Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned 1999-09-03
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20247A6511997-12-0808 December 1997 Rev 11 to Odcm ML20248J5391997-06-0909 June 1997 Rev 0 to MWC02, Fermi 2 Work Control Conduct Manual ML20217H6671996-12-22022 December 1996 Rev 0 to DE Fermi 2 Work Management Guidelines ML20129J0381996-07-15015 July 1996 Rev 3,Change 11 to Inservice Testing Program (Plan) for Pumps & Valves for Fermi 2 Power Plant ML20100B8831996-01-24024 January 1996 Self-Assessment Plan SWS Operational Performance Insp (Swsopi) ML20086L4591995-07-0505 July 1995 Change 9 to Rev 3 to IST Program (Plan) for Pumps & Valves for Fermi 2 Power Plant ML20149H8631994-12-20020 December 1994 Rev 3,Change 8 to ISI-IST Program, IST Program (Plan) for Pumps & Valves for Fermi 2 Power Plant ML20029E4371994-01-14014 January 1994 Recovery Plan. ML20044E0251993-05-0707 May 1993 Rev 5 to Performance Evaluation Procedure 47.306.02, Votes Sys Operating Procedure. ML20098A2931992-12-31031 December 1992 1992 Performance Mgt Program Work Plan ML20101H3801992-02-17017 February 1992 Rev 3,Change 1 to ISI-IST Program, IST Program Plan for Pumps & Valves for Fermi 2 Power Plant ML20101H3881992-02-0505 February 1992 Rev 1,Change 1 to ISI-NDE Program, ISI-NDE Program Plan for Fermi 2 Power Plant ML20098A2911991-12-31031 December 1991 Work Plan & Performance Appraisal for a & M-Grade Employees ML20086G1351991-11-26026 November 1991 Draft ODCM 0.0 ML20090A5601991-11-13013 November 1991 Rev 14 to Process Control Program ML20077C9221991-05-30030 May 1991 Rev 0 to TS Interpretation Manual, TS Interpretation 3.5.E.1 & 2-1 ML20066C1031990-12-0707 December 1990 Change 0 of Rev 1 to Inservice Insp - NDE Program for Fermi 2 Power Plant ML20062H9081990-11-13013 November 1990 Rev 3 to Inservice Testing Program (Plan) for Pumps & Valves for Fermi 2 Power Plant ML20065K2891990-10-30030 October 1990 Rev 5 to Regulatory Affairs Administrative Procedure RAP-EM1-04, Drills & Exercise ML20245H0371989-04-21021 April 1989 Revised Radiological Emergency Response Preparedness Procedures,Including Rev 5 to EP-402, Responsibilities of Recovery Organization & Rev 3 to RAP-EM1-04, Drills & Exercise ML20244B0611989-01-18018 January 1989 Rev 2 to Odcm ML20238C1921987-08-31031 August 1987 Exercise Manual:Fermex 87 Aug 1987 ML20238A3541987-08-18018 August 1987 Exercise Manual Fermex 87 ML20204F2851987-03-0909 March 1987 Rev 23 to Pom 12.000.015 (Sr), Work Requests ML20204F7621987-03-0909 March 1987 Rev 14 to Pom 12.000.012, Tagging & Protective Barrier Sys ML20204F9741987-03-0404 March 1987 Rev 1 to 11.000.107, Requisitioning Process for Items & Svcs ML20204F6601987-02-0404 February 1987 Rev 0 to Pom 12.000.022, Performance Evaluation Program ML20205T7371987-01-31031 January 1987 Rev 0 to Change 2 to Inservice Insp-Nondestructive Exam (ISI-NDE) Program (Plan) ML20204F5511987-01-12012 January 1987 Rev 5 to Pom 38.000.09, New Cable Terminations ML20204F5991987-01-0606 January 1987 Rev 4 to Pom 44.220.102, Jet Pump Instrument Lines Excess Flow Check Valves Functional Test ML20204F7291987-01-0202 January 1987 Rev 3 to Pom 35.000.075, Mechanical Snubber Maint ML20204F3811986-11-0404 November 1986 Rev 20 to Pom 12.000.007, Plant Operations Manual Procedures ML20211C8661986-10-0909 October 1986 Rev 1 to Procedure 11.000.52, Deviation & Corrective Action Reporting ML20204F3281986-09-15015 September 1986 Rev 0 to MI-M402, Guidelines for Determining Component- Level Testing Requirements ML20204F4901986-09-0404 September 1986 Rev 6 to Pom 44.010.72, Reactor Protection Sys - Scram Discharge Vol High Water Level,Div Ii,Channel B1,Functional Test;C11-N601B ML20204F4021986-07-31031 July 1986 Draft Rev 0 to, Procedures Generation Package ML20204G0191986-07-26026 July 1986 Rev 5 to Pom 12.000.17, Preventive Maint Program. Related Info Encl 1999-08-13
[Table view] |
Text
.._......
