Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray 1999-09-03
[Table view] Category:TEST REPORT
MONTHYEARML20216G5151998-02-28028 February 1998 Non-proprietary Version of NEDC-32788, Safety Review for Enrico Fermi Energy Center Unit 2 Safety/Relief Valve Setpoint Tolerance Relaxation Analyses ML20197J1901993-03-31031 March 1993 Power Uprate Startup Test Rept for Nov 1992-Mar 1993 ML20127P1461993-01-0808 January 1993 Third Refueling Outage Final Rept for Reactor Containment Bldg Integrated Leak Rate Test NRC-90-0022, Final Rept for Reactor Containment Bldg Integrated Leak Rate Test1990-01-31031 January 1990 Final Rept for Reactor Containment Bldg Integrated Leak Rate Test NRC-88-0212, Suppl 9 to Interim Startup Test Rept1988-09-10010 September 1988 Suppl 9 to Interim Startup Test Rept ML20151K0271988-07-25025 July 1988 Confirmation Test Rept for IE Bulletin 85-003 NRC-88-0038, Suppl 7 to Interim Startup Test Rept1988-03-10010 March 1988 Suppl 7 to Interim Startup Test Rept ML20147D6841987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6741987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6661987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6981987-12-21021 December 1987 Rev 1 to Chemical & Physical Testing of Fasteners for Fermi 2 NRC-87-0229, Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept1987-12-0707 December 1987 Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept NRC-87-0155, Suppl 5 to Interim Startup Test Rept1987-09-19019 September 1987 Suppl 5 to Interim Startup Test Rept ML20235F5761987-08-31031 August 1987 Max Credible Fault Tests CM249-Q2 Carrier Modulator for Fermi 2 Spds. Fault Applied to Output of CM249-Q2 Does Not Cause Degradation of Isolator Input Signal Beyond Acceptable Level ML20238E9371987-08-31031 August 1987 Rev 0 to Vols 1 & 2 to DET-22-103, Final Test Rept, In-Plant Safety Relief Valve Discharge Test,Enrico Fermi Atomic Plant,Unit 2 ML20237G3991987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Post-Accident Sampling Sys (P3400) ML20237G3821987-08-0606 August 1987 Leakage Reduction Program Summary Rept for RWCU Sys (G33-00) ML20237G3621987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Process Sampling Leakage Monitoring Sys (P33-00) NRC-87-0084, Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept1987-06-10010 June 1987 Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept ML20214J4151987-03-12012 March 1987 Leakage Reduction Program Summary Rept for Standby Gas Filter Sys (T46-00) ML20214J3991987-03-12012 March 1987 Leakage Reduction Program Summary Rept for RCIC Sys (E51-00) ML20214J3811987-03-12012 March 1987 Leakage Reduction Program Summary Rept for HPCI Sys (E41-00) ML20204H0071987-03-10010 March 1987 Suppl 3 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept ML20210A7691987-02-0303 February 1987 Leakage Reduction Program Summary Rept for Control Room Drive Sys-(C1100),Fermi Unit 2 ML20211D3601986-10-16016 October 1986 Main Steam Bypass Sys Testing Program Rept ML20197C2531986-10-10010 October 1986 Leakage Reduction Program Summary Rept for RHR Sys - (E1100) ML20199E8631986-06-13013 June 1986 Submits Suppl 1 to 860312 Startup Rept,Per Tech Spec 6.9.1.3.No Test Results Available Due to 851031 Plant Shutdown.Supplemental Rept Will Be Submitted by 860920 ML20203A0661986-03-20020 March 1986 Leak Reduction Program Summary Rept for Primary Containment Monitoring Sys - (T50-00) ML20203A0281986-03-20020 March 1986 Leakage Reduction Program Summary Rept for Core Spray Sys - (E2100) ML20210D9091986-03-18018 March 1986 Rev to Description of Diesel Generator Bearing Reliability Demonstration Test Program ML20140D4161986-03-12012 March 1986 Interim Startup Test Rept ML20215C2601985-07-17017 July 1985 Radiation Measurements - Complete Survey ML20107E1941984-11-30030 November 1984 Reactor Containment Bldg Integrated Leak Rate Test, Preoperational Test Results,Nov 1984 ML20065F9751982-07-0808 July 1982 Inservice Testing Program ML20009B2421981-06-10010 June 1981 Revised Slope Stability Analysis of Shore Barrier,Enrico Fermi Atomic Power Plant,Unit 2,810610. ML20010E6651979-12-13013 December 1979 Test Rept: Cofrentes H22-P017B-H22-P018-H22-P005 ML20010E6641979-12-11011 December 1979 Test Rept: Cofrentes H13-P618 1998-02-28
[Table view] |
Text
-
- Attachment VP-86-0146
. Page 1 of 23 fb i
Main Steam Bypass System Testing Program Report Projects and Plant Engineering Fermi 2
/
Written By:
J. Contoni S. Uema
]
I I
B610220180 861016
~
DR ADOCK 05000341 ~
PDR I
i f
--,_.-.,m.
