Letter Sequence Request |
---|
|
|
MONTHYEARML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired Project stage: Request ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED Project stage: Other 1999-09-24
[Table View] |
Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be RepairedML20212H286 |
Person / Time |
---|
Site: |
Fermi |
---|
Issue date: |
09/24/1999 |
---|
From: |
DETROIT EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20212H278 |
List: |
---|
References |
---|
NUDOCS 9910010018 |
Download: ML20212H286 (8) |
|
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray ML20199H2411998-01-28028 January 1998 Proposed Tech Specs,Revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch Can Be Performed ML20199H2501998-01-28028 January 1998 Proposed Tech Specs 4.4.3.2.2.a,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements ML20199H2141998-01-28028 January 1998 Proposed Tech Specs,Revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement ML20199H2281998-01-28028 January 1998 Proposed Marked Up & Retyped TS of Sheet 2,Table 3.3.6-2, Deleting RCS Recirculation Flow Trip Functions ML20199H9371998-01-28028 January 1998 Proposed Tech Specs Re thermal-hydraulic Stability,Idle Recirculation Loop Startup & Post Accident Monitoring ML20199H2611998-01-28028 January 1998 Proposed Tech Specs Re Access Control to Provide Flexibility While Maintaining Similar Control Over Access ML20199H2561998-01-28028 January 1998 Proposed Tech Specs,Modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Requirements Per 10CFR50.36a ML20203F1941997-12-10010 December 1997 Proposed Tech Specs Revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20202A7961997-11-26026 November 1997 Proposed Tech Specs Reflecting Alternative Wording for Surveillance Which Address Only Clarification to Situational Testing Requirement NRC-97-0089, Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested1997-09-29029 September 1997 Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested ML20216F3581997-09-0505 September 1997 Proposed Tech Specs,Adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing ML20141B8881997-06-20020 June 1997 Proposed Tech Specs Re Relocation of Reactor Recirculation Sys MG Set Scoop Tube Stop Setting Surveillance 1999-09-03
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray 1999-09-03
[Table view] |
Text
1 c
1 l
1 ENCLOSURE 4-PART1 TO NRC-99-0082 l
PROPOSED TECHNICAL SPECIFICATION MARKED UP PAGES INCLUDED PAGE(Sh 3/4 6-14 9910010018 990924 PDR ADOCK 05000341 p
PDR
CONTAINMENT SYSTEMS DRWELL AND SUPPRESS 10k, CHAMBER PURGE SVSTEM LIMIT 1h6 CONDITION FOR.0PERATION. -
20-inch, and 24-inch valves)pression chamber purge syst:v, (6-inch,10-inch, 3.6.1.8 The drywell and sup isolatici valves in one supply line and one extsust line open for inerting, deinerting or pressure control. Ritrogen VENTING / makeup and pressure control is also allowed through the 1-inch valves. purge / vent operations through the SETS shall be limited to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> each 365 days.*
APPLICABILITY: OPERATIONAL CONDITIDMS 1, 2, and 3.
ACTION:
a.
With a drywell and suppression chasber purge systes supply and/or exhaust isolation valve open, except as permitted above, close the valve (s) o~r otherwise isolate the penetration (s) within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWP:
within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With a drywell ar.d suppressiori chaeber purge systest supply and/or exhaust isolation valve (s) with resilient material seals having a men-sured leakage rate exceeding (the 11adt of Specification 4.6.1.8.2, restore the inoperable valve s) to OPERABLE status witMn 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> m in COLD SHUTDOWN within tne following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,.K.M.
Le SURVE1LLANCE REQUIREMEITS 4.6.1.8.1 Before being opened for purge / vent operation through SGTS, the dry-well and suppression chanter purge supply and exhaust butterfly isclation valves shall be verified nct to have been open for purge / vent operation through SGTS for sore than 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> in the previous 365 days.*
4.6.1.8.2 At least once per g2 days each penetration for each 6-inch, each 10-inch, each 20-1pch, and each 24-inch drywell and supp essico charber purge supply and exhaust isolation valve with resilient eaterial stals shall be descostrated OPERABLE by verifying that the measured leakage rate is less l
than or equal to 0.05 L, when pressurized to P,.
l
' Primary containment nitrogen VEIT!t;G tr.d pressure control is pers.itted through the 1-inch salves and is not subject to tht 90 nours per 365 day lin.it.
3/4 6-14 Amendnent fic.jHI
/
\\
INSERT A l
- For Penetration X 26 inoperability due to leakage exceeding the limit of 4.6.1.8.2, operation may continue until the next plant shutdown provided that the penetration is isolated via deactivated and closed valves T4800F407, with flanged cover, and T4800F408 and that these valves are verified deactivated and closed every 31 days. For the purpose of this exception, Surveillance testing en T4800F407 and T4800F408 shall be deferred until the next shutdown. At least every 45 days, leak testing will be performed to verify that the limit of 0.6 La is not exceeded due to additional penetration leakage. This testing will. also qualitatively continue to verify the integrity of outboard valves T4800F407 and T4800F408.
These requirements remain in effect until the isolation valve leakage is restored to within applicable limits. This leakage shall be restored to within applicable limits prior to startup from the next plant shutdown.