DETROIT EDISON - FERMI 2
. AUTOMATED RECORD MANAGEMENT-DISTRIBUTION CONTROL LIST 09/23/98 To: 00935 US NRC PAGE 1
. DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number
.Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 23 11 IR 09/23/98 AFC r
a 4
/
/
3 [. f-e m Q \\,
u 'A J
' Please destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
.........................................................===.=...===.==.=====.==
8
' Detroit-Edison EF2e C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newpor'. MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref E49970 1
9809290107 980923 PDR ADOCK 05000341 i
P PM
__... ~. _.. _ _. -
.m
. _ _.. _. _. ~. _.._... _ _ _ _ _ _. _.. -.. _ _. _ _ _ _ -
LICENSING DOCUMENT TRANSMITTAL
. TECHNICAL REQUIREMENTS MANUAL, VOLUME 1 Instructions for Revision 23 dated 09/23/98 Immediately upon receipt of the item (s) below, please insert and/or remove the documents indicated. Destroy the removed documents. Be sure Revision 22 has been placed in TRM Vol I prior to inserting these pages.
1,0 cation Remove Insert Title Page Title Page Title Page Rev 22 08/18/98 Rev 23 09/23/98 List of Effective Pages LEP-1, Rev. 22 08/98 LEP-1, Rev. 23 9/98 LEP-2, Rev. 22 08/98 LEP-2, Rev. 23 9/98 Table of Contents Page i Rev 20 06/98 Page i Rev 23 9/98 Table of Contents Page iii Rev 20 06/98 Page iii Rev 23 9/98 Section 3.8 Page 3/4 8-5 Rev 19 05/98 Pages 3/4 8-5 Rev 23 9/98 END l
u) 4 l
i
Fermi 2 Technical Requirements Manual O
Volume I Detroit Edison 9(ffR0_ LED ARMS-INFORMATION DTC: TMTRM l File: 1754 DSN: TRM VOLI l Rev: 23 Date: 09/23/98 Recipient T%5
FERMI 2 - TECHNICAL REOUIREMENTS MANUAL-l LIST OF EFFECTIVE PAGES I
Pace Revision Pace Revision 1
'19 3/4 6-1 19 2
19 3/4 6-2 19 i.
-ii_
23 3/4 6-3 19-20 3/4 6-4 19 iii 23 3/4 6-5 19 iv 20 3/4 6-6 19 v
20 3/4 6-7 19 3/4'6-8 19 TECHNICAL REOUIREMENTS 3/4 6-9 19 3/4 6-10 19 1-1 19 3/4 6-11 19 1-2 19 3/4 6-12 19 1-3 19 3/4 6-13 19 1-4 19 3/4 6-14 19 2-1 Blank 3/4 6-15 19 3/4 0-1 19 3/4 6-16 19 3/4 0-2 19 3/4 6-17 19 3/4 0-3 19 3/4 6-18 19 3/4 0-4 19 3/4 6-19 19 3/4 0-5 19
-3/4 6-20 19 3/4 0-6 19 3/4 6-21 19 3/4 0-7 19 3/4 6-22 19 i
'3/4.1-1 Blank 3/4 6-23 19 j-mg (j
3/4 2-1 Blank 3/4 6-24 19 3/4 3-1 19 3/4 6-25 19 3/4 3-2 19 3/4 6-26 19 3/4 3-3 19 3/4 6-27 19 3/4 3-4 19 3/4 6-28 19 3/4.3-5 22 3/4 6-29 19 3/4 3-6 19 3/4 7-1 Blank 3/4 3-7 19 3/4 8-1 19 3/4 3-8 19 3/4 8-2 19 3/4 3-9 19 3/4 8-3 19 3/4 3-10 19 3/4 8-4 19 3/4 3-11 20 3/4 8-5 23 3/4 3-12 21 3/4 8-6 19 3/4 3-13 20 3/4 9-1 Blank 3/4 3-14 20 3/4 10-1 Blank 3/4'3-15 20 3/4 11-1 Blank 3/4 3-16 20 3/4 12 Blank 3/4 3-17 20 5-1 Blank L
3/4 3-18 20 6-1 Blank i
3/4 3-19 20 l
-3/4 3-20 20 CORE OPERATING LIMITS REPORT 3/4 3-21 20 COLR 6, Revision 1 3/4 3-22 20 3/4 3-23 20 Notation Page 3/4 3-24 20 1
1
'T 3/4 4-1 Blank 2
1
%l 3/4 5-1 Blank 3
1 i
TRM Vol. I LEP-1 REV 23 9/98
l l
FERMI 2 - TECHNICAL.REOUIREMENTS MANUAL l..