-,,a-
,,n-a- - - - - - - - - -. ~,-
.--,------r------u---~~-
-'----'-'~---v*-
~~w-
' ' - - ~ '
Attachment s VI)-86-0146 age 2y,23ceneral A test program was implemented by Detroit Edison that provided measured pipe wall strain data over the design flow ranges of the main steam bypass lines. The test program consisted of six test mns over three reactor power levels - approximately 4.9, 8.2 &
19%. At each power level two tests were run - one test with both bypass lines and the other with only the West bypass line. Pipe wall strain sta was obtained on 9-16-86 and 9-17-86 for valve positions at approximately 245, 365, 39%, 50% and 97% open.
The pipe wall strain sta has been forwarded to both Hopper &
Associates and Stone & Webster, (per NE-PJ-86-0756 and NE-PJ-86-0755), for re-evaluation of the bypass line life projections. Executive stmaaries of the final reports were received from Hopper & Associates (HA-1W86-532) and Stone &
Webster (NE-SW-86-0018) on 10-3-86, which are attached.
II. Hoooer & Associates Results Hopper & Associates approach for evaluating the bypass line fatique life was based upon a detailed fracture mechanics analysis in which a maximal constmetion code permissible weld flaw was asstzned at the location of highest stress. The test data validated the asstanption that the structural response in the form of pipe wall flutter has a random vibration characteristic. A statistical analysis of the strain data resulted in a time history for the alternating stresses, which was utilized to predict crack initiation and fatique growth to failure. This " threshold stress" level and its rate of occurrence per unit of time was used to predict service life of the line.
The report concluded that for bypass valve openings rarging from 30 to 40%, the measured maximal random strains exceed the crack growth threshold level of 100 microstrains. The predicted acctzculative operating life in the bypass valve operating range of interest was in excess of 130 days.' The critical fatique life prediction is conservative, since a non-destmetive examination performed on the pipe seam weld running between the bypass valve and the first orifice did not reveal any inclusions approaching the maximal constmetion code permissible size.
III. Stone & Wergter Results The Stone & Webster approach for evaluating the line fatique life j
is in accordance with micmscopic fatique theory. That is, the l
asstanption of a flaw in the material was not needed. The alternating stress calculated from the actual strain sta was compared to the altemating stress predictions from a NUPIPE conputer model.
- (This corresponds to a 40 year plant life, given our current operating.
procedures.)
n Page 1
.~.
. Attachment VP;86-0146.
Th2 model gava equal forcing input credit to both flexural and Page 3 of 23 moment forens postulated to be acting on the piping. Thn dynamic alternating stresses consisted of the moment stress (calculated from the NUPIPE Computer Program - that is based on a theoretical forcing fbnction) and the hoop stress resulting from the piping flexural vibration. The calculated altemating stress was compared with the ANSI /ASME fatique life curve to determine the allowable cycles. For infinite life, the allowable stress cycles nust exceed 10 cycles.
