ML20154M461
| ML20154M461 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/09/1998 |
| From: | DETROIT EDISON CO. |
| To: | |
| References | |
| PROC-981009, NUDOCS 9810200298 | |
| Download: ML20154M461 (6) | |
Text
n-.-
-. - ~ - - -.. - -
DETROIT EDISON - FERM3 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST l
10/09/98 i
To 00935
]
US NRC PAGE 2
' DOCUMENT CNTRL DESK.
l
- WASHINGTON,.DC 20555 Mediai 8 1/2 X 11-~
Number Cnt Issue Doc. Serial Number.
Page Rev Copies Lvl Date Sec Status f
4.DTC.
TMTRM TRM VOL;I 25 11-IR 10/09/98 AFC l
)
l- -
i l
r-1 I'
f j
l 4
l
\\
l l
l l
l 1 T' Ju 0 0
.o.L v v au l
l g
Please destroy or mark all revised, superseded, or cancelled documents
-as such. CONTROLLED stamps must be voided by lining through and initialing.
...............................................................................=
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI.48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Reft E51833 9810200298 981009 o'
PDR ADOCK 05000341 e
P pg
t LICENSING DOCUMENT TRANSMITTAL TECHNICAL REQUIREMENTS MANUAL, VOLUME 1 Instructions for Revision 25 dated 10/9/98 Immediately upon receipt of the item (s) below, please insert and/or remove the documents indicated. Destroy the removed documents. Be sure Revision 24 has been placed in TRM Vol I prior to inserting these pages.
Location Remove Insert Title Page Title Page Title Page Rev 24 10/8/98 Rev 25 10/9/98 List of Effective Pages LEP-1, Rev. 24 10/98 LEP-1, Rev. 25 10/98 LEP-2, Rev. 24 10/98 LEP-2, Rev. 25 10/98 Section 3.3 Page 3/4 3-2 Rev 19 05/98 Page 3/4 3-2 Rev 25 10/98 END O
i 3
i D
1
'd i
Fermi 2 l
t i
Technical l
Requirements
{
Manual i
O i
Volume I J
i l
l Detroit Edison ARMS-INFORMA TION j
DTC: TMTRM l File: 1754 DSN: TRM VOLI l Rev: 25 Date: 10/9/98 Recipient 935
)
.~
..- ~ -
h j.
FERMI 2 - TECHNICAL REOUIREMENTS MANUAL l
l:
LIST OF EFFECTIVE-PAGES
!_ W)
E, Page Revision-Page
. Revision 1
19
- 3/4 6-1 19 l
2 19 3/4 6-2 19
.i 23 3/4 6-3 19
- LL 20 3/4 6-4 19
' iii' 23 3/4 6-5 19 iv.
20 3/4 6-6 19 v
20 3/4 6-7 19 3/4 6-8 19 TECHNICAL REOUIREMENTS' 3/4 6-9 19 3/4 6-10 19 1-1 19 3/4 6-11 19 1-2 19 3/4 6-12 19 1-3 19 3/4 6-13 19 1 -
.19 3/4 6-14 19 2-1 Blank 3/4 6-15 19 3/4 0-1 19 3/4 6-16 19
)
-3/4 0-2 19 3/4 6-17 19 3/4'0-3 19 3/4 6-18
.19
-3/4 0-4
'19 3/4 6-19 19 3/4 0-5 19 3/4 6-20 19 3/4 0-6 19 3/4 6-21 19
~3/4 0-7 19 3/4 6-22 19 3/4~1-1 Blank 3/4 6-23 19 p)s 3/4'2-1 Blank 3/4 6-24 19
(,,
3/4 3-1 19 3/4 6-25 19 3/4 3-2 25 3/4 6-26 19 i
3/4 3-3 19 3/4 6-27 19 3/4 3-4 19 3/4 6 19
-3/4 3-5 22 3/4 6-29 19 3/4 3-6 19 3/4 7-1 Blank
-3/4 3-7 19 3/4 8-1 19 3/4 3-8 19 3/4 8-2 29 3/4 3-9 19 3/4 8-3 19 3/4 3-10 19 3/4 8-4 19
.3/4 3-11 20 3/4 8-5 23 3/4 3-12 21 3/4 8-6 19 3/4 3-13 20 3/4-9-1 Blank 3/4'3-14 20 3/4 10-1 Blank
'3/4 3-15 20 3/4 11-1 Blank 3/4 3-16 20 3/4 12-1 Blank 3/4 3-17 20
. 5-1 Blank 3/4 3-18 20 6-1 Blank 3/4 3 20 3/4 3-20 20 3/4 3-21 20
~ /4 3-22 20 3
3/4 3-23 20 3/4 3-24 20 i
3/4 4-1 Blank kl 3/4 5-1.