1 I
I l
ENCLOSURE 4-PART2 TO NRC-99-0082 PROPOSED TECHNICAL SPECIFICATION REVISED PAGES INCLUDED PAGE(Sh 3/4 6-14 3.10-22 [ITS]
3.10-23 [ITS]
B.3.10.8-1 (ITS) i
e CONTAINMENT SYSTEMS DitYWELL'ANDSUPPRESSIONCHAMBERPURGESYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.8 The drywell and sup 20-inch,.and 24-inch valves)pression chamber purge system (6-inch, 10-inch,ay be in ope isolation valves in one suppl line and one exhaust line open for inerting
- deinerting or pressure contro. Nitrogen VENTING / makeup and pressure control is also allowed through the 1-inch valve's.
Purge SGTS shall be limited to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> each 365 days.*/ vent operations through the APPL.ICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
a.
With a drywell and suppression chamber purge system supply and/or exhaust isolation valve open, except as permitted above,4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or close the valve (s) or otherwise isolate the penetration (s) within be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With a drywell and suppression chamber purge system supply and/or exhaust isolation valve (s) with resilient material sals having a measured leakage rate exceeding the limit of Specification 4.6.1.8.2, restore the inoperable valve (s) to OPERABLE status within 24-hours er be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.**
l SURVEILLANCE RE0VIREMENTS 4.6.1.8.1 Before being o)ened for purge drywell and suppression c1 amber ) urge su/ vent operation through SGTS, thepply and exh
- valves shall be verified not to 1 ave been open for purge / vent operation through SGTS for more than 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> in the previous 365 days.*
4.6.1.8.2 At least once per 92 days each penetration for each 6-inch, each 10-inch, each 20-inch, and each 24-inch drywell and suppression chamber purge supply and exhaust isolation valve with resilient material seals shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than or equal to 0.05 La when pressurized to P -
a
- Primary containment nitrogen VENTING and pressure control is permitted through the 1-inch valves and is not subject to the 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per 365 day limit.
- For. Penetration X.26 inoperability due to leakage exceeding the limit of 4.6.1.8.2, operation may continue until the next plant shutdown provided that the penetration is isolated via deactivated and closed valves T4800F407, with flanged cover,d every 31 days. For the-purpose of this and T4800F408 and that these valves are verified deactivated and close exception, Surveillance testing on T*800F407 and T4800F408 shall be deferred until the next shutdown. At least every 45 days, leak testing will be performed to verify that the limit of 0.6 La is not exceeded due to additional penetration leakage. This testing will also qualitatively continue to verify the integrity of outboard valves T4800F407 and T4800F408.
These requirements remain in effect until the isolation valve leakage is restored to within applicable limits. This leakage shall be restored to within applicable limits prior to startup from the next plant shutdown.
i FERMI.- UNIT 2 3/4 6-14 Amendment No. #,
L T4803F601, Nitrogen Inerting Drywell Air Purge Inlet Supply Valve L
3.10.8 L
3 c10 SPECIAL OPERATIONS 3.10.8 T4003F601, Nitrogen Inerting Drywell Air Purge Inlet Supply Valve LC0 3.10.8-LC0 3.6.1.3, "PCIVs," may be changed to exclude penetration X26 flow paths for purge valve leakage rate not within limit provided:
a.
Penetration X26 outboard isolation valves T4800F407 and T4800F408 are closed and deactivated; b.
Penetration X26 pi by a blind flange: ping outboard of T4800F407 is closed c.
This Special Operation allowance is withdrawn on the first entry into MODE 2 or MODE 3.
.........................N0TE Upon exiting this S wcial Operation LC0 the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time of _C0 3.6.1.3 Required Action D.1 is considered expired for purge valve leakage not within limit.
APPLICABILITY:
MODE 1 with SR 3.6.1.3.6 not met.
ACTIONS U"
REQUIRED ACTION COMPLETION TIME A.
One or more A.1 Enter the applicable Immediately requirements of the Condition of LC0 not met.
LC0 3.6.1.3, "PCIVs."
i l
l FERMI UNIT 2 3.10 22 Amendment No. 135
g T4803F601, Nitrogen Inerting Drywell Air Purge Inlet Supply Valve 3.10.8 SURVEILLANCE REQUIREMENTS l
SURVtlLLANCE FREQUENCY SR 3.10.8.1 Verify pnetration X26 outboard isolation
- -NOTE-valves T4800F407 and T4800F408 are closed SR 3.0.2 is not and deactivated.
applicable.
f 31 days i
SR 3.10.8.2 NOTE-----
Results shall be evaluated against acceptance criteria applicable to l
SR 3.6.1.1.1.
Perform leakage rate testing for primary NOTE -- -
i containment purge valves with resilient SR 3.0.2 is not seals on penetration X26.
applicable.
45 days i
i l
l FERMI UNIT 2 3.10-23 Amendment No. 135
T4803F601, Nitrogen Inerting Drywell Air Purge Inlet Supply Valve B 3.10.8 i
B 3.10 SPECIAL' OPERATIONS B 3.10.8 T4803F601, Nitrogen Inerting Drywell Air Purge Inlet Supply Valve
-BASES The Background, Applicable Safety Analysis, and other related Bases are presented in References 1 and 2.
REFERENCES 1.
'" Request For Enforcement Discretion," letter from D.R. Gipson (DECO) to NRC, NRC-99 0092, dated September 24, 1999.
2.
" Proposed Exigent Technical Specification Change (License Amendment To Technical Specification "TS 1
3/4,6.1.8, Drywell and Suppression Chamber Purge System," letter from D.R. Gipson (DECO) to NRC, NRC 99 0082, dated September 24, 1999.
2.
NRC Safety Evaluation for Fermi-2 Amendment No.135.
1 i
l l
FERMI UNIT 2 B 3.10.8 - 1 Amendment No. 135