ML20237G382

From kanterella
Jump to navigation Jump to search
Leakage Reduction Program Summary Rept for RWCU Sys (G33-00)
ML20237G382
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/06/1987
From:
DETROIT EDISON CO.
To:
Shared Package
ML20237G331 List:
References
G3300-87-01, G3300-87-1, NUDOCS 8709020226
Download: ML20237G382 (3)


Text

.

LFMAGE REDUCTION PRQ3PRI SLMWN REPORT FOR RF/CPOR IRTER CLEAN-UP SYSTai (G33-00)

DETROIT EDISON C04PME FER1I-2 POER PLM7f REPORT NO G3300-87-01 1

Prepared by: -  !! Date: ['3/-8'I f5I Pr ' r- [Eisor Approved By: / Date: [

Plant Manager 8709020226 870828 PDR ADOCK 05000341 p PDR

_ ___ - _ _ - _ - _ _ _ , _ _ = _ _ _

LF.* CAGE RTDUCTION PRCCPA'1 FJPORT FOR Pl%CTO1 WATSR CIIA'7-UP SYSTC1 (G33-00)

T'n'"l7TTTO'h Both the For:ai 2 L . , ' cal Spacificationa, paragranh G.O.4.a. ani Ford 2 UPSAR, Secti 5.2.7.8, require that leakage froa ralloactive fluide, be reducai and laaintained to an-loa-an practical leveln. To de.nonntrato the leak tight integrity of the Reactor '7ater Clocinun Syctam, a syntea leakage tcat io coniucted onca por reactor refueling (approximately onco ovary 18 :aontha) .

Thin recort 13 for the initial leakago tect.

RM"O 1) IX73. No. Ef721-5711-1, " Reactor Uater Clean-up Syntca" -Functional O?ct:ating Sketch.

2) Em. Mo. F1721-5711-2 "Roactor Uator: Clean-up Filter Dc.aineralizar Syntca" - Functional Operating Sketch.
3) Plant 0 ,arations ?tanual 43.707.01 " Reactor Water Clean-up Monitoring Tent.

T"q"' 990'?TTv"Tmq - Uith the reactor at rate temperature A and prencuro and the Rarbor Water Cican-up (300) Systen in opration, all piping, inntru:aentation and puann outaide of containment vere walked loan with all leakage nottr3 an1 measured.

MT "NCR :  ?.io cor:pleta surveillance tests ucre conducted en the Rortor Water Clean-up Syntca. The firnt t03t was cc:Y!ucted on Chtober 15, 1935. This initial test identifiei leakage ubich van nubject to correctiva : maintenance. Paculta for both tento are premented belou.

Co m onantc Letn e Anoug Rmtn G33-F165T 500 apa Paching G33-FlG7A 25 dpa Packing Puan A Saaln 20 dpa Pu p Saal G33-F042 8 Apra Packing G33-F104 8 apca Packing G33-F166A 6 S p.a Packing G33-F120 5 daa Indicator Packing G33-F121 5 S n.a Actuator Packing G33-F090A - 3 aga Packing G33-P154A 2 S p;a Packing G33-F1543 2dm Packing G33-F1533 2 S p;a Packing G33-F090A 2 S p.a Paching G33-F0903 2 0m a Packing C33-F0913 2 S p;a Packing G33-F159T 2 S pla Packing G33-F130A 1 do.a Pach ing G33-F131A 1 ina Packing Total Loakage 59G im

Page 2 nanultn of Pont

  • maintenance Tent Co;anleted 'iay 29, 1907.

r'o rment- T.e P ane Anoun t nemm:'m G33-F1663 122 dpra Packing G33-Fil4 4 5 t' p;n Packing C33-F1677. 3 C A p.a Packing G33-Pl57A' 24 dpa Packing G33-F159A. 10 dp;a Pecking Pttn_"A" Seal 12 nga Purr 3 Seal G33-F121 10 dp.a Tctuator Loakoff

!117 pic G33-F004 8 O p.a Pz: ting G33-PO44 8 dp.a Packing G33-F405 5 d p;a Packing G33-FlG53 4 Sp:a Pac!:ing Pu n "3" Seal 4 dp a ?ttnp Scal 033-F162A 3 d p.a Packing G33-r154A 2.1 Op.a Packing Inntrtrnent Tan to 1.8 dNa Fitting (PnTS '1187A)

G33-F1623 1. 0 dna Pack i.ng G33-F091n 0.5 dp.a Packing G33-F130A 0 . 5 d o.n Packing Inntrttaant Tap to 0.5 Agn Fitting

("'T ';l8'T3)

Total Laakage 304.2 aga n'me, 7;mr/m mt??'- Carctctive!iaintenanco yielled a not reduction in total ?pten leakago of 291.3 dropc p2;. :nin..

LiZ'M PlDU"D DY Y: Mrn T,'WW"; ?S T,T"P Tay'AT 'MT?!Pr'I','r'" A7Pvv7'IV 595 c'n.a 304.2 tra 291.9 ap;a NWA'm r'i?T'T'rD'A: The. general leakage crite ia to ba appliei during tha firnt fuel cple an the basic for in-titutin3 corrcctivo-action in the foon of corrective reintenance chall beV00 drona per min. Per the r"-2 U"SAR, this losago criteria will be further evaluate 1 at the oM of tha firnt refueling cycle to r?.atermina the long-ran;e le9 age reduction pro]:a.a critieria. Tain will niloa

  • e::parience gaincd during the initial feal cycle co ha factorei'into the long-range critem. .i