Leakage Reduction Program Summary Rept for RWCU Sys (G33-00)ML20237G382 |
Person / Time |
---|
Site: |
Fermi |
---|
Issue date: |
08/06/1987 |
---|
From: |
DETROIT EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20237G331 |
List: |
---|
References |
---|
G3300-87-01, G3300-87-1, NUDOCS 8709020226 |
Download: ML20237G382 (3) |
|
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned 1999-09-03
[Table view] Category:TEST REPORT
MONTHYEARML20216G5151998-02-28028 February 1998 Non-proprietary Version of NEDC-32788, Safety Review for Enrico Fermi Energy Center Unit 2 Safety/Relief Valve Setpoint Tolerance Relaxation Analyses ML20197J1901993-03-31031 March 1993 Power Uprate Startup Test Rept for Nov 1992-Mar 1993 ML20127P1461993-01-0808 January 1993 Third Refueling Outage Final Rept for Reactor Containment Bldg Integrated Leak Rate Test NRC-90-0022, Final Rept for Reactor Containment Bldg Integrated Leak Rate Test. W/900221 Ltr1990-01-31031 January 1990 Final Rept for Reactor Containment Bldg Integrated Leak Rate Test. W/900221 Ltr NRC-88-0212, Suppl 9 to Interim Startup Test Rept1988-09-10010 September 1988 Suppl 9 to Interim Startup Test Rept ML20151K0271988-07-25025 July 1988 Confirmation Test Rept for IE Bulletin 85-003 NRC-88-0038, Suppl 7 to Interim Startup Test Rept1988-03-10010 March 1988 Suppl 7 to Interim Startup Test Rept ML20147D6841987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6741987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6661987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6981987-12-21021 December 1987 Rev 1 to Chemical & Physical Testing of Fasteners for Fermi 2 NRC-87-0229, Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept1987-12-0707 December 1987 Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept NRC-87-0155, Suppl 5 to Interim Startup Test Rept1987-09-19019 September 1987 Suppl 5 to Interim Startup Test Rept ML20235F5761987-08-31031 August 1987 Max Credible Fault Tests CM249-Q2 Carrier Modulator for Fermi 2 Spds. Fault Applied to Output of CM249-Q2 Does Not Cause Degradation of Isolator Input Signal Beyond Acceptable Level ML20237G3621987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Process Sampling Leakage Monitoring Sys (P33-00) ML20237G3821987-08-0606 August 1987 Leakage Reduction Program Summary Rept for RWCU Sys (G33-00) ML20237G3991987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Post-Accident Sampling Sys (P3400) NRC-87-0084, Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept1987-06-10010 June 1987 Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept ML20214J3811987-03-12012 March 1987 Leakage Reduction Program Summary Rept for HPCI Sys (E41-00) ML20214J4151987-03-12012 March 1987 Leakage Reduction Program Summary Rept for Standby Gas Filter Sys (T46-00) ML20214J3991987-03-12012 March 1987 Leakage Reduction Program Summary Rept for RCIC Sys (E51-00) ML20204H0071987-03-10010 March 1987 Suppl 3 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept ML20210A7691987-02-0303 February 1987 Leakage Reduction Program Summary Rept for Control Room Drive Sys-(C1100),Fermi Unit 2 ML20211D3601986-10-16016 October 1986 Main Steam Bypass Sys Testing Program Rept ML20197C2531986-10-10010 October 1986 Leakage Reduction Program Summary Rept for RHR Sys - (E1100) ML20199E8631986-06-13013 June 1986 Submits Suppl 1 to 860312 Startup Rept,Per Tech Spec 6.9.1.3.No Test Results Available Due to 851031 Plant Shutdown.Supplemental Rept Will Be Submitted by 860920 ML20203A0281986-03-20020 March 1986 Leakage Reduction Program Summary Rept for Core Spray Sys - (E2100) ML20203A0661986-03-20020 March 1986 Leak Reduction Program Summary Rept for Primary Containment Monitoring Sys - (T50-00) ML20210D9091986-03-18018 March 1986 Rev to Description of Diesel Generator Bearing Reliability Demonstration Test Program ML20140D4161986-03-12012 March 1986 Interim Startup Test Rept ML20215C2601985-07-17017 July 1985 Radiation Measurements - Complete Survey ML20107E1941984-11-30030 November 1984 Reactor Containment Bldg Integrated Leak Rate Test, Preoperational Test Results,Nov 1984 ML20065F9751982-07-0808 July 1982 Inservice Testing Program ML20009B2421981-06-10010 June 1981 Revised Slope Stability Analysis of Shore Barrier,Enrico Fermi Atomic Power Plant,Unit 2,810610. ML20010E6651979-12-13013 December 1979 Test Rept: Cofrentes H22-P017B-H22-P018-H22-P005. ML20010E6641979-12-11011 December 1979 Test Rept: Cofrentes H13-P618. 1998-02-28
[Table view] |
Text
.