LIST OF EFFECTIVE PAGES Pace
. Revision Page Revision f
4 1
1 5
1 6-1 7
1 8
1 9
1 10 1
11 1
12 1
13 1
14 1
15 1
l' 16 1
FIRE PROTECTION LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REOUREMENTS 9A.6-1 3
9A.6-2 6
9A.6-3 5
O 9A.6-4 5
i.]
9A.6-5 TRM REV 17 9A.6-6 TRM REV 17 9A.6-7 TRM REV 17 9A.6-8 6
9A.6-9
'TRM REV 17 9A.6-10 6a 9A.6-11 6a 9A.6-12 6
9A.6-13 6
9A.6-14 3
9A 6-15 3
9A.6-16 3
.9A.6-17 3
9A.6-18 3
9A.6-19 6
9A.6-20 3
9A.6-21 TRM REV 7 9A.6-22 3
9A.6-23 TRM REV 8 9A.6-24 TRM REV 8 9A.6-25 TRM REV 15 l
9A.6-26 TRM REV 15 l
9A.6-27 3
l 9A.6-28 3
b)
V t-I TRM Vol. I LEP-2 REV 23 9/98
a -~,
a
+
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL l
TABLE OF CONTEt((1,- VOLUME 1 1
i -(~N Section and Title Page Q )'
INTRODUCTION..........................................
1 SECTION 1 DEFINITIONS TR 1.0 DEFINITIONS...............................
1-1 SECTION 2 SAFETY LIMITS TR 2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS..................................
2-1 SECTION 3 APPLICABILITY TR 3/4.0 APPLICABILITY...........................
3/4 0-1 SECTION 3.1 TR 3/4.1 REACTIVITY CONTROL SYSTEMS..............
3/4 1-1 l
SECTION 3.2 TR 3/4.2 POWER DISTRIBUTION LIMITS...............
3/4 2-1 l
l SECTION 3.3 TR 3/4.3 INSTRUMENTATION TR 3/4.3.1 Reactor Protection System i
Instrumentation.......................
3/4 3-1
("]
TR 3/4.3.2 Isolation Actuation Instrumentation...
3/4 3-4
- ,)
TR 3/4.3.3 Emergency Core Cooling System Actuation
)
Instrumentation.......................
3/4 3-8 TR 3/4.3.7.2 Seismic Monitoring Instrumentation..
3/4 3-11 j
TR 3/4.3.7.3 Meteorological Monitoring Instrumentation...................
3/4 3-15 TR 3/4.3.7.7 Traversing In-Core Probe System.....
3/4 3-19 TR 3/4.3.7.8 Chlorine Detection System...........
3/4 3-21 TR 3/4.3.7.10 Loose-Part Detection System.........
3/4 3-23 SECTION 3.4 TR 3/4.4 REACTOR COOLANT SYSTEM..................
3/4 4-1 SECTION 3.5 TR 3/4.5 EMERGENCY CORE COOLING SYSTEMS..........