Blank TRM Vol.
I.
LEP-1 REV 25 10/98 g
p m9
-r
-m--n-'r q
e-=
3
3 ~
. - -.. -... ~
.. -. ~
. ~. -
. ~.,
l FERMI 2 - TECHNICAL REOUIREMENTS MANUAL l
LIST OF EFFECTIVE-PAGES (U.
Page Revision Page Revision l-CORE OPERATING LIMITS REPORT.
9A.6-26 TRM REV 15 COLR 7, Revision 0-
-9A.6-27 3
9A.6-28 3
Notati'on Page
.1 0
l 2
0 3
0 4'
O 5
0 6
0 7
0 8
0
'9 0
10 0
11-0
- 12 0
13 0
14 0
15
.0 FIRE' PROTECTION LIMITING
-[
CONDITIONS FOR OPERATION g
AND SURVEILLANCE REOUREMENTS 9A.' 6 - 1.
3 9A'.6-2 6
9A~6-3 5
9A.6-4 5
9A.6-5 TRM REV 17 9A.6-6 TRM REV 17 9A.6-7 TRM REV 17 9A.6-8 6
9A.6-9 TRM REV 17
' 9A'. 6-10 6a l
9A.6-11 6a 9A.6-12 6
9A.6-13 6
9A.6-14 3
9A.6-15 3.
'9A.6-16 3
9A.6-17 3
l 9A.6-18 3
9A.6-19 6
9A.6-20.
3-
-9A.6 TRM REV 7
.9A.6 3 9A.6-23 TRM REV 8 i'
-9A.6-24 TRM REV 8 t
A~ '
9A.6-25 TRM REV 15
'.TRM.Vol.-I LEP-2 REV 25 10/98 s
- - - ~.
.. - ~, ~.
I 4
,Y TRM - TABLE 3.3.1-2
{v l
_(UFSAR TABLE 7.2-4) i REACTOR PROTECTION SYSTEM RESPONSE TIMES
-FUNCTIONAL UNIT
-RESPONSE TIME (Seconds) 1.
a.
Neutron Flux - High NA j.
b.
Inoperative NA
- 2.. Average Power Range Monitor *:
a.
Neutron Flux - Upscale, Setdown NA b.
Simulated Thermal Power - Upscale NA c.
Neutron Flux - Upscale HA d.
Inoperative NA e;
2-out-of-4 Trip Voters s0.05*
3.
Reactor Vessel Steam Dome Pressure - High s 0.55' 4.
Reactor Vessel Low Water Level - Level _3 s 1.05' 5.
Main Steam Line Isolation ~ Valve - Closure s 0.06
- 6. ~ Main Steam Line Radiation - High NA 7.
Drywell Pressure - High NA
.p-
~
Scram Discharge Volume Water Level - High i
8.
wV
'a.
Float Switch NA b.
Level Transmitter NA 9.
Turbine Stop Valve - Closure s 0.06 10.
Turbine Control Valve Fast Closure s 0.08***
11.
Reactor Mode Switch Shutdown Position NA
-12.
Manual Scram NA 13.
Deleted
- Neutron detectors, APRM channel and 2-out-of-4 Trip Voter digital electronics are exempt from response time testing.
Response time shall.be measured from activation of the 2-out-of-4 Trip Voter output relay.
- Measured from deenergization of K-37 relay which inputs the turbine control valve closure signal to the RPS.
- .The sensor response time need not be measured and may be assumed to be the design sensor response time.
Prior to return to service of a new transmitter or.following refurbishment of a transmitter (e.g.,
sensor cell or variable damping components), a hydraulic response time test will be performed to determine an initial sensor-specific
.t'~N response time value.
k)
TRM Vol. I 3/4 3-2 REV 25 10/98