LFMAGE REDUCTION PRQ3PRI SLMWN REPORT FOR RF/CPOR IRTER CLEAN-UP SYSTai (G33-00)
DETROIT EDISON C04PME FER1I-2 POER PLM7f REPORT NO G3300-87-01 1
Prepared by: - !! Date: ['3/-8'I f5I Pr ' r- [Eisor Approved By: / Date: [
Plant Manager 8709020226 870828 PDR ADOCK 05000341 p PDR
_ ___ - _ _ - _ - _ _ _ , _ _ = _ _ _
LF.* CAGE RTDUCTION PRCCPA'1 FJPORT FOR Pl%CTO1 WATSR CIIA'7-UP SYSTC1 (G33-00)
T'n'"l7TTTO'h Both the For:ai 2 L . , ' cal Spacificationa, paragranh G.O.4.a. ani Ford 2 UPSAR, Secti 5.2.7.8, require that leakage froa ralloactive fluide, be reducai and laaintained to an-loa-an practical leveln. To de.nonntrato the leak tight integrity of the Reactor '7ater Clocinun Syctam, a syntea leakage tcat io coniucted onca por reactor refueling (approximately onco ovary 18 :aontha) .
Thin recort 13 for the initial leakago tect.
RM"O 1) IX73. No. Ef721-5711-1, " Reactor Uater Clean-up Syntca" -Functional O?ct:ating Sketch.
- 2) Em. Mo. F1721-5711-2 "Roactor Uator: Clean-up Filter Dc.aineralizar Syntca" - Functional Operating Sketch.
- 3) Plant 0 ,arations ?tanual 43.707.01 " Reactor Water Clean-up Monitoring Tent.
T"q"' 990'?TTv"Tmq - Uith the reactor at rate temperature A and prencuro and the Rarbor Water Cican-up (300) Systen in opration, all piping, inntru:aentation and puann outaide of containment vere walked loan with all leakage nottr3 an1 measured.
MT "NCR : ?.io cor:pleta surveillance tests ucre conducted en the Rortor Water Clean-up Syntca. The firnt t03t was cc:Y!ucted on Chtober 15, 1935. This initial test identifiei leakage ubich van nubject to correctiva : maintenance. Paculta for both tento are premented belou.
Co m onantc Letn e Anoug Rmtn G33-F165T 500 apa Paching G33-FlG7A 25 dpa Packing Puan A Saaln 20 dpa Pu p Saal G33-F042 8 Apra Packing G33-F104 8 apca Packing G33-F166A 6 S p.a Packing G33-F120 5 daa Indicator Packing G33-F121 5 S n.a Actuator Packing G33-F090A - 3 aga Packing G33-P154A 2 S p;a Packing G33-F1543 2dm Packing G33-F1533 2 S p;a Packing G33-F090A 2 S p.a Paching G33-F0903 2 0m a Packing C33-F0913 2 S p;a Packing G33-F159T 2 S pla Packing G33-F130A 1 do.a Pach ing G33-F131A 1 ina Packing Total Loakage 59G im
Page 2 nanultn of Pont
- maintenance Tent Co;anleted 'iay 29, 1907.
r'o rment- T.e P ane Anoun t nemm:'m G33-F1663 122 dpra Packing G33-Fil4 4 5 t' p;n Packing C33-F1677. 3 C A p.a Packing G33-Pl57A' 24 dpa Packing G33-F159A. 10 dp;a Pecking Pttn_"A" Seal 12 nga Purr 3 Seal G33-F121 10 dp.a Tctuator Loakoff
!117 pic G33-F004 8 O p.a Pz: ting G33-PO44 8 dp.a Packing G33-F405 5 d p;a Packing G33-FlG53 4 Sp:a Pac!:ing Pu n "3" Seal 4 dp a ?ttnp Scal 033-F162A 3 d p.a Packing G33-r154A 2.1 Op.a Packing Inntrtrnent Tan to 1.8 dNa Fitting (PnTS '1187A)
G33-F1623 1. 0 dna Pack i.ng G33-F091n 0.5 dp.a Packing G33-F130A 0 . 5 d o.n Packing Inntrttaant Tap to 0.5 Agn Fitting
("'T ';l8'T3)
Total Laakage 304.2 aga n'me, 7;mr/m mt??'- Carctctive!iaintenanco yielled a not reduction in total ?pten leakago of 291.3 dropc p2;. :nin..
LiZ'M PlDU"D DY Y: Mrn T,'WW"; ?S T,T"P Tay'AT 'MT?!Pr'I','r'" A7Pvv7'IV 595 c'n.a 304.2 tra 291.9 ap;a NWA'm r'i?T'T'rD'A: The. general leakage crite ia to ba appliei during tha firnt fuel cple an the basic for in-titutin3 corrcctivo-action in the foon of corrective reintenance chall beV00 drona per min. Per the r"-2 U"SAR, this losago criteria will be further evaluate 1 at the oM of tha firnt refueling cycle to r?.atermina the long-ran;e le9 age reduction pro]:a.a critieria. Tain will niloa
- e::parience gaincd during the initial feal cycle co ha factorei'into the long-range critem. .i