3/4 5-1 SECTION 3.6 TR 3/4.6 CONTAINMENT SYSTEMS.....................
TR 3/4.6.1 Primary Containment...................
TR 3/4.6.2 Depressurization Systems..............
TR 3/4.6.3 Primary Containment Isolation Valves..
3.6-1 TR 3/4.6.4 Vacuum Hi.............................
TR 3/4.6.5 Secondary Containment.................
(
TR 3/4.3.6 Primary Containment...................
i TRM Vol. I i
REV 23 09/98
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL TABLE OF CONTENTS (Cont'd) - VOLUME 1 1 p.
Section and, Title Eggp 1
G l
SECTION 3.11 TR'3/4.11 RADIOACTIVE EFFLUENTS..................
3/4 11-1 TR 3/4.11.1 Liquid Effluents.....................
SECTION 3.12 TR 3/4.12 DELETED..................
SECTION 5 DESIGN FEATURES TR 5.0 DESIGN FEATURES...........................
5-1 TR 5.1 SITE......................................
1
'TR 5.2 CONTAINMENT...............................
i TR 5.3 REACTOR CORE..............................
TR 5.4 REACTOR COOLANT SYSTEM....................
TR 5.5 METEOROLOGICAL TOWER LOCATION.............
TR 5.6 FUEL STORAGE..............................
q TR 5.7 COMPONENT CYCLIC OR TRANSIENT LIMIT.......
V SECTION 6 ADMINISTRATIVE CONTROLS TR 6.0 ADMINISTRATIVE CONTROLS...................
6-1 TR 6.1 RESPONSIBILITY...........................
TR 6.2 ORGANIZATION..............................
TR 6.2.1 Offsite and Onsite Organizations........
4 TR 6.2.2 Unit Staff..............................
TR 6.2.3 Independent Safety Engineering Group....
TR 6.2.4 Shift Technical Advisor.................
TR 6.3 UNIT STAFF QUALIFICATIONS.................
TR 6.5 REVIEW AND AUDIT..........................
TR 6.5.1 Onsite Review Organization (OSRO).......
TR 6.5.2 Nuclear Safety Review Group (NSRG)......
TR 6.5.3 Technical Review and Control............
TR 6.6 REPORTABLE EVENT ACTION...................
l TR 6.7 SAFETY LIMIT VIOLATION....................
TR 6.8 PROCEDURES AND PROGRAMS...................
i TRM Vol. I iii REV 23 9/98
TRM - TABLE 3.8.4.3-1 (Continued) p
(,5 MOTO'R-OPERATED VALVES THERMAL OVERLOAD PROTECTION SYSTEM (S)
VALVE NUMBER AFFECTED 12.
DELETED 13.
P4400-F601A Emergency Equipment Cooling Water (EECW) l P4400-F601B EECW
)
P4400-F602A EECW P4400-F602B EECW P4400-F603A EECW P4400-F603B EECW 1
P4400-F604 EECW 1
P4400-F605A EECW P4400-F605B EECW P4400-F606A EECW P4400-F606B EECW P4400-F607A EECW P4400-F607B EECW P4400-F608 EECW P4400-F613 EECW P4400-F614 EECW P4400-F615 EECW
,S P4400-F616 EECW
\\_)'
i 14.
P5000-F603 Compressed Air System P5000-F604 Compressed Air System 15.
T4804-F601A Containment Atmosphere Control System T4804-F601B Containment Atmosphere Control System T4804-F602A Containment Atmosphere Control System T4804-F602B Containment Atmosphere Control System T4804-F603A Containment Atmosphere Control System T4804-F603B Containment Atmosphere Control System T4804-F604A Containment Atmosphere Control System T4804-F604B Containment Atmosphere Control System T4804-F605A Containment Atmosphere Control System T4804-F605B Containment Atmosphere Control System T4804-F606A Containment Atmosphere Control System j
T4804-F606B Containment Atmosphere Control System i
T4803-F601 Containment Atmosphere Control System T4803-F602 Containment Atmosphere Control System 16.
T4901-F601 Primary Containment Pneumatic Supply System T4901-F602 Primary Containment Pneumatic Supply System
'D iv TRM Vol. I 3/4 8-5 REV 23 9/98