ML20212H435 | 24 September 1999 | Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys | Enforcement Discretion |
ML20212H286 | 24 September 1999 | Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired | Enforcement Discretion |
ML20211Q184 | 10 September 1999 | Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement | |
ML20211Q735 | 3 September 1999 | Proposed Its,Rev 15 | |
ML20211G092 | 25 August 1999 | Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal | Reactor Vessel Water Level |
ML20211B986 | 13 August 1999 | Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval | |
ML20211C263 | 13 August 1999 | Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Scram Discharge Volume Intergranular Stress Corrosion Cracking Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
ML20211B999 | 6 August 1999 | Proposed Its,Rev 13 | |
ML20210N023 | 4 August 1999 | Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal | |
ML20210J164 | 30 July 1999 | Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) | Fuel cladding Power change Power Uprate Manual Operator Action |
ML20216D609 | 26 July 1999 | Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 | |
ML20209H033 | 13 July 1999 | Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS | |
ML20209D400 | 7 July 1999 | Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 | |
ML20196K168 | 1 July 1999 | Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 | |
ML20210A303 | 30 June 1999 | Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan | Contraband Safeguards Contingency Plan |
ML20196F468 | 24 June 1999 | Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 | |
ML20212H504 | 2 June 1999 | Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS | |
ML20206M112 | 7 May 1999 | Proposed Tech Specs Section 3.6,converting to ITS | High Radiation Area Stroke time Hydrostatic Squib Excess Flow Check Valve |
ML20206M865 | 6 May 1999 | Rev 30,Vol I to Technical Requirements Manual | Fuel cladding Overspeed |
ML20206H552 | 30 April 1999 | Proposed Rev 5 to Improved TS Pages | |
ML20205T536 | 20 April 1999 | Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex | Temporary Modification |
ML20196K662 | 2 April 1999 | Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal | |
ML20205A320 | 23 March 1999 | Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used | |
ML20202D955 | 26 January 1999 | Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized | |
ML20198D139 | 14 December 1998 | Rev 28 to Vol 1 of Technical Requirements Manual | |
ML20198B812 | 10 December 1998 | Rev 27 to Fermi 2 Technical Requirements Manual,Vol I | |
ML20155A711 | 22 October 1998 | Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose | |
ML20154Q077 | 15 October 1998 | 6 to Fermi 2, Technical Requirements Manual, Vol I | Reactor Vessel Water Level |
ML20154M461 | 9 October 1998 | 5 to Vol 1 of Fermi 2 Technical Requirements Manual | Scram Discharge Volume |
ML20154H893 | 8 October 1998 | Rev 24 to Fermi 2 Technical Requirements Manual,Vol I | Safety Limit Minimum Critical Power Ratio Abnormal operational transient Fuel cladding |
ML20154E562 | 28 September 1998 | Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS | Safe Shutdown Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Scram Discharge Volume Battery sizing |
ML20153F393 | 23 September 1998 | Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 | |
ML20237E898 | 26 August 1998 | Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a | |
ML20237D631 | 18 August 1998 | Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 | |
ML20236W470 | 31 July 1998 | Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation | Reactor Vessel Water Level Water hammer |
ML20236U460 | 23 July 1998 | Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals | |
ML20236U042 | 16 July 1998 | TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change | |
ML20236F067 | 26 June 1998 | Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 | Squib |
ML20236P924 | 10 June 1998 | Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Shift Technical Advisor Process Control Program Earthquake |
ML20248L802 | 5 June 1998 | Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow | Safety Limit Minimum Critical Power Ratio |
ML20248H090 | 31 May 1998 | Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 | Shutdown Margin Reactor Vessel Water Level High Radiation Area Offsite Dose Calculation Manual Stroke time Incorporated by reference Scram Discharge Volume Shift Technical Advisor Process Control Program Excess Flow Check Valve |
ML20248E415 | 28 May 1998 | Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys | |
ML20247Q119 | 20 May 1998 | Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days | Scram Discharge Volume |
ML20247A740 | 27 April 1998 | Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 | Safe Shutdown |
ML20216J758 | 9 April 1998 | Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation | |
ML20216F697 | 9 April 1998 | Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys | Fuel cladding |
ML20216B331 | 3 April 1998 | Proposed Tech Specs,Extending EDG Allowed Times at Plant | Offsite Circuit |
ML20217P569 | 2 April 1998 | Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors | |
ML20217P063 | 2 April 1998 | Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 | |
ML20217J584 | 27 March 1998 | Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned | Reactor Vessel Water Level Water hammer |