dated 5/6/99 Immediately upon receipt of the item (s) below, please insert and/or remove the documents indicated. Destroy the removed documents. He sure Revision 29 has been placed in TRM Vol I prior to insertine these nancs.

Location Remove Insert Title Page Title Page Title Page Rev 29 2/12/99 Rev30 5/6/99 List of Effective Pages LEP-1, Rev. 29 2/99 LEP-1, Rev. 30 5/99 LEP-2, Rev. 29 2/99 LEP-2, Rev. 30 5/99 I

Table of Contents Page i, Rev 23 09/98 Page i, Rev 30, 5/99 Od Section 3.4 Page 3/4 4-1, Rev 19,05/98 Page 3/4 4-1, Rev 30,5/99 Page 3/4 4-2, Rev 3't,5/99 END O

O I

Fermi 2 Technical Requirements Manual O

Volume I Detroit Edison O

ARMS-INFORMATION DTC: TMTRM l File: 1754 DSN: TRM VO_LI l Rev: 30 Date: 3/6/99 Recipient Q 3ff

FERMI 2 - TECHNICAL REOUIREMENTS MANUAL LIST OF EFFECTIVE PAGES O

Pace Revision Page Revision 1

19 3/4 5-1 Blank 2

19 3/4 6-1 19 i

30 3/4 6-2 19 11 20 3/4 6-3 29 iii 23 3/4 6-4 19 iv 20 3/4 6 19 v

20 3/4 6-6 19 3/4 6-7 19 TECHNICAL REOUIREMENTS 3/4 6-8 19 3/4 6-9 19 1-1 19 3/4 6-10 19 1-2 19 3/4 6-11 19 1-3 19 3/4 6-12 19 1-4 19 3/4 6-13 19 2-1 Blank 3/4 6-14 19 3/4 0-1 19 3/4 6-15 19 3/4 0-2 19 3/4 6-16 19 3/4 0-3 19.

3/4 6-17 19 l

3/4 0-4 19 3/4 6-18 19 3/4 0-5 19 3/4 6-19 19 3/4 0-6 19 3/4 6-20 19 3/4 0-7 19 3/4 6-21 19 Os 3/4 1-1 Blank 3/4 6-22 19 l

s/4 2-1 Blank 3/4 6-23 19 3/4 3-1 19 3/4 6-24 19 3/4 3-2 25 3/4 6-25 19 3/4 3-3 19 3/4 6-26 19 3/4 3-4 19 3/4 6-27 19 3/4 3-5 22 3/4 6-28 19 3/4 3-6 19

~/4 6-29 19 3/4 3-7 19 3/4 7-1 Blank 3/4 3-8 19 3/4 8-1 19 3/4 3-9 26 3/4 8-2 19 3/4 3-10 19 3/4 8-3 19 3/4 3-11 20 3/4 8-4 19 3/4 3-12 21 3/4 8-5 23 3/4 3-0.3 27 3/4 8-6 19 3/4 3-14 20 3/4 9-1 Blank 3/4 3-15 20 3/4 10-1 Blank 3/4 3-16 20 3/4 11-1 Blank 3/4 3-17 20 3/4 12-1 Blank 3/4 3-18 20 5-1 Blank 3/4 3-19 20 6-1 Blank 3/4 3-20 20 3/4 3-21 20 l

3/4 3-22 28 3/4 3-23 28 O'

3/4 3-24 20 3/4 4-1 30 3/4 4-2 30 TRM Vol. I LEP-1 REV 30 5/99 l

(

l l

l FERMI 2 - TECHNICAL REOUIREMENTS MANUAL l

i l

\\

f. s LIST OF EFFECTIVE PAGES i

(,

Pace Revision Pace Revision CORE OPERATING LIMITS REPORT 9A.6-26 TRM REV 15 COLR 7, Revision 0 9A.6-27 3

9A.6-28 3

Notation Page 1

0 2

0 3

0 4

0 5

0 6

0 7

0 8

0 9

0 10 0

11 0

12 0

13 0

14 0

15 0

l FIRE PROTECTION LIMITING Q

CONDITIONS FOR OPERATION AND SURVEILLANCE REOUREMENTS 9A.6-1 3

9A.6-2 6

9A.6-3 5

9A.6-4 5

9A.6-5 TRM REV 17 9A.6-6 TRM REV 17 9A.6-7 TRM REV 17 9A.6-8 6

9A.6-9 TRM REV 17 9A.6-10 va 9A.6-11 6a 9A.6-12 6

9A.6-13 6

9A.6-14 3

9A.6-15 3

9A.6-16 3

9A.6-17 3

9A.6-18 3

9A.6-19 6

9A.6-20 3

9A.6-21 TRM REV 7 9A.6-22 3

9A.6-23 TRM REV 8 C

9A.6-24 TRM REV 8 9A.6-25 TRM REV 15 TRM Vol. I LEP-2 REV 30 5/99

~

FERMI '2 - TEr'WWItT-W W O U I D E M E M T S ' M W ff E 4-

)

TABLE OF CONTENTS

' VOLUME l' q

Section and Title Page INTRODUCTION..........................................