Stone & Webster concluded that the critical bypass valve operating range was from 35 to 45% valve opening, dere the expected line life varies from 13 to 26 days. Infinite service life was predicted for valve positions from 0 to 24% open and from 68 to 100% open. This was based on the life expectancy & art for a stress concentration factor (C K ) = 3.0, see page 4 of the S&W 22 report. S&W used the C 2 = 3.0 & art instead of the Cf = 5.45 chart becau e it more accurately reflected the actbal physical field conditions, as they stated in item 2.b on page 1 of their report. Therefore the Cf presented just for infonnational purpose 5.2 = 5.45 & art was IV. Discussion 1.
Points of Agreewnt Both Hopper & Associates and Stone & Webster agreed on the general location of highest stress. The piping section of nost interest was between and included, the first two elbows downstream of the West bypass valve.
Also, both analyses predicted that the valve operating rarige Were limited life occurs is from 30-45% open.
2.
Points of Dingreamnt The differences between the two approaches are listed as follows:
- a. Hopper & Associates analysis is based on random pipe wall flutter induced by a complex shock wave system at the bypass valve outlet. The analysis technique was macroscopic fracture me&anics.
- b. Stone & Webster conducted a bending analysis in which sirrple flexing and moments are induced in the piping.
- 1. This analysis used a shear cone forcing function which was independent of shock wave effects.
Page 2 1
Attachment VP186-0146
- 2. Tha moment strtss rtsulting from bending is based on the Page'4 of 23 LVDT and cccelcrometzr d2tn that was obtnined for the 3/8" wall pipe for valve positions up to 25% open. This data was extrapolated from the 3/8" wall configuration to the 1" wall configuration. Such an analysis is sensitive to the accuracy of the displacement data and its extrapolation.
- 3. This analysis is also sensitive to where the bending / moment strains are applied.
V.
Conclusions; 1.
In order to validate or invalidate the basis of Stone &
Webster's analysis, Detroit Edison shall install strain gages on the first elbow downstream of the West bypass valve as specified by Stone & Webster per Attachment A (attached). With this strain data, obtained in the bypass valve posttion rarge of interest, contributions from bending can be evaluated. The actual alternating stress will be used to reassess the service life of the lines. It is expected that Stone & Webster's life prediction would be more compatible with Hopper & Associates as a result of this testing. This assessment would be corrpleted prior to using up 13 days of accmulated operation within the critical range of valve position.
2.
Nuclear Production will be required to keep tra:k of the operating hours of the bypass system while the valve positions are in the 305 to 45% opening rarge.
3.
The operating modes of the system are not restricted by Engineering. However, a cmulative running total of the hours as defined above is needed. This ensures the 40 year life of the lines is achieved.
4.
The need to perform additional nor>-cestructive examination of the bypass piping will be predicated on the results of the testing described in item 1 above and the emulative runrILng hours described in 2 above.
i l
Page 3 8
' At.tachment s =sve ucts
'VP-86-0146 Page eswora - carasu vrLLew corv.
ccruza -- catu
........... _.._ _ _ __ __ s,,;n :~;;g;.g,,__
s.at..n :... 12 n e.c ~. " ~~ u ~n s m c..
INTEROFFICE CORRESPONDENCE C) e A ad / e/ 3 7o.
Locatio susJECT I REFERENCE / J.O.NO. f gg go,/f
~ Z Co.ukn >
Deca nc 71< rbits.
5/ean o pea v
PROMy, p,,,
gu,c h***f
$cP 0/9 unasAoE:-
/)//ochae/ p /c ose /nc/ 5tJEC re com m enc /anAers.r f,
g,,
gage loca rien s on afram
&Po
sysi%,
soinct Jdou.
7%< reyuas/'is kr-c
/Ystativst,/ m cq/
/s} ren de pages c) Q e e
fes/ s/do w o!**M '/tc o n cf &Ac cond'e/ valvt 6 ea c 4 e./ e <f 3.
b
/W Q
5 C
C C
O sn isatten.
}
AOSb f)
Y r.1 -
Oc/ 9 / 9N f
RTt/
OATO 5
ggNATW98 TI.E PMCht REPLY:
I i,
tA
- att sionatwas is6:enome g g *.;;;...
v 2%
.;4 t'00'ON IN DOHD M5 65:80 96'60'OT
_ _i
Attachme CALCUL ATION SHEET
~ggs%}t.
6AP./ aa/.s C ALCUL ATION IDENTIFICATION NUMBER 6 of
? 23
..0. O n w.0. N O.
DIVISION r, GROUP CALCUL ATION NO.
OPTIONAL TASK C00t PAGE d
i s
3 e
s 7
fALV5 80 O
IS' TyPb}
si 1/
/ dim 15'Tga) o y
I?
g B
ee e
so 4
SEcTLOM A-A O
si q
st 23 04 87 se 30 38 38 55 3.
i.
,l REconusNDATtou : strain e..e%s. at eack.f the designated lo catrow e A
O ug k H.
l (A
c)
AddMrowal a sets of gages af seat.* e-B r
,b od sectron c.c enck, sectam se d
sectn.n c-c eo
,l 6'away pen Secit'en AA ave 100 E00 'ON IN DOHD M5 9t* :90 99/60'01 s,
' At.tabiment i
6/) M S Y 2 VP-86-0146 Pags 7 of 23 ELBOW STRESS INDEX NCOP Oitttfl0N
+
^
B F
,i/
\\
\\
.A o
4
/\\ Y
// k/\\N
//
l
/\\)\\
// A\\ \\
//
/It 3\\
- /
/\\
h \\
//
I
\\ \\\\
/ / /1
\\L 1 *)
\\ \\~
\\
//
J T
\\
T
///
'(A V
//
\\ h N
/ //
m V\\
//
V hY' T/
\\ Y/
\\ ( 7
" v s
7 V
D.DO E.75 1.57 2.38 3.14 3.II 4.71 5.55 5.28 O
MPW
+
cu o
90M ELBOW STRESS INDEX WKMT OIEECtl0N
/\\
, a y
4
\\
L
/W r\\
f i
I l
,irM
/
h
/N h
l W
M T
\\/
- A
///
l
%C// \\\\ Li /f%
ll1
~'
v
\\ W
/
% //
l l
g g-g 5
~'
l
\\/
_4
[
-l E.80 B.FI 1JP 2.30 3.14 1.53 4.71 5.99 E.28 F'0W 0
mPW P
o TOM b,. 7 =
z tm m m ac ms t,:ea es se or 1
_1.
httachMynt VP;86-0146 Page'8 of 23 Date:
October 3, 1986 File No.: 0801.05 NE-SW-86-0018 J.O. No.: 15680.11 Response Not Required To:
J. Contoni Lead Mechanical Engineer Projects and Plant Engineering Detroit Edison Company From:
T. S. Sz'bo a
Assistant Director, Nuclear Design Stone & Webster Engineering
Subject:
PRELIMINARY FATIGUE LIFE ANALYSIS MAIN STEAM TURBINE BYPASS SYSTEM i
SCP-86-019
Reference:
SWF-T-153, 6-6-86, Transmittal of Steam Bypass System Study Enclosed for your information and use are three copies of a preliminary fatigue life analysis of main steam bypass piping. This analysis is based on test data forwarded by S. Uema of Detroit Edison, P&PE.
This report is marked preliminary since it is based on the results of an' unchecked calculation. Per your request we will try to complete this calculation by October 17, 1986 at which time we will issue a final report.
Should you have any further questions, please contact the undersigned at (609)482-3542.
- /
.T.-S.
Szabo Assistant Director, Nuclear Design Enclosures cc: R. Byrnes R. Strych (encl)
T. Chitester (encl)
~
S. Noetzel D. Spiers A. Alchalbi SWMI Job Book /P. Kinkead SWEC Job Book /L. Purdy K. Floyd (encl)
T. L. Wang (encl) 4
..