1 SECTION 1 DEFINITIONS TR 1.0 DEFINITIONS...............................

1-1 SECTION 2 SAFETY LIMITS TR 2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS..................................

2-1 SECTION 3-APPLICABILITY TR 3/4.0 APPLICABILITY...........................

3/4 0-1 SECTION.3.1 TR 3/4.1 REACTIVITY CONTROL SYSTEMS..............

3/4 1-1 SECTION 3.2 TR 3/4.2 POWER DIS'TRIBUTION LIMITS.......

3/4 2-1 SECTION 3.3 TR 3/4.3 INSTRUMENTATION i

TR 3/4.3.1 Reactor Protection System

. Instrumentation.......................

3/4 3-1 TR 3/4.3.2 Isolation Actuation Instrumentation...

3/4 3-4 3

TR 3/4.3.3-Emergency Core Cooling System Actuation Instrumentation.......................

3/4 3-8 TR!3/4.3.7.2 Seismic Monitoring Instrumentation..

3/4 3-11 TR 3/4.3.7.3 Meteorological Monitoring Instrumentation...................

3/4'3-15 l

TR 3/4.3.7.7 Traversing In-Core Probe System.....

3/4 3-19 l

TR 3/4.3.7.8 Chlorine Detection System...........

3/4 3-21 l

TR 3/4.3.7.10 Loose-Part Detection System.........

3/4 3-23 I

SECTION 3.4 j

TR 3/4.4 REACTOR COO ~ ANT SYSTEM TR 3 /4. 4. 2 Reactor Recirculation System Recirculation Loops....................

3/4 4-1 SECTION 3.5 TR 3/4.5 EMERGENCY CORE COOLING SYSTEMS..........

3/4 5-1 SECTION 3.6

~TR 3/4.6 CONTAINMENT SYSTEMS.....................

TR 3/4.6.1 Primary Containment...................

TR 3/4.6.2 Depressurization Systems..............

TR 3/4.6~3 Primary Containment Isolation Valves..

3.6-1 TR 3/4.6.4 Vacuum H1.............................

TR 3/4.6.5 Secondary Containment.................

g TR 3/4.3.6 Primary Containment...................

TRM Vol. I i

REV 30 05/99

3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 ' RECIRCULATION SYSTEM RECIRCULATION LOOPS LIMITING CONDITION FOR OPERATION 3.4.1.1 Both recirculation pump MG set scoop tube mechanical high speed stops shall be OPERABLE.

APPLICABILITY:

MODE 1 ACTION:

Lock the,MG set scoop tube and turn off power to the positioner-fur any MG set with an inoperable mechanical high speed stop within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, OR Comply with Limiting Conditions for Operation for Technical Specification 3.2.1,

" Average Planar Linear _ Heat Generation Rate" i

and Technical Specification 3.2.3, " Minimum Critical Power

!5 Ratio."

l l

l SURVEILLANCE REQUIREMENTS l

l L

4.4.1.1 Each pump MG set scoop tube mechanical high speed stop shall be demonstrated OPERABLE at least once per 18 months with overspeed setpoints less than or equal to core flow values assumed in the COLR for determining MAPLHGR(F) and MCPR(F).

Dd' TRM Vol. I 3/4 4-1 REV 30 05/99 i

F' l

L i

3/4.4 REACTOR COOLANT SYSTEM l

BASES 3 /4. 4.1 RECIRCULATION SYSTEM RECIRCULATION LOOPS The purpose of the mechanical high speed stops is to terminate a postulated dual reactor recirculation pump slow flow runout transient which is not terminated by a reactor scram (the design basis event for the Maximum Extended Operating Domain (MEOD) analysis documented in NEDC-31843P, " Fermi 2 Maximum Extended Operating Domain Analysie, dated July 1990).

This l

r event stabilizes at a new core power level, corresponding to the maximum possible core flow along the Maximum Extended Load Line Limit (MELLL) rod line, which is dictated by the actual MG set scoop tube mechanical high speed stops.

The mechanical high speed stops protect the fuel cladding by limiting the reactor power increase which would result from this postulated increase in recirculation flow such that neither the one-percent plastic strain limit nor the Minimum Critical Power Ratio (MCPR) Safety Limit are violated.

This analysis assumes that the core is being operated within the flow dependent limits for Maximum Average Planar Linear Heat Generation Rate (MAPLHGR(F)) and Minimum Critical Power Ratio (MCPR (F) ), which are also dependent on the

()

MG set scoop tube mechanical high speed stop settings.

Reference:

Technical Specification Amendment No. 130.

M TRM Vol. I 3/4 4-2 REV 30 05/